Communications Interoperability
Action Plan for Canada
January 2011
© Her Majesty the Queen in Right of Canada, 2011
Cat. No.: PS4-111/2011E-PDF
ISBN: 978-1-100-17650-5
Printed in Canada
Communications Interoperability
Action Plan for Canada
COMMUNICATIONS INTEROPERABILITY ACTION PLAN FOR CANADA 1
Interoperability Action
Plan Tasks and Sub-Tasks
2010-2011
1. The purpose of the Action Plan is to articulate the
specific tasks assigned to the each action item
derived from the Canadian Communications
Interoperability Plan (CCIP), including those items
from the CCIP Working Group’s last meeting in
Windsor in September 2010.The action plan
integrates related interoperability initiatives within
Public Safety used in the compendium of day-to-day
to extremis operations thereby enhancing
emergency personal safety and improved efficacy.
Each designated tasks is assigned a coordinator,
deliverable(s) and a prospective timeline.
2. The action items are directly linked to the Strategic
Objectives as laid out in the Communications
Interoperability Action Plan for Canada:
I Governance: The development of supportive and
responsive governance architecture at the national
and bi-lateral level;
I Standards: The development of harmonized
standardized operational procedures, information
exchange models and protocols;
I Future Communication Systems: Promote
national adoption of information exchange
standards. Foster an environment of collaboration
where best practices for information management
and information technology (IM/IT) as well as
common operation procedures and
policies/regulations are exchange and usage
promoted.
I Promote and support the development of national
emergency communications open architecture
approach and promote the adoption of open data
exchange standards.
I Training and Exercises: The continued evolution
of multi-faceted and cross-jurisdictional education,
training, exercise and evaluation programs; and
I Usage: The daily use of present and future
communication and information system(s) including
all further development and evolution.
3. The specific timelines established for each action
item will be reviewed by the F/P/T Interoperability
Working Group and approved by SOREM during its
cyclical review of the Action Plan. Any requirement
for reprioritization will be addressed through
SOREM and incorporated in the annual version of
this evergreen process.
4. The organization or agency initially identified as the
Coordinator for each action item is the primary or
lead for that issue. Additional organizations have
been identified as those who are in direct support to
or directly linked with the specific item.
5. This document encourages the development of
complimentary and supportive action plans for each
of the identified action items. This concurrent
planning activity will facilitate the coherency of
multi-jurisdictional efforts in the move towards the
desired interoperability end state.
6. The F/P/T Communications Working Group will be
based on the membership of the Canadian
Communications Interoperability Plan Working
Group until the Provinces and Territories appoint
their Interoperability Coordinator and
representatives to the Working Group. In addition
there will be representatives from federal
departments and an observer from CITIG.
7. This action items complete with tasks, deliverables
and timelines will be prioritized annually by the PS
Interoperability Working Group and subsequently
approved by SOREM
2 COMMUNICATIONS INTEROPERABILITY ACTION PLAN FOR CANADA
CANADA
Governance
1. Establish a formal
multi-level
interoperability
governance structure
2. Develop and share
F/P/T Interoperability
Roadmaps (3-5 years
forecast on specific
lines of operation /
development
1.Appointment of
F/P/T
Interoperability
Coordinator
2. Develop TORs for
interoperability
group members
1. Develop / refine P/T
interoperability plan
framework
a. Co-chairs TORs
developed by PS
in cooperation
with SOREM
a. Coordinate TOR
development
with previous
CCIP TORs
b. Write
Interoperability
Group TORs
c. Confirm TORs
with CCIP
representatives
d. Publish WG TORs
a. Conduct
interoperability
self-assessment.
Self-assessment
should be
reviewed and
confirmed on a
regular period
Action Items Task Sub-Task Coordinators Deliverable Tracked Timeline
Source
PS
PS
PS
SOREM
PS
NB
PS Co-Chair is TBD–
need P/T rep appointed
from SOREM
Concurrence with way-
ahead for
Interoperability Group
(Extant CCIP WG TORs
may suffice or be used
as basis for further
refinement)
TORs
Confirmed TORs
Accepted and
implemented TORs
F/P/T documentation
that supports and
facilitates
interoperability
amongst emergency
responders in daily and
crisis operations while
providing focal points
for future evolution
and development
within the fora of
interoperability
Dec 2010
Dec 2010
Jan 2011
Apr 2011
Jun 2011
2011
CCIP Goal 1
CCIP Anx B
Action Plan 2
–
PSIC
(Mar 2010)
CCIP Goal 6
COMMUNICATIONS INTEROPERABILITY ACTION PLAN FOR CANADA 3
3. Create universal
awareness of
interoperability
4. Create a Public
Safety
Interoperability
Development Centre
(IDC)
1. Develop strategic
communication plan
supportive of
National Strategy
2. Implement a
Practioners Web
Portal
1. Develop proposal
and TORs for IDC
a. Develop, with
stakeholders
strategic
communications
plan for:
(1) Policy Makers
and IM/IT
practitioners
(2) Decision makers
(for WG
representatives)
(3) Public
(4) Emergency
Responders
Develop list of
Portal requirements
Develop a common
repository / registry
for Interoperability
best practices and
tools for data
a. Develop master
implementation
plan (MIP) for
IDC
b. Develop
partnership with
TBS
Interoperability
Centre of
Excellence (ICOE)
Action Items Task Sub-Task Coordinators Deliverable Tracked Timeline
Source
PS
SOREM
PS
PS
PS
PS-TBS
A strategic
communications plan
that informs and
educates senior F/P/T
organizations,
interested agencies
and the public on
issues of
interoperability.
Will identify synergies
with similar US
interoperability
strategy
Operational and
sustainable web portal
CIOD will lead on
technical aspect
definition.
One stop shop to find
tools, white paper,
architecture artifact
and standards
information
MIP should include:
IDC vision and
mandate
IDC IOC/FOC
definitions
IDC organigram plus
positional TORs
IDC location and
infrastructure
resourcing
IDC personnel
resourcing
IDC funding
(multi-year)
IDC timelines and
decisive points
(IOC/FOC)
Determined TORs for
aligning initiatives at
federal level
Federal funding
2011
Apr 2011
Apr 2011
Apr 2011
Apr 2011
CCIP Goal 2
CCIP Anx A
Action Plans
1
CCIP Anx B
Action Plan 2
–
CCIP Anx C
Action Plan 3
–
PSIC
(Mar 2010)
4 COMMUNICATIONS INTEROPERABILITY ACTION PLAN FOR CANADA
Standard Operation
Procedures (SOPs)
5. Shape common
interoperability
environment for
voice and data
communication
1. Develop F/P/T
standards for
interoperable data
communication
a. Identify
information
exchange
requirements for
law enforcement
community
b. Adoption of
open data
standards for
Law Enforcement
Community
c. Identify
information
exchange
requirement (IER)
for emergency
management
community
Action Items Task Sub-Task Coordinators Deliverable Tracked Timeline
Source
PS NDQS-PS Information
exchange
requirements
PS Recommendation
report
CACP-Informatics
endorsed NIEM as
national law
enforcement
information exchange
standard December
2010
NDQS recommended
re-marketing of title to
Law Enforcement
Interoperable Data
Standards with
National
Interoperability Data
Standards Working
Group (NIDS WG) has
been recommended by
CIOD as way forward
on data
interoperability.
Provide a task matrix
for the further
evolution of the
NIEM within the
emergency
management
community – may
require Emergency
Management
Interoperable Data
sub-WG to ensure
conformance
Mar 2011
Mar 2011
NDQS action
item 17
NDQS action
item 17
CCIP Goal 4
CCIP Anx E
Action Plan 6
COMMUNICATIONS INTEROPERABILITY ACTION PLAN FOR CANADA 5
Future
Communication
Systems
6. Support the
implementation of
the Multi-Agency
Situational
Awareness System
(MASAS)
2. Develop effective
and scalable
communication
SOPs and best
practices for P/T
emergency
responder agencies
1. Develop national
MASAS framework
2. Develop a MASAS
tool kit
development
3. Develop a CAP-CP
governance Model
and Road Map for
sustainability model
4. Develop a national
geographic
information system
(i.e. symbology,
baseline maps)
5. Support national
implementation of
MASAS
f.Adoption of open
data standards
for Emergency
Management
community
a. Identify
communications
interoperability
best practices at
the P/T level
a. Coordinate
development
with all P/T
emergency
management
practioners
a. Includes
technical support
WRT MASAS and
provincial
system(s)
interface
Action Items Task Sub-Task Coordinators Deliverable Tracked Timeline
Source
PS
CSS
PS
PS
PS
PS
PS
CACP has adopted
NIEM as standard for
Canadian policing
community. PS, RCMP
and Edmonton Police
Service will conduct
NIEM proof of concept
by end Mar 2011.
Remainder of
emergency
management
community studying
potential impact
Compendium of
communications SOPs
and best practices for
review and integration
by stakeholders
National MASAS
framework to support
the further evolution
and development of
this application
MASAS tool kit for
F/P/T EOC usage
CAP-CP governance
and way forward for
national
implementation of this
application
Functional and
interoperable GIS
system
Dec 2010
Aug 2011
2011
2011
2011
2011
CCIP
CCIP Goal 4
– CCIP Anx E
Action Plan
6
CCIP Anx F
Action Plan 7
–
CCIP Goal 6
6 COMMUNICATIONS INTEROPERABILITY ACTION PLAN FOR CANADA
7. Develop 700 MHZ
employment strategy
and action plan
8. Support the adoption
of data exchange
standards
1. Refine national
radio spectrum
utilization plan
2. Develop impact
analysis and
recommendations
for public safety
employment of 700
MHZ spectrum
1. Educate
stakeholders on the
national and bi-
national data
exchange standards
2. Support emergency
management
departments and
agencies in the
adoption of these
standards
a. Coordinate
development of
impact analysis
with other F/P/T
partners and
stakeholders
b. Confirm
synchronicity and
supportability of
F/P/T impact
analysis and
business cases
a. If required,
establish a
National
Interoperable
Data Standards
Working Group
Action Items Task Sub-Task Coordinators Deliverable Tracked Timeline
Source
PS
PS
PS
PS
Refined and updated
national spectrum
utilization plan
Coordinated impact
analysis to IC
An emergency
management
community with an
enhanced basis for
informed decision-
making on data
exchange standards
Emergency responders
(tri-level) that have no
challenges or
impediments to the
exchange of data
during daily or crisis
operations (i.e. MA-
SAS)
NLT 28 Feb
2011
NLT 28 Feb
2011
Dec 2010
Jun 2011
CCIP Goal 6
PS
PS
COMMUNICATIONS INTEROPERABILITY ACTION PLAN FOR CANADA 7
CANADA –
UNITED STATES
Governance
1. Establish bilateral
governance
protocols
2. Creation of
cross-border
communications
working groups
1. Identification and
engagement of
cross-border
interoperability
champions
2. Develop bilateral
interoperability
mandate between
Public Safety
Canada and the
Department of
Homeland Security
3. Develop MOU/MOA
to eliminate legal
impediments to
cross-border sharing
of communications
and information
1. Appointment of a
cross-border
communications
operability
coordinator from
each province and
at the federal level
equivalent to the
U.S. state-wide
Interoperability
Coordinators (SWIC)
2. Develop TORs for
all members of the
CANUS
Interoperability
Group
Action Items Task Sub-Task Coordinators Deliverable Tracked Timeline
Source
PS / DHS
PS / DHS
PS / DHS
SOREM
Named national
champions for cross-
border interoperability
A bi-lateral mandate
that facilitates cross-
border operations
A MOU/MOA that
eliminates legal
impediments that
limits cross-border
information sharing
and communications
Appointment of
provincial/territorial
representatives (this
may be the same
representatives as
those assigned to CCIP
WG)
Established positional
TORs for all members
of the CANUS
Interoperability Group
Jun 2011
Jun 2011
Sept 2011
Apr 2011
Apr 2011
Windsor
Report Pt 8
Windsor
Report Pt 3
Windsor
Report Pt 10
Windsor
Report Pt 7
Windsor
Report Pt 1
Windsor
Report Pt 2
8 COMMUNICATIONS INTEROPERABILITY ACTION PLAN FOR CANADA
Future
Communication
Systems
3. Enhance CANUS
Science and
Technology
Interoperability
Collaboration
1. Develop through
the CANUS
Enterprise
Resilience
Experimentation
Program (aka
CAUSE Resiliency) a
CANUS Border
Region
Interoperability
Technology
Demonstration
Series (CBRITD
Series)
Action Items Task Sub-Task Coordinators Deliverable Tracked Timeline
Source
PS / CSS and DHS
S&T
PS / CSS and DHS
S&T
Mandate, concept of
operations and terms
of reference for
CBIRTD series
Guidance on project
deliverables expected
from the CBRITD Series
program
Multi-year forecast of
CBRITD Series
locations, potential
Series themes and
sponsors
CBRITD Series resource
requirement and
allocation program
2011
Note: with
resource
requirement
and
allocation
program
following
DRDC and
PS business
planning
templates
and timeline
US Budget
cycle is Oct-
Sep – may
require
bridging to
mesh with
CA business
cycle
PS Data
Input
COMMUNICATIONS INTEROPERABILITY ACTION PLAN FOR CANADA 9
Acronyms
AKA......................Also Known AS
CA ........................Canada
CANUS.................Canada-United States
CAUSE..................Canada-United States Expertise Resilience Experimentation
CBIRTD.................CANUS Border Region Interoperability Technology Demonstration
CCIP .....................Canadian Communications Interoperability Plan
CITIG....................Canadian Interoperability Technical Interest Group
CPSIN...................Canadian Public Safety Information Network
CSS.......................Centre for Security Science
DHS......................Department of Homeland Security
DRDC ...................Defence Research and Development Canada
EM........................Emergency Management
EMSI ....................Emergency Management Systems and Interoperability
FOC ......................Full Operational Capability
F/P/T.....................Federal/Provincial/Territorial
GIS .......................Geographic Information System
Gp ........................Group
IAW......................In Agreement With
IC..........................Industry Canada
ICOE.....................Interoperability Centre of Excellence
IDC.......................Interoperability Development Centre
IER........................Information Exchange Requirements
IOC.......................Initial Operational Capability
MIP ......................Master Implementation Plan
MoE .....................Measurement of Effectiveness
MoS .....................Measurement of Success
MOA.....................Memorandum of Agreement
MOU.....................Memorandum of Understanding
NDQS...................National Data Quality Standards
NED......................National Exercise Division
NIEM....................National Information Exchange Model
OAG .....................Office of the Auditor General
PA.........................Public Affairs
PM........................Project Management
PS.........................Public Safety Canada
10 COMMUNICATIONS INTEROPERABILITY ACTION PLAN FOR CANADA
PSIC .....................Public Safety Interoperability Center
P/T........................Provincial/Territorial
S&T ......................Science and Technology
SCONSAD ............Standing Committee on National Security and Defence
SOREM.................Senior Officials Responsible for Emergency Management
SOPs.....................Standard Operating Procedures
SOR(s)..................Statement of Requirement
SWIC ....................State Wide Interoperability Co-ordinators
TBC.......................To Be Confirmed
TBD ......................To Be Determined
TBS.......................Treasury Board Secretariat
TOR(s) ..................Terms of Reference
WG.......................Working Group
WRT......................With respect to

More Related Content

What's hot

Paper-8-Discussion-Paper-from-DG-Use-of-IATI-in-Country-Systems2
Paper-8-Discussion-Paper-from-DG-Use-of-IATI-in-Country-Systems2Paper-8-Discussion-Paper-from-DG-Use-of-IATI-in-Country-Systems2
Paper-8-Discussion-Paper-from-DG-Use-of-IATI-in-Country-Systems2Fabrice Musoni
 
Day 4 emerging role of hpro ea
Day 4 emerging role of hpro eaDay 4 emerging role of hpro ea
Day 4 emerging role of hpro eaea-imcha
 
Western Balkan Countries Assessment of Capacities for Low-carbon and Climate ...
Western Balkan Countries Assessment of Capacities for Low-carbon and Climate ...Western Balkan Countries Assessment of Capacities for Low-carbon and Climate ...
Western Balkan Countries Assessment of Capacities for Low-carbon and Climate ...UNDP Eurasia
 
DHS_NCSWIC-SAFECOM_Spring_052915v2
DHS_NCSWIC-SAFECOM_Spring_052915v2DHS_NCSWIC-SAFECOM_Spring_052915v2
DHS_NCSWIC-SAFECOM_Spring_052915v2Phil Royce
 
CGIAR ICT Roadmap
CGIAR ICT RoadmapCGIAR ICT Roadmap
CGIAR ICT Roadmapcgxchange
 
FINAL_Internews_SPELP_External_Evaluation_Report_17_03_2015
FINAL_Internews_SPELP_External_Evaluation_Report_17_03_2015FINAL_Internews_SPELP_External_Evaluation_Report_17_03_2015
FINAL_Internews_SPELP_External_Evaluation_Report_17_03_2015Kishor Pradhan, MA, DMC, CKM
 
Guidelines activity1point7 11052012_final
Guidelines activity1point7 11052012_finalGuidelines activity1point7 11052012_final
Guidelines activity1point7 11052012_finalformezeu
 
Guidelines for Public Finance Data Dissemination and Access
Guidelines for Public Finance Data Dissemination and AccessGuidelines for Public Finance Data Dissemination and Access
Guidelines for Public Finance Data Dissemination and AccessCarlo Vaccari
 
Ca fco project concept note
Ca fco project concept noteCa fco project concept note
Ca fco project concept noteGerald Ogoko
 
Collaborating on Technology Service Delivery Summary report final
Collaborating on Technology Service Delivery Summary report finalCollaborating on Technology Service Delivery Summary report final
Collaborating on Technology Service Delivery Summary report finalSabina Visser
 
2016 Annual Report - UN Global Pulse
2016 Annual Report - UN Global Pulse 2016 Annual Report - UN Global Pulse
2016 Annual Report - UN Global Pulse UN Global Pulse
 
CGMap and Ongoing Research: Putting CGIAR Research on the Map
CGMap and Ongoing Research: Putting CGIAR Research on the MapCGMap and Ongoing Research: Putting CGIAR Research on the Map
CGMap and Ongoing Research: Putting CGIAR Research on the Mapcgxchange
 
Nordic eGovernment Conference 201 - Ellen Strålberg
Nordic eGovernment Conference 201 - Ellen StrålbergNordic eGovernment Conference 201 - Ellen Strålberg
Nordic eGovernment Conference 201 - Ellen StrålbergJulieCarlslund
 

What's hot (14)

Paper-8-Discussion-Paper-from-DG-Use-of-IATI-in-Country-Systems2
Paper-8-Discussion-Paper-from-DG-Use-of-IATI-in-Country-Systems2Paper-8-Discussion-Paper-from-DG-Use-of-IATI-in-Country-Systems2
Paper-8-Discussion-Paper-from-DG-Use-of-IATI-in-Country-Systems2
 
Day 4 emerging role of hpro ea
Day 4 emerging role of hpro eaDay 4 emerging role of hpro ea
Day 4 emerging role of hpro ea
 
Western Balkan Countries Assessment of Capacities for Low-carbon and Climate ...
Western Balkan Countries Assessment of Capacities for Low-carbon and Climate ...Western Balkan Countries Assessment of Capacities for Low-carbon and Climate ...
Western Balkan Countries Assessment of Capacities for Low-carbon and Climate ...
 
DHS_NCSWIC-SAFECOM_Spring_052915v2
DHS_NCSWIC-SAFECOM_Spring_052915v2DHS_NCSWIC-SAFECOM_Spring_052915v2
DHS_NCSWIC-SAFECOM_Spring_052915v2
 
Coordination 2.0: Coordinated Transportation Plans
Coordination 2.0: Coordinated Transportation PlansCoordination 2.0: Coordinated Transportation Plans
Coordination 2.0: Coordinated Transportation Plans
 
CGIAR ICT Roadmap
CGIAR ICT RoadmapCGIAR ICT Roadmap
CGIAR ICT Roadmap
 
FINAL_Internews_SPELP_External_Evaluation_Report_17_03_2015
FINAL_Internews_SPELP_External_Evaluation_Report_17_03_2015FINAL_Internews_SPELP_External_Evaluation_Report_17_03_2015
FINAL_Internews_SPELP_External_Evaluation_Report_17_03_2015
 
Guidelines activity1point7 11052012_final
Guidelines activity1point7 11052012_finalGuidelines activity1point7 11052012_final
Guidelines activity1point7 11052012_final
 
Guidelines for Public Finance Data Dissemination and Access
Guidelines for Public Finance Data Dissemination and AccessGuidelines for Public Finance Data Dissemination and Access
Guidelines for Public Finance Data Dissemination and Access
 
Ca fco project concept note
Ca fco project concept noteCa fco project concept note
Ca fco project concept note
 
Collaborating on Technology Service Delivery Summary report final
Collaborating on Technology Service Delivery Summary report finalCollaborating on Technology Service Delivery Summary report final
Collaborating on Technology Service Delivery Summary report final
 
2016 Annual Report - UN Global Pulse
2016 Annual Report - UN Global Pulse 2016 Annual Report - UN Global Pulse
2016 Annual Report - UN Global Pulse
 
CGMap and Ongoing Research: Putting CGIAR Research on the Map
CGMap and Ongoing Research: Putting CGIAR Research on the MapCGMap and Ongoing Research: Putting CGIAR Research on the Map
CGMap and Ongoing Research: Putting CGIAR Research on the Map
 
Nordic eGovernment Conference 201 - Ellen Strålberg
Nordic eGovernment Conference 201 - Ellen StrålbergNordic eGovernment Conference 201 - Ellen Strålberg
Nordic eGovernment Conference 201 - Ellen Strålberg
 

Viewers also liked

7 золотых правил внедрения системы управления обучением в корпоративной среде...
7 золотых правил внедрения системы управления обучением в корпоративной среде...7 золотых правил внедрения системы управления обучением в корпоративной среде...
7 золотых правил внедрения системы управления обучением в корпоративной среде...HyperMethod
 
MESSS 2015 Final Report_no pics_in
MESSS 2015 Final Report_no pics_inMESSS 2015 Final Report_no pics_in
MESSS 2015 Final Report_no pics_inMarie-Josee Gagnon
 
Appréciation AF.PDF
Appréciation AF.PDFAppréciation AF.PDF
Appréciation AF.PDFEric Picot
 
This is a Tire Fire
This is a Tire FireThis is a Tire Fire
This is a Tire FireShaun Mouton
 
Apostila contabilidade para iniciantes pat
Apostila contabilidade para iniciantes patApostila contabilidade para iniciantes pat
Apostila contabilidade para iniciantes patUnilago
 
Global CCS Institute - Day 1 - Panel 2 - CCS in Developing Countries
Global CCS Institute - Day 1 - Panel 2 - CCS in Developing CountriesGlobal CCS Institute - Day 1 - Panel 2 - CCS in Developing Countries
Global CCS Institute - Day 1 - Panel 2 - CCS in Developing CountriesGlobal CCS Institute
 

Viewers also liked (11)

7 золотых правил внедрения системы управления обучением в корпоративной среде...
7 золотых правил внедрения системы управления обучением в корпоративной среде...7 золотых правил внедрения системы управления обучением в корпоративной среде...
7 золотых правил внедрения системы управления обучением в корпоративной среде...
 
resume
resumeresume
resume
 
Item #7 ppt 630 lamont
Item #7   ppt 630 lamontItem #7   ppt 630 lamont
Item #7 ppt 630 lamont
 
2016 FFIN Annual Meeting Presentation
2016 FFIN Annual Meeting Presentation2016 FFIN Annual Meeting Presentation
2016 FFIN Annual Meeting Presentation
 
2.38 seguridad-en-las-escaleras.
2.38 seguridad-en-las-escaleras.2.38 seguridad-en-las-escaleras.
2.38 seguridad-en-las-escaleras.
 
MESSS 2015 Final Report_no pics_in
MESSS 2015 Final Report_no pics_inMESSS 2015 Final Report_no pics_in
MESSS 2015 Final Report_no pics_in
 
Symposium Potato Poster
Symposium Potato PosterSymposium Potato Poster
Symposium Potato Poster
 
Appréciation AF.PDF
Appréciation AF.PDFAppréciation AF.PDF
Appréciation AF.PDF
 
This is a Tire Fire
This is a Tire FireThis is a Tire Fire
This is a Tire Fire
 
Apostila contabilidade para iniciantes pat
Apostila contabilidade para iniciantes patApostila contabilidade para iniciantes pat
Apostila contabilidade para iniciantes pat
 
Global CCS Institute - Day 1 - Panel 2 - CCS in Developing Countries
Global CCS Institute - Day 1 - Panel 2 - CCS in Developing CountriesGlobal CCS Institute - Day 1 - Panel 2 - CCS in Developing Countries
Global CCS Institute - Day 1 - Panel 2 - CCS in Developing Countries
 

Similar to Communications Interoperability Action Plan Tasks and Timelines

Case Study: Developing a truly integrated media measurement system in support...
Case Study: Developing a truly integrated media measurement system in support...Case Study: Developing a truly integrated media measurement system in support...
Case Study: Developing a truly integrated media measurement system in support...Arturo Romboli
 
mICF project plan accepted at FRDG midyear meeting in London (May 2014)
mICF project plan accepted at FRDG midyear meeting in London (May 2014)mICF project plan accepted at FRDG midyear meeting in London (May 2014)
mICF project plan accepted at FRDG midyear meeting in London (May 2014)Stefanus Snyman
 
Fdrg bcn-015 - m icf project plan (june 2014)
Fdrg bcn-015 - m icf project plan (june 2014)Fdrg bcn-015 - m icf project plan (june 2014)
Fdrg bcn-015 - m icf project plan (june 2014)Stefanus Snyman
 
Case Study: UNICEF Global Integrated Media Monitoring Programme Lessons learn...
Case Study: UNICEF Global Integrated Media Monitoring Programme Lessons learn...Case Study: UNICEF Global Integrated Media Monitoring Programme Lessons learn...
Case Study: UNICEF Global Integrated Media Monitoring Programme Lessons learn...Arturo Romboli
 
3-year Work Plan Summary for Sustainable Communities Consortium
3-year Work Plan Summary for Sustainable Communities Consortium3-year Work Plan Summary for Sustainable Communities Consortium
3-year Work Plan Summary for Sustainable Communities ConsortiumMetropolitan Area Planning Council
 
MFleming-Training for Interoperable Communications
MFleming-Training for Interoperable CommunicationsMFleming-Training for Interoperable Communications
MFleming-Training for Interoperable CommunicationsMichael Fleming
 
HFA and NRCS (Pitamber Aryal)
HFA and NRCS (Pitamber Aryal)HFA and NRCS (Pitamber Aryal)
HFA and NRCS (Pitamber Aryal)DPNet
 
Q3 2011 Progress Report MoSS
Q3 2011 Progress Report   MoSSQ3 2011 Progress Report   MoSS
Q3 2011 Progress Report MoSSMoheebSattar
 
PIDA Terms of Reference Panel of Experts
PIDA   Terms of Reference Panel of ExpertsPIDA   Terms of Reference Panel of Experts
PIDA Terms of Reference Panel of ExpertsDr Lendy Spires
 
S&I Framework Transitions of Care
S&I Framework Transitions of CareS&I Framework Transitions of Care
S&I Framework Transitions of CareBrian Ahier
 
Jisc fe and skills project (csg briefing paper 1)
Jisc fe and skills project (csg briefing paper 1)Jisc fe and skills project (csg briefing paper 1)
Jisc fe and skills project (csg briefing paper 1)Tony Toole
 
NDEP ORIENTATION POWERPOINT FOR DIFFERENT AREAS OF LEARNING
NDEP ORIENTATION POWERPOINT FOR DIFFERENT AREAS OF LEARNINGNDEP ORIENTATION POWERPOINT FOR DIFFERENT AREAS OF LEARNING
NDEP ORIENTATION POWERPOINT FOR DIFFERENT AREAS OF LEARNINGlouieilo1
 
Unops strategy pan 2014 2017 sustainable focus and excellence
Unops strategy pan 2014 2017 sustainable focus and excellenceUnops strategy pan 2014 2017 sustainable focus and excellence
Unops strategy pan 2014 2017 sustainable focus and excellenceDr Lendy Spires
 
Summary and-analysis-of-ntia-public safety broadband planning grant
Summary and-analysis-of-ntia-public safety broadband planning grantSummary and-analysis-of-ntia-public safety broadband planning grant
Summary and-analysis-of-ntia-public safety broadband planning grantState of Georgia
 
What does the Paris Agreement’s transparency framework mean for LDCs?
What does the Paris Agreement’s transparency framework mean for LDCs?What does the Paris Agreement’s transparency framework mean for LDCs?
What does the Paris Agreement’s transparency framework mean for LDCs?IIED
 
CCCXG Global Forum March 2017 BG3 Indonesia NDC Experience in Communicating M...
CCCXG Global Forum March 2017 BG3 Indonesia NDC Experience in Communicating M...CCCXG Global Forum March 2017 BG3 Indonesia NDC Experience in Communicating M...
CCCXG Global Forum March 2017 BG3 Indonesia NDC Experience in Communicating M...OECD Environment
 
D6.1 deployment of_platforms_on_local_regional_and_national_levels
D6.1 deployment of_platforms_on_local_regional_and_national_levelsD6.1 deployment of_platforms_on_local_regional_and_national_levels
D6.1 deployment of_platforms_on_local_regional_and_national_levelsplan4all
 

Similar to Communications Interoperability Action Plan Tasks and Timelines (20)

CISC.2011.
CISC.2011.CISC.2011.
CISC.2011.
 
Case Study: Developing a truly integrated media measurement system in support...
Case Study: Developing a truly integrated media measurement system in support...Case Study: Developing a truly integrated media measurement system in support...
Case Study: Developing a truly integrated media measurement system in support...
 
mICF project plan accepted at FRDG midyear meeting in London (May 2014)
mICF project plan accepted at FRDG midyear meeting in London (May 2014)mICF project plan accepted at FRDG midyear meeting in London (May 2014)
mICF project plan accepted at FRDG midyear meeting in London (May 2014)
 
Fdrg bcn-015 - m icf project plan (june 2014)
Fdrg bcn-015 - m icf project plan (june 2014)Fdrg bcn-015 - m icf project plan (june 2014)
Fdrg bcn-015 - m icf project plan (june 2014)
 
Case Study: UNICEF Global Integrated Media Monitoring Programme Lessons learn...
Case Study: UNICEF Global Integrated Media Monitoring Programme Lessons learn...Case Study: UNICEF Global Integrated Media Monitoring Programme Lessons learn...
Case Study: UNICEF Global Integrated Media Monitoring Programme Lessons learn...
 
Bushfire Preparedness Program 2010/12
Bushfire Preparedness Program 2010/12Bushfire Preparedness Program 2010/12
Bushfire Preparedness Program 2010/12
 
3-year Work Plan Summary for Sustainable Communities Consortium
3-year Work Plan Summary for Sustainable Communities Consortium3-year Work Plan Summary for Sustainable Communities Consortium
3-year Work Plan Summary for Sustainable Communities Consortium
 
MFleming-Training for Interoperable Communications
MFleming-Training for Interoperable CommunicationsMFleming-Training for Interoperable Communications
MFleming-Training for Interoperable Communications
 
HFA and NRCS (Pitamber Aryal)
HFA and NRCS (Pitamber Aryal)HFA and NRCS (Pitamber Aryal)
HFA and NRCS (Pitamber Aryal)
 
11 wectorial work group
11 wectorial work group11 wectorial work group
11 wectorial work group
 
Q3 2011 Progress Report MoSS
Q3 2011 Progress Report   MoSSQ3 2011 Progress Report   MoSS
Q3 2011 Progress Report MoSS
 
PIDA Terms of Reference Panel of Experts
PIDA   Terms of Reference Panel of ExpertsPIDA   Terms of Reference Panel of Experts
PIDA Terms of Reference Panel of Experts
 
S&I Framework Transitions of Care
S&I Framework Transitions of CareS&I Framework Transitions of Care
S&I Framework Transitions of Care
 
Jisc fe and skills project (csg briefing paper 1)
Jisc fe and skills project (csg briefing paper 1)Jisc fe and skills project (csg briefing paper 1)
Jisc fe and skills project (csg briefing paper 1)
 
NDEP ORIENTATION POWERPOINT FOR DIFFERENT AREAS OF LEARNING
NDEP ORIENTATION POWERPOINT FOR DIFFERENT AREAS OF LEARNINGNDEP ORIENTATION POWERPOINT FOR DIFFERENT AREAS OF LEARNING
NDEP ORIENTATION POWERPOINT FOR DIFFERENT AREAS OF LEARNING
 
Unops strategy pan 2014 2017 sustainable focus and excellence
Unops strategy pan 2014 2017 sustainable focus and excellenceUnops strategy pan 2014 2017 sustainable focus and excellence
Unops strategy pan 2014 2017 sustainable focus and excellence
 
Summary and-analysis-of-ntia-public safety broadband planning grant
Summary and-analysis-of-ntia-public safety broadband planning grantSummary and-analysis-of-ntia-public safety broadband planning grant
Summary and-analysis-of-ntia-public safety broadband planning grant
 
What does the Paris Agreement’s transparency framework mean for LDCs?
What does the Paris Agreement’s transparency framework mean for LDCs?What does the Paris Agreement’s transparency framework mean for LDCs?
What does the Paris Agreement’s transparency framework mean for LDCs?
 
CCCXG Global Forum March 2017 BG3 Indonesia NDC Experience in Communicating M...
CCCXG Global Forum March 2017 BG3 Indonesia NDC Experience in Communicating M...CCCXG Global Forum March 2017 BG3 Indonesia NDC Experience in Communicating M...
CCCXG Global Forum March 2017 BG3 Indonesia NDC Experience in Communicating M...
 
D6.1 deployment of_platforms_on_local_regional_and_national_levels
D6.1 deployment of_platforms_on_local_regional_and_national_levelsD6.1 deployment of_platforms_on_local_regional_and_national_levels
D6.1 deployment of_platforms_on_local_regional_and_national_levels
 

Communications Interoperability Action Plan Tasks and Timelines

  • 2. © Her Majesty the Queen in Right of Canada, 2011 Cat. No.: PS4-111/2011E-PDF ISBN: 978-1-100-17650-5 Printed in Canada
  • 4.
  • 5. COMMUNICATIONS INTEROPERABILITY ACTION PLAN FOR CANADA 1 Interoperability Action Plan Tasks and Sub-Tasks 2010-2011 1. The purpose of the Action Plan is to articulate the specific tasks assigned to the each action item derived from the Canadian Communications Interoperability Plan (CCIP), including those items from the CCIP Working Group’s last meeting in Windsor in September 2010.The action plan integrates related interoperability initiatives within Public Safety used in the compendium of day-to-day to extremis operations thereby enhancing emergency personal safety and improved efficacy. Each designated tasks is assigned a coordinator, deliverable(s) and a prospective timeline. 2. The action items are directly linked to the Strategic Objectives as laid out in the Communications Interoperability Action Plan for Canada: I Governance: The development of supportive and responsive governance architecture at the national and bi-lateral level; I Standards: The development of harmonized standardized operational procedures, information exchange models and protocols; I Future Communication Systems: Promote national adoption of information exchange standards. Foster an environment of collaboration where best practices for information management and information technology (IM/IT) as well as common operation procedures and policies/regulations are exchange and usage promoted. I Promote and support the development of national emergency communications open architecture approach and promote the adoption of open data exchange standards. I Training and Exercises: The continued evolution of multi-faceted and cross-jurisdictional education, training, exercise and evaluation programs; and I Usage: The daily use of present and future communication and information system(s) including all further development and evolution. 3. The specific timelines established for each action item will be reviewed by the F/P/T Interoperability Working Group and approved by SOREM during its cyclical review of the Action Plan. Any requirement for reprioritization will be addressed through SOREM and incorporated in the annual version of this evergreen process. 4. The organization or agency initially identified as the Coordinator for each action item is the primary or lead for that issue. Additional organizations have been identified as those who are in direct support to or directly linked with the specific item. 5. This document encourages the development of complimentary and supportive action plans for each of the identified action items. This concurrent planning activity will facilitate the coherency of multi-jurisdictional efforts in the move towards the desired interoperability end state. 6. The F/P/T Communications Working Group will be based on the membership of the Canadian Communications Interoperability Plan Working Group until the Provinces and Territories appoint their Interoperability Coordinator and representatives to the Working Group. In addition there will be representatives from federal departments and an observer from CITIG. 7. This action items complete with tasks, deliverables and timelines will be prioritized annually by the PS Interoperability Working Group and subsequently approved by SOREM
  • 6. 2 COMMUNICATIONS INTEROPERABILITY ACTION PLAN FOR CANADA CANADA Governance 1. Establish a formal multi-level interoperability governance structure 2. Develop and share F/P/T Interoperability Roadmaps (3-5 years forecast on specific lines of operation / development 1.Appointment of F/P/T Interoperability Coordinator 2. Develop TORs for interoperability group members 1. Develop / refine P/T interoperability plan framework a. Co-chairs TORs developed by PS in cooperation with SOREM a. Coordinate TOR development with previous CCIP TORs b. Write Interoperability Group TORs c. Confirm TORs with CCIP representatives d. Publish WG TORs a. Conduct interoperability self-assessment. Self-assessment should be reviewed and confirmed on a regular period Action Items Task Sub-Task Coordinators Deliverable Tracked Timeline Source PS PS PS SOREM PS NB PS Co-Chair is TBD– need P/T rep appointed from SOREM Concurrence with way- ahead for Interoperability Group (Extant CCIP WG TORs may suffice or be used as basis for further refinement) TORs Confirmed TORs Accepted and implemented TORs F/P/T documentation that supports and facilitates interoperability amongst emergency responders in daily and crisis operations while providing focal points for future evolution and development within the fora of interoperability Dec 2010 Dec 2010 Jan 2011 Apr 2011 Jun 2011 2011 CCIP Goal 1 CCIP Anx B Action Plan 2 – PSIC (Mar 2010) CCIP Goal 6
  • 7. COMMUNICATIONS INTEROPERABILITY ACTION PLAN FOR CANADA 3 3. Create universal awareness of interoperability 4. Create a Public Safety Interoperability Development Centre (IDC) 1. Develop strategic communication plan supportive of National Strategy 2. Implement a Practioners Web Portal 1. Develop proposal and TORs for IDC a. Develop, with stakeholders strategic communications plan for: (1) Policy Makers and IM/IT practitioners (2) Decision makers (for WG representatives) (3) Public (4) Emergency Responders Develop list of Portal requirements Develop a common repository / registry for Interoperability best practices and tools for data a. Develop master implementation plan (MIP) for IDC b. Develop partnership with TBS Interoperability Centre of Excellence (ICOE) Action Items Task Sub-Task Coordinators Deliverable Tracked Timeline Source PS SOREM PS PS PS PS-TBS A strategic communications plan that informs and educates senior F/P/T organizations, interested agencies and the public on issues of interoperability. Will identify synergies with similar US interoperability strategy Operational and sustainable web portal CIOD will lead on technical aspect definition. One stop shop to find tools, white paper, architecture artifact and standards information MIP should include: IDC vision and mandate IDC IOC/FOC definitions IDC organigram plus positional TORs IDC location and infrastructure resourcing IDC personnel resourcing IDC funding (multi-year) IDC timelines and decisive points (IOC/FOC) Determined TORs for aligning initiatives at federal level Federal funding 2011 Apr 2011 Apr 2011 Apr 2011 Apr 2011 CCIP Goal 2 CCIP Anx A Action Plans 1 CCIP Anx B Action Plan 2 – CCIP Anx C Action Plan 3 – PSIC (Mar 2010)
  • 8. 4 COMMUNICATIONS INTEROPERABILITY ACTION PLAN FOR CANADA Standard Operation Procedures (SOPs) 5. Shape common interoperability environment for voice and data communication 1. Develop F/P/T standards for interoperable data communication a. Identify information exchange requirements for law enforcement community b. Adoption of open data standards for Law Enforcement Community c. Identify information exchange requirement (IER) for emergency management community Action Items Task Sub-Task Coordinators Deliverable Tracked Timeline Source PS NDQS-PS Information exchange requirements PS Recommendation report CACP-Informatics endorsed NIEM as national law enforcement information exchange standard December 2010 NDQS recommended re-marketing of title to Law Enforcement Interoperable Data Standards with National Interoperability Data Standards Working Group (NIDS WG) has been recommended by CIOD as way forward on data interoperability. Provide a task matrix for the further evolution of the NIEM within the emergency management community – may require Emergency Management Interoperable Data sub-WG to ensure conformance Mar 2011 Mar 2011 NDQS action item 17 NDQS action item 17 CCIP Goal 4 CCIP Anx E Action Plan 6
  • 9. COMMUNICATIONS INTEROPERABILITY ACTION PLAN FOR CANADA 5 Future Communication Systems 6. Support the implementation of the Multi-Agency Situational Awareness System (MASAS) 2. Develop effective and scalable communication SOPs and best practices for P/T emergency responder agencies 1. Develop national MASAS framework 2. Develop a MASAS tool kit development 3. Develop a CAP-CP governance Model and Road Map for sustainability model 4. Develop a national geographic information system (i.e. symbology, baseline maps) 5. Support national implementation of MASAS f.Adoption of open data standards for Emergency Management community a. Identify communications interoperability best practices at the P/T level a. Coordinate development with all P/T emergency management practioners a. Includes technical support WRT MASAS and provincial system(s) interface Action Items Task Sub-Task Coordinators Deliverable Tracked Timeline Source PS CSS PS PS PS PS PS CACP has adopted NIEM as standard for Canadian policing community. PS, RCMP and Edmonton Police Service will conduct NIEM proof of concept by end Mar 2011. Remainder of emergency management community studying potential impact Compendium of communications SOPs and best practices for review and integration by stakeholders National MASAS framework to support the further evolution and development of this application MASAS tool kit for F/P/T EOC usage CAP-CP governance and way forward for national implementation of this application Functional and interoperable GIS system Dec 2010 Aug 2011 2011 2011 2011 2011 CCIP CCIP Goal 4 – CCIP Anx E Action Plan 6 CCIP Anx F Action Plan 7 – CCIP Goal 6
  • 10. 6 COMMUNICATIONS INTEROPERABILITY ACTION PLAN FOR CANADA 7. Develop 700 MHZ employment strategy and action plan 8. Support the adoption of data exchange standards 1. Refine national radio spectrum utilization plan 2. Develop impact analysis and recommendations for public safety employment of 700 MHZ spectrum 1. Educate stakeholders on the national and bi- national data exchange standards 2. Support emergency management departments and agencies in the adoption of these standards a. Coordinate development of impact analysis with other F/P/T partners and stakeholders b. Confirm synchronicity and supportability of F/P/T impact analysis and business cases a. If required, establish a National Interoperable Data Standards Working Group Action Items Task Sub-Task Coordinators Deliverable Tracked Timeline Source PS PS PS PS Refined and updated national spectrum utilization plan Coordinated impact analysis to IC An emergency management community with an enhanced basis for informed decision- making on data exchange standards Emergency responders (tri-level) that have no challenges or impediments to the exchange of data during daily or crisis operations (i.e. MA- SAS) NLT 28 Feb 2011 NLT 28 Feb 2011 Dec 2010 Jun 2011 CCIP Goal 6 PS PS
  • 11. COMMUNICATIONS INTEROPERABILITY ACTION PLAN FOR CANADA 7 CANADA – UNITED STATES Governance 1. Establish bilateral governance protocols 2. Creation of cross-border communications working groups 1. Identification and engagement of cross-border interoperability champions 2. Develop bilateral interoperability mandate between Public Safety Canada and the Department of Homeland Security 3. Develop MOU/MOA to eliminate legal impediments to cross-border sharing of communications and information 1. Appointment of a cross-border communications operability coordinator from each province and at the federal level equivalent to the U.S. state-wide Interoperability Coordinators (SWIC) 2. Develop TORs for all members of the CANUS Interoperability Group Action Items Task Sub-Task Coordinators Deliverable Tracked Timeline Source PS / DHS PS / DHS PS / DHS SOREM Named national champions for cross- border interoperability A bi-lateral mandate that facilitates cross- border operations A MOU/MOA that eliminates legal impediments that limits cross-border information sharing and communications Appointment of provincial/territorial representatives (this may be the same representatives as those assigned to CCIP WG) Established positional TORs for all members of the CANUS Interoperability Group Jun 2011 Jun 2011 Sept 2011 Apr 2011 Apr 2011 Windsor Report Pt 8 Windsor Report Pt 3 Windsor Report Pt 10 Windsor Report Pt 7 Windsor Report Pt 1 Windsor Report Pt 2
  • 12. 8 COMMUNICATIONS INTEROPERABILITY ACTION PLAN FOR CANADA Future Communication Systems 3. Enhance CANUS Science and Technology Interoperability Collaboration 1. Develop through the CANUS Enterprise Resilience Experimentation Program (aka CAUSE Resiliency) a CANUS Border Region Interoperability Technology Demonstration Series (CBRITD Series) Action Items Task Sub-Task Coordinators Deliverable Tracked Timeline Source PS / CSS and DHS S&T PS / CSS and DHS S&T Mandate, concept of operations and terms of reference for CBIRTD series Guidance on project deliverables expected from the CBRITD Series program Multi-year forecast of CBRITD Series locations, potential Series themes and sponsors CBRITD Series resource requirement and allocation program 2011 Note: with resource requirement and allocation program following DRDC and PS business planning templates and timeline US Budget cycle is Oct- Sep – may require bridging to mesh with CA business cycle PS Data Input
  • 13. COMMUNICATIONS INTEROPERABILITY ACTION PLAN FOR CANADA 9 Acronyms AKA......................Also Known AS CA ........................Canada CANUS.................Canada-United States CAUSE..................Canada-United States Expertise Resilience Experimentation CBIRTD.................CANUS Border Region Interoperability Technology Demonstration CCIP .....................Canadian Communications Interoperability Plan CITIG....................Canadian Interoperability Technical Interest Group CPSIN...................Canadian Public Safety Information Network CSS.......................Centre for Security Science DHS......................Department of Homeland Security DRDC ...................Defence Research and Development Canada EM........................Emergency Management EMSI ....................Emergency Management Systems and Interoperability FOC ......................Full Operational Capability F/P/T.....................Federal/Provincial/Territorial GIS .......................Geographic Information System Gp ........................Group IAW......................In Agreement With IC..........................Industry Canada ICOE.....................Interoperability Centre of Excellence IDC.......................Interoperability Development Centre IER........................Information Exchange Requirements IOC.......................Initial Operational Capability MIP ......................Master Implementation Plan MoE .....................Measurement of Effectiveness MoS .....................Measurement of Success MOA.....................Memorandum of Agreement MOU.....................Memorandum of Understanding NDQS...................National Data Quality Standards NED......................National Exercise Division NIEM....................National Information Exchange Model OAG .....................Office of the Auditor General PA.........................Public Affairs PM........................Project Management PS.........................Public Safety Canada
  • 14. 10 COMMUNICATIONS INTEROPERABILITY ACTION PLAN FOR CANADA PSIC .....................Public Safety Interoperability Center P/T........................Provincial/Territorial S&T ......................Science and Technology SCONSAD ............Standing Committee on National Security and Defence SOREM.................Senior Officials Responsible for Emergency Management SOPs.....................Standard Operating Procedures SOR(s)..................Statement of Requirement SWIC ....................State Wide Interoperability Co-ordinators TBC.......................To Be Confirmed TBD ......................To Be Determined TBS.......................Treasury Board Secretariat TOR(s) ..................Terms of Reference WG.......................Working Group WRT......................With respect to