ArcelorMittal Italia
Realising the potential of Europe's lowest cost asset
Matthieu Jehl, CEOMarch 19, 2019
Disclaimer
Forward-Looking Statements
This document may contain forward-looking information and statements about ArcelorMittal and its
subsidiaries. These statements include financial projections and estimates and their underlying
assumptions, statements regarding plans, objectives and expectations with respect to future operations,
products and services, and statements regarding future performance. Forward-looking statements may be
identified by the words “believe,” “expect,” “anticipate,” “target” or similar expressions. Although
ArcelorMittal’s management believes that the expectations reflected in such forward-looking statements
are reasonable, investors and holders of ArcelorMittal’s securities are cautioned that forward-looking
information and statements are subject to numerous risks and uncertainties, many of which are difficult to
predict and generally beyond the control of ArcelorMittal, that could cause actual results and
developments to differ materially and adversely from those expressed in, or implied or projected by, the
forward-looking information and statements. These risks and uncertainties include those discussed or
identified in the filings with the Luxembourg Stock Market Authority for the Financial Markets (Commission
de Surveillance du Secteur Financier) and the United States Securities and Exchange Commission (the
“SEC”) made or to be made by ArcelorMittal, including ArcelorMittal’s latest Annual Report on Form 20-F
on file with the SEC. ArcelorMittal undertakes no obligation to publicly update its forward-looking
statements, whether as a result of new information, future events, or otherwise.
1
• From Ilva to ArcelorMittal Italia
• ArcelorMittal Italia: plan and priorities
• First 100 days and work in progress
– Health & Safety
– Environment
– Turnaround
– Integration
Agenda
2
ArcelorMittal Italia:
A tier-1 asset, a perfect fit with ArcelorMittal’s strategy
* Source: Eurofer Market supply data 2018; **Iberia defined as Spain + Portugal
Italy: Second largest European flat steel consuming market (Mt)*
• Solid asset base: Taranto is the biggest
single-site integrated steel plant in Europe
• Increased geographical balance and better
presence in Southern Europe & Italy. A tier-
1 supplier to European & Italian customers
• Taranto is well positioned on the structural
cost curve and complemented by two high
quality finishing facilities
• Significant cost improvement potential and
synergies identified to drive value
• Able to leverage ArcelorMittal’s strengths in
R&D, product leadership and service
93.9 Mt
Total European Flat
steel demand 2018
20.9
15.4
10.7
7.9
5.7 5.6
PolandGermany Iberia**Italy FranceUK
3
ArcelorMittal Italia shipment product mix (Feb 2019)
TINPLATE
HRC
PICKLED
ANNEALED
3%
48%
27%
10%
9%
3%
HDG
HP
ArcelorMittal Italia: key deal milestones
Multi-year acquisition project concluded in November 2018
May 2018 Sept 2018 1 Nov 2018Sept 2018
Antitrust approval
from European
Commission
Enhanced
environmental
and social
commitments
Agreement with unions ArcelorMittal
takes over ILVA
operations:
renamed
ArcelorMittal Italia
2014 Beginning 2015 June 2017 Sept 2017
First
publication of
ILVA contract
notice
First
ArcelorMittal
offer
ILVA is assigned to
AM InvestCo,
contract signed with
Italian government
Environmental
law approved
Jan 2016
Second
publication of
ILVA contract
notice
4
ArcelorMittal in Italy
A fully integrated network
Novi Ligure
Cold rolling mill to serve
end-user customers (i.e.
automotive)
Genova
Cold rolling mill with hot
dip galvanizing capacity
Taranto
The largest single-site
steel making facility in
Europe
Strategically positioned
with a deep water port
3 production units
7 service centres including 5 within the joint
venture AMCLN*
13 distribution facilities including 12 within the
joint venture AMCLN*
5*Already existing JV between ArcelorMittal and CLN (shareholding: 49% ArcelorMittal Distribution Solutions Italia)
2 welded pipes facilities
ArcelorMittal Italia
Main production units
6
Taranto
Primary and finishing facilities
• Deep sea port for vessels >320kt
• 4 Coke batteries in operation, 2 Sinter Plants
• 3 x 11m BFs in operations, 1 x 14m BF in
standby waiting relining
• 2 steel shops, 6 BOFs, 5 CCs
• 2 HSMs, 1 plate mill, 3 tube mills
• 1 Pickling line, 1 PLTCM
• 2 HDG lines (HDG #1 and #2)
• Integrated SSC for slitted coils/sheets
• Logistic integration (incl. seaport loading)
• 2 integrated power plants, Air separation units
• Mining activities for lime, 2 lime furnaces
Main products
HRC black; CR coils; HDG coils; HR steel plates;
Raw/coated welded pipe; Cut sheets and coils
Finishing facilities
• 1 PLTCM
• 2 HDG (HDG #3 and #5)
• Tin plate: CRM, 2 CAL, 1 tinning line,
1 tin free line
• Tin plate service centre
Main products
Cold rolled coils
Hot rolled pickled coils
Hot-dip galvanized coils
Electrolytic tinplate
Electrolytic chrome plate
Cut sheets and coils
Finishing facilities
• 1 PLTCM
• 1 CAL plus several BA furnaces
• 1 HDG (#4) exposed capable
• 1 AluSi line
• 1 ELO line
Main products
Cold rolled coils
Hot-dip galvanized coils
Electro-galvanized coils
Cut sheets and coils
Genova Novi Ligure
• Transportation and storage of Ilva’s raw materials and processed products are provided by an
infrastructure system comprising three sea terminals (Genova, Taranto and Marghera) from fleet of
five vessels
• Taranto plant served by over 200 km of rail network and 50km of roads
• Port of Taranto strategically located for Middle East and Black Sea Traffic. We operate 4 piers and
a wharf totalling 4,589m of quayside (draught up to 24m) and 691,300m of operating space
• The “Gemma” (very large carrier): at 330m long and 57m broad, is currently the biggest ever
registered in Italy, used to carry raw materials (up to 315,000t)
Leverage strong logistics and infrastructure
7
ArcelorMittal Italia: organisation
COO Primary
Stefan Van Campe
COO Finishing
Taranto
Philippe Aubron
COO Finishing
Genova / Novi Ligure
Giuseppe Frustaci
CPO
Emmanuel Rodriguez
CMO Italy
Carlo Malasomma
Head of Finance & Govt. Affairs
Samuele Pasi
Head of Human Resources
Annalisa Pasquini
CEO
Matthieu Jehl
Head of R&D
Nicolas Bontems
Head of Environment
Alessandro Labile
Head of H&S
Sergio Palmisano
Investment plan coordination
Henri-Pierre Orsoni
8
• From Ilva to ArcelorMittal Italia
• ArcelorMittal Italia: plan and priorities
• First 100 days and work in progress
– Health & Safety
– Environment
– Turnaround
– Integration
Agenda
9
Our vision for ArcelorMittal Italia
A clear vision of long-term, sustainable success
10
• Significant environmental issues – need to
bring ILVA up to and beyond EU
environmental standards
• Industrial challenge: investment and
expertise to improve operational performance
of ILVA’s assets
• Poor financial performance: material
decline in revenue since 2011, loss-making
for the past 6 years
• Low share of high-value added steels in
the portfolio of ILVA
• Need to rebuild client confidence: product
quality, innovation, supply chain
• A company recognised for
environmental performance excellence:
emissions to be reduced to best practice
levels, in line with and beyond European
environmental standards and legislation
• Become a world-class player in terms of
competitiveness, sustainability,
environmental performance, value-add
• Leading presence in Italy, adding value
to the Italian industrial fabric
• A sustainably profitable company: one
that creates value for all stakeholders, and
the Italian economy
Yesterday Tomorrow
Investment plan to turnaround ArcelorMittal Italia
Capex commitment plan (€2.4bn)
• Comprehensive investment programme of c. €2.4 billion, and highly detailed industrial,
environmental and commercial plans
1.3
2.4
2.1
1.2
0.3
Environmental
2018-2023*
Industrial
2018-2024
Total capex
2018-2024
Capex funded by
ILVA SA (Riva)*
Net capex
*Additional €200m funds are available to cover cost of increased environmental capex, should additional reclamation of soil be necessary; i.e net spend to remain at €2.1bn 11
Three priorities of the plan:
Sustainability, Turnaround, Integration
Turnaround: buy - make - sell
Bring ArcelorMittal Italia
to Group profitability
level across its buy-
make-sell scope
Performance
and
profitability
Integration
Sustainability
and reputation
Health & Safety, environment, compliance
Bring ArcelorMittal Italia up and beyond
EU environmental standards. Rebuild the
public reputation of ArcelorMittal Italia
Key function/process
optimisation and alignment
Rebuilding and optimize
organisation, processes
and systems
12
Our approach
Clear actions and pathway to turnaround
Sustainability
and reputation
Performance
and profitability
Rebuilding and
Integration
Beg. Nov
Target setting and
planning.
Quick win launch
End 2018
Prioritisation and
implementation launch
(short cycles)
• Priorities set and agreed
• Clear program structure,
masterplan
• Tracking and steering
2019
Turnaround
implementation
• Projects realisation
• Ensuring positive
change
management
• Move to profitability
Beyond
Structural
continuous
improvement
towards
excellence
13
• From Ilva to ArcelorMittal Italia
• ArcelorMittal Italia: plan and priorities
• First 100 days and work in progress
– Health & Safety
– Environment
– Turnaround
– Integration
Agenda
14
• Group Health & Safety: Priority no. 1 in our
journey to “zero”  Align the ArcelorMittal Italia
health & safety performance to Group standards
Sustainability and reputation: health & safety
First 100 days and work in progress
1.9
3.1
2.5
1.8
1.4
1.0
201520132008 201220102007 2009 2011 2014 2016 2017 2018**
LTIF* rate in 2018 for ArcelorMittal
* LTIF = Lost time injury frequency defined as Lost Time Injuries per 1.000.000 worked hours; based on own personnel and contractors; A Lost Time Injury (LTI) is an incident that causes an injury that
prevents the person from returning to his next scheduled shift or work period. Lost Time Injury Frequency Rate (LTIFR) is the number of Lost Time Injuries per million man-hours.
** Data does not include the LTIFR for Ilva, which came into the scope as from November 1, 2018; *** Data for 4 months from Nov 18-Feb 19 only
15
0.810.85
0.780.820.85
0.69
Targets First 100 days and work in progress
• H&S progresses in a short period of time, but
LTIF*** (10.6x) is higher than Group average
• > 7900 trainees since Nov’18 (safety
leadership training, coaching, etc.)
• Review/ update Risk Assessment documents
• Fatality Prevention Audit to check Fatality
Prevention Standards (isolation, confined
spaces & gas hazard areas, HIRA, working at
heights, cranes & lifting, vehicles & driving,
rails, contractors)
• Introduce tool to check safety conditions
during non-routine & emergency activities
• Safety of machines and equipment
ArcelorMittal Italia LTIF
Nov18–Feb19 is 10.6x;
significantly
higher than group average
Sustainability and reputation: environment
Post investment ArcelorMittal Italia will be a global benchmark for the steel sector
Raw material yards
Zero dust emissions in
Tamburi from the raw materials
yards and conveyor belt before
the 1H 2020
€350m
Rain and waste water
treatment
Elimination of
run off polluted water
€160m
Coke plant revamping
Technology
best-in-class
€200m
Main areas of
intervention
16
Key elements of €1.2bn environmental capex plan 2018-2023*
• ~70 environmental projects are monitored ongoing basis  Equivalent to ~€500k spend per day
Filter in the sinter plants
Dust, metals and dioxin
reduction to lower levels
than EU BAT
€35m
*Additional funds are to b recovered from Riva fund so net environmental spend is €0.8bn
Sustainability and Reputation: environment
Improved commitments
Intervention
Requirements under DPCM*
2017
ArcelorMittal’s
commitments
Improved commitments
of summer 2018
Iron ore yard
coverage
• Start of the works required by
30.09.2018
• Completion within 36 months
from ArcelorMittal taking the
business (31.10.2018)
• Works started on
01.02.2018
• Planning to complete
within 24 months, by the
end of December 2019
• Work started 8 months earlier than
required.
• Expected to complete at least 22
months ahead of deadline.
Coal yard
coverage
• Completion within 36 months
from ArcelorMittal taking the
business
• Planning to complete by
the end of May 2020
• Completion at least 17 months earlier
than required
Treatment of
the coke oven
gas
• Level of H2S content in the
coke oven gas below 500
mg/Nm3, with the exception
of during the annual plant
maintenance (20 days)
• Implementation of the
improvement of the coke
oven gas desulphurization
plant within 36 months
from ArcelorMittal taking
the business.
• Reduction of SO2 emissions
associated to the use of coke oven gas
at Taranto plant.
• Maintenance of the H2S level in coke
oven gas below 500mg / Nm3 even
during the 20 days of annual
maintenance.
Waste water
treatment for
the Blast
Furnaces
scrubbing water
• Compliance with new limits by
1st July 2020
• Built new waste water
treatment, applying in
house technology for which
a patent has been filed in
December 2017
• Anticipate future regulation by avoiding
the use of highly hazardous chemical,
formaldehyde.
• Tailor made solution: onsite testing with
ArcelorMittal pilot plant already in
November 2017
17
* Decree of the President of the Council of Ministers
Sustainability and Reputation: environment
First 100 days and work in progress
✓ SH4 building closure
✓ PCI building closure
✓ OMO2 building closure
✓ Coking plant FC1 building closure and dedusting
✓ Dismantlement of the building sili cec of the cokes
and construction of the new conveyor belt NT2 as
by-pass
✓ Adjustment of temporary waste area in operation
✓ Construction of mobile hoods at GRF
✓ Dredging of the branch 1 of the discharge channel
number 1
✓ Waterproofing of the full landfill G2 in the Mater
Gratiae area
✓ Environmental investigation in the area of former
seized sleepers
✓ Environmental investigation in the area of former
seized tires
✓ Demolition of the S3 tank
✓ Pump & treat stockyards system
✓ Adjustment of the monitoring systems to the partial
discharges
 Pavement of BF slag yard
 Investments at coke batteries
 Conveyor belts enclosure
 Dismantling BF3
 Sinter yard coverage ordering for south and north
 Intervention for collection and treatment of rain
water
 Primary raw materials yard coverage
Completed by December 31, 2018 Work in progress
18
PCI building
SH4 building
Raw materials yard coverage
A unique project in Europe
Starting of
excavation
activities on
iron ore
yard
Installation of
foundation poles
on the iron ore
yard and
assembling of the
erection piers
Completion of
the first arch
of the shed
Feb 1, 2018 May 2018 4Q 2019 May 2020Dec 2018
Completion of
the iron ore
yard (first
phase)
Finalisation
of the coke
yard (first
phase)
Today
Yesterday
Tomorrow
19
Feb 2019
First section of
six roof arches
completed
Turnaround: buy – make – sell
First 100 days and work in progress
Buy
Make
Sell
Leverage on Group’s size and experience
• Continuity ensured on transferred contract and orders
• Access to ArcelorMittal contracts for all categories, starting with raw materials
• Enter into new partnership in full transparency
• Rationalize procurement strategy, so far driven by cash constraint and not cost
performance
Italy is a big and dynamic market, ArcelorMittal Italia is the relevant local producer
• Implementation of Group’s commercial approach and internal policies
• Align service and quality reputation to ArcelorMittal’s standards through an enlarged
and improved range of products (also through our new R&D centre in Taranto)
• Commercial impact on track, starting to get some results in general industry, not yet
automotive  we have secured some high level contracts and regained some
customers ILVA had lost
Turnaround of underperforming assets
• Ensure business continuity: raw materials, maintenance and repair
• Maintenance: accelerated plan for continuous casting segments
• Nov 2018: Restart production of plate mill and hot rolling mill #1
• Main operational priorities are being set up per area for proper industrial turnaround
20
Performance and profitability: industrial plan
Extensive program initiated across business to improve performance
Key investments in €1.3bn industrial capex plan 2018-2024
21
• Industrial capex plan with commitment to invest €1.3bn by 2024; including investment in BF#5 to
increase production from 6Mt to 8Mt upon completion of environmental plan
Eur
1.3bn
Mechanical and automation
upgrade for finishing
production tools
Maintenance of HSM, plate
mill, annealing and CRM
Rolls
Continuous caster
revamping
Hot stoves BF1 and BF4
BF1 heart repair
Hot stoves
BF1 and BF4
Steel shops (converters
and chimneys repair)
Energy efficiency
Product development /
enhancement
BF5
• Jan 2019: workforce complete with headcounts
of 10,700 (>8,200 employees in Taranto)
• Group mobility
• Filled positions with new colleagues or
ArcelorMittal people to provide new
competences to the organization
• Industrial relations: build new social dialogue
forums, EWC
• Integration of ArcelorMittal Group HR
processes (evaluation, KPIs, …)
• Definition of a training plan by role/function
• Promote personal development through a
culture of individual responsibility,
entrepreneurship and proactivity
Integration: HR
First 100 days and work in progress
14,000
10,700
Old ILVA ArcelorMittal Italia
-24%
Headcount (FTE)
22
* Based on crude steel per employee; ArcelorMittal estimates
**Between 2023 and 2025, the Company has committed to hire any workers who remain under Ilva’s extraordinary administration
Integration: Communication & CR
First 100 days and work in progress
• Dedicated channels for 2-way dialogue with our
people for their engagement
– Employees = first ambassadors of the company
and its culture
• Transparency, accountability and continuous
dialogue with our stakeholders
– STK mapping: 150 + organisations identified and
ranked according to relevance/influence
– Stakeholder meetings and dialogues
– Reporting
• Build and sustain the reputation: community
investments are a key to meet and win this
challenge
– Criteria developed to identify best projects
– 20 + requests received: first community investment
projects ready to be launched by April 2019
23
Integration: new R&D laboratory in Taranto
Creation during the first
18 months after
takeover
€10
millions
20
Researchers min.
Link with local
schools &
technology
institutes
• To support ArcelorMittal Italia growth by boosting Global R&D process solutions roll-out and by
transferring know-how of the Group
• To support ArcelorMittal Italia growth by boosting the copy-engineering of product mix
• To develop new process & products technogical solutions, with a particular focus on the
improvement of the environmental footprint of the steelmaking processes
• To focus on the continuous improvement and update of technologies & know-how
24
Integration: Group support
First 100 days and work in progress
25
• Use of internal benchmarks in the
Group to guide actions to improve
industrial KPIs
• Operating practices and processes to
turnaround the Italian business
• ArcelorMittal experts with extensive
experience in different sites, stationed
on ground in Italy to support and guide
Italian colleagues in their improvement
actions
• “Twinning” from rest of ArcelorMittal
Europe to provide more dedicated
support for improvement and product
development
“It is a great pleasure and honour
to be part of the recovery of this
plant together with a team who has
positive spirit to restore its
potential”
Stefan Van Campe, COO Primary
“The turnaround of ArcelorMittal
Italia is a once in a lifetime
experience and one of the biggest
challenges for the Group. That’s
why I am expecting a very big
challenge from a professional point of
view, in collaboration with some of
the best experts from the Group”
Jef Queeckers, Supply Process Engineer
c
Testimonials from Italy
“Having the opportunity to work in the biggest European steel plant is such
a challenge and I feel privileged to experience this in my career. I strongly
encourage everyone to take advantage of the opportunity to move
across sites and countries. It’s scary to get out of our comfort zone, but you
won’t believe me how scary it is to even think of getting back to it”
(Luciene Caberlin, Energy Manager)
“Discover a new plant, consolidate my technical skills, increase my professional
network, being part of a new team, increase my responsibilities. But on top of
those “professional” expectations, I have also some personal ones: offering to my
family the possibility to live in Italy, discovering a new culture, a new language, a
new cuisine, a new way of living: the famous “dolce vita”. Such a project will work
only if you have that double expectation”
(Antoine Dhennin, Head of Automation)
“I accepted because I felt great the call of a very big challenge. Apart from the
transfer to Taranto, build the Research Centre from scratch, identifying the
people, the structure, the research programs. A very exciting challenge because it
contains an aspect of social responsibility that I like. It has a useful target for the
ArcelorMittal Group, Italy, Puglia and Taranto”
(Nicolas Bontems, Head of R&D Centre)
26
Wrap up, our way to EBITDA accretive
2018
EBITDA
Positive
Year 1
FCF
Positive
Year 3
Performance in
line with AM
Europe levels
Production from 6Mt to 8MT; BF#5 ramp up
Procurement synergies
2019 2020 2021 2022 2023 2024
Key Improvement Drivers:
Procurement synergies
Commercial synergies
Operational synergies
Increase production to 6Mt
Key Targets
Increase production to 8Mt
Improve downstream utilisation and mix
Continuous improvement plans
Complete Environmental capex program
27
Key takeaways
• ArcelorMittal Italia target to be the lowest cost site in Europe with full complement of
downstream capabilities
• H&S performance is a priority
• Operationally, we began from low point given delay in acquisition closing; more short
term challenges, yet long term potential remains robust. On track to hit 6Mt this year
• We are on time with our environmental investments which are the key to enabling an
increase in production to 8Mt to generate further fixed cost savings
• Buy, make, sell is ArcelorMittal Italia’s key business philosophy and where €310m
synergies will be captured
• Progress on commercial approach despite challenging market environment
• Employee engagement is positive with ongoing development
• On track to achieve Financial targets set at time of acquisition: EBITDA positive year 1
and FCF positive year 3
28
Thank you for your attention
Genoa HDG LineTaranto

More Related Content

What's hot

PRESENTATION on annealing pickling of steel
PRESENTATION on annealing pickling of steelPRESENTATION on annealing pickling of steel
PRESENTATION on annealing pickling of steelMohdAman22
 
VOCATIONAL TRAINING REPORT
VOCATIONAL TRAINING REPORTVOCATIONAL TRAINING REPORT
VOCATIONAL TRAINING REPORTGunjesh Jha
 
Iron making
Iron makingIron making
Iron makingguddu_92
 
My report on bhushan power plant orisa
My report on bhushan power plant orisaMy report on bhushan power plant orisa
My report on bhushan power plant orisatidke123
 
Summer Training at JSW
Summer Training at JSWSummer Training at JSW
Summer Training at JSWArpan Paul
 
JSW- Steel Plant -Operation process -TMT
JSW- Steel Plant -Operation process -TMT   JSW- Steel Plant -Operation process -TMT
JSW- Steel Plant -Operation process -TMT Niraj Kumar
 
ELECTRIC ARC FURNACE AC (PART 1) - Layout & Components (steel - steelmaking -...
ELECTRIC ARC FURNACE AC (PART 1) - Layout & Components (steel - steelmaking -...ELECTRIC ARC FURNACE AC (PART 1) - Layout & Components (steel - steelmaking -...
ELECTRIC ARC FURNACE AC (PART 1) - Layout & Components (steel - steelmaking -...Matteo Sporchia
 
Ppt on bokaro steel plant
Ppt on bokaro steel plantPpt on bokaro steel plant
Ppt on bokaro steel plantPrashant Kumar
 
Vocational Training in Steel Authority of India Limited (SAIL)-Bokaro Steel P...
Vocational Training in Steel Authority of India Limited (SAIL)-Bokaro Steel P...Vocational Training in Steel Authority of India Limited (SAIL)-Bokaro Steel P...
Vocational Training in Steel Authority of India Limited (SAIL)-Bokaro Steel P...Sumit Kumar
 
Bicycle Manufacturing Process
Bicycle Manufacturing ProcessBicycle Manufacturing Process
Bicycle Manufacturing ProcessAditya Kumawat
 
Hot Rolling And cold rolling process
Hot Rolling And cold rolling processHot Rolling And cold rolling process
Hot Rolling And cold rolling processDhyey Shukla
 
CV - 19 yrs exp at HOT ROLLING MILL operation with DME & MBA in Operation Man...
CV - 19 yrs exp at HOT ROLLING MILL operation with DME & MBA in Operation Man...CV - 19 yrs exp at HOT ROLLING MILL operation with DME & MBA in Operation Man...
CV - 19 yrs exp at HOT ROLLING MILL operation with DME & MBA in Operation Man...Arun Chowdhury
 
Steel making
Steel makingSteel making
Steel makingS Gafoor
 

What's hot (20)

JSW Steel
JSW SteelJSW Steel
JSW Steel
 
Steel plant ppt 1
Steel plant ppt 1Steel plant ppt 1
Steel plant ppt 1
 
PRESENTATION on annealing pickling of steel
PRESENTATION on annealing pickling of steelPRESENTATION on annealing pickling of steel
PRESENTATION on annealing pickling of steel
 
VOCATIONAL TRAINING REPORT
VOCATIONAL TRAINING REPORTVOCATIONAL TRAINING REPORT
VOCATIONAL TRAINING REPORT
 
Induction furnace
Induction furnaceInduction furnace
Induction furnace
 
Iron making
Iron makingIron making
Iron making
 
My report on bhushan power plant orisa
My report on bhushan power plant orisaMy report on bhushan power plant orisa
My report on bhushan power plant orisa
 
Training presentation-BHILAI STEEL PLANT
Training presentation-BHILAI STEEL PLANTTraining presentation-BHILAI STEEL PLANT
Training presentation-BHILAI STEEL PLANT
 
Summer Training at JSW
Summer Training at JSWSummer Training at JSW
Summer Training at JSW
 
JSW- Steel Plant -Operation process -TMT
JSW- Steel Plant -Operation process -TMT   JSW- Steel Plant -Operation process -TMT
JSW- Steel Plant -Operation process -TMT
 
ELECTRIC ARC FURNACE AC (PART 1) - Layout & Components (steel - steelmaking -...
ELECTRIC ARC FURNACE AC (PART 1) - Layout & Components (steel - steelmaking -...ELECTRIC ARC FURNACE AC (PART 1) - Layout & Components (steel - steelmaking -...
ELECTRIC ARC FURNACE AC (PART 1) - Layout & Components (steel - steelmaking -...
 
Ppt on bokaro steel plant
Ppt on bokaro steel plantPpt on bokaro steel plant
Ppt on bokaro steel plant
 
Blast furnace
Blast furnaceBlast furnace
Blast furnace
 
Steel manufacturing
Steel manufacturingSteel manufacturing
Steel manufacturing
 
Vocational Training in Steel Authority of India Limited (SAIL)-Bokaro Steel P...
Vocational Training in Steel Authority of India Limited (SAIL)-Bokaro Steel P...Vocational Training in Steel Authority of India Limited (SAIL)-Bokaro Steel P...
Vocational Training in Steel Authority of India Limited (SAIL)-Bokaro Steel P...
 
Bicycle Manufacturing Process
Bicycle Manufacturing ProcessBicycle Manufacturing Process
Bicycle Manufacturing Process
 
Rolling Process
Rolling ProcessRolling Process
Rolling Process
 
Hot Rolling And cold rolling process
Hot Rolling And cold rolling processHot Rolling And cold rolling process
Hot Rolling And cold rolling process
 
CV - 19 yrs exp at HOT ROLLING MILL operation with DME & MBA in Operation Man...
CV - 19 yrs exp at HOT ROLLING MILL operation with DME & MBA in Operation Man...CV - 19 yrs exp at HOT ROLLING MILL operation with DME & MBA in Operation Man...
CV - 19 yrs exp at HOT ROLLING MILL operation with DME & MBA in Operation Man...
 
Steel making
Steel makingSteel making
Steel making
 

Similar to Arcelormittal Italie

Ilva_Aquisition_InvestorPresentation.pdf
Ilva_Aquisition_InvestorPresentation.pdfIlva_Aquisition_InvestorPresentation.pdf
Ilva_Aquisition_InvestorPresentation.pdfNirajKumar4077
 
Exposé d'Aditya Mittal à Paris ce lundi 5 octobre
Exposé d'Aditya Mittal à Paris ce lundi 5 octobreExposé d'Aditya Mittal à Paris ce lundi 5 octobre
Exposé d'Aditya Mittal à Paris ce lundi 5 octobreLuxemburger Wort
 
Electrical contractor blind profile
Electrical contractor   blind profileElectrical contractor   blind profile
Electrical contractor blind profilePaolo Cirani
 
Company overview
Company overviewCompany overview
Company overviewERG S.p.A.
 
Analyst presentation: Energy – 02 October 2014
Analyst presentation: Energy – 02 October 2014Analyst presentation: Energy – 02 October 2014
Analyst presentation: Energy – 02 October 2014Atkins
 
Klöckner & Co - German Investment Conference 2012
Klöckner & Co - German Investment Conference 2012Klöckner & Co - German Investment Conference 2012
Klöckner & Co - German Investment Conference 2012Klöckner & Co SE
 
Strategic & Financial Analysis Siemens(2002-2012)
Strategic & Financial Analysis Siemens(2002-2012)Strategic & Financial Analysis Siemens(2002-2012)
Strategic & Financial Analysis Siemens(2002-2012)Hari Prashad K.V.
 
Strategic & Financial analysis siemens(2002-2012)
Strategic & Financial analysis   siemens(2002-2012)Strategic & Financial analysis   siemens(2002-2012)
Strategic & Financial analysis siemens(2002-2012)Hari Prashad K.V.
 
ITM Power Annual Report 2016
ITM Power Annual Report 2016ITM Power Annual Report 2016
ITM Power Annual Report 2016Rebecca Markillie
 
9569 ITM Annual Report 2016 2.3_Web
9569 ITM Annual Report 2016 2.3_Web9569 ITM Annual Report 2016 2.3_Web
9569 ITM Annual Report 2016 2.3_WebRebecca Markillie
 
Klöckner & Co - Baader Investment Conference 2012
Klöckner & Co - Baader Investment Conference 2012Klöckner & Co - Baader Investment Conference 2012
Klöckner & Co - Baader Investment Conference 2012Klöckner & Co SE
 
Italian sustainability day 2018
Italian sustainability day 2018Italian sustainability day 2018
Italian sustainability day 2018ERG S.p.A.
 
Corporate Responsibility Report ArcelorMittal Gent, Geel and Genk 2013 (EN)
Corporate Responsibility Report ArcelorMittal Gent, Geel and Genk 2013 (EN)Corporate Responsibility Report ArcelorMittal Gent, Geel and Genk 2013 (EN)
Corporate Responsibility Report ArcelorMittal Gent, Geel and Genk 2013 (EN)Davy Van Swael
 
Architectural Aluminium Ltd. Company Update Spring 2018
Architectural Aluminium Ltd. Company Update Spring 2018Architectural Aluminium Ltd. Company Update Spring 2018
Architectural Aluminium Ltd. Company Update Spring 2018Brian Kenny MSc.
 
Per Astra Project List
Per Astra Project ListPer Astra Project List
Per Astra Project ListJanas
 
Citec Group brochure 2016_lowres
Citec Group brochure 2016_lowresCitec Group brochure 2016_lowres
Citec Group brochure 2016_lowresAustin Antony
 
Ie Wind Venture Business Plan
Ie Wind Venture Business PlanIe Wind Venture Business Plan
Ie Wind Venture Business Planfptoscano
 

Similar to Arcelormittal Italie (20)

Ilva_Aquisition_InvestorPresentation.pdf
Ilva_Aquisition_InvestorPresentation.pdfIlva_Aquisition_InvestorPresentation.pdf
Ilva_Aquisition_InvestorPresentation.pdf
 
Project rashmi steel
Project rashmi steelProject rashmi steel
Project rashmi steel
 
Exposé d'Aditya Mittal à Paris ce lundi 5 octobre
Exposé d'Aditya Mittal à Paris ce lundi 5 octobreExposé d'Aditya Mittal à Paris ce lundi 5 octobre
Exposé d'Aditya Mittal à Paris ce lundi 5 octobre
 
Electrical contractor blind profile
Electrical contractor   blind profileElectrical contractor   blind profile
Electrical contractor blind profile
 
Company overview
Company overviewCompany overview
Company overview
 
Analyst presentation: Energy – 02 October 2014
Analyst presentation: Energy – 02 October 2014Analyst presentation: Energy – 02 October 2014
Analyst presentation: Energy – 02 October 2014
 
Klöckner & Co - German Investment Conference 2012
Klöckner & Co - German Investment Conference 2012Klöckner & Co - German Investment Conference 2012
Klöckner & Co - German Investment Conference 2012
 
Strategic & Financial Analysis Siemens(2002-2012)
Strategic & Financial Analysis Siemens(2002-2012)Strategic & Financial Analysis Siemens(2002-2012)
Strategic & Financial Analysis Siemens(2002-2012)
 
Strategic & Financial analysis siemens(2002-2012)
Strategic & Financial analysis   siemens(2002-2012)Strategic & Financial analysis   siemens(2002-2012)
Strategic & Financial analysis siemens(2002-2012)
 
ITM Power Annual Report 2016
ITM Power Annual Report 2016ITM Power Annual Report 2016
ITM Power Annual Report 2016
 
9569 ITM Annual Report 2016 2.3_Web
9569 ITM Annual Report 2016 2.3_Web9569 ITM Annual Report 2016 2.3_Web
9569 ITM Annual Report 2016 2.3_Web
 
Klöckner & Co - Baader Investment Conference 2012
Klöckner & Co - Baader Investment Conference 2012Klöckner & Co - Baader Investment Conference 2012
Klöckner & Co - Baader Investment Conference 2012
 
Italian sustainability day 2018
Italian sustainability day 2018Italian sustainability day 2018
Italian sustainability day 2018
 
Corporate Responsibility Report ArcelorMittal Gent, Geel and Genk 2013 (EN)
Corporate Responsibility Report ArcelorMittal Gent, Geel and Genk 2013 (EN)Corporate Responsibility Report ArcelorMittal Gent, Geel and Genk 2013 (EN)
Corporate Responsibility Report ArcelorMittal Gent, Geel and Genk 2013 (EN)
 
Cui 6262013
Cui 6262013Cui 6262013
Cui 6262013
 
Annual_Report_2015
Annual_Report_2015Annual_Report_2015
Annual_Report_2015
 
Architectural Aluminium Ltd. Company Update Spring 2018
Architectural Aluminium Ltd. Company Update Spring 2018Architectural Aluminium Ltd. Company Update Spring 2018
Architectural Aluminium Ltd. Company Update Spring 2018
 
Per Astra Project List
Per Astra Project ListPer Astra Project List
Per Astra Project List
 
Citec Group brochure 2016_lowres
Citec Group brochure 2016_lowresCitec Group brochure 2016_lowres
Citec Group brochure 2016_lowres
 
Ie Wind Venture Business Plan
Ie Wind Venture Business PlanIe Wind Venture Business Plan
Ie Wind Venture Business Plan
 

More from Paperjam_redaction

rapport-compte-gnral-2022-vf.pdf
rapport-compte-gnral-2022-vf.pdfrapport-compte-gnral-2022-vf.pdf
rapport-compte-gnral-2022-vf.pdfPaperjam_redaction
 
Lere-de-lIA_Opportunites-et-defis_Fondation-IDEA-asbl_VD.pdf
Lere-de-lIA_Opportunites-et-defis_Fondation-IDEA-asbl_VD.pdfLere-de-lIA_Opportunites-et-defis_Fondation-IDEA-asbl_VD.pdf
Lere-de-lIA_Opportunites-et-defis_Fondation-IDEA-asbl_VD.pdfPaperjam_redaction
 
Bank account in Luxembourg - Contacts FinTechs_October 2023_v5.pdf
Bank account in Luxembourg - Contacts FinTechs_October 2023_v5.pdfBank account in Luxembourg - Contacts FinTechs_October 2023_v5.pdf
Bank account in Luxembourg - Contacts FinTechs_October 2023_v5.pdfPaperjam_redaction
 
Bank account in Luxembourg - Contacts AIFs_October 2023_final_v2.pdf
Bank account in Luxembourg - Contacts AIFs_October 2023_final_v2.pdfBank account in Luxembourg - Contacts AIFs_October 2023_final_v2.pdf
Bank account in Luxembourg - Contacts AIFs_October 2023_final_v2.pdfPaperjam_redaction
 
Patents-trade-marks-and-startup-finance-study.pdf
Patents-trade-marks-and-startup-finance-study.pdfPatents-trade-marks-and-startup-finance-study.pdf
Patents-trade-marks-and-startup-finance-study.pdfPaperjam_redaction
 
Rapport d'analyse 8 - subvention de loyer.pdf
Rapport d'analyse 8 - subvention de loyer.pdfRapport d'analyse 8 - subvention de loyer.pdf
Rapport d'analyse 8 - subvention de loyer.pdfPaperjam_redaction
 
European innovation scoreboard 2022-KI0922386ENN (1).pdf
European innovation scoreboard 2022-KI0922386ENN (1).pdfEuropean innovation scoreboard 2022-KI0922386ENN (1).pdf
European innovation scoreboard 2022-KI0922386ENN (1).pdfPaperjam_redaction
 
Affiche Mouvement Social L01B Metz Thionville Luxembourg du mardi 26 septembr...
Affiche Mouvement Social L01B Metz Thionville Luxembourg du mardi 26 septembr...Affiche Mouvement Social L01B Metz Thionville Luxembourg du mardi 26 septembr...
Affiche Mouvement Social L01B Metz Thionville Luxembourg du mardi 26 septembr...Paperjam_redaction
 
IMD World Talent Report 2023.pdf
IMD World Talent Report 2023.pdfIMD World Talent Report 2023.pdf
IMD World Talent Report 2023.pdfPaperjam_redaction
 
Conférence Luxembourg Stratégie - Programme - 26.09.23[19].pdf
Conférence Luxembourg Stratégie - Programme - 26.09.23[19].pdfConférence Luxembourg Stratégie - Programme - 26.09.23[19].pdf
Conférence Luxembourg Stratégie - Programme - 26.09.23[19].pdfPaperjam_redaction
 
RÈGLEMENT (UE) 2023/1115 DU PARLEMENT EUROPÉEN ET DU CONSEIL du 31 mai 2023
RÈGLEMENT (UE) 2023/1115 DU PARLEMENT EUROPÉEN ET DU CONSEIL du 31 mai 2023RÈGLEMENT (UE) 2023/1115 DU PARLEMENT EUROPÉEN ET DU CONSEIL du 31 mai 2023
RÈGLEMENT (UE) 2023/1115 DU PARLEMENT EUROPÉEN ET DU CONSEIL du 31 mai 2023Paperjam_redaction
 

More from Paperjam_redaction (20)

rapport-compte-gnral-2022-vf.pdf
rapport-compte-gnral-2022-vf.pdfrapport-compte-gnral-2022-vf.pdf
rapport-compte-gnral-2022-vf.pdf
 
ADC2023.pdf
ADC2023.pdfADC2023.pdf
ADC2023.pdf
 
Lere-de-lIA_Opportunites-et-defis_Fondation-IDEA-asbl_VD.pdf
Lere-de-lIA_Opportunites-et-defis_Fondation-IDEA-asbl_VD.pdfLere-de-lIA_Opportunites-et-defis_Fondation-IDEA-asbl_VD.pdf
Lere-de-lIA_Opportunites-et-defis_Fondation-IDEA-asbl_VD.pdf
 
Bank account in Luxembourg - Contacts FinTechs_October 2023_v5.pdf
Bank account in Luxembourg - Contacts FinTechs_October 2023_v5.pdfBank account in Luxembourg - Contacts FinTechs_October 2023_v5.pdf
Bank account in Luxembourg - Contacts FinTechs_October 2023_v5.pdf
 
Bank account in Luxembourg - Contacts AIFs_October 2023_final_v2.pdf
Bank account in Luxembourg - Contacts AIFs_October 2023_final_v2.pdfBank account in Luxembourg - Contacts AIFs_October 2023_final_v2.pdf
Bank account in Luxembourg - Contacts AIFs_October 2023_final_v2.pdf
 
Patents-trade-marks-and-startup-finance-study.pdf
Patents-trade-marks-and-startup-finance-study.pdfPatents-trade-marks-and-startup-finance-study.pdf
Patents-trade-marks-and-startup-finance-study.pdf
 
Bulletin du Statec
Bulletin du StatecBulletin du Statec
Bulletin du Statec
 
Rapport d'analyse 8 - subvention de loyer.pdf
Rapport d'analyse 8 - subvention de loyer.pdfRapport d'analyse 8 - subvention de loyer.pdf
Rapport d'analyse 8 - subvention de loyer.pdf
 
Note 34.pdf
Note 34.pdfNote 34.pdf
Note 34.pdf
 
Note 35.pdf
Note 35.pdfNote 35.pdf
Note 35.pdf
 
European innovation scoreboard 2022-KI0922386ENN (1).pdf
European innovation scoreboard 2022-KI0922386ENN (1).pdfEuropean innovation scoreboard 2022-KI0922386ENN (1).pdf
European innovation scoreboard 2022-KI0922386ENN (1).pdf
 
Lettre d'intention LU-BE.pdf
Lettre d'intention LU-BE.pdfLettre d'intention LU-BE.pdf
Lettre d'intention LU-BE.pdf
 
Affiche Mouvement Social L01B Metz Thionville Luxembourg du mardi 26 septembr...
Affiche Mouvement Social L01B Metz Thionville Luxembourg du mardi 26 septembr...Affiche Mouvement Social L01B Metz Thionville Luxembourg du mardi 26 septembr...
Affiche Mouvement Social L01B Metz Thionville Luxembourg du mardi 26 septembr...
 
IMD World Talent Report 2023.pdf
IMD World Talent Report 2023.pdfIMD World Talent Report 2023.pdf
IMD World Talent Report 2023.pdf
 
Conférence Luxembourg Stratégie - Programme - 26.09.23[19].pdf
Conférence Luxembourg Stratégie - Programme - 26.09.23[19].pdfConférence Luxembourg Stratégie - Programme - 26.09.23[19].pdf
Conférence Luxembourg Stratégie - Programme - 26.09.23[19].pdf
 
RÈGLEMENT (UE) 2023/1115 DU PARLEMENT EUROPÉEN ET DU CONSEIL du 31 mai 2023
RÈGLEMENT (UE) 2023/1115 DU PARLEMENT EUROPÉEN ET DU CONSEIL du 31 mai 2023RÈGLEMENT (UE) 2023/1115 DU PARLEMENT EUROPÉEN ET DU CONSEIL du 31 mai 2023
RÈGLEMENT (UE) 2023/1115 DU PARLEMENT EUROPÉEN ET DU CONSEIL du 31 mai 2023
 
Asti.pdf
Asti.pdfAsti.pdf
Asti.pdf
 
2023-26-inf-fr.docx.pdf
2023-26-inf-fr.docx.pdf2023-26-inf-fr.docx.pdf
2023-26-inf-fr.docx.pdf
 
CGFP-WAHLPRÜFSTEINE.pdf
CGFP-WAHLPRÜFSTEINE.pdfCGFP-WAHLPRÜFSTEINE.pdf
CGFP-WAHLPRÜFSTEINE.pdf
 
OGBL.pdf
OGBL.pdfOGBL.pdf
OGBL.pdf
 

Recently uploaded

NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...
NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...Khaled Al Awadi
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadAyesha Khan
 
Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...
Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...
Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...lizamodels9
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCRsoniya singh
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckHajeJanKamps
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...lizamodels9
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxgeorgebrinton95
 

Recently uploaded (20)

NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...
NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
 
Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...
Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...
Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
 

Arcelormittal Italie

  • 1. Highly Restricted 0 ArcelorMittal Italia Realising the potential of Europe's lowest cost asset Matthieu Jehl, CEOMarch 19, 2019
  • 2. Disclaimer Forward-Looking Statements This document may contain forward-looking information and statements about ArcelorMittal and its subsidiaries. These statements include financial projections and estimates and their underlying assumptions, statements regarding plans, objectives and expectations with respect to future operations, products and services, and statements regarding future performance. Forward-looking statements may be identified by the words “believe,” “expect,” “anticipate,” “target” or similar expressions. Although ArcelorMittal’s management believes that the expectations reflected in such forward-looking statements are reasonable, investors and holders of ArcelorMittal’s securities are cautioned that forward-looking information and statements are subject to numerous risks and uncertainties, many of which are difficult to predict and generally beyond the control of ArcelorMittal, that could cause actual results and developments to differ materially and adversely from those expressed in, or implied or projected by, the forward-looking information and statements. These risks and uncertainties include those discussed or identified in the filings with the Luxembourg Stock Market Authority for the Financial Markets (Commission de Surveillance du Secteur Financier) and the United States Securities and Exchange Commission (the “SEC”) made or to be made by ArcelorMittal, including ArcelorMittal’s latest Annual Report on Form 20-F on file with the SEC. ArcelorMittal undertakes no obligation to publicly update its forward-looking statements, whether as a result of new information, future events, or otherwise. 1
  • 3. • From Ilva to ArcelorMittal Italia • ArcelorMittal Italia: plan and priorities • First 100 days and work in progress – Health & Safety – Environment – Turnaround – Integration Agenda 2
  • 4. ArcelorMittal Italia: A tier-1 asset, a perfect fit with ArcelorMittal’s strategy * Source: Eurofer Market supply data 2018; **Iberia defined as Spain + Portugal Italy: Second largest European flat steel consuming market (Mt)* • Solid asset base: Taranto is the biggest single-site integrated steel plant in Europe • Increased geographical balance and better presence in Southern Europe & Italy. A tier- 1 supplier to European & Italian customers • Taranto is well positioned on the structural cost curve and complemented by two high quality finishing facilities • Significant cost improvement potential and synergies identified to drive value • Able to leverage ArcelorMittal’s strengths in R&D, product leadership and service 93.9 Mt Total European Flat steel demand 2018 20.9 15.4 10.7 7.9 5.7 5.6 PolandGermany Iberia**Italy FranceUK 3 ArcelorMittal Italia shipment product mix (Feb 2019) TINPLATE HRC PICKLED ANNEALED 3% 48% 27% 10% 9% 3% HDG HP
  • 5. ArcelorMittal Italia: key deal milestones Multi-year acquisition project concluded in November 2018 May 2018 Sept 2018 1 Nov 2018Sept 2018 Antitrust approval from European Commission Enhanced environmental and social commitments Agreement with unions ArcelorMittal takes over ILVA operations: renamed ArcelorMittal Italia 2014 Beginning 2015 June 2017 Sept 2017 First publication of ILVA contract notice First ArcelorMittal offer ILVA is assigned to AM InvestCo, contract signed with Italian government Environmental law approved Jan 2016 Second publication of ILVA contract notice 4
  • 6. ArcelorMittal in Italy A fully integrated network Novi Ligure Cold rolling mill to serve end-user customers (i.e. automotive) Genova Cold rolling mill with hot dip galvanizing capacity Taranto The largest single-site steel making facility in Europe Strategically positioned with a deep water port 3 production units 7 service centres including 5 within the joint venture AMCLN* 13 distribution facilities including 12 within the joint venture AMCLN* 5*Already existing JV between ArcelorMittal and CLN (shareholding: 49% ArcelorMittal Distribution Solutions Italia) 2 welded pipes facilities
  • 7. ArcelorMittal Italia Main production units 6 Taranto Primary and finishing facilities • Deep sea port for vessels >320kt • 4 Coke batteries in operation, 2 Sinter Plants • 3 x 11m BFs in operations, 1 x 14m BF in standby waiting relining • 2 steel shops, 6 BOFs, 5 CCs • 2 HSMs, 1 plate mill, 3 tube mills • 1 Pickling line, 1 PLTCM • 2 HDG lines (HDG #1 and #2) • Integrated SSC for slitted coils/sheets • Logistic integration (incl. seaport loading) • 2 integrated power plants, Air separation units • Mining activities for lime, 2 lime furnaces Main products HRC black; CR coils; HDG coils; HR steel plates; Raw/coated welded pipe; Cut sheets and coils Finishing facilities • 1 PLTCM • 2 HDG (HDG #3 and #5) • Tin plate: CRM, 2 CAL, 1 tinning line, 1 tin free line • Tin plate service centre Main products Cold rolled coils Hot rolled pickled coils Hot-dip galvanized coils Electrolytic tinplate Electrolytic chrome plate Cut sheets and coils Finishing facilities • 1 PLTCM • 1 CAL plus several BA furnaces • 1 HDG (#4) exposed capable • 1 AluSi line • 1 ELO line Main products Cold rolled coils Hot-dip galvanized coils Electro-galvanized coils Cut sheets and coils Genova Novi Ligure
  • 8. • Transportation and storage of Ilva’s raw materials and processed products are provided by an infrastructure system comprising three sea terminals (Genova, Taranto and Marghera) from fleet of five vessels • Taranto plant served by over 200 km of rail network and 50km of roads • Port of Taranto strategically located for Middle East and Black Sea Traffic. We operate 4 piers and a wharf totalling 4,589m of quayside (draught up to 24m) and 691,300m of operating space • The “Gemma” (very large carrier): at 330m long and 57m broad, is currently the biggest ever registered in Italy, used to carry raw materials (up to 315,000t) Leverage strong logistics and infrastructure 7
  • 9. ArcelorMittal Italia: organisation COO Primary Stefan Van Campe COO Finishing Taranto Philippe Aubron COO Finishing Genova / Novi Ligure Giuseppe Frustaci CPO Emmanuel Rodriguez CMO Italy Carlo Malasomma Head of Finance & Govt. Affairs Samuele Pasi Head of Human Resources Annalisa Pasquini CEO Matthieu Jehl Head of R&D Nicolas Bontems Head of Environment Alessandro Labile Head of H&S Sergio Palmisano Investment plan coordination Henri-Pierre Orsoni 8
  • 10. • From Ilva to ArcelorMittal Italia • ArcelorMittal Italia: plan and priorities • First 100 days and work in progress – Health & Safety – Environment – Turnaround – Integration Agenda 9
  • 11. Our vision for ArcelorMittal Italia A clear vision of long-term, sustainable success 10 • Significant environmental issues – need to bring ILVA up to and beyond EU environmental standards • Industrial challenge: investment and expertise to improve operational performance of ILVA’s assets • Poor financial performance: material decline in revenue since 2011, loss-making for the past 6 years • Low share of high-value added steels in the portfolio of ILVA • Need to rebuild client confidence: product quality, innovation, supply chain • A company recognised for environmental performance excellence: emissions to be reduced to best practice levels, in line with and beyond European environmental standards and legislation • Become a world-class player in terms of competitiveness, sustainability, environmental performance, value-add • Leading presence in Italy, adding value to the Italian industrial fabric • A sustainably profitable company: one that creates value for all stakeholders, and the Italian economy Yesterday Tomorrow
  • 12. Investment plan to turnaround ArcelorMittal Italia Capex commitment plan (€2.4bn) • Comprehensive investment programme of c. €2.4 billion, and highly detailed industrial, environmental and commercial plans 1.3 2.4 2.1 1.2 0.3 Environmental 2018-2023* Industrial 2018-2024 Total capex 2018-2024 Capex funded by ILVA SA (Riva)* Net capex *Additional €200m funds are available to cover cost of increased environmental capex, should additional reclamation of soil be necessary; i.e net spend to remain at €2.1bn 11
  • 13. Three priorities of the plan: Sustainability, Turnaround, Integration Turnaround: buy - make - sell Bring ArcelorMittal Italia to Group profitability level across its buy- make-sell scope Performance and profitability Integration Sustainability and reputation Health & Safety, environment, compliance Bring ArcelorMittal Italia up and beyond EU environmental standards. Rebuild the public reputation of ArcelorMittal Italia Key function/process optimisation and alignment Rebuilding and optimize organisation, processes and systems 12
  • 14. Our approach Clear actions and pathway to turnaround Sustainability and reputation Performance and profitability Rebuilding and Integration Beg. Nov Target setting and planning. Quick win launch End 2018 Prioritisation and implementation launch (short cycles) • Priorities set and agreed • Clear program structure, masterplan • Tracking and steering 2019 Turnaround implementation • Projects realisation • Ensuring positive change management • Move to profitability Beyond Structural continuous improvement towards excellence 13
  • 15. • From Ilva to ArcelorMittal Italia • ArcelorMittal Italia: plan and priorities • First 100 days and work in progress – Health & Safety – Environment – Turnaround – Integration Agenda 14
  • 16. • Group Health & Safety: Priority no. 1 in our journey to “zero”  Align the ArcelorMittal Italia health & safety performance to Group standards Sustainability and reputation: health & safety First 100 days and work in progress 1.9 3.1 2.5 1.8 1.4 1.0 201520132008 201220102007 2009 2011 2014 2016 2017 2018** LTIF* rate in 2018 for ArcelorMittal * LTIF = Lost time injury frequency defined as Lost Time Injuries per 1.000.000 worked hours; based on own personnel and contractors; A Lost Time Injury (LTI) is an incident that causes an injury that prevents the person from returning to his next scheduled shift or work period. Lost Time Injury Frequency Rate (LTIFR) is the number of Lost Time Injuries per million man-hours. ** Data does not include the LTIFR for Ilva, which came into the scope as from November 1, 2018; *** Data for 4 months from Nov 18-Feb 19 only 15 0.810.85 0.780.820.85 0.69 Targets First 100 days and work in progress • H&S progresses in a short period of time, but LTIF*** (10.6x) is higher than Group average • > 7900 trainees since Nov’18 (safety leadership training, coaching, etc.) • Review/ update Risk Assessment documents • Fatality Prevention Audit to check Fatality Prevention Standards (isolation, confined spaces & gas hazard areas, HIRA, working at heights, cranes & lifting, vehicles & driving, rails, contractors) • Introduce tool to check safety conditions during non-routine & emergency activities • Safety of machines and equipment ArcelorMittal Italia LTIF Nov18–Feb19 is 10.6x; significantly higher than group average
  • 17. Sustainability and reputation: environment Post investment ArcelorMittal Italia will be a global benchmark for the steel sector Raw material yards Zero dust emissions in Tamburi from the raw materials yards and conveyor belt before the 1H 2020 €350m Rain and waste water treatment Elimination of run off polluted water €160m Coke plant revamping Technology best-in-class €200m Main areas of intervention 16 Key elements of €1.2bn environmental capex plan 2018-2023* • ~70 environmental projects are monitored ongoing basis  Equivalent to ~€500k spend per day Filter in the sinter plants Dust, metals and dioxin reduction to lower levels than EU BAT €35m *Additional funds are to b recovered from Riva fund so net environmental spend is €0.8bn
  • 18. Sustainability and Reputation: environment Improved commitments Intervention Requirements under DPCM* 2017 ArcelorMittal’s commitments Improved commitments of summer 2018 Iron ore yard coverage • Start of the works required by 30.09.2018 • Completion within 36 months from ArcelorMittal taking the business (31.10.2018) • Works started on 01.02.2018 • Planning to complete within 24 months, by the end of December 2019 • Work started 8 months earlier than required. • Expected to complete at least 22 months ahead of deadline. Coal yard coverage • Completion within 36 months from ArcelorMittal taking the business • Planning to complete by the end of May 2020 • Completion at least 17 months earlier than required Treatment of the coke oven gas • Level of H2S content in the coke oven gas below 500 mg/Nm3, with the exception of during the annual plant maintenance (20 days) • Implementation of the improvement of the coke oven gas desulphurization plant within 36 months from ArcelorMittal taking the business. • Reduction of SO2 emissions associated to the use of coke oven gas at Taranto plant. • Maintenance of the H2S level in coke oven gas below 500mg / Nm3 even during the 20 days of annual maintenance. Waste water treatment for the Blast Furnaces scrubbing water • Compliance with new limits by 1st July 2020 • Built new waste water treatment, applying in house technology for which a patent has been filed in December 2017 • Anticipate future regulation by avoiding the use of highly hazardous chemical, formaldehyde. • Tailor made solution: onsite testing with ArcelorMittal pilot plant already in November 2017 17 * Decree of the President of the Council of Ministers
  • 19. Sustainability and Reputation: environment First 100 days and work in progress ✓ SH4 building closure ✓ PCI building closure ✓ OMO2 building closure ✓ Coking plant FC1 building closure and dedusting ✓ Dismantlement of the building sili cec of the cokes and construction of the new conveyor belt NT2 as by-pass ✓ Adjustment of temporary waste area in operation ✓ Construction of mobile hoods at GRF ✓ Dredging of the branch 1 of the discharge channel number 1 ✓ Waterproofing of the full landfill G2 in the Mater Gratiae area ✓ Environmental investigation in the area of former seized sleepers ✓ Environmental investigation in the area of former seized tires ✓ Demolition of the S3 tank ✓ Pump & treat stockyards system ✓ Adjustment of the monitoring systems to the partial discharges  Pavement of BF slag yard  Investments at coke batteries  Conveyor belts enclosure  Dismantling BF3  Sinter yard coverage ordering for south and north  Intervention for collection and treatment of rain water  Primary raw materials yard coverage Completed by December 31, 2018 Work in progress 18 PCI building SH4 building
  • 20. Raw materials yard coverage A unique project in Europe Starting of excavation activities on iron ore yard Installation of foundation poles on the iron ore yard and assembling of the erection piers Completion of the first arch of the shed Feb 1, 2018 May 2018 4Q 2019 May 2020Dec 2018 Completion of the iron ore yard (first phase) Finalisation of the coke yard (first phase) Today Yesterday Tomorrow 19 Feb 2019 First section of six roof arches completed
  • 21. Turnaround: buy – make – sell First 100 days and work in progress Buy Make Sell Leverage on Group’s size and experience • Continuity ensured on transferred contract and orders • Access to ArcelorMittal contracts for all categories, starting with raw materials • Enter into new partnership in full transparency • Rationalize procurement strategy, so far driven by cash constraint and not cost performance Italy is a big and dynamic market, ArcelorMittal Italia is the relevant local producer • Implementation of Group’s commercial approach and internal policies • Align service and quality reputation to ArcelorMittal’s standards through an enlarged and improved range of products (also through our new R&D centre in Taranto) • Commercial impact on track, starting to get some results in general industry, not yet automotive  we have secured some high level contracts and regained some customers ILVA had lost Turnaround of underperforming assets • Ensure business continuity: raw materials, maintenance and repair • Maintenance: accelerated plan for continuous casting segments • Nov 2018: Restart production of plate mill and hot rolling mill #1 • Main operational priorities are being set up per area for proper industrial turnaround 20
  • 22. Performance and profitability: industrial plan Extensive program initiated across business to improve performance Key investments in €1.3bn industrial capex plan 2018-2024 21 • Industrial capex plan with commitment to invest €1.3bn by 2024; including investment in BF#5 to increase production from 6Mt to 8Mt upon completion of environmental plan Eur 1.3bn Mechanical and automation upgrade for finishing production tools Maintenance of HSM, plate mill, annealing and CRM Rolls Continuous caster revamping Hot stoves BF1 and BF4 BF1 heart repair Hot stoves BF1 and BF4 Steel shops (converters and chimneys repair) Energy efficiency Product development / enhancement BF5
  • 23. • Jan 2019: workforce complete with headcounts of 10,700 (>8,200 employees in Taranto) • Group mobility • Filled positions with new colleagues or ArcelorMittal people to provide new competences to the organization • Industrial relations: build new social dialogue forums, EWC • Integration of ArcelorMittal Group HR processes (evaluation, KPIs, …) • Definition of a training plan by role/function • Promote personal development through a culture of individual responsibility, entrepreneurship and proactivity Integration: HR First 100 days and work in progress 14,000 10,700 Old ILVA ArcelorMittal Italia -24% Headcount (FTE) 22 * Based on crude steel per employee; ArcelorMittal estimates **Between 2023 and 2025, the Company has committed to hire any workers who remain under Ilva’s extraordinary administration
  • 24. Integration: Communication & CR First 100 days and work in progress • Dedicated channels for 2-way dialogue with our people for their engagement – Employees = first ambassadors of the company and its culture • Transparency, accountability and continuous dialogue with our stakeholders – STK mapping: 150 + organisations identified and ranked according to relevance/influence – Stakeholder meetings and dialogues – Reporting • Build and sustain the reputation: community investments are a key to meet and win this challenge – Criteria developed to identify best projects – 20 + requests received: first community investment projects ready to be launched by April 2019 23
  • 25. Integration: new R&D laboratory in Taranto Creation during the first 18 months after takeover €10 millions 20 Researchers min. Link with local schools & technology institutes • To support ArcelorMittal Italia growth by boosting Global R&D process solutions roll-out and by transferring know-how of the Group • To support ArcelorMittal Italia growth by boosting the copy-engineering of product mix • To develop new process & products technogical solutions, with a particular focus on the improvement of the environmental footprint of the steelmaking processes • To focus on the continuous improvement and update of technologies & know-how 24
  • 26. Integration: Group support First 100 days and work in progress 25 • Use of internal benchmarks in the Group to guide actions to improve industrial KPIs • Operating practices and processes to turnaround the Italian business • ArcelorMittal experts with extensive experience in different sites, stationed on ground in Italy to support and guide Italian colleagues in their improvement actions • “Twinning” from rest of ArcelorMittal Europe to provide more dedicated support for improvement and product development “It is a great pleasure and honour to be part of the recovery of this plant together with a team who has positive spirit to restore its potential” Stefan Van Campe, COO Primary “The turnaround of ArcelorMittal Italia is a once in a lifetime experience and one of the biggest challenges for the Group. That’s why I am expecting a very big challenge from a professional point of view, in collaboration with some of the best experts from the Group” Jef Queeckers, Supply Process Engineer
  • 27. c Testimonials from Italy “Having the opportunity to work in the biggest European steel plant is such a challenge and I feel privileged to experience this in my career. I strongly encourage everyone to take advantage of the opportunity to move across sites and countries. It’s scary to get out of our comfort zone, but you won’t believe me how scary it is to even think of getting back to it” (Luciene Caberlin, Energy Manager) “Discover a new plant, consolidate my technical skills, increase my professional network, being part of a new team, increase my responsibilities. But on top of those “professional” expectations, I have also some personal ones: offering to my family the possibility to live in Italy, discovering a new culture, a new language, a new cuisine, a new way of living: the famous “dolce vita”. Such a project will work only if you have that double expectation” (Antoine Dhennin, Head of Automation) “I accepted because I felt great the call of a very big challenge. Apart from the transfer to Taranto, build the Research Centre from scratch, identifying the people, the structure, the research programs. A very exciting challenge because it contains an aspect of social responsibility that I like. It has a useful target for the ArcelorMittal Group, Italy, Puglia and Taranto” (Nicolas Bontems, Head of R&D Centre) 26
  • 28. Wrap up, our way to EBITDA accretive 2018 EBITDA Positive Year 1 FCF Positive Year 3 Performance in line with AM Europe levels Production from 6Mt to 8MT; BF#5 ramp up Procurement synergies 2019 2020 2021 2022 2023 2024 Key Improvement Drivers: Procurement synergies Commercial synergies Operational synergies Increase production to 6Mt Key Targets Increase production to 8Mt Improve downstream utilisation and mix Continuous improvement plans Complete Environmental capex program 27
  • 29. Key takeaways • ArcelorMittal Italia target to be the lowest cost site in Europe with full complement of downstream capabilities • H&S performance is a priority • Operationally, we began from low point given delay in acquisition closing; more short term challenges, yet long term potential remains robust. On track to hit 6Mt this year • We are on time with our environmental investments which are the key to enabling an increase in production to 8Mt to generate further fixed cost savings • Buy, make, sell is ArcelorMittal Italia’s key business philosophy and where €310m synergies will be captured • Progress on commercial approach despite challenging market environment • Employee engagement is positive with ongoing development • On track to achieve Financial targets set at time of acquisition: EBITDA positive year 1 and FCF positive year 3 28
  • 30. Thank you for your attention Genoa HDG LineTaranto