Biodiversity Net Gain (BNG)
& Local Plans
Planning Advisory Service (PAS)
• Martin Hutchings, Local Plans Principle Adviser, PAS
• PAS - a programme of work that sits in the LGA, funded by
DLUHC
“PAS exists to support local planning
authorities to provide efficient & effective
planning services, to drive improvement and to
respond to and deliver changes in the planning
system”
Local Plans & Biodiversity (today)
 National policy – ‘where possible’
 NPPF Paras 170(d), 174(b) and 175(d)
 Natural Environment Planning Practice Guidance
 Infrastructure Commission’s Design Principles
 National Policy Statements
 National Design Guide
 Government’s 25 Year Environment Plan
 Plus other bits and pieces e.g. BS8683
• Environment Act Schedule 14, 15 (NSIPS)
• Amends TCPAct 1990, Planning Act 2008
• Minimum 10% gain Nov 2023, small sites April 2024
• Maintains mitigation hierarchy of avoid, mitigate, compensate
• On, off-site, or statutory biodiversity credits scheme
• Existing legal protections unchanged
• Office for Environmental Protection
• Habitat secured by condition, at least 30 years
Key components of mandatory BNG
Local Plans & Mandatory BNG
 Adopted plans – 10% legislative requirement, can’t
be reduced (e.g. viability)
 Legislative requirement – no need to repeat wording
 LPAs encouraged to develop a locally specific BNG policy:
oTest approaches prior to November
oRush to get permissions
oSet strategy for delivering BNG
 BNG is wider than the Local Plan. Wholistic approach =
more efficient & effective. Effective governance…
What might be included in the Local Plan?
• What is it, what is its purpose, what does it require,?
• What other initiatives, policies does it support?
• How it operates (e.g. mitigation hierarchy, on/off site
(where is acceptable ‘off site’?), credits)
• Treatment of different development scales
• How it is baselined, measured and monitored
• Biodiversity strategy (applications)
• Mitigation options
Local Plan Production - considerations
• Agreeing and setting out local priorities
• Impacts for site selection methodology (inc. ‘habitat banks’?)
• Evidence – where going above 10%
• Justification
• Demonstrating viability
• Mitigation preference – on/off site (inc. how and where)
• Setting a target
• Accessing the metric
• Setting requirements for management and maintenance
PAS support
• Peer-to-peer learning:
– BNG practitioner network
– NN catchment networks
– Case studies, examples, sharing
experience
• Online resources, including
– FAQs and advice
– BNG process flowchart, with Future
Homes Hub
– Readiness benchmarking tool
– Training modules
• Workshops and events
• Feeding back to
Government and Natural
England, helping develop
guidance
• Joining it all up…
Final thoughts
• It’s important – not just for the ecologists
– impacts on all aspects of planning and place making
• Incomplete knowledge is no excuse for inaction
– lots of examples of BNG working now
– lessons to learn and ideas to pinch
• Perfection is the enemy of the good
• A practical opportunity for planners & planning
–need to work corporately and build relationships
–working with neighbouring areas makes sense
PAS is here to help
For more information:
• https://www.local.gov.uk/pas/topics/environment
• Sign up to the PAS bulletin:
https://www.local.gov.uk/pas/our-work/keep-touch
• Join our BNG practitioner network – email:
pas@local.gov.uk
• Questions?!

More Related Content

Similar to PAS BNG in Local Plans slides June 2023

Embedding the ecosystem approach in policy: Problems and Potential
Embedding the ecosystem approach in policy: Problems and Potential Embedding the ecosystem approach in policy: Problems and Potential
Embedding the ecosystem approach in policy: Problems and Potential
ruralfringe
 
PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptx
PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptxPAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptx
PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptx
PAS_Team
 

Similar to PAS BNG in Local Plans slides June 2023 (20)

Neighbourhood Planning (July 2014)
Neighbourhood Planning (July 2014)Neighbourhood Planning (July 2014)
Neighbourhood Planning (July 2014)
 
Embedding the ecosystem approach in policy: Problems and Potential
Embedding the ecosystem approach in policy: Problems and Potential Embedding the ecosystem approach in policy: Problems and Potential
Embedding the ecosystem approach in policy: Problems and Potential
 
Strengthening capacities for informed mitigation action planning across Indon...
Strengthening capacities for informed mitigation action planning across Indon...Strengthening capacities for informed mitigation action planning across Indon...
Strengthening capacities for informed mitigation action planning across Indon...
 
Planning Aid England - Neighbourhood Planning - community group experiences
Planning Aid England - Neighbourhood Planning - community group experiencesPlanning Aid England - Neighbourhood Planning - community group experiences
Planning Aid England - Neighbourhood Planning - community group experiences
 
Biodiversity and Development: Mainstreaming and Managing for Results - CBD SBI
Biodiversity and Development: Mainstreaming and Managing for Results - CBD SBIBiodiversity and Development: Mainstreaming and Managing for Results - CBD SBI
Biodiversity and Development: Mainstreaming and Managing for Results - CBD SBI
 
Planning Aid England Neighbourhood Planning
Planning Aid England Neighbourhood PlanningPlanning Aid England Neighbourhood Planning
Planning Aid England Neighbourhood Planning
 
PAS BNG consultation events Feb to Mar 2022 - what we heard.pptx
PAS BNG consultation events Feb to Mar 2022 - what we heard.pptxPAS BNG consultation events Feb to Mar 2022 - what we heard.pptx
PAS BNG consultation events Feb to Mar 2022 - what we heard.pptx
 
An introduction to planning (July 2013)
An introduction to planning (July 2013)An introduction to planning (July 2013)
An introduction to planning (July 2013)
 
Integration (Joint (Public Bodies) Bill presentation slides - oct 2013 - tr...
Integration  (Joint (Public Bodies) Bill  presentation slides - oct 2013 - tr...Integration  (Joint (Public Bodies) Bill  presentation slides - oct 2013 - tr...
Integration (Joint (Public Bodies) Bill presentation slides - oct 2013 - tr...
 
PAS biodiversity net gain and nature recovery update for LPA officers (20 Oct...
PAS biodiversity net gain and nature recovery update for LPA officers (20 Oct...PAS biodiversity net gain and nature recovery update for LPA officers (20 Oct...
PAS biodiversity net gain and nature recovery update for LPA officers (20 Oct...
 
Efforts in the field of adaptation in the Alpine space . outcomes of the C3-A...
Efforts in the field of adaptation in the Alpine space . outcomes of the C3-A...Efforts in the field of adaptation in the Alpine space . outcomes of the C3-A...
Efforts in the field of adaptation in the Alpine space . outcomes of the C3-A...
 
PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptx
PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptxPAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptx
PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptx
 
ecoBudget_cycle_leaflet__1_-1.pdf
ecoBudget_cycle_leaflet__1_-1.pdfecoBudget_cycle_leaflet__1_-1.pdf
ecoBudget_cycle_leaflet__1_-1.pdf
 
Strategic planning and the duty to co-operate (March 2014)
Strategic planning and the duty to co-operate (March 2014) Strategic planning and the duty to co-operate (March 2014)
Strategic planning and the duty to co-operate (March 2014)
 
Use of a Theory of Change approach for learning processes - Giuseppe Daconto ...
Use of a Theory of Change approach for learning processes - Giuseppe Daconto ...Use of a Theory of Change approach for learning processes - Giuseppe Daconto ...
Use of a Theory of Change approach for learning processes - Giuseppe Daconto ...
 
Plan making - getting your plan in place (July 2013)
Plan making - getting your plan in place (July 2013) Plan making - getting your plan in place (July 2013)
Plan making - getting your plan in place (July 2013)
 
Item 6c_Biodiversity in EECCA_Takayoshi Kato_OECD.pdf
Item 6c_Biodiversity in EECCA_Takayoshi Kato_OECD.pdfItem 6c_Biodiversity in EECCA_Takayoshi Kato_OECD.pdf
Item 6c_Biodiversity in EECCA_Takayoshi Kato_OECD.pdf
 
Kirklees Council Budget Options - 2015-2018
Kirklees Council Budget Options - 2015-2018Kirklees Council Budget Options - 2015-2018
Kirklees Council Budget Options - 2015-2018
 
EOR Webinar PAS presentation slidesFINAL.pptx
EOR Webinar PAS presentation slidesFINAL.pptxEOR Webinar PAS presentation slidesFINAL.pptx
EOR Webinar PAS presentation slidesFINAL.pptx
 
Combining and Aligning Transportation and Economic Development Plans
Combining and Aligning Transportation and Economic Development PlansCombining and Aligning Transportation and Economic Development Plans
Combining and Aligning Transportation and Economic Development Plans
 

More from PAS_Team

More from PAS_Team (20)

231121 SP slides - PAS workshop November 2023.pdf
231121 SP slides - PAS workshop November 2023.pdf231121 SP slides - PAS workshop November 2023.pdf
231121 SP slides - PAS workshop November 2023.pdf
 
So you want to apply for the Planning Skills Delivery Fund PAS Events August ...
So you want to apply for the Planning Skills Delivery Fund PAS Events August ...So you want to apply for the Planning Skills Delivery Fund PAS Events August ...
So you want to apply for the Planning Skills Delivery Fund PAS Events August ...
 
Guildford BC BNG Policy June 2023.pdf
Guildford BC BNG Policy June 2023.pdfGuildford BC BNG Policy June 2023.pdf
Guildford BC BNG Policy June 2023.pdf
 
BNG at Salford City Council_June 2023.pdf
BNG at Salford City Council_June 2023.pdfBNG at Salford City Council_June 2023.pdf
BNG at Salford City Council_June 2023.pdf
 
Leeds Beckett Lecture Career Advice.pptx
Leeds Beckett Lecture Career Advice.pptxLeeds Beckett Lecture Career Advice.pptx
Leeds Beckett Lecture Career Advice.pptx
 
Infrastructure Levy Technical Consultation (Workshop 3 Delivering Affordable ...
Infrastructure Levy Technical Consultation (Workshop 3 Delivering Affordable ...Infrastructure Levy Technical Consultation (Workshop 3 Delivering Affordable ...
Infrastructure Levy Technical Consultation (Workshop 3 Delivering Affordable ...
 
Infrastructure Levy Technical Consultation (Workshop 2 Spending the levy and ...
Infrastructure Levy Technical Consultation (Workshop 2 Spending the levy and ...Infrastructure Levy Technical Consultation (Workshop 2 Spending the levy and ...
Infrastructure Levy Technical Consultation (Workshop 2 Spending the levy and ...
 
Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...
Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...
Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...
 
PAS Natural England Biodiversity Net Gain update 18_04_23
PAS Natural England Biodiversity Net Gain update 18_04_23PAS Natural England Biodiversity Net Gain update 18_04_23
PAS Natural England Biodiversity Net Gain update 18_04_23
 
230329 IL Technical Consultation - launch event.pptx
230329 IL Technical Consultation - launch event.pptx230329 IL Technical Consultation - launch event.pptx
230329 IL Technical Consultation - launch event.pptx
 
PAS Pre-App March 2023.pdf
PAS Pre-App March 2023.pdfPAS Pre-App March 2023.pdf
PAS Pre-App March 2023.pdf
 
CBC Monitoring Review.pptx
CBC Monitoring  Review.pptxCBC Monitoring  Review.pptx
CBC Monitoring Review.pptx
 
PAS Salford Pre App Journey March 2023 JC.pptx
PAS Salford Pre App Journey March 2023 JC.pptxPAS Salford Pre App Journey March 2023 JC.pptx
PAS Salford Pre App Journey March 2023 JC.pptx
 
PAS BNG and Nature Recovery Autumn 2022 Events Evaluation.pdf
PAS BNG and Nature Recovery Autumn 2022 Events Evaluation.pdfPAS BNG and Nature Recovery Autumn 2022 Events Evaluation.pdf
PAS BNG and Nature Recovery Autumn 2022 Events Evaluation.pdf
 
PAS NERC guidance events Nov 22 web.pptx
PAS NERC guidance events Nov 22 web.pptxPAS NERC guidance events Nov 22 web.pptx
PAS NERC guidance events Nov 22 web.pptx
 
PAS Nature Recovery for LAs 8 Dec Post Event.pptx
PAS Nature Recovery for LAs 8 Dec Post Event.pptxPAS Nature Recovery for LAs 8 Dec Post Event.pptx
PAS Nature Recovery for LAs 8 Dec Post Event.pptx
 
PAS Biodiversity Net Gain and Nature Recovery update for members
PAS Biodiversity Net Gain and Nature Recovery update for membersPAS Biodiversity Net Gain and Nature Recovery update for members
PAS Biodiversity Net Gain and Nature Recovery update for members
 
PAS biodiversity net gain and nature recovery update for LPA officers (20 Oct)
PAS biodiversity net gain and nature recovery update for LPA officers (20 Oct)PAS biodiversity net gain and nature recovery update for LPA officers (20 Oct)
PAS biodiversity net gain and nature recovery update for LPA officers (20 Oct)
 
Constructed Wetland Guidance & Hub
Constructed Wetland Guidance & Hub Constructed Wetland Guidance & Hub
Constructed Wetland Guidance & Hub
 
Biodiversity Net Gain for the House Briefing 3- June 2022 - Helen Fearnley, C...
Biodiversity Net Gain for the House Briefing 3- June 2022 - Helen Fearnley, C...Biodiversity Net Gain for the House Briefing 3- June 2022 - Helen Fearnley, C...
Biodiversity Net Gain for the House Briefing 3- June 2022 - Helen Fearnley, C...
 

Recently uploaded

Program Kickoff- Cohort......_4 (1).pptx
Program Kickoff- Cohort......_4 (1).pptxProgram Kickoff- Cohort......_4 (1).pptx
Program Kickoff- Cohort......_4 (1).pptx
ScottMeyers35
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
enbam
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
enbam
 
Program Kickoff- Cohort 4______ (2).pptx
Program Kickoff- Cohort 4______ (2).pptxProgram Kickoff- Cohort 4______ (2).pptx
Program Kickoff- Cohort 4______ (2).pptx
ScottMeyers35
 
Daftar Rumpun, Pohon, dan Cabang Ilmu (2024) - Daftar Rumpun, Pohon, dan Caba...
Daftar Rumpun, Pohon, dan Cabang Ilmu (2024) - Daftar Rumpun, Pohon, dan Caba...Daftar Rumpun, Pohon, dan Cabang Ilmu (2024) - Daftar Rumpun, Pohon, dan Caba...
Daftar Rumpun, Pohon, dan Cabang Ilmu (2024) - Daftar Rumpun, Pohon, dan Caba...
suryaaamsyah
 
一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单
一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单
一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单
enbam
 
Low Atmospheric Pressure Stunning is not a humane alternative to Carbon Dioxi...
Low Atmospheric Pressure Stunning is not a humane alternative to Carbon Dioxi...Low Atmospheric Pressure Stunning is not a humane alternative to Carbon Dioxi...
Low Atmospheric Pressure Stunning is not a humane alternative to Carbon Dioxi...
Harm Kiezebrink
 

Recently uploaded (20)

Program Kickoff- Cohort......_4 (1).pptx
Program Kickoff- Cohort......_4 (1).pptxProgram Kickoff- Cohort......_4 (1).pptx
Program Kickoff- Cohort......_4 (1).pptx
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
 
Ghana High Commission on list of diplomats including US & China who owe £143m...
Ghana High Commission on list of diplomats including US & China who owe £143m...Ghana High Commission on list of diplomats including US & China who owe £143m...
Ghana High Commission on list of diplomats including US & China who owe £143m...
 
Effective Financial Reporting - May 2024
Effective Financial Reporting - May 2024Effective Financial Reporting - May 2024
Effective Financial Reporting - May 2024
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
 
07/03/2024 Publiekdomeindag - voormiddag
07/03/2024 Publiekdomeindag - voormiddag07/03/2024 Publiekdomeindag - voormiddag
07/03/2024 Publiekdomeindag - voormiddag
 
Program Kickoff- Cohort 4______ (2).pptx
Program Kickoff- Cohort 4______ (2).pptxProgram Kickoff- Cohort 4______ (2).pptx
Program Kickoff- Cohort 4______ (2).pptx
 
RPO America Peer Exchange: Rural Transportation Planning Programs
RPO America Peer Exchange: Rural Transportation Planning ProgramsRPO America Peer Exchange: Rural Transportation Planning Programs
RPO America Peer Exchange: Rural Transportation Planning Programs
 
Daftar Rumpun, Pohon, dan Cabang Ilmu (2024) - Daftar Rumpun, Pohon, dan Caba...
Daftar Rumpun, Pohon, dan Cabang Ilmu (2024) - Daftar Rumpun, Pohon, dan Caba...Daftar Rumpun, Pohon, dan Cabang Ilmu (2024) - Daftar Rumpun, Pohon, dan Caba...
Daftar Rumpun, Pohon, dan Cabang Ilmu (2024) - Daftar Rumpun, Pohon, dan Caba...
 
2024: The FAR - Federal Acquisition Regulations, Part 34
2024: The FAR - Federal Acquisition Regulations, Part 342024: The FAR - Federal Acquisition Regulations, Part 34
2024: The FAR - Federal Acquisition Regulations, Part 34
 
How to Save a Place: How to Fund Your Preservation Project
How to Save a Place: How to Fund Your Preservation ProjectHow to Save a Place: How to Fund Your Preservation Project
How to Save a Place: How to Fund Your Preservation Project
 
How to Save a Place: Get the Word Out Far And Wide
How to Save a Place: Get the Word Out Far And WideHow to Save a Place: Get the Word Out Far And Wide
How to Save a Place: Get the Word Out Far And Wide
 
Rocky Mount Greenville Willson Regional Transit Plan
Rocky Mount Greenville Willson Regional Transit PlanRocky Mount Greenville Willson Regional Transit Plan
Rocky Mount Greenville Willson Regional Transit Plan
 
Proposed Facility Types: Chesapeake Trails and Connectivity Plan
Proposed Facility Types: Chesapeake Trails and Connectivity PlanProposed Facility Types: Chesapeake Trails and Connectivity Plan
Proposed Facility Types: Chesapeake Trails and Connectivity Plan
 
A House is not a Home Yale Historical Reivew
A House is not a Home Yale Historical ReivewA House is not a Home Yale Historical Reivew
A House is not a Home Yale Historical Reivew
 
一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单
一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单
一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单
 
Low Atmospheric Pressure Stunning is not a humane alternative to Carbon Dioxi...
Low Atmospheric Pressure Stunning is not a humane alternative to Carbon Dioxi...Low Atmospheric Pressure Stunning is not a humane alternative to Carbon Dioxi...
Low Atmospheric Pressure Stunning is not a humane alternative to Carbon Dioxi...
 
Sponsoring a Girl Child's Education in kurnool
Sponsoring a Girl Child's Education in kurnoolSponsoring a Girl Child's Education in kurnool
Sponsoring a Girl Child's Education in kurnool
 
Effective governance in the modern charity
Effective governance in the modern charityEffective governance in the modern charity
Effective governance in the modern charity
 
WhenWomenTakeControl.pdf Yale Historical Review
WhenWomenTakeControl.pdf Yale Historical ReviewWhenWomenTakeControl.pdf Yale Historical Review
WhenWomenTakeControl.pdf Yale Historical Review
 

PAS BNG in Local Plans slides June 2023

  • 1. July 2021 local.gov.uk/pas Biodiversity Net Gain (BNG) & Local Plans
  • 2. Planning Advisory Service (PAS) • Martin Hutchings, Local Plans Principle Adviser, PAS • PAS - a programme of work that sits in the LGA, funded by DLUHC “PAS exists to support local planning authorities to provide efficient & effective planning services, to drive improvement and to respond to and deliver changes in the planning system”
  • 3. Local Plans & Biodiversity (today)  National policy – ‘where possible’  NPPF Paras 170(d), 174(b) and 175(d)  Natural Environment Planning Practice Guidance  Infrastructure Commission’s Design Principles  National Policy Statements  National Design Guide  Government’s 25 Year Environment Plan  Plus other bits and pieces e.g. BS8683
  • 4. • Environment Act Schedule 14, 15 (NSIPS) • Amends TCPAct 1990, Planning Act 2008 • Minimum 10% gain Nov 2023, small sites April 2024 • Maintains mitigation hierarchy of avoid, mitigate, compensate • On, off-site, or statutory biodiversity credits scheme • Existing legal protections unchanged • Office for Environmental Protection • Habitat secured by condition, at least 30 years Key components of mandatory BNG
  • 5. Local Plans & Mandatory BNG  Adopted plans – 10% legislative requirement, can’t be reduced (e.g. viability)  Legislative requirement – no need to repeat wording  LPAs encouraged to develop a locally specific BNG policy: oTest approaches prior to November oRush to get permissions oSet strategy for delivering BNG  BNG is wider than the Local Plan. Wholistic approach = more efficient & effective. Effective governance…
  • 6. What might be included in the Local Plan? • What is it, what is its purpose, what does it require,? • What other initiatives, policies does it support? • How it operates (e.g. mitigation hierarchy, on/off site (where is acceptable ‘off site’?), credits) • Treatment of different development scales • How it is baselined, measured and monitored • Biodiversity strategy (applications) • Mitigation options
  • 7. Local Plan Production - considerations • Agreeing and setting out local priorities • Impacts for site selection methodology (inc. ‘habitat banks’?) • Evidence – where going above 10% • Justification • Demonstrating viability • Mitigation preference – on/off site (inc. how and where) • Setting a target • Accessing the metric • Setting requirements for management and maintenance
  • 8. PAS support • Peer-to-peer learning: – BNG practitioner network – NN catchment networks – Case studies, examples, sharing experience • Online resources, including – FAQs and advice – BNG process flowchart, with Future Homes Hub – Readiness benchmarking tool – Training modules • Workshops and events • Feeding back to Government and Natural England, helping develop guidance • Joining it all up…
  • 9. Final thoughts • It’s important – not just for the ecologists – impacts on all aspects of planning and place making • Incomplete knowledge is no excuse for inaction – lots of examples of BNG working now – lessons to learn and ideas to pinch • Perfection is the enemy of the good • A practical opportunity for planners & planning –need to work corporately and build relationships –working with neighbouring areas makes sense
  • 10. PAS is here to help For more information: • https://www.local.gov.uk/pas/topics/environment • Sign up to the PAS bulletin: https://www.local.gov.uk/pas/our-work/keep-touch • Join our BNG practitioner network – email: pas@local.gov.uk • Questions?!