SlideShare a Scribd company logo
1 of 5
Download to read offline
365 BY 12 CONSULTANCY PROJECTS – 8978707207
ON / OFF LINE SUPPORT FOR DESIGN /FABRICATION PROJECTS
LSY Estates, 107, 1st Floor, Near Image Hospital, above Karur Vysya Bank, Nagarjuna Nagar colony,
Ameerpet, Hyderabad, Telangana 500073
MECHANICAL DIPLOMA/B.TECH FABRICATION
PROJECTS
AUTOMOBILE
S.NO PROJECT TITLE COST
1. FABRICATION OF COMPRESSED AIR ENGINE. 16000
2. POWER GENERATION BY USING AUTOMOBILE
EXHAUST GASES.
8500
3. FABRICATION OF SOLAR CAR( 4 WHEEL CAR). 48000
4. FABRICATION OF CHAIN LESS BICYCLE. 18000
5. FABRICATION OF ELECTRIC TWO WHEELER
WITH RECHARGEABLE BATTERY.
25000
6. FABRICATION OF WIND ENERGY VEHICLE. 8000
7. FABRICATION OF 360 DEGREES ROTATION
STEERING MECHANISM.
9000
8. REGENERATIVE BRAKING SYSTEM 9000
9. SOLAR BASED AIR COMPRESSOR PUMP FOR
CAR BIKE TIRE INFLATE.
13000
10. FABRICATION OF GEAR LESS TRANSMISSION 13000
11. FABRICATION OF ROCKER BOGIE SUSPENSION
SYSTEM
10000
12. FABRICATION OF 90 DEGREE STEERING
MECHANISM
12000
13. FABRICATION OF KINETIC ENERGY RESTORE
SYSTEM (KERS) BICYCLE
25000
14. FABRICATION OF SOLAR BI-CYCLE 20000
15. FABRICATION OF AIR POWERED CAR 49000
MANUFACTURING
365 BY 12 CONSULTANCY PROJECTS – 8978707207
ON / OFF LINE SUPPORT FOR DESIGN /FABRICATION PROJECTS
LSY Estates, 107, 1st Floor, Near Image Hospital, above Karur Vysya Bank, Nagarjuna Nagar colony,
Ameerpet, Hyderabad, Telangana 500073
S.NO PROJECT TITLE COST
16. FABRICATION OF PADDY THRESHER. 21000
17. FABRICATION OF FOUR WAY HACKSAW MACHINE 16000 or 25000
18. FABRICATION OF COLLAPSABLE STEERING 11000
19. FABRICATION OF PORTABLE THERMO ELECTRIC
REFRIGERATOR.
9000
20. FABRICATION OF HYDROELECTRIC POWER
GENERATION SYSTEM.
9000
21. FABRICATION OF GENEVA MECHANISM BASED
CONVEYOR BELT.
11000
22. PEDAL POWERED WASHING MACHINE (PPWM). 16000
23. DEVELOPMENT OF PEDAL POWER HACKSAW
MACHINE.
10000
24. FABRICATION OF V, U, L TYPE BENDING MACHINES. 9000 or 12000
25. FABRICATION OF LOW COST 3-AXIS CNC DRILLING
MACHINE.
26000
26. FABRICATION OF VERTICAL AXIS WIND TURBINE. 9000
27. HYBRID POWER GENERATION USING SOLAR, WIND
AND HYDEL AND DESIGNING OF HIGH EFFICIENT
INVERTER.
12000
28. FABRICATION OF STEAM POWER PLANT. 22000
29. FABRICATION OF HORIZONTAL WIND MILL. 13000
30. FABRICATION OF COCONUT DE-HUSKING MACHINE. 21000
31. FABRICATION OF DOUBLE ACTING SAW USING
SCOTCH YOKE MECHANISM.
12000 or 16000
32. FABRICATION OF LEAF SPRING HAMMER. 14000 or 21000
33. FABRICATION OF AUTOMATIC SIDE STAND
RETRIVAL
10000
34. ELECTRICAL POWER GENERATION FROM FOOT
STEP.
9000
35. FABRICATION OF ELECTRICITY GENERATION FROM
SEA-SAW
13000
36. FABRICATION OF MULTI OPERATING MACHINE 25000
37.
38. FABRICATION OF 4-WHEEL STEERING VEHICLE. 21000
365 BY 12 CONSULTANCY PROJECTS – 8978707207
ON / OFF LINE SUPPORT FOR DESIGN /FABRICATION PROJECTS
LSY Estates, 107, 1st Floor, Near Image Hospital, above Karur Vysya Bank, Nagarjuna Nagar colony,
Ameerpet, Hyderabad, Telangana 500073
39. CHAIR CUM BEB INNOVATIVE MECHANICAL
DEVELOPMENT FOR PHYSICALLY CHALLENGED
PEOPLE (PROTOTYPE AND REAL TIME)
13000
40. FABRICATION OF ECO FRIENDLY ROAD CLEANER 22000
41. AUTOMATIC BOTTLE FILLING MACHINE 10000
42. PEDAL POWERED CAN CRUSHER 13000
43. FABRICATION OF SINGLE AXIS SOLAR TRACKER
WITH MPTS
11000
44. FABRICATION OF BOX TRANSPORT MECHANISM. 15000
45. FABRICATION OF AUTOMATIC SCISSOR JACK
LIFTING.
13000
46. FABRICATION OF TREADMILL BICYCLE 31000
47. FABRICATION OF MOTORIZED SCREW JACK FOR
CAR LIFTING
11000
48. FABRICATION OF AUTO ROLL PUNCHING MACHINE
USING GENEVA MECHANISM
15000
49. FABRICATION OF AUTO ROLL PAPER CUTTING
MACHINE USING GENEVA MECHANISM
15000
50. FABRICATION OF MOTORIZED SCREW JACK FOR
CAR LIFTING WITH SPUR GEAR
11000
S.NO PROJECT TITLE COST
51. FABRICATION OF AUTOMATIC SCREW JACK LIFTING. 10000
52. FABRICATION OF AUTOMATIC FEEDING AND DRILLING
WITH PNEUMATICS
23000
53. FABRICATION OF AUTOMATIC SIDE STAND RETRIEVE
SYSTEM
9000
54. AUTOMATIC HYDRAULIC MOVING JACK FOR FOUR
WHEELE
15000
55. FABRICATION OF PNEUMATIC VEHICLE ( 4 WHEELS ) 16000
56. FABRICATION OF PNEUMATIC JACK FOR CAR 11000
57. FABRICATION OF MINI DRILLING MACHINE WITH
PNEUMATICS.
14000
58. AUTOMATIC PNEUMATIC SHEET CUTTING MACHINE. 14000
59. FABRICATION OF AIR POWERED PNEUMATIC PUNCHING
MACHINE.
12000
60. AUTOMATIC GEAR SHIFTING IN TWO WHEELER BY
USING PNEUMATICS
12000
365 BY 12 CONSULTANCY PROJECTS – 8978707207
ON / OFF LINE SUPPORT FOR DESIGN /FABRICATION PROJECTS
LSY Estates, 107, 1st Floor, Near Image Hospital, above Karur Vysya Bank, Nagarjuna Nagar colony,
Ameerpet, Hyderabad, Telangana 500073
61. FABRICATION OF BARREL LIFTING 12000
62. FABRICATION OF PNEUMATIC VICE 9000
63. FABRICATION OF PNEUMATIC WASTE CAN CRUSHER 11000
64. FABRICATION OF SOLAR POWERED GRASS CUTTING
MACHINE
9000
65. FABRICATION OF PNEUMATIC 3-AXIS TRAILER 21000
66. FABRICATION OF DUAL AXIS SOLAR TRACKING SYSTEM 14000
67. FABRICATION OF PNEUMATIC BASED DUAL HAND
WATER PUMP
15000
68. FABRICATION OF PNEUMATIC BASED PEDAL OPERATED
WATER PUMPING SYSTEM
15000
AGRICULTURE
S.NO PROJECT TITLE COST
69. WATER PUMPING SYSTEM USING WIND
POWER(high speed fan must use for output)
16000
70. FABRICATION OF MOTORIZED GRASS CUTTING
MACHINE FOR AGRICULTURAL PURPOSE.
9000
71. FABRICATION OF ELECTRICITY AND WATER
PUMPING SYSTEM USING WIND MILL
8000
72. FABRICATION OF SEED SOWER MACHINE 13000
73. FABRICATION OF DUAL BLADE SOLAR GRASS
CUTTER
9000
POWER GENERATION USING MECHANICAL COMPONENTS
S.NO PROJECT TITLE COST
74. HYBRID POWER GENERATION USING SOLAR, WIND
AND PIEZO.
11000
75. FABRICATION OF POWER GENERATION USING SHOCK
ABSORBER.
7000
76. HYBRID POWER GENERATION USING SOLAR, WIND
AND HYDEL AND DESIGNING OF HIGH EFFICIENT
INVERTER.
14000
365 BY 12 CONSULTANCY PROJECTS – 8978707207
ON / OFF LINE SUPPORT FOR DESIGN /FABRICATION PROJECTS
LSY Estates, 107, 1st Floor, Near Image Hospital, above Karur Vysya Bank, Nagarjuna Nagar colony,
Ameerpet, Hyderabad, Telangana 500073
77. ELECTRICAL POWER GENERATION FROM SPEED
BREAKERS.
7000
78. FABRICATION OF ELECTRICITY AND WATER PUMPING
SYSTEM USING WIND MILL
9000
79. REVOLVING DOOR ENERGY GENERATION 9000
80. POWER GENERATION FROM SEA-SAW 12000
81. KNEE POWER GENERATION 9000
82. FABRICATION OF STEAM POWER PLANT 23000
83. HAND CRANK POWER GENERATION FOR COAL MINE
WORKERS
9000
84. ELECTRICITY POWER GENERATION FROM OVER HEAD
TANK
7000
85. RE-GENERATIVE BRAKING SYSTEM 13000
86. PEDAL POWER GENERATION WITH HIGH EFFICIENT
100WATT INVERTER
9000

More Related Content

Similar to mechanical projects for btech mtech (4).pdf

Km28 solar energy based hacksaw machine (wecompress)
Km28 solar energy based hacksaw machine (wecompress)Km28 solar energy based hacksaw machine (wecompress)
Km28 solar energy based hacksaw machine (wecompress)1000kv technologies
 
Km234 car hydraulic jack using internal car battery
Km234 car hydraulic jack using internal car batteryKm234 car hydraulic jack using internal car battery
Km234 car hydraulic jack using internal car battery1000kv technologies
 
New mechanical projects for final year students, mechanical live projects 100...
New mechanical projects for final year students, mechanical live projects 100...New mechanical projects for final year students, mechanical live projects 100...
New mechanical projects for final year students, mechanical live projects 100...1000kv technologies
 
Mini ee 11 solar powered grass cutting robo with switch control Electrical en...
Mini ee 11 solar powered grass cutting robo with switch control Electrical en...Mini ee 11 solar powered grass cutting robo with switch control Electrical en...
Mini ee 11 solar powered grass cutting robo with switch control Electrical en...1000kv technologies
 
VEICHI SI20 Solar Pump Inverter
VEICHI SI20 Solar Pump InverterVEICHI SI20 Solar Pump Inverter
VEICHI SI20 Solar Pump InverterVEICHI Overseas
 
KEHUA Tech INDIA - Corporate Presentation
KEHUA Tech INDIA - Corporate Presentation KEHUA Tech INDIA - Corporate Presentation
KEHUA Tech INDIA - Corporate Presentation Tahnoon Elahi
 
2013 mechanical project titles
2013 mechanical project titles2013 mechanical project titles
2013 mechanical project titlesEcway Technologies
 
Km243 metal cutting and foot step power generation
Km243 metal cutting and foot step power generationKm243 metal cutting and foot step power generation
Km243 metal cutting and foot step power generation1000kv technologies
 
Km63 e car solar based electric car real time (wecompress)
Km63 e car solar based electric car real time (wecompress)Km63 e car solar based electric car real time (wecompress)
Km63 e car solar based electric car real time (wecompress)1000kv technologies
 
Anand P
Anand PAnand P
Anand PAnand P
 
1000kv technologies b.tech mini mechanical 2018
1000kv technologies b.tech mini mechanical 20181000kv technologies b.tech mini mechanical 2018
1000kv technologies b.tech mini mechanical 20181000kv technologies
 
Power Generation by Multiple Road Humps
Power Generation by Multiple Road HumpsPower Generation by Multiple Road Humps
Power Generation by Multiple Road HumpsIRJET Journal
 
BE Mechanical Engineering Final Year Academic Projects Bangalore
BE Mechanical Engineering Final Year Academic Projects BangaloreBE Mechanical Engineering Final Year Academic Projects Bangalore
BE Mechanical Engineering Final Year Academic Projects BangaloreIGEEKS TECHNOLOGIES
 
Mechanical engineering project ideas
Mechanical engineering project ideasMechanical engineering project ideas
Mechanical engineering project ideasManish Nepal
 
Main project tittles
Main project tittlesMain project tittles
Main project tittlesNandha Kumar
 
Speed breaker power
Speed breaker powerSpeed breaker power
Speed breaker powerSamir9064
 
speed breaker power
speed breaker powerspeed breaker power
speed breaker powerSamir9064
 

Similar to mechanical projects for btech mtech (4).pdf (20)

Km28 solar energy based hacksaw machine (wecompress)
Km28 solar energy based hacksaw machine (wecompress)Km28 solar energy based hacksaw machine (wecompress)
Km28 solar energy based hacksaw machine (wecompress)
 
Km234 car hydraulic jack using internal car battery
Km234 car hydraulic jack using internal car batteryKm234 car hydraulic jack using internal car battery
Km234 car hydraulic jack using internal car battery
 
New mechanical projects for final year students, mechanical live projects 100...
New mechanical projects for final year students, mechanical live projects 100...New mechanical projects for final year students, mechanical live projects 100...
New mechanical projects for final year students, mechanical live projects 100...
 
Mini ee 11 solar powered grass cutting robo with switch control Electrical en...
Mini ee 11 solar powered grass cutting robo with switch control Electrical en...Mini ee 11 solar powered grass cutting robo with switch control Electrical en...
Mini ee 11 solar powered grass cutting robo with switch control Electrical en...
 
VEICHI SI20 Solar Pump Inverter
VEICHI SI20 Solar Pump InverterVEICHI SI20 Solar Pump Inverter
VEICHI SI20 Solar Pump Inverter
 
KEHUA Tech INDIA - Corporate Presentation
KEHUA Tech INDIA - Corporate Presentation KEHUA Tech INDIA - Corporate Presentation
KEHUA Tech INDIA - Corporate Presentation
 
2013 mechanical project titles
2013 mechanical project titles2013 mechanical project titles
2013 mechanical project titles
 
Km243 metal cutting and foot step power generation
Km243 metal cutting and foot step power generationKm243 metal cutting and foot step power generation
Km243 metal cutting and foot step power generation
 
Km63 e car solar based electric car real time (wecompress)
Km63 e car solar based electric car real time (wecompress)Km63 e car solar based electric car real time (wecompress)
Km63 e car solar based electric car real time (wecompress)
 
62.deepak joshi
62.deepak joshi 62.deepak joshi
62.deepak joshi
 
Anand P
Anand PAnand P
Anand P
 
1000kv technologies b.tech mini mechanical 2018
1000kv technologies b.tech mini mechanical 20181000kv technologies b.tech mini mechanical 2018
1000kv technologies b.tech mini mechanical 2018
 
Power Generation by Multiple Road Humps
Power Generation by Multiple Road HumpsPower Generation by Multiple Road Humps
Power Generation by Multiple Road Humps
 
BE Mechanical Engineering Final Year Academic Projects Bangalore
BE Mechanical Engineering Final Year Academic Projects BangaloreBE Mechanical Engineering Final Year Academic Projects Bangalore
BE Mechanical Engineering Final Year Academic Projects Bangalore
 
Mechanical engineering project ideas
Mechanical engineering project ideasMechanical engineering project ideas
Mechanical engineering project ideas
 
Main project tittles
Main project tittlesMain project tittles
Main project tittles
 
minor.pptx
minor.pptxminor.pptx
minor.pptx
 
Speed breaker power
Speed breaker powerSpeed breaker power
Speed breaker power
 
speed breaker power
speed breaker powerspeed breaker power
speed breaker power
 
for LinkedIN
for LinkedINfor LinkedIN
for LinkedIN
 

Recently uploaded

💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...vershagrag
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsArindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxpritamlangde
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X79953056974 Low Rate Call Girls In Saket, Delhi NCR
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksMagic Marks
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 

Recently uploaded (20)

💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 

mechanical projects for btech mtech (4).pdf

  • 1. 365 BY 12 CONSULTANCY PROJECTS – 8978707207 ON / OFF LINE SUPPORT FOR DESIGN /FABRICATION PROJECTS LSY Estates, 107, 1st Floor, Near Image Hospital, above Karur Vysya Bank, Nagarjuna Nagar colony, Ameerpet, Hyderabad, Telangana 500073 MECHANICAL DIPLOMA/B.TECH FABRICATION PROJECTS AUTOMOBILE S.NO PROJECT TITLE COST 1. FABRICATION OF COMPRESSED AIR ENGINE. 16000 2. POWER GENERATION BY USING AUTOMOBILE EXHAUST GASES. 8500 3. FABRICATION OF SOLAR CAR( 4 WHEEL CAR). 48000 4. FABRICATION OF CHAIN LESS BICYCLE. 18000 5. FABRICATION OF ELECTRIC TWO WHEELER WITH RECHARGEABLE BATTERY. 25000 6. FABRICATION OF WIND ENERGY VEHICLE. 8000 7. FABRICATION OF 360 DEGREES ROTATION STEERING MECHANISM. 9000 8. REGENERATIVE BRAKING SYSTEM 9000 9. SOLAR BASED AIR COMPRESSOR PUMP FOR CAR BIKE TIRE INFLATE. 13000 10. FABRICATION OF GEAR LESS TRANSMISSION 13000 11. FABRICATION OF ROCKER BOGIE SUSPENSION SYSTEM 10000 12. FABRICATION OF 90 DEGREE STEERING MECHANISM 12000 13. FABRICATION OF KINETIC ENERGY RESTORE SYSTEM (KERS) BICYCLE 25000 14. FABRICATION OF SOLAR BI-CYCLE 20000 15. FABRICATION OF AIR POWERED CAR 49000 MANUFACTURING
  • 2. 365 BY 12 CONSULTANCY PROJECTS – 8978707207 ON / OFF LINE SUPPORT FOR DESIGN /FABRICATION PROJECTS LSY Estates, 107, 1st Floor, Near Image Hospital, above Karur Vysya Bank, Nagarjuna Nagar colony, Ameerpet, Hyderabad, Telangana 500073 S.NO PROJECT TITLE COST 16. FABRICATION OF PADDY THRESHER. 21000 17. FABRICATION OF FOUR WAY HACKSAW MACHINE 16000 or 25000 18. FABRICATION OF COLLAPSABLE STEERING 11000 19. FABRICATION OF PORTABLE THERMO ELECTRIC REFRIGERATOR. 9000 20. FABRICATION OF HYDROELECTRIC POWER GENERATION SYSTEM. 9000 21. FABRICATION OF GENEVA MECHANISM BASED CONVEYOR BELT. 11000 22. PEDAL POWERED WASHING MACHINE (PPWM). 16000 23. DEVELOPMENT OF PEDAL POWER HACKSAW MACHINE. 10000 24. FABRICATION OF V, U, L TYPE BENDING MACHINES. 9000 or 12000 25. FABRICATION OF LOW COST 3-AXIS CNC DRILLING MACHINE. 26000 26. FABRICATION OF VERTICAL AXIS WIND TURBINE. 9000 27. HYBRID POWER GENERATION USING SOLAR, WIND AND HYDEL AND DESIGNING OF HIGH EFFICIENT INVERTER. 12000 28. FABRICATION OF STEAM POWER PLANT. 22000 29. FABRICATION OF HORIZONTAL WIND MILL. 13000 30. FABRICATION OF COCONUT DE-HUSKING MACHINE. 21000 31. FABRICATION OF DOUBLE ACTING SAW USING SCOTCH YOKE MECHANISM. 12000 or 16000 32. FABRICATION OF LEAF SPRING HAMMER. 14000 or 21000 33. FABRICATION OF AUTOMATIC SIDE STAND RETRIVAL 10000 34. ELECTRICAL POWER GENERATION FROM FOOT STEP. 9000 35. FABRICATION OF ELECTRICITY GENERATION FROM SEA-SAW 13000 36. FABRICATION OF MULTI OPERATING MACHINE 25000 37. 38. FABRICATION OF 4-WHEEL STEERING VEHICLE. 21000
  • 3. 365 BY 12 CONSULTANCY PROJECTS – 8978707207 ON / OFF LINE SUPPORT FOR DESIGN /FABRICATION PROJECTS LSY Estates, 107, 1st Floor, Near Image Hospital, above Karur Vysya Bank, Nagarjuna Nagar colony, Ameerpet, Hyderabad, Telangana 500073 39. CHAIR CUM BEB INNOVATIVE MECHANICAL DEVELOPMENT FOR PHYSICALLY CHALLENGED PEOPLE (PROTOTYPE AND REAL TIME) 13000 40. FABRICATION OF ECO FRIENDLY ROAD CLEANER 22000 41. AUTOMATIC BOTTLE FILLING MACHINE 10000 42. PEDAL POWERED CAN CRUSHER 13000 43. FABRICATION OF SINGLE AXIS SOLAR TRACKER WITH MPTS 11000 44. FABRICATION OF BOX TRANSPORT MECHANISM. 15000 45. FABRICATION OF AUTOMATIC SCISSOR JACK LIFTING. 13000 46. FABRICATION OF TREADMILL BICYCLE 31000 47. FABRICATION OF MOTORIZED SCREW JACK FOR CAR LIFTING 11000 48. FABRICATION OF AUTO ROLL PUNCHING MACHINE USING GENEVA MECHANISM 15000 49. FABRICATION OF AUTO ROLL PAPER CUTTING MACHINE USING GENEVA MECHANISM 15000 50. FABRICATION OF MOTORIZED SCREW JACK FOR CAR LIFTING WITH SPUR GEAR 11000 S.NO PROJECT TITLE COST 51. FABRICATION OF AUTOMATIC SCREW JACK LIFTING. 10000 52. FABRICATION OF AUTOMATIC FEEDING AND DRILLING WITH PNEUMATICS 23000 53. FABRICATION OF AUTOMATIC SIDE STAND RETRIEVE SYSTEM 9000 54. AUTOMATIC HYDRAULIC MOVING JACK FOR FOUR WHEELE 15000 55. FABRICATION OF PNEUMATIC VEHICLE ( 4 WHEELS ) 16000 56. FABRICATION OF PNEUMATIC JACK FOR CAR 11000 57. FABRICATION OF MINI DRILLING MACHINE WITH PNEUMATICS. 14000 58. AUTOMATIC PNEUMATIC SHEET CUTTING MACHINE. 14000 59. FABRICATION OF AIR POWERED PNEUMATIC PUNCHING MACHINE. 12000 60. AUTOMATIC GEAR SHIFTING IN TWO WHEELER BY USING PNEUMATICS 12000
  • 4. 365 BY 12 CONSULTANCY PROJECTS – 8978707207 ON / OFF LINE SUPPORT FOR DESIGN /FABRICATION PROJECTS LSY Estates, 107, 1st Floor, Near Image Hospital, above Karur Vysya Bank, Nagarjuna Nagar colony, Ameerpet, Hyderabad, Telangana 500073 61. FABRICATION OF BARREL LIFTING 12000 62. FABRICATION OF PNEUMATIC VICE 9000 63. FABRICATION OF PNEUMATIC WASTE CAN CRUSHER 11000 64. FABRICATION OF SOLAR POWERED GRASS CUTTING MACHINE 9000 65. FABRICATION OF PNEUMATIC 3-AXIS TRAILER 21000 66. FABRICATION OF DUAL AXIS SOLAR TRACKING SYSTEM 14000 67. FABRICATION OF PNEUMATIC BASED DUAL HAND WATER PUMP 15000 68. FABRICATION OF PNEUMATIC BASED PEDAL OPERATED WATER PUMPING SYSTEM 15000 AGRICULTURE S.NO PROJECT TITLE COST 69. WATER PUMPING SYSTEM USING WIND POWER(high speed fan must use for output) 16000 70. FABRICATION OF MOTORIZED GRASS CUTTING MACHINE FOR AGRICULTURAL PURPOSE. 9000 71. FABRICATION OF ELECTRICITY AND WATER PUMPING SYSTEM USING WIND MILL 8000 72. FABRICATION OF SEED SOWER MACHINE 13000 73. FABRICATION OF DUAL BLADE SOLAR GRASS CUTTER 9000 POWER GENERATION USING MECHANICAL COMPONENTS S.NO PROJECT TITLE COST 74. HYBRID POWER GENERATION USING SOLAR, WIND AND PIEZO. 11000 75. FABRICATION OF POWER GENERATION USING SHOCK ABSORBER. 7000 76. HYBRID POWER GENERATION USING SOLAR, WIND AND HYDEL AND DESIGNING OF HIGH EFFICIENT INVERTER. 14000
  • 5. 365 BY 12 CONSULTANCY PROJECTS – 8978707207 ON / OFF LINE SUPPORT FOR DESIGN /FABRICATION PROJECTS LSY Estates, 107, 1st Floor, Near Image Hospital, above Karur Vysya Bank, Nagarjuna Nagar colony, Ameerpet, Hyderabad, Telangana 500073 77. ELECTRICAL POWER GENERATION FROM SPEED BREAKERS. 7000 78. FABRICATION OF ELECTRICITY AND WATER PUMPING SYSTEM USING WIND MILL 9000 79. REVOLVING DOOR ENERGY GENERATION 9000 80. POWER GENERATION FROM SEA-SAW 12000 81. KNEE POWER GENERATION 9000 82. FABRICATION OF STEAM POWER PLANT 23000 83. HAND CRANK POWER GENERATION FOR COAL MINE WORKERS 9000 84. ELECTRICITY POWER GENERATION FROM OVER HEAD TANK 7000 85. RE-GENERATIVE BRAKING SYSTEM 13000 86. PEDAL POWER GENERATION WITH HIGH EFFICIENT 100WATT INVERTER 9000