Annual Review Second Quarter Report for 2012
Deliverable Description                                                  Date: 1st July 2012

Purpose/Description of the Target Annual Progress Report for 2012:
    An annual project progress report should be prepared toward the end of
    each year to document the performance of each project and communicate
    it to appropriate stakeholders. This review will focus on the extent to which
    progress is being made towards production of deliverables required to
    generate output and identification of project issues and their solutions.

Format:

Any standard appearance to which the Deliverable must conform:

Annual Project Progress Report Atlas


Derivation/Inputs:
Annual Progress Report receives inputs from:
    Deliverable Descriptions
    Quality Log
    Issues Log
    Risks Log

Quality Control Method:

Project Assurance will review the Annual Progress Report and ensure that
progress is properly documented including % progress towards deliverables,
risks and issues.

Accountabilities:

Accountabilities for producing the Annual Review Report:
    Project Manager




                                             1 of 15
Annual Review Second Quarter Report for 2012
         Deliverable Description                                                  Date: 1st July 2012

Annual Report


DATE:
Award ID: 00044225
Description: Annual Review Report of Strengthening the Ministry of Social Solidarity
Implementing Partner: Ministry of Social Solidarity
Period Covered: 2012
Project Issues:


Updated Project Risks:                                          Updated Project Risk Management

   1. MoSS has a weak infrastructure mainly in its                 1. The Project hired a Senior Accounting
      financial reporting capacity due to the lack of                 Manager, with strong financial
      international experience with donors.                           background, to ensure the proper
                                                                      financial management of the project
                                                                      resources in accordance with rules
                                                                      and regulations.

   2. The capacity of the MoSS staff to adapt and                  2. The Project has supported and
      absorb changes introduced by the project is                     expanded all types of training
      limited.                                                        programs of MoSS staff, in order to
                                                                      ensure adoption of introduced
                                                                      reforms by MoSS’ staff.

   3. Mainstreaming and inclusion of the Project                   3. The Project management ensured
      Management Unit (PMU). The PMU                                  that all contracted Senior Advisors,
      operates in seclusion of the remainder of the                   Consultants, and Specialists are
      Ministry and is not yet fully integrated with                   assigned to interact and work directly
      MoSS.                                                           with MoSS’ senior and middle level
                                                                      staff, in order to ensure transfer of
                                                                      Knowledge & expertise.

   4. The newly formed ministry MoSS’s complex                     4. Extensive efforts are underway to
      and changing mandate has made it difficult                      formulate and broadcast MoSS’
      for both Ministry staff and other government                    reform mandate and its vision of
      counterparts to interpret its role and                          reform to both its staff and to the
      activities.                                                     public. A broad communication
                                                                      message will be launched in 2009.


   5. Expected changes in both the Egyptian NGO                    5. The Project/UNDP has advocated a
      law and social policy pertaining to subsidies                   participatory approach towards both
      might result in increased social pressures.                     change processes in order to
                                                                      incorporate inputs and perspective
                                                                      from a wide variety of stakeholders,
                                                                      including the set-up of various internal
                                                                      and external NGO Policy Review
                                                                      Committees.


                                                      2 of 15
Annual Review Second Quarter Report for 2012
         Deliverable Description                                                  Date: 1st July 2012


Project Performance:

OUTPUT 1: MOSS TAU ESTABLISHED

Project ID:  00044225
Description: To support MOSS in recruiting outside expertise to assist it carry out the project .

YYYY target: 2012

   1. Set-up and organized regular senior staff meetings with regard to presenting the various
      projects of MoSS to all Consultants, with the purpose of facilitating communication and
      cooperation among all project staff, Consultants and various task managers.

YYYY Achievement:

   1. The Project management ensured that all contracted Senior Advisors, Consultants, and
      Specialists are assigned to interact and work directly with MoSS’ senior and middle level
      staff, in order to ensure transfer of Knowledge & expertise.


OUTPUT 2: MOSS NEW STRUCTURE
Project ID:  00044225
Description: To developing Moss’ mission & vision in order to respond to its new mandate

YYYY Target: 2012

   1. Central Agency for Reconstruction projects:
      Follow-up establishment of (80) projects to be implementing as follow:
           Establishment of (62) projects.
           Development of (18) projects.
   2. Educational Buildings Authority projects:
      Follow-up establishment of (21) projects to be implementing by the holder as follow:
           Establishment of (10) projects.
           Development of (9) projects.
           Raising the efficiency of (2) projects.
   3. Housing Directorates Projects in Governorates:
      Follow-up establishment of (15) projects being implemented by housing directorates in
      Governorates.

   4. Court building project for the new ministry building in Agouza:
      Follow up the implementation of the project, being implemented by the Military Works
      Department of Armed Forces and planned to be completed in 31/12/2011 to be outfitted
      with fiscal year plan 2012/2013.
   5. Raise the efficiency of social units project:
      Follow-up the upgrading of (33) units, Social Directorates in Governorates were approved to
      raise the efficiency of social units according to fiscal year plan 2010/2011 & 2011/2012.


                                                      3 of 15
Annual Review Second Quarter Report for 2012
         Deliverable Description                                                  Date: 1st July 2012

   6. Ratification to start establishment of (13) new social services centers and development of
      (15) social units in addition to equipped (103) service projects in many Governorates
      according to fiscal year plan 2012/2013.
   7. Investment plan for the fiscal year 2011/2012 & 2012/2013:
      Monitor the implementation of the investment plan for Social Affairs Sector and Supply
      sector. (25.7 million L.E. allocated from Social Affairs Sector and 9.19 million L.E. allocated
      from Supply Sector of an item of non-residential buildings) to complete implementation the
      projects according to Investment plan for the fiscal year 2011/2012.


YYYY Achievement:

   1. Projects of the Central Agency for Reconstruction (Completed):
       Establishment of (33) projects (from a total of 62 projects).
       Development of (9) projects (from a total of 18 projects).
   2. Educational Buildings Authority projects (Been completed):
       Establishment of (5) projects plus (2) projects ready to handover (out of 10 total
         projects).
       Development of (7) projects (out of 9 total projects).
       Raising the efficiency of (2) projects (out of 2 total projects).
   3. Housing Directorates Projects in Governorates:
      Follow-up establishment of (15) projects being implemented by housing directorates in
      Governorates.
   4. Court building project for the new ministry building in Agouza:
      Been ratified by the Ministry of Planning and International Cooperation, transferred of 16
      million L.E. from (16 million L.E.) allocated for Court building project for the new ministry
      building in Agouza and paid for Military Works Department of Forced Armed as down
      payment.

   5. Raise the efficiency of social units project:
      Upgrading of (9) social units (out of total 33 social units) planned to be raised the efficiency.



OUTPUT 3: MOSS CAPACITY DEVELOPMENT
ID: 00044225
Description: To develop capacity building for MOSS (and NGOs).

YYYY target: 2012
First : Information Technology Activities:

   1. Family Database System:
       Finalize rollout of the system for all Governorates.
       Interface with Smart Card Companies via web services.
       Interface with Social Insurance Organization via web services.
       Hosting Family Database at Social Insurance Organization Information Center.


                                                      4 of 15
Annual Review Second Quarter Report for 2012
     Deliverable Description                                                  Date: 1st July 2012

2. GIS System:
    Produce GIS reports for targeting system.
    Integration with Ministry of State for Administrative Development systems
      (E. Government).
3. Establishing the Ministry of Insurance and Social Affairs IT infrastructure:
    Finalize outsourcing Hosting of Data Center at Social Insurance Organization
      Information Center.
    Finalize setting up a Disaster Recovery Center for Ministry of Supply and Internal Trade.
4. NGOs System:
    Develop the system to meet all the requirements of Central Department of NGO’s of
     Ministry of Insurance and Social Affairs.
    Complete the design of the required reports (Statistics - detailed data).
5. Pilgrimage System :
    Enhancement for running Hajj Program.
    Design a new set of report.
6. MOSS Website:
   Develop the website of the 2 ministries (Ministry of Supply and Internal Trade & Ministry of
   Insurance and Social Affairs) through:
     Coordinating with Project IT Team, the ministry's IT department and Media Consultant
       to gather information about the current MoSS web site and the needs to be met in the
       new web site.
     Analysis of the current web site, and identifying the restructuring needed and
       the information and services to be included on the new website.
     Developing the new website information structure.
     Selecting and evaluating the platform to be used in the development of the new website.
     Preparing the development environment.
     Creating the design of the new web site, and implementing sample homepage and an
       internal page.
7. Call Center Project :
    Implement new services and updates.
    Rollout of MoSS new updates, services and requirements.
    Integration of Call Center Database and Complains Database on Website.
8. ERP System:
    Keep the project on track.
Secondly : Training Component:

 A- Ministry of Supply and Internal Trade :
    Training (60) directors and managers of the sectors (Senior Management).
    Training (80) employees of Citizens Service Department (Executive Management).
    Training (45) employees of Public Relations and Media Department (Executive
      Management).
    Training (125) inspectors of Central Department for Inspection (Middle Management).
    Training (80) employees of Supply Departments and Offices (Middle Management).
    Training (80) employees of Internal Trade Sector (Middle Management).


                                                  5 of 15
Annual Review Second Quarter Report for 2012
        Deliverable Description                                                  Date: 1st July 2012

    B- Ministry of Insurance and Social Affairs :
       Conversion Training (160) of Social Units secretarial employees to work as assistant
        social specialist (Executive Management).
       Training (80) social specialists to develop skills and increase functional capacity
         (Middle Management).
       Training (160) social specialists for data entry of Family Database System (Middle
        Management).
       Establish 3 workshops for (400) of social specialist on the New Social Protection Law
        (Middle Management).
       Training (20) of Senior Managers on Total Quality Management TQM.
       Training (20) of employees on the Computer Skills (Executive Management).
       Training (20) of employees on English language (Middle Management).


YYYY Achievement:

First : Information Technology Activities:

   1. Smart Cards:
        Defined the rules of matching the input data for the ration cards with the exchange
         data and sent it to the Smart Cards Companies.
        The smart cards companies designed programs necessary to the matching.
        Testing the matching programs in some Governorates Such as Port Said, Ismalia,
         Aswan.

   2. Family Database System:
        Finalize rollout of the system in 27 governorates
        Technical support for Family Database
   3. Targeting:
        Technical support for Targeting Program
        Exporting Targeting data for the completed Governorates in a format that easy for
          SPSS statistics
   4. Social Solidarity Pensions from Post Offices
       Following up the monthly payment of Social Solidarity Pensions from Post Offices.
       Co-operating with the Governorates and social administrative offices and Information
         Center to solve all networks and technical problems related to the project.
   5. NGOs Application
       Enhancement the system to meet the requirements of NGOs central department.
       Implementation of the new screens include (training programs, membership,
        contributions, committees, directors board members, directors board meetings,
        assembly members, assembly meetings, volunteers, NGO problems, research
        experience, revenues and expenses, budget).
       Added and redesigned some required reports (Statistics & detailed data).
       Due to quite of Eng. Ahmed Husien (System Developer), we are going to hire another
        one to do his work.


                                                     6 of 15
Annual Review Second Quarter Report for 2012
    Deliverable Description                                                  Date: 1st July 2012

6. Pilgrimage System :
    The program is divided into 2 main parts:
    A- Electronic lottery program:
         Hajj applications for members of NGOs' directorates & ministry staff.
         Implementation of all required amendments to the electronic lottery program.
    B- Hajj Information System:
        Includes data for the winners of the Hajj, supervisors data, financial receipts,
          hotels, hotels accommodation, flights, fellow-up reports.
        The current screens have been updated to increase the level of performance.
        Design a new set of reports.
        Enhancement for running Hajj Program.
        Adding and redesign some of the Hajj program features.
        Implementation a program to print the identity cards of the pilgrims and supervisors
          including their data and personal photos.
        Providing technical support for Hajj Program users.
        Due to quite of Eng. Ahmed Husien (System Developer), we are going to hire
          another one to do his work.

7. Call Center Project:
        Finalize system updates, which include the following:
          o Adding new services (Botagaz , Productive Families , Customer services).
          o Create new complaint forms for the new services.
          o Changing the mandatory/optional filed according to our business need.
          o Customizing the Citizen form.
          o Editing the Validation rules.
      Continue established training courses for users:
         o Follow up Department in Tamween Sector.
         o Follow up Department in Sheoon Sector.
      Keep the project on track, by continually monitoring the departments’ performance
         through monthly reports.
      Handover of the system to Eng. Mohamed Abd El-Fatah who will be the new
         project manager instead of Eng. Ayman Abd El-Kader due to his quite.
8. ERP Project:
   A. Regarding (Payroll and HR applications for Sheoon sector):
         Finalizing the register employees records process (1600 record) and update
            their information which include:
               o General information (name, birth date, ID, Graduation information,
                    employee rank, promotions).
               o Basic salaries.
               o Training courses.
               o Motivation bounce.
               o Yearly bounce.
               o Vacations.
         Continue running the audit process of reviewing the employee’s payroll data, to
            be able for issuing electronic payroll lists.
   B. Regarding (Accounting, budgeting applications for Sheoon and Tamween sectors):
         The employees work on day to day basis, and they deliver the Application
            Output every month, as required.


                                                 7 of 15
Annual Review Second Quarter Report for 2012
    Deliverable Description                                                  Date: 1st July 2012

   C. Regarding (Inventory and purchasing applications for Sheoon and Tamween sectors):
           The employees register departments data and keep it updated.
   D. Handover of the system to Eng. Aml Helmy who will be the new project manager
      instead of Eng. Ayman Abd El-Kader due to his quite.

9. GIS System:
   GIS work includes three main billers, each has its status according to its scopes needs
   and details, these billers are:
    A. GIS Web Portal
        GIS Webpage linked to Ministry main web site:
         - Updating the GIS portal through linking the current GIS database with the
             updated version of family database (Automatically updated link) on 3
             aggregation levels (Governorates, Districts, Sub districts).
         - Adding more web functions (zoom in/out & info) to facilitate the usage of the
             portal.
         - Working on customizing more technical function such print layouts function
             using VB studio ver.10.

    B. Mapping Supply services
       Goal: Creating GIS maps for the current supply services on the street level detailed
               maps (scale 1:5000) covers all Egypt Governorates.
       Participants:
              MOSS Central Department of Planning.
              Al-Massryen Company.
              CAPMAS.
              MOSS GIS unit.
       Roles and responsibilities :
             CAPMAS: Based on verbal agreement between the Minster and General
                Abu-Bakr Al Gindy (Head of CAPMAS), CAPMAS provides MOSS GIS unit
                with complete set of GIS vector data on street level (1:5000) for all Egypt
                Governorates, these maps will be used to locate the supply services
                starting by subsidized bakeries with its linked outlets.
             MOSS GIS unit: receiving maps from CAPMAS then prepare the paper
                layouts and print each sub district separated in map size A0.
             Central planning department receives the paper print outs maps to be
                disseminated to different other departments responsible for Bakeries and
                Outlets distribution.
             Al-Massreyn Company is responsible for mapping the bakeries and outlets,
                in addition to submit all details related to the bakeries such as (name, type,
                quota, separated or not, address..etc).
              Then all data to be back again to MOSS GIS unit to do the following actions:
                o Build complete access database contains the gathered data related to
                    each bakery and attached its outlets.
                o Locate both bakeries and outlets on the Maps which enable the decision
                    makers to judge the equality of their distribution over certain location.
       Work status:
             After many periodical visits to CAPMAS; a complete detailed digital maps
                for 6 Governorates had been delivered to the MOSS GIS unit. these


                                                 8 of 15
Annual Review Second Quarter Report for 2012
  Deliverable Description                                                  Date: 1st July 2012

                    governorates are:
                    (Giza, Cairo, Qaluobia, Gharbia, Sharkia, Behira).
                   The project starts with mapping bakeries and outlets on the governorate of
                    Greater Cairo Area (Cairo, Giza and Qaluobia).

Note: All finished and revised maps original copies are kept in GIS unit.

  C. Mapping Target Project results:
      Goal: Creating GIS printouts highlight the result of targeting project with
            co-operation of Social Study Institute (Dr Ibtsam Al Gafarawy).
      Work status :
       GIS unit was responsible for receiving the targeting data and then preparing
         the layouts which shows the result of targeting project to be printed on the
         complete report, starting by Al Behira Governorate with its district.
       All the work in this phase has been done and sent it to Dr Ibtsam.
         A sample of the map produced showed as:




  D. GIS Handover
      Starting from 15 September 2011; The GIS unit had been delivered completely to
        a technical committee of MOSS Information Center.
      The GIS handover includes the flowing:
           -       GIS Hardware:
                   3 units - original Dell PC’s
                   1 unit - Plotter
                   1 unit - A4 Black& white laser printer
                   1 unit - A4 Colour printer
                   1 unit - Scanner



                                               9 of 15
Annual Review Second Quarter Report for 2012
    Deliverable Description                                                  Date: 1st July 2012

             -   GIS Software:
                 Handover 3 Original GIS licenses (2) ARCGIS Editor & (1) ARC Server, and
                 Installation packages needed for plotter, printers and scanner.
             -   GIS Work situation :
                 Detailed hand over notes and delivery reports had been submitted to the
                 information center committee , in addition to give them 13 days on job
                 training to let them be able to complete the needed whole GIS work on time .


10. Redesign & development of ministry of Insurance and Social Affairs, MISA
    Website:
      Coordinating with Project IT Team, the ministry's IT department and Media
       Consultant to gather information about the current MISA web site and the needs to
       be met in the new web site.
      Analysis of the current web site, and identifying the restructuring needed and the
       information and services to be included on the new website.
      Developing the new website information structure.
      Selecting and evaluating the platform to be used in the development of the new
       website.
      Preparing the development environment.
      Creating the design of the new web site, and implementing sample homepage and
       an internal page.


Secondly : Training Activities:

 A- Ministry of Supply and Internal Trade :
    Training (20) directors and managers of the sectors (Senior Management).
    Training (20) employees of Citizens Service Department (Executive Management).
    Training (25) employees of Public Relations and Media Department (Executive
      Management).
    Training (40) inspectors of Central Department for Inspection (Middle Management).
    Training (30) employees of Supply Departments and Offices (Middle Management).
    Training (30) employees of Internal Trade Sector (Middle Management).

 B- Ministry of Insurance and Social Affairs :
    Training (160) social specialists for data entry of Family Database System (Middle
     Management).


Thirdly : Research & Development:
Activities of the short term National Consultants:
    Scientific Coordinator with World Food Program.
    Prepared memos to the minister regarding economic and management issues.
    Participated in the Minster’s Meetings that related to economic issues.
    Reviewed Egyptian Country Strategy for the World Food Program 2012 to 2016.
    Participated in the preparation of the draft of “the National Body of Food Subsidy” law.


                                                10 of 15
Annual Review Second Quarter Report for 2012
      Deliverable Description                                                  Date: 1st July 2012

       Prepare case study on “General Structure of MEGA Bakeries and Merging of Small
        Bakeries”.
       Finalized and Present the final result of the “Supply Chain Study” to the Minister.
       Finalized conduct study of “Measuring of the Balady Bread Production Cost”.
       Prepared the TOR of “Build and design a new efficient and effective system for Balady
        Bread through removing government intervention from initial stages of the Balady
        Bread Supply Chain to its last stage”.
Ongoing conduct in collaboration with WFP and international experts:
   Build and design a new efficient and effective system for Balady bread.
   Draw structured implementation plan for the new Balady Bread system.
   Design a pilot project for the first phase of the implementation of the new enhanced
     and efficient Balady Bread system.
Responsible for the following files:
   World Bank: meetings on behalf of his Excellency the minister; drafts & executive
   Islamic Bank for Development: meetings with his Excellency, drafts & executive
   Summaries of MoS&SJ vision & strategies, proposed plan of collaboration.
   NGO: work follow‐up & reviewing of proposed new NGO, follow‐up of successful
     experiences all over the world to acquire experience in targeting the poorest.
   Developing Egyptian NGO map ( geographic distribution, activities, total numbers of
     beneficiaries, etc…).
   UN World Food Programme: executive summary of monthly reports related to
     Work in Egypt (FFT).
Executive summaries of studies & reports:
    Evaluating the performance of help & social development sector in MoS&SJ.
    The disaster fund.
    Targeting the most vulnerable groups.
    Evaluating the national module to reduce poverty.
    The role of NGO in promoting human development.
    Aya company for consultancy & development.




                                                  11 of 15
Annual Review Second Quarter Report for 2012
        Deliverable Description                                                  Date: 1st July 2012

OUTPUT 4: ACCREDIT & ELIGIBILITY SYSTEM FOR NGO

Project ID:  00044225
Description: To create an accreditation & eligibility system for NGO in Egypt.

YYYY Target: 2012

   1. Establishing the Audit Committee, and implementing of its role and responsibilities.
   2. Training Governorates relevant staff on the application of the eligibility criteria forms.
   3. Evaluation and analysis the criteria application results on waves of NGOs.
   4. Arrange for tailored training courses to cover the main weakness elements in the majority
      of NGOs based on the analysis of the criteria evaluation results.
   5. Drafting the NGOs guiding report.

YYYY Achievement:

1. NGO’s Eligibility System

   A. NGO’s Central Department gathering more information and data to be included in the
      NGO’s report/guiding book, It is supposed to cover regulations and directives aspects,
      criteria, statistics, challenges, examples of promising and successful NGO’s, granting
      parties, kinds and conditions of support, large networking groups and valuable
      partnerships projects, volunteers roles, regional NGO’s, ministry's targeted social
      solidarity activities, recommendations, etc …
   B. NGO’s Central Department follow-up the implementation of NGO’s eligibility criteria.
   C. Drafting proposals to act positively towards loses deriving to meet the current aspirations
      following the January 25th Revolution.
   D. Follow up remarks and recommendations related to audit findings and NGO’s activities.




                                                    12 of 15
Annual Review Second Quarter Report for 2012
       Deliverable Description                                                  Date: 1st July 2012

OUTPUT 5: NEW SOCIAL PROTECTION SYSTEM

Project ID:   00044225
Description: To Review & Improve targeting
YYYY target: 2012
  1. Smart Cards:
       Rollout of smart cards for Solidarity Pension Service throughout all Governorates.
       Develop and implement interface with wholesale companies.
  2. Social Solidarity Pensions from Post Offices:
       Study payment from more than one post office for each social service center.
       Finalize issuing Social Solidarity Pension from Post Offices by family smart card.


YYYY Achievement:

  1. Smart Cards:
       Defined the rules of matching the input data for the ration cards with the exchange
         data and sent it to the smart card companies.
       The smart card companies designed programs necessary to the matching.
       Testing the matching programs in some Governorates such as Port Said and Aswan.
  2. Targeting:
       Technical support for Targeting Program.
       Exporting Targeting data for the completed governorates in a format that easy for
        SPSS statistics analysis.
  3. Social Solidarity Pensions from Post Offices:
      Following up the monthly implantation circulation of Social Solidarity Pensions from
        Post Offices.
       Co-operating with Governorates and social administrative offices and Information
         Center of MoSS to solve all the networks and technical problems of the project.




                                                   13 of 15
Annual Review Second Quarter Report for 2012
        Deliverable Description                                                  Date: 1st July 2012

OUTPUT 6: IMPROVING NASSER SOCIAL BANK

Project ID: 00044225
Description: To assess Nasser Social Bank and prepare it for restructuring.
YYYY target: 2012
   1. Finalize prepared revised set of regulations for NSB Investment, “Takaful”,
      “Takeraats/Akarats” and Legal divisions.
   2. Continue to:
      Connect central departments to newly commissioned NSB’s digital network.
      Investigate means to modernize archiving capabilities.
      Introduce ATM services to NSB clients and employees.
      Redefine branches’ performance criteria to match NSB’s philosophies/mission.
      Develop NSB website.
      Develop NSB intranet site (for internal use).
      Develop a preliminary concept for a revamped main branch at 35 Kasr El Nil-Cairo.
      Implement Year 2012 NBE training program.
      Continue monitoring progress of 3 new branches: Nasr City, 6 Oct., and Zakazeek.
      Prepare a human development program for NSB staff.
      Monitor progress of the new Human Capital Development Centre (HCDC).
   3. Evaluate 6 branches of NSB and “Zakaat” committees in Southern Egypt.
   4. Connect central departments to NSB’s newly commissioned digital network.
   5. Issue the Strategy Formulation Process with NSB’s Executives.
   6. Initiate contact with Engineering Authority of Armed Forces to revamp upper Egypt
      branches, and Initiate a study to formulate functionalities and roles to introduce new NSB
      access points.
   7. Revamped, completely, the Bank’s Database Center, and Establish the Bank’s Call
      Center and documenting all operational regulations.
   8. Revamped, completely, 10 Information Center of NSB Branches, and connecting them
      with the NSB Database Center.

NSB’s Reforms Pilot Project has been completed successfully.
Phase-1 of the Reforms Project begins on November 1st, 2010. It focuses on preparing,
publishing, and implementing NSB strategies for the next 3 years including:
full automation of services, executing an aggressive human capital development plan, and
physically revamping all NSB branches.
     1. Conduct a third round of negotiations with the African Development Bank (AFDB) in
        Tunisia.
     2. Conduct a fourth round of negotiations with the AFDB in Cairo.
     3. Initialized the loan and grant agreement with the AFDB.
     4. Prepare memos required to increase take-home pay of NSB employees.
     5. Successfully selecting, nominating, and qualifying two NSB staff members to attend a two
        month training courses in India sponsored by the African Asian Rural Development
        Organization (AARDO).
     6. Continued to:
           Work on a comprehensive automation project.
           Investigate the feasibility to implement the first social business project in Sohag.
           Prepare an NSB aggressive Human Capital Development program.


                                                    14 of 15
Annual Review Second Quarter Report for 2012
        Deliverable Description                                                  Date: 1st July 2012


Conclusion:
In November, 2010 NSB’s Reforms Pilot Project has been completed successfully, and began
Phase-1 of its Reforms Project.
It focuses on preparing, publishing, and implementing NSB strategies for the next 3 years
including: full automation of services, executing an aggressive human capital development plan,
and revamping all of NSB 90 branches.
The Reforms Pilot Project included: revamping the current data center at NSB Head Office to
enable the operation of a newly developed state-of-the-art digital network, established an NSB
Human Capital Development Center (HCDC), developed new/revised bank regulations,
developed a model for the look-and-feel of rebranded bank branches, hired well over 400 new
employees based on predefined set of selection criteria, and opened 3 new branches
conforming to the new rebranded branch model.
NSB automation project will fully automate all NSB services and connect all of its 90 branches
through a sophisticated/secured network. It will also ensure that the bank uses state-of-the-art
technologies and information systems. The project will incorporate an efficient business
continuity solution to ensure data integrity and around the clock availability of services. In
addition, the project will enable the bank to provide a set of services that it is not currently
possible due to the nature of its legacy/outdated information systems and technologies.
The bank is undertaking an aggressive Human Capital Development Center initiative and
succession plan. The initiative will begin with a massive human capital assessment and gap
analysis phase followed by a customized human capital development program that targets
employees across the organization to change/improve its culture while drastically improving on
its human capital assets.
Through the project, NSB was able to upgrade and refurbish the branches of 6th of October,
Zagazig, Mohandiseen, Qous, New Valley, Aswan; then developing Madinet Nasr, and four
other branches will be finished at Asyut, Suhaj, Qena and Luxor.
Furthermore, within 2011, NSB has a plan to upgrade and refurbish 19 other branches.
Other branches are in serious need for upgrading, refurbishing and retrofitting. NSB has a plan
to continue upgrading other branches by the year 2014 through consulting engineering firms and
certified contractors.




                                                    15 of 15

More Related Content

Viewers also liked

UNDP MoSS Project Board Meeting 30062012
UNDP MoSS Project Board Meeting 30062012UNDP MoSS Project Board Meeting 30062012
UNDP MoSS Project Board Meeting 30062012MoheebSattar
 
Managed DirectX
Managed DirectXManaged DirectX
Managed DirectXA. LE
 
Publication - The feasibility of gaze tracking for “mind reading” during search
Publication - The feasibility of gaze tracking for “mind reading” during searchPublication - The feasibility of gaze tracking for “mind reading” during search
Publication - The feasibility of gaze tracking for “mind reading” during searchA. LE
 
Master Thesis - Algorithm for pattern recognition
Master Thesis - Algorithm for pattern recognitionMaster Thesis - Algorithm for pattern recognition
Master Thesis - Algorithm for pattern recognitionA. LE
 
Prasentation Managed DirectX
Prasentation Managed DirectXPrasentation Managed DirectX
Prasentation Managed DirectXA. LE
 
Introduction into Search Engines and Information Retrieval
Introduction into Search Engines and Information RetrievalIntroduction into Search Engines and Information Retrieval
Introduction into Search Engines and Information RetrievalA. LE
 
Guilt fund in india
Guilt fund in indiaGuilt fund in india
Guilt fund in indialalitmiyani
 
Tracking and Scoring Engagement for More Effective Development
Tracking and Scoring Engagement for More Effective DevelopmentTracking and Scoring Engagement for More Effective Development
Tracking and Scoring Engagement for More Effective DevelopmentPaul Ramsbottom
 
Kertas kerja kem kepimpinan 2015 (1)
Kertas kerja kem kepimpinan 2015 (1)Kertas kerja kem kepimpinan 2015 (1)
Kertas kerja kem kepimpinan 2015 (1)Isma Sharni
 
Tarea3 erik lestarpe y sofía baliz
Tarea3 erik lestarpe y sofía balizTarea3 erik lestarpe y sofía baliz
Tarea3 erik lestarpe y sofía balizErik Lestarpe
 
Small-Medium Enterprise Business Accelerator
Small-Medium Enterprise Business AcceleratorSmall-Medium Enterprise Business Accelerator
Small-Medium Enterprise Business AcceleratorRaul Velazquez, Ph. D.
 

Viewers also liked (13)

UNDP MoSS Project Board Meeting 30062012
UNDP MoSS Project Board Meeting 30062012UNDP MoSS Project Board Meeting 30062012
UNDP MoSS Project Board Meeting 30062012
 
Managed DirectX
Managed DirectXManaged DirectX
Managed DirectX
 
Heat
HeatHeat
Heat
 
18 k v kamath
18 k v kamath18 k v kamath
18 k v kamath
 
Publication - The feasibility of gaze tracking for “mind reading” during search
Publication - The feasibility of gaze tracking for “mind reading” during searchPublication - The feasibility of gaze tracking for “mind reading” during search
Publication - The feasibility of gaze tracking for “mind reading” during search
 
Master Thesis - Algorithm for pattern recognition
Master Thesis - Algorithm for pattern recognitionMaster Thesis - Algorithm for pattern recognition
Master Thesis - Algorithm for pattern recognition
 
Prasentation Managed DirectX
Prasentation Managed DirectXPrasentation Managed DirectX
Prasentation Managed DirectX
 
Introduction into Search Engines and Information Retrieval
Introduction into Search Engines and Information RetrievalIntroduction into Search Engines and Information Retrieval
Introduction into Search Engines and Information Retrieval
 
Guilt fund in india
Guilt fund in indiaGuilt fund in india
Guilt fund in india
 
Tracking and Scoring Engagement for More Effective Development
Tracking and Scoring Engagement for More Effective DevelopmentTracking and Scoring Engagement for More Effective Development
Tracking and Scoring Engagement for More Effective Development
 
Kertas kerja kem kepimpinan 2015 (1)
Kertas kerja kem kepimpinan 2015 (1)Kertas kerja kem kepimpinan 2015 (1)
Kertas kerja kem kepimpinan 2015 (1)
 
Tarea3 erik lestarpe y sofía baliz
Tarea3 erik lestarpe y sofía balizTarea3 erik lestarpe y sofía baliz
Tarea3 erik lestarpe y sofía baliz
 
Small-Medium Enterprise Business Accelerator
Small-Medium Enterprise Business AcceleratorSmall-Medium Enterprise Business Accelerator
Small-Medium Enterprise Business Accelerator
 

Similar to Q2 2012 Progress Report MoSS

Consortium program of work and budget 2013 october 2012
Consortium program of work and budget 2013 october 2012Consortium program of work and budget 2013 october 2012
Consortium program of work and budget 2013 october 2012CGIAR
 
Human Resources Strategy for 2022–25.pdf
Human Resources Strategy for 2022–25.pdfHuman Resources Strategy for 2022–25.pdf
Human Resources Strategy for 2022–25.pdfDisoniSaha
 
BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1Imoh Etuk
 
VALUE ASSURANCE GOV NAO.docx
VALUE ASSURANCE GOV NAO.docxVALUE ASSURANCE GOV NAO.docx
VALUE ASSURANCE GOV NAO.docxANGUSMACLEOD21
 
DPE guidelines on CSR for CPSE 2010
DPE guidelines on CSR for CPSE 2010DPE guidelines on CSR for CPSE 2010
DPE guidelines on CSR for CPSE 2010Dinesh Agrawal
 
Implementation of the pmo proposal
Implementation of the pmo proposalImplementation of the pmo proposal
Implementation of the pmo proposalHugh Shults
 
NAO Guide Initiating_Successful_Projects
NAO Guide Initiating_Successful_ProjectsNAO Guide Initiating_Successful_Projects
NAO Guide Initiating_Successful_ProjectsLuis Olaya
 
Project Management- introduction
Project Management- introductionProject Management- introduction
Project Management- introductionAditi Garg
 
Production of the Industrial Development Report 2024.
Production of the Industrial Development Report 2024.Production of the Industrial Development Report 2024.
Production of the Industrial Development Report 2024.Christina Parmionova
 
The role of the sponsor in successful public sector projects
The role of the sponsor in successful public sector projectsThe role of the sponsor in successful public sector projects
The role of the sponsor in successful public sector projectsJoost Van Den Berg MITM
 
[SDI-EDU] WP5 Dissemination Plan
[SDI-EDU] WP5 Dissemination Plan[SDI-EDU] WP5 Dissemination Plan
[SDI-EDU] WP5 Dissemination PlanKarel Janečka
 
A Project On The Project Life Cycle
A Project On The Project Life CycleA Project On The Project Life Cycle
A Project On The Project Life CycleDeb Birch
 
UCISA Toolkit - Establishing a PMO in an HE Environment
UCISA Toolkit - Establishing a PMO in an HE Environment UCISA Toolkit - Establishing a PMO in an HE Environment
UCISA Toolkit - Establishing a PMO in an HE Environment Mark Ritchie
 
AWW 2013 Poster Paper66 JCordovilla JColoma
AWW 2013 Poster Paper66 JCordovilla JColomaAWW 2013 Poster Paper66 JCordovilla JColoma
AWW 2013 Poster Paper66 JCordovilla JColomaJose Cordovilla
 
Maintenance operational-plan
Maintenance operational-planMaintenance operational-plan
Maintenance operational-planAdrianniko
 
Chapter 1 An Overview Of Project Management
Chapter 1  An Overview Of Project ManagementChapter 1  An Overview Of Project Management
Chapter 1 An Overview Of Project ManagementMahesh Bendigeri
 

Similar to Q2 2012 Progress Report MoSS (20)

Consortium program of work and budget 2013 october 2012
Consortium program of work and budget 2013 october 2012Consortium program of work and budget 2013 october 2012
Consortium program of work and budget 2013 october 2012
 
Human Resources Strategy for 2022–25.pdf
Human Resources Strategy for 2022–25.pdfHuman Resources Strategy for 2022–25.pdf
Human Resources Strategy for 2022–25.pdf
 
BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1
 
VALUE ASSURANCE GOV NAO.docx
VALUE ASSURANCE GOV NAO.docxVALUE ASSURANCE GOV NAO.docx
VALUE ASSURANCE GOV NAO.docx
 
Selma_CV1
Selma_CV1Selma_CV1
Selma_CV1
 
DPE guidelines on CSR for CPSE 2010
DPE guidelines on CSR for CPSE 2010DPE guidelines on CSR for CPSE 2010
DPE guidelines on CSR for CPSE 2010
 
Implementation of the pmo proposal
Implementation of the pmo proposalImplementation of the pmo proposal
Implementation of the pmo proposal
 
NAO Guide Initiating_Successful_Projects
NAO Guide Initiating_Successful_ProjectsNAO Guide Initiating_Successful_Projects
NAO Guide Initiating_Successful_Projects
 
project design
project designproject design
project design
 
Project Management- introduction
Project Management- introductionProject Management- introduction
Project Management- introduction
 
Production of the Industrial Development Report 2024.
Production of the Industrial Development Report 2024.Production of the Industrial Development Report 2024.
Production of the Industrial Development Report 2024.
 
The role of the sponsor in successful public sector projects
The role of the sponsor in successful public sector projectsThe role of the sponsor in successful public sector projects
The role of the sponsor in successful public sector projects
 
[SDI-EDU] WP5 Dissemination Plan
[SDI-EDU] WP5 Dissemination Plan[SDI-EDU] WP5 Dissemination Plan
[SDI-EDU] WP5 Dissemination Plan
 
A Project On The Project Life Cycle
A Project On The Project Life CycleA Project On The Project Life Cycle
A Project On The Project Life Cycle
 
2004
20042004
2004
 
UCISA Toolkit - Establishing a PMO in an HE Environment
UCISA Toolkit - Establishing a PMO in an HE Environment UCISA Toolkit - Establishing a PMO in an HE Environment
UCISA Toolkit - Establishing a PMO in an HE Environment
 
AWW 2013 Poster Paper66 JCordovilla JColoma
AWW 2013 Poster Paper66 JCordovilla JColomaAWW 2013 Poster Paper66 JCordovilla JColoma
AWW 2013 Poster Paper66 JCordovilla JColoma
 
FinalreportELS
FinalreportELSFinalreportELS
FinalreportELS
 
Maintenance operational-plan
Maintenance operational-planMaintenance operational-plan
Maintenance operational-plan
 
Chapter 1 An Overview Of Project Management
Chapter 1  An Overview Of Project ManagementChapter 1  An Overview Of Project Management
Chapter 1 An Overview Of Project Management
 

Q2 2012 Progress Report MoSS

  • 1. Annual Review Second Quarter Report for 2012 Deliverable Description Date: 1st July 2012 Purpose/Description of the Target Annual Progress Report for 2012: An annual project progress report should be prepared toward the end of each year to document the performance of each project and communicate it to appropriate stakeholders. This review will focus on the extent to which progress is being made towards production of deliverables required to generate output and identification of project issues and their solutions. Format: Any standard appearance to which the Deliverable must conform: Annual Project Progress Report Atlas Derivation/Inputs: Annual Progress Report receives inputs from:  Deliverable Descriptions  Quality Log  Issues Log  Risks Log Quality Control Method: Project Assurance will review the Annual Progress Report and ensure that progress is properly documented including % progress towards deliverables, risks and issues. Accountabilities: Accountabilities for producing the Annual Review Report:  Project Manager 1 of 15
  • 2. Annual Review Second Quarter Report for 2012 Deliverable Description Date: 1st July 2012 Annual Report DATE: Award ID: 00044225 Description: Annual Review Report of Strengthening the Ministry of Social Solidarity Implementing Partner: Ministry of Social Solidarity Period Covered: 2012 Project Issues: Updated Project Risks: Updated Project Risk Management 1. MoSS has a weak infrastructure mainly in its 1. The Project hired a Senior Accounting financial reporting capacity due to the lack of Manager, with strong financial international experience with donors. background, to ensure the proper financial management of the project resources in accordance with rules and regulations. 2. The capacity of the MoSS staff to adapt and 2. The Project has supported and absorb changes introduced by the project is expanded all types of training limited. programs of MoSS staff, in order to ensure adoption of introduced reforms by MoSS’ staff. 3. Mainstreaming and inclusion of the Project 3. The Project management ensured Management Unit (PMU). The PMU that all contracted Senior Advisors, operates in seclusion of the remainder of the Consultants, and Specialists are Ministry and is not yet fully integrated with assigned to interact and work directly MoSS. with MoSS’ senior and middle level staff, in order to ensure transfer of Knowledge & expertise. 4. The newly formed ministry MoSS’s complex 4. Extensive efforts are underway to and changing mandate has made it difficult formulate and broadcast MoSS’ for both Ministry staff and other government reform mandate and its vision of counterparts to interpret its role and reform to both its staff and to the activities. public. A broad communication message will be launched in 2009. 5. Expected changes in both the Egyptian NGO 5. The Project/UNDP has advocated a law and social policy pertaining to subsidies participatory approach towards both might result in increased social pressures. change processes in order to incorporate inputs and perspective from a wide variety of stakeholders, including the set-up of various internal and external NGO Policy Review Committees. 2 of 15
  • 3. Annual Review Second Quarter Report for 2012 Deliverable Description Date: 1st July 2012 Project Performance: OUTPUT 1: MOSS TAU ESTABLISHED Project ID: 00044225 Description: To support MOSS in recruiting outside expertise to assist it carry out the project . YYYY target: 2012 1. Set-up and organized regular senior staff meetings with regard to presenting the various projects of MoSS to all Consultants, with the purpose of facilitating communication and cooperation among all project staff, Consultants and various task managers. YYYY Achievement: 1. The Project management ensured that all contracted Senior Advisors, Consultants, and Specialists are assigned to interact and work directly with MoSS’ senior and middle level staff, in order to ensure transfer of Knowledge & expertise. OUTPUT 2: MOSS NEW STRUCTURE Project ID: 00044225 Description: To developing Moss’ mission & vision in order to respond to its new mandate YYYY Target: 2012 1. Central Agency for Reconstruction projects: Follow-up establishment of (80) projects to be implementing as follow:  Establishment of (62) projects.  Development of (18) projects. 2. Educational Buildings Authority projects: Follow-up establishment of (21) projects to be implementing by the holder as follow:  Establishment of (10) projects.  Development of (9) projects.  Raising the efficiency of (2) projects. 3. Housing Directorates Projects in Governorates: Follow-up establishment of (15) projects being implemented by housing directorates in Governorates. 4. Court building project for the new ministry building in Agouza: Follow up the implementation of the project, being implemented by the Military Works Department of Armed Forces and planned to be completed in 31/12/2011 to be outfitted with fiscal year plan 2012/2013. 5. Raise the efficiency of social units project: Follow-up the upgrading of (33) units, Social Directorates in Governorates were approved to raise the efficiency of social units according to fiscal year plan 2010/2011 & 2011/2012. 3 of 15
  • 4. Annual Review Second Quarter Report for 2012 Deliverable Description Date: 1st July 2012 6. Ratification to start establishment of (13) new social services centers and development of (15) social units in addition to equipped (103) service projects in many Governorates according to fiscal year plan 2012/2013. 7. Investment plan for the fiscal year 2011/2012 & 2012/2013: Monitor the implementation of the investment plan for Social Affairs Sector and Supply sector. (25.7 million L.E. allocated from Social Affairs Sector and 9.19 million L.E. allocated from Supply Sector of an item of non-residential buildings) to complete implementation the projects according to Investment plan for the fiscal year 2011/2012. YYYY Achievement: 1. Projects of the Central Agency for Reconstruction (Completed):  Establishment of (33) projects (from a total of 62 projects).  Development of (9) projects (from a total of 18 projects). 2. Educational Buildings Authority projects (Been completed):  Establishment of (5) projects plus (2) projects ready to handover (out of 10 total projects).  Development of (7) projects (out of 9 total projects).  Raising the efficiency of (2) projects (out of 2 total projects). 3. Housing Directorates Projects in Governorates: Follow-up establishment of (15) projects being implemented by housing directorates in Governorates. 4. Court building project for the new ministry building in Agouza: Been ratified by the Ministry of Planning and International Cooperation, transferred of 16 million L.E. from (16 million L.E.) allocated for Court building project for the new ministry building in Agouza and paid for Military Works Department of Forced Armed as down payment. 5. Raise the efficiency of social units project: Upgrading of (9) social units (out of total 33 social units) planned to be raised the efficiency. OUTPUT 3: MOSS CAPACITY DEVELOPMENT ID: 00044225 Description: To develop capacity building for MOSS (and NGOs). YYYY target: 2012 First : Information Technology Activities: 1. Family Database System:  Finalize rollout of the system for all Governorates.  Interface with Smart Card Companies via web services.  Interface with Social Insurance Organization via web services.  Hosting Family Database at Social Insurance Organization Information Center. 4 of 15
  • 5. Annual Review Second Quarter Report for 2012 Deliverable Description Date: 1st July 2012 2. GIS System:  Produce GIS reports for targeting system.  Integration with Ministry of State for Administrative Development systems (E. Government). 3. Establishing the Ministry of Insurance and Social Affairs IT infrastructure:  Finalize outsourcing Hosting of Data Center at Social Insurance Organization Information Center.  Finalize setting up a Disaster Recovery Center for Ministry of Supply and Internal Trade. 4. NGOs System:  Develop the system to meet all the requirements of Central Department of NGO’s of Ministry of Insurance and Social Affairs.  Complete the design of the required reports (Statistics - detailed data). 5. Pilgrimage System :  Enhancement for running Hajj Program.  Design a new set of report. 6. MOSS Website: Develop the website of the 2 ministries (Ministry of Supply and Internal Trade & Ministry of Insurance and Social Affairs) through:  Coordinating with Project IT Team, the ministry's IT department and Media Consultant to gather information about the current MoSS web site and the needs to be met in the new web site.  Analysis of the current web site, and identifying the restructuring needed and the information and services to be included on the new website.  Developing the new website information structure.  Selecting and evaluating the platform to be used in the development of the new website.  Preparing the development environment.  Creating the design of the new web site, and implementing sample homepage and an internal page. 7. Call Center Project :  Implement new services and updates.  Rollout of MoSS new updates, services and requirements.  Integration of Call Center Database and Complains Database on Website. 8. ERP System:  Keep the project on track. Secondly : Training Component: A- Ministry of Supply and Internal Trade :  Training (60) directors and managers of the sectors (Senior Management).  Training (80) employees of Citizens Service Department (Executive Management).  Training (45) employees of Public Relations and Media Department (Executive Management).  Training (125) inspectors of Central Department for Inspection (Middle Management).  Training (80) employees of Supply Departments and Offices (Middle Management).  Training (80) employees of Internal Trade Sector (Middle Management). 5 of 15
  • 6. Annual Review Second Quarter Report for 2012 Deliverable Description Date: 1st July 2012 B- Ministry of Insurance and Social Affairs :  Conversion Training (160) of Social Units secretarial employees to work as assistant social specialist (Executive Management).  Training (80) social specialists to develop skills and increase functional capacity (Middle Management).  Training (160) social specialists for data entry of Family Database System (Middle Management).  Establish 3 workshops for (400) of social specialist on the New Social Protection Law (Middle Management).  Training (20) of Senior Managers on Total Quality Management TQM.  Training (20) of employees on the Computer Skills (Executive Management).  Training (20) of employees on English language (Middle Management). YYYY Achievement: First : Information Technology Activities: 1. Smart Cards:  Defined the rules of matching the input data for the ration cards with the exchange data and sent it to the Smart Cards Companies.  The smart cards companies designed programs necessary to the matching.  Testing the matching programs in some Governorates Such as Port Said, Ismalia, Aswan. 2. Family Database System:  Finalize rollout of the system in 27 governorates  Technical support for Family Database 3. Targeting:  Technical support for Targeting Program  Exporting Targeting data for the completed Governorates in a format that easy for SPSS statistics 4. Social Solidarity Pensions from Post Offices  Following up the monthly payment of Social Solidarity Pensions from Post Offices.  Co-operating with the Governorates and social administrative offices and Information Center to solve all networks and technical problems related to the project. 5. NGOs Application  Enhancement the system to meet the requirements of NGOs central department.  Implementation of the new screens include (training programs, membership, contributions, committees, directors board members, directors board meetings, assembly members, assembly meetings, volunteers, NGO problems, research experience, revenues and expenses, budget).  Added and redesigned some required reports (Statistics & detailed data).  Due to quite of Eng. Ahmed Husien (System Developer), we are going to hire another one to do his work. 6 of 15
  • 7. Annual Review Second Quarter Report for 2012 Deliverable Description Date: 1st July 2012 6. Pilgrimage System : The program is divided into 2 main parts: A- Electronic lottery program:  Hajj applications for members of NGOs' directorates & ministry staff.  Implementation of all required amendments to the electronic lottery program. B- Hajj Information System:  Includes data for the winners of the Hajj, supervisors data, financial receipts, hotels, hotels accommodation, flights, fellow-up reports.  The current screens have been updated to increase the level of performance.  Design a new set of reports.  Enhancement for running Hajj Program.  Adding and redesign some of the Hajj program features.  Implementation a program to print the identity cards of the pilgrims and supervisors including their data and personal photos.  Providing technical support for Hajj Program users.  Due to quite of Eng. Ahmed Husien (System Developer), we are going to hire another one to do his work. 7. Call Center Project:  Finalize system updates, which include the following: o Adding new services (Botagaz , Productive Families , Customer services). o Create new complaint forms for the new services. o Changing the mandatory/optional filed according to our business need. o Customizing the Citizen form. o Editing the Validation rules.  Continue established training courses for users: o Follow up Department in Tamween Sector. o Follow up Department in Sheoon Sector.  Keep the project on track, by continually monitoring the departments’ performance through monthly reports.  Handover of the system to Eng. Mohamed Abd El-Fatah who will be the new project manager instead of Eng. Ayman Abd El-Kader due to his quite. 8. ERP Project: A. Regarding (Payroll and HR applications for Sheoon sector):  Finalizing the register employees records process (1600 record) and update their information which include: o General information (name, birth date, ID, Graduation information, employee rank, promotions). o Basic salaries. o Training courses. o Motivation bounce. o Yearly bounce. o Vacations.  Continue running the audit process of reviewing the employee’s payroll data, to be able for issuing electronic payroll lists. B. Regarding (Accounting, budgeting applications for Sheoon and Tamween sectors):  The employees work on day to day basis, and they deliver the Application Output every month, as required. 7 of 15
  • 8. Annual Review Second Quarter Report for 2012 Deliverable Description Date: 1st July 2012 C. Regarding (Inventory and purchasing applications for Sheoon and Tamween sectors):  The employees register departments data and keep it updated. D. Handover of the system to Eng. Aml Helmy who will be the new project manager instead of Eng. Ayman Abd El-Kader due to his quite. 9. GIS System: GIS work includes three main billers, each has its status according to its scopes needs and details, these billers are: A. GIS Web Portal GIS Webpage linked to Ministry main web site: - Updating the GIS portal through linking the current GIS database with the updated version of family database (Automatically updated link) on 3 aggregation levels (Governorates, Districts, Sub districts). - Adding more web functions (zoom in/out & info) to facilitate the usage of the portal. - Working on customizing more technical function such print layouts function using VB studio ver.10. B. Mapping Supply services Goal: Creating GIS maps for the current supply services on the street level detailed maps (scale 1:5000) covers all Egypt Governorates. Participants:  MOSS Central Department of Planning.  Al-Massryen Company.  CAPMAS.  MOSS GIS unit. Roles and responsibilities :  CAPMAS: Based on verbal agreement between the Minster and General Abu-Bakr Al Gindy (Head of CAPMAS), CAPMAS provides MOSS GIS unit with complete set of GIS vector data on street level (1:5000) for all Egypt Governorates, these maps will be used to locate the supply services starting by subsidized bakeries with its linked outlets.  MOSS GIS unit: receiving maps from CAPMAS then prepare the paper layouts and print each sub district separated in map size A0.  Central planning department receives the paper print outs maps to be disseminated to different other departments responsible for Bakeries and Outlets distribution.  Al-Massreyn Company is responsible for mapping the bakeries and outlets, in addition to submit all details related to the bakeries such as (name, type, quota, separated or not, address..etc).  Then all data to be back again to MOSS GIS unit to do the following actions: o Build complete access database contains the gathered data related to each bakery and attached its outlets. o Locate both bakeries and outlets on the Maps which enable the decision makers to judge the equality of their distribution over certain location. Work status:  After many periodical visits to CAPMAS; a complete detailed digital maps for 6 Governorates had been delivered to the MOSS GIS unit. these 8 of 15
  • 9. Annual Review Second Quarter Report for 2012 Deliverable Description Date: 1st July 2012 governorates are: (Giza, Cairo, Qaluobia, Gharbia, Sharkia, Behira).  The project starts with mapping bakeries and outlets on the governorate of Greater Cairo Area (Cairo, Giza and Qaluobia). Note: All finished and revised maps original copies are kept in GIS unit. C. Mapping Target Project results: Goal: Creating GIS printouts highlight the result of targeting project with co-operation of Social Study Institute (Dr Ibtsam Al Gafarawy). Work status :  GIS unit was responsible for receiving the targeting data and then preparing the layouts which shows the result of targeting project to be printed on the complete report, starting by Al Behira Governorate with its district.  All the work in this phase has been done and sent it to Dr Ibtsam. A sample of the map produced showed as: D. GIS Handover  Starting from 15 September 2011; The GIS unit had been delivered completely to a technical committee of MOSS Information Center.  The GIS handover includes the flowing: - GIS Hardware: 3 units - original Dell PC’s 1 unit - Plotter 1 unit - A4 Black& white laser printer 1 unit - A4 Colour printer 1 unit - Scanner 9 of 15
  • 10. Annual Review Second Quarter Report for 2012 Deliverable Description Date: 1st July 2012 - GIS Software: Handover 3 Original GIS licenses (2) ARCGIS Editor & (1) ARC Server, and Installation packages needed for plotter, printers and scanner. - GIS Work situation : Detailed hand over notes and delivery reports had been submitted to the information center committee , in addition to give them 13 days on job training to let them be able to complete the needed whole GIS work on time . 10. Redesign & development of ministry of Insurance and Social Affairs, MISA Website:  Coordinating with Project IT Team, the ministry's IT department and Media Consultant to gather information about the current MISA web site and the needs to be met in the new web site.  Analysis of the current web site, and identifying the restructuring needed and the information and services to be included on the new website.  Developing the new website information structure.  Selecting and evaluating the platform to be used in the development of the new website.  Preparing the development environment.  Creating the design of the new web site, and implementing sample homepage and an internal page. Secondly : Training Activities: A- Ministry of Supply and Internal Trade :  Training (20) directors and managers of the sectors (Senior Management).  Training (20) employees of Citizens Service Department (Executive Management).  Training (25) employees of Public Relations and Media Department (Executive Management).  Training (40) inspectors of Central Department for Inspection (Middle Management).  Training (30) employees of Supply Departments and Offices (Middle Management).  Training (30) employees of Internal Trade Sector (Middle Management). B- Ministry of Insurance and Social Affairs :  Training (160) social specialists for data entry of Family Database System (Middle Management). Thirdly : Research & Development: Activities of the short term National Consultants:  Scientific Coordinator with World Food Program.  Prepared memos to the minister regarding economic and management issues.  Participated in the Minster’s Meetings that related to economic issues.  Reviewed Egyptian Country Strategy for the World Food Program 2012 to 2016.  Participated in the preparation of the draft of “the National Body of Food Subsidy” law. 10 of 15
  • 11. Annual Review Second Quarter Report for 2012 Deliverable Description Date: 1st July 2012  Prepare case study on “General Structure of MEGA Bakeries and Merging of Small Bakeries”.  Finalized and Present the final result of the “Supply Chain Study” to the Minister.  Finalized conduct study of “Measuring of the Balady Bread Production Cost”.  Prepared the TOR of “Build and design a new efficient and effective system for Balady Bread through removing government intervention from initial stages of the Balady Bread Supply Chain to its last stage”. Ongoing conduct in collaboration with WFP and international experts:  Build and design a new efficient and effective system for Balady bread.  Draw structured implementation plan for the new Balady Bread system.  Design a pilot project for the first phase of the implementation of the new enhanced and efficient Balady Bread system. Responsible for the following files:  World Bank: meetings on behalf of his Excellency the minister; drafts & executive  Islamic Bank for Development: meetings with his Excellency, drafts & executive  Summaries of MoS&SJ vision & strategies, proposed plan of collaboration.  NGO: work follow‐up & reviewing of proposed new NGO, follow‐up of successful experiences all over the world to acquire experience in targeting the poorest.  Developing Egyptian NGO map ( geographic distribution, activities, total numbers of beneficiaries, etc…).  UN World Food Programme: executive summary of monthly reports related to Work in Egypt (FFT). Executive summaries of studies & reports:  Evaluating the performance of help & social development sector in MoS&SJ.  The disaster fund.  Targeting the most vulnerable groups.  Evaluating the national module to reduce poverty.  The role of NGO in promoting human development.  Aya company for consultancy & development. 11 of 15
  • 12. Annual Review Second Quarter Report for 2012 Deliverable Description Date: 1st July 2012 OUTPUT 4: ACCREDIT & ELIGIBILITY SYSTEM FOR NGO Project ID: 00044225 Description: To create an accreditation & eligibility system for NGO in Egypt. YYYY Target: 2012 1. Establishing the Audit Committee, and implementing of its role and responsibilities. 2. Training Governorates relevant staff on the application of the eligibility criteria forms. 3. Evaluation and analysis the criteria application results on waves of NGOs. 4. Arrange for tailored training courses to cover the main weakness elements in the majority of NGOs based on the analysis of the criteria evaluation results. 5. Drafting the NGOs guiding report. YYYY Achievement: 1. NGO’s Eligibility System A. NGO’s Central Department gathering more information and data to be included in the NGO’s report/guiding book, It is supposed to cover regulations and directives aspects, criteria, statistics, challenges, examples of promising and successful NGO’s, granting parties, kinds and conditions of support, large networking groups and valuable partnerships projects, volunteers roles, regional NGO’s, ministry's targeted social solidarity activities, recommendations, etc … B. NGO’s Central Department follow-up the implementation of NGO’s eligibility criteria. C. Drafting proposals to act positively towards loses deriving to meet the current aspirations following the January 25th Revolution. D. Follow up remarks and recommendations related to audit findings and NGO’s activities. 12 of 15
  • 13. Annual Review Second Quarter Report for 2012 Deliverable Description Date: 1st July 2012 OUTPUT 5: NEW SOCIAL PROTECTION SYSTEM Project ID: 00044225 Description: To Review & Improve targeting YYYY target: 2012 1. Smart Cards:  Rollout of smart cards for Solidarity Pension Service throughout all Governorates.  Develop and implement interface with wholesale companies. 2. Social Solidarity Pensions from Post Offices:  Study payment from more than one post office for each social service center.  Finalize issuing Social Solidarity Pension from Post Offices by family smart card. YYYY Achievement: 1. Smart Cards:  Defined the rules of matching the input data for the ration cards with the exchange data and sent it to the smart card companies.  The smart card companies designed programs necessary to the matching.  Testing the matching programs in some Governorates such as Port Said and Aswan. 2. Targeting:  Technical support for Targeting Program.  Exporting Targeting data for the completed governorates in a format that easy for SPSS statistics analysis. 3. Social Solidarity Pensions from Post Offices:  Following up the monthly implantation circulation of Social Solidarity Pensions from Post Offices.  Co-operating with Governorates and social administrative offices and Information Center of MoSS to solve all the networks and technical problems of the project. 13 of 15
  • 14. Annual Review Second Quarter Report for 2012 Deliverable Description Date: 1st July 2012 OUTPUT 6: IMPROVING NASSER SOCIAL BANK Project ID: 00044225 Description: To assess Nasser Social Bank and prepare it for restructuring. YYYY target: 2012 1. Finalize prepared revised set of regulations for NSB Investment, “Takaful”, “Takeraats/Akarats” and Legal divisions. 2. Continue to:  Connect central departments to newly commissioned NSB’s digital network.  Investigate means to modernize archiving capabilities.  Introduce ATM services to NSB clients and employees.  Redefine branches’ performance criteria to match NSB’s philosophies/mission.  Develop NSB website.  Develop NSB intranet site (for internal use).  Develop a preliminary concept for a revamped main branch at 35 Kasr El Nil-Cairo.  Implement Year 2012 NBE training program.  Continue monitoring progress of 3 new branches: Nasr City, 6 Oct., and Zakazeek.  Prepare a human development program for NSB staff.  Monitor progress of the new Human Capital Development Centre (HCDC). 3. Evaluate 6 branches of NSB and “Zakaat” committees in Southern Egypt. 4. Connect central departments to NSB’s newly commissioned digital network. 5. Issue the Strategy Formulation Process with NSB’s Executives. 6. Initiate contact with Engineering Authority of Armed Forces to revamp upper Egypt branches, and Initiate a study to formulate functionalities and roles to introduce new NSB access points. 7. Revamped, completely, the Bank’s Database Center, and Establish the Bank’s Call Center and documenting all operational regulations. 8. Revamped, completely, 10 Information Center of NSB Branches, and connecting them with the NSB Database Center. NSB’s Reforms Pilot Project has been completed successfully. Phase-1 of the Reforms Project begins on November 1st, 2010. It focuses on preparing, publishing, and implementing NSB strategies for the next 3 years including: full automation of services, executing an aggressive human capital development plan, and physically revamping all NSB branches. 1. Conduct a third round of negotiations with the African Development Bank (AFDB) in Tunisia. 2. Conduct a fourth round of negotiations with the AFDB in Cairo. 3. Initialized the loan and grant agreement with the AFDB. 4. Prepare memos required to increase take-home pay of NSB employees. 5. Successfully selecting, nominating, and qualifying two NSB staff members to attend a two month training courses in India sponsored by the African Asian Rural Development Organization (AARDO). 6. Continued to:  Work on a comprehensive automation project.  Investigate the feasibility to implement the first social business project in Sohag.  Prepare an NSB aggressive Human Capital Development program. 14 of 15
  • 15. Annual Review Second Quarter Report for 2012 Deliverable Description Date: 1st July 2012 Conclusion: In November, 2010 NSB’s Reforms Pilot Project has been completed successfully, and began Phase-1 of its Reforms Project. It focuses on preparing, publishing, and implementing NSB strategies for the next 3 years including: full automation of services, executing an aggressive human capital development plan, and revamping all of NSB 90 branches. The Reforms Pilot Project included: revamping the current data center at NSB Head Office to enable the operation of a newly developed state-of-the-art digital network, established an NSB Human Capital Development Center (HCDC), developed new/revised bank regulations, developed a model for the look-and-feel of rebranded bank branches, hired well over 400 new employees based on predefined set of selection criteria, and opened 3 new branches conforming to the new rebranded branch model. NSB automation project will fully automate all NSB services and connect all of its 90 branches through a sophisticated/secured network. It will also ensure that the bank uses state-of-the-art technologies and information systems. The project will incorporate an efficient business continuity solution to ensure data integrity and around the clock availability of services. In addition, the project will enable the bank to provide a set of services that it is not currently possible due to the nature of its legacy/outdated information systems and technologies. The bank is undertaking an aggressive Human Capital Development Center initiative and succession plan. The initiative will begin with a massive human capital assessment and gap analysis phase followed by a customized human capital development program that targets employees across the organization to change/improve its culture while drastically improving on its human capital assets. Through the project, NSB was able to upgrade and refurbish the branches of 6th of October, Zagazig, Mohandiseen, Qous, New Valley, Aswan; then developing Madinet Nasr, and four other branches will be finished at Asyut, Suhaj, Qena and Luxor. Furthermore, within 2011, NSB has a plan to upgrade and refurbish 19 other branches. Other branches are in serious need for upgrading, refurbishing and retrofitting. NSB has a plan to continue upgrading other branches by the year 2014 through consulting engineering firms and certified contractors. 15 of 15