SlideShare a Scribd company logo
1 of 4
Download to read offline
‫سالگ‬ ‫درباره‬ ‫چیس‬ ‫همه‬
‫؟‬ ‫چیست‬ ‫سالگ‬ِ‫لَل‬ ‫ٌّگام‬ ‫در‬ ‫پاییي‬ ِ‫ب‬ ُ‫چا‬ ‫درٍى‬ ‫گل‬ ‫دادى‬ ‫ّل‬ ‫بوٌظَر‬ ِ‫ک‬ ‫است‬ ُ‫چا‬ ‫درٍى‬ ‫گل‬ ‫از‬ ‫تر‬ ‫سٌگیي‬ ‫گل‬ ‫یک‬ ‫سالگ‬
‫شَد‬ ‫هی‬ ُ‫استفاد‬ ‫باال‬.‫شَد‬ ‫هی‬ ُ‫استفاد‬ ‫آیٌذ‬ ‫هی‬ ‫بیرٍى‬ ‫خیس‬ ‫بصَرت‬ ‫ّا‬ ِ‫لَل‬ ِ‫ک‬ ‫ٌّگاهی‬ ‫سالگ‬ ‫از‬.
‫بط‬ٍ‫سالگ‬ ‫ٍزى‬ ‫هعوَل‬ ‫ر‬5/1‫تا‬2ppg‫باشذ‬ ‫هی‬ ُ‫چا‬ ‫درٍى‬ ‫گل‬ ‫ٍزى‬ ‫از‬ ‫بیشتر‬.‫هقذار‬ ٍ ‫ٍزى‬ ِ‫البت‬‫دقیق‬‫هی‬ ِ‫هحاسب‬ ‫قابل‬ ‫آى‬
‫باشذ‬.
‫هقذار‬ ‫هعوَال‬‫را‬ ‫گیرد‬ ‫هی‬ ‫حفاری‬ ‫ّای‬ ِ‫لَل‬ ‫در‬ ُ‫شذ‬ ‫پوپ‬ ‫سالگ‬ ِ‫ک‬ ‫ارتفاعی‬ُ‫اًذاز‬ ‫با‬ ‫برابر‬200‫هعادل‬ ِ‫ک‬ ‫فَت‬2‫هی‬ ‫استٌذ‬
‫قاًَى‬ ‫براساس‬ ‫آًرا‬ ‫حجن‬ ‫تَاى‬ ‫هی‬ ِ‫ک‬ ‫گیرًذ‬ ‫هی‬ ‫درًظر‬ ‫باشذ‬U-Tube‫ًوَد‬ ‫گیری‬ ُ‫اًذاز‬ ‫زیر‬ ‫شکل‬ ٍ.
‫دلخواه‬ ‫طول‬ ‫برای‬ ‫نیاز‬ ‫مورد‬ ‫سالگ‬ ‫حجم‬ ‫محاسبه‬:
‫اٍل‬ ِ‫هرحل‬:ُ‫دلخَا‬ ‫طَل‬ ‫برای‬ ‫الزم‬ ‫ّیذرٍاستاتیک‬ ‫فشار‬ ِ‫هحاسب‬
Hydrostatic Pressure in psi = mud weight in ppg x 0.052 x ft of dry pipe
‫دٍم‬ ِ‫هرحل‬:ُ‫چا‬ ‫درٍى‬ ‫گل‬ ٍ ‫سالگ‬ ‫بیي‬ ‫فشار‬ ‫گرادیاى‬ ‫تفاٍت‬ ِ‫هحاسب‬
Pressure gradient difference in psi/ft = (slug weight in ppg – mud weight in ppg) x 0.052
‫سَم‬ ِ‫هرحل‬:‫حفاری‬ ‫ّای‬ ِ‫لَل‬ ‫در‬ ‫سالگ‬ ‫طَل‬ ِ‫هحاسب‬
Slug length in ft = Hydrostatic Pressure in psi ÷ Pressure gradient difference in psi/ft
‫چْارم‬ ِ‫هرحل‬:ِ‫بشک‬ ِ‫ب‬ ‫ًیاز‬ ‫هَرد‬ ‫سالگ‬ ‫حجن‬ ِ‫هحاسب‬
Slug volume in barrel = Slug length in ft x drill pipe capacity in bbl/ft
‫مثال‬:‫؟‬ ‫ًواییذ‬ ِ‫هحاسب‬ ‫را‬ ‫زیر‬ ‫هشخصات‬ ‫برای‬ ‫ًیاز‬ ‫هَرد‬ ‫سالگ‬ ‫حجن‬
Desired length of dry pipe = 200 ft
Drill pipe capacity = 0.016 bbl/ft
Mud weight = 10.0 ppg
Slug weight = 11.5 ppg
Step 1: Hydrostatic pressure required:
Hydrostatic Pressure in psi = 10.0 ppg x 0.052 x 200 ft
Hydrostatic Pressure in psi = 104 psi
Step 2: differences in pressure gradient between slug weight and mud weight:
Pressure gradient difference in psi/ft = (11.5 ppg – 10.5 ppg) x 0.052
Pressure gradient difference in psi/ft = 0.078 psi/ft
Step 3: length of slug in drill pipe:
Slug length in ft = 104psi ÷ 0.078
Slug length in ft = 1,333 ft
Step 4: Slug volume required in barrels:
Slug volume required = 1333 ft x 0.016 bbl/ft
Slug volume required = 21.3 bbl
‫آى‬ ‫از‬ ‫هشخصی‬ ‫حجن‬ ‫اساس‬ ‫بر‬ ‫ًیاز‬ ‫هَرد‬ ‫سالگ‬ ‫ٍزى‬ ِ‫هحاسب‬
‫ًوَد‬ ِ‫هحاسب‬ ‫آى‬ ‫از‬ ‫هشخصی‬ ‫حجن‬ ‫براساس‬ ‫را‬ ‫آى‬ ‫ٍزى‬ ‫تَاى‬ ‫هی‬ ‫باشیذ‬ ‫حجن‬ ‫هحذٍدیت‬ ‫دارای‬ ‫سالگ‬ ‫از‬ ُ‫استفاد‬ ‫در‬ ِ‫چٌاًچ‬.
‫اٍل‬ ِ‫هرحل‬:‫حفاری‬ ‫ّای‬ ِ‫لَل‬ ‫در‬ ‫سالگ‬ ‫طَل‬ ِ‫هحاسب‬
Length of slug in drill pipe in ft = slug volume in bbl ÷ drill pipe capacity in bbl/ft
‫دٍم‬ ِ‫هرحل‬:‫خشک‬ ‫ّای‬ ِ‫لَل‬ ‫برای‬ ‫الزم‬ ‫ّیذرٍاستاتیک‬ ‫فشار‬ ِ‫هحاسب‬
Hydrostatic Pressure in psi = mud weight in ppg x 0.052 x desired length of dry pipe
‫سَم‬ ِ‫هرحل‬:‫هَردًیاز‬ ‫سالگ‬ ‫ٍزى‬ ِ‫هحاسب‬
Slug weight in ppg = (Hydrostatic Prssure (from step 2) ÷ 0.052 ÷ Length of slug in ft
(step1)) + mud weight, ppg, in hole
‫هثال‬:‫؟‬ ‫ًواییذ‬ ِ‫هحاسب‬ ‫زیر‬ ‫هشخصات‬ ‫برای‬ ‫را‬ ‫سالگ‬ ‫ٍزى‬
Desired length of dry pipe = 200 ft
Mud weight in hole = 12.0 ppg
Drill pipe capacity = 0.016 bbl/ft
Volume of slug = 20 bbl
Step 1 Determine Length of slug inside drill pipe in ft:
Slug length = 20 bbl ÷ 0.016
Slug length = 1250 ft
Step 2 Determine hydrostatic pressure required to give desired dry pipe drill pipe
Hydrostatic Pressure in psi = 12.0 x 0.052 x 200
Hydrostatic Pressure in psi = 124.8 psi
Step 3 Determine slug weight needed in ppg:
Slug weight in ppg = (124.8 ÷ 0.052 ÷ 1250) + 12.0
Slug weight in ppg = 13.92 ppg
‫حفاری‬ ‫اطالعات‬ ‫هرجع‬ ‫از‬ ِ‫برگرفت‬drlginfo.com
‫هرجع‬:‫کتاب‬Formulas and calculations for Drilling, Production and Workover
‫هترجن‬:‫هَسایی‬ ‫عباس‬

More Related Content

Viewers also liked

It och skola = sant fågelskolan
It och skola = sant fågelskolanIt och skola = sant fågelskolan
It och skola = sant fågelskolanAnders Erenius
 
Into to Android Live Wallpapers
Into to Android Live WallpapersInto to Android Live Wallpapers
Into to Android Live WallpapersKieran Gutteridge
 
Everglades Elementary
Everglades ElementaryEverglades Elementary
Everglades Elementarystoklosa
 
TBEX15 North America Fort Lauderdale Emma Sparks
TBEX15 North America Fort Lauderdale Emma SparksTBEX15 North America Fort Lauderdale Emma Sparks
TBEX15 North America Fort Lauderdale Emma SparksTBEX
 
App Stores Global Opportunities
App Stores Global OpportunitiesApp Stores Global Opportunities
App Stores Global OpportunitiesKieran Gutteridge
 
Londroid - Non native development
Londroid - Non native developmentLondroid - Non native development
Londroid - Non native developmentKieran Gutteridge
 

Viewers also liked (11)

volcano
volcano volcano
volcano
 
Ecole républicaine
Ecole républicaineEcole républicaine
Ecole républicaine
 
Bonnin antonia pouerpoin
Bonnin antonia pouerpoinBonnin antonia pouerpoin
Bonnin antonia pouerpoin
 
App sharing
App sharingApp sharing
App sharing
 
It och skola = sant fågelskolan
It och skola = sant fågelskolanIt och skola = sant fågelskolan
It och skola = sant fågelskolan
 
Into to Android Live Wallpapers
Into to Android Live WallpapersInto to Android Live Wallpapers
Into to Android Live Wallpapers
 
Everglades Elementary
Everglades ElementaryEverglades Elementary
Everglades Elementary
 
TBEX15 North America Fort Lauderdale Emma Sparks
TBEX15 North America Fort Lauderdale Emma SparksTBEX15 North America Fort Lauderdale Emma Sparks
TBEX15 North America Fort Lauderdale Emma Sparks
 
Hack camp 2011
Hack camp 2011Hack camp 2011
Hack camp 2011
 
App Stores Global Opportunities
App Stores Global OpportunitiesApp Stores Global Opportunities
App Stores Global Opportunities
 
Londroid - Non native development
Londroid - Non native developmentLondroid - Non native development
Londroid - Non native development
 

Similar to slug

VLP AND WORKING CHART LECTURE #2.pdf
VLP AND WORKING CHART LECTURE #2.pdfVLP AND WORKING CHART LECTURE #2.pdf
VLP AND WORKING CHART LECTURE #2.pdfHassanJOudah
 
Assignment 1 artificial lift
Assignment 1 artificial liftAssignment 1 artificial lift
Assignment 1 artificial liftOYLex LMS
 
Gas dehydration using solid bed
Gas dehydration using solid bed Gas dehydration using solid bed
Gas dehydration using solid bed Mohamed Bedair
 
Hydrostatic Pressure & Fluid Gradient.pdf
Hydrostatic Pressure & Fluid Gradient.pdfHydrostatic Pressure & Fluid Gradient.pdf
Hydrostatic Pressure & Fluid Gradient.pdfsalem123gmaal
 
silo.tips_pete-203-drilling-engineering.ppt
silo.tips_pete-203-drilling-engineering.pptsilo.tips_pete-203-drilling-engineering.ppt
silo.tips_pete-203-drilling-engineering.pptKOSIREDDYASHOKDEVAKU
 
Unit7 nozzles
Unit7   nozzlesUnit7   nozzles
Unit7 nozzlesMalaysia
 
Experimentalstudy measurement of sonic speed of drilling muds under shear stress
Experimentalstudy measurement of sonic speed of drilling muds under shear stressExperimentalstudy measurement of sonic speed of drilling muds under shear stress
Experimentalstudy measurement of sonic speed of drilling muds under shear stressFrank-Michael Jäger
 
Experimentalstudy measurement of sonic speed of drilling muds under shear stress
Experimentalstudy measurement of sonic speed of drilling muds under shear stressExperimentalstudy measurement of sonic speed of drilling muds under shear stress
Experimentalstudy measurement of sonic speed of drilling muds under shear stressFrank-Michael Jäger
 
Deck footing
Deck footingDeck footing
Deck footingNhi Nam
 

Similar to slug (14)

VLP AND WORKING CHART LECTURE #2.pdf
VLP AND WORKING CHART LECTURE #2.pdfVLP AND WORKING CHART LECTURE #2.pdf
VLP AND WORKING CHART LECTURE #2.pdf
 
Drilling Mannual
Drilling MannualDrilling Mannual
Drilling Mannual
 
Assignment 1 artificial lift
Assignment 1 artificial liftAssignment 1 artificial lift
Assignment 1 artificial lift
 
3.1 hydraulics
3.1  hydraulics3.1  hydraulics
3.1 hydraulics
 
Gas dehydration using solid bed
Gas dehydration using solid bed Gas dehydration using solid bed
Gas dehydration using solid bed
 
Duct design
Duct designDuct design
Duct design
 
Hydrostatic Pressure & Fluid Gradient.pdf
Hydrostatic Pressure & Fluid Gradient.pdfHydrostatic Pressure & Fluid Gradient.pdf
Hydrostatic Pressure & Fluid Gradient.pdf
 
Flow charts for pipes
Flow charts for pipesFlow charts for pipes
Flow charts for pipes
 
silo.tips_pete-203-drilling-engineering.ppt
silo.tips_pete-203-drilling-engineering.pptsilo.tips_pete-203-drilling-engineering.ppt
silo.tips_pete-203-drilling-engineering.ppt
 
Unit7 nozzles
Unit7   nozzlesUnit7   nozzles
Unit7 nozzles
 
Experimentalstudy measurement of sonic speed of drilling muds under shear stress
Experimentalstudy measurement of sonic speed of drilling muds under shear stressExperimentalstudy measurement of sonic speed of drilling muds under shear stress
Experimentalstudy measurement of sonic speed of drilling muds under shear stress
 
Experimentalstudy measurement of sonic speed of drilling muds under shear stress
Experimentalstudy measurement of sonic speed of drilling muds under shear stressExperimentalstudy measurement of sonic speed of drilling muds under shear stress
Experimentalstudy measurement of sonic speed of drilling muds under shear stress
 
Deck footing
Deck footingDeck footing
Deck footing
 
Drill.pptx
Drill.pptxDrill.pptx
Drill.pptx
 

slug

  • 1. ‫سالگ‬ ‫درباره‬ ‫چیس‬ ‫همه‬ ‫؟‬ ‫چیست‬ ‫سالگ‬ِ‫لَل‬ ‫ٌّگام‬ ‫در‬ ‫پاییي‬ ِ‫ب‬ ُ‫چا‬ ‫درٍى‬ ‫گل‬ ‫دادى‬ ‫ّل‬ ‫بوٌظَر‬ ِ‫ک‬ ‫است‬ ُ‫چا‬ ‫درٍى‬ ‫گل‬ ‫از‬ ‫تر‬ ‫سٌگیي‬ ‫گل‬ ‫یک‬ ‫سالگ‬ ‫شَد‬ ‫هی‬ ُ‫استفاد‬ ‫باال‬.‫شَد‬ ‫هی‬ ُ‫استفاد‬ ‫آیٌذ‬ ‫هی‬ ‫بیرٍى‬ ‫خیس‬ ‫بصَرت‬ ‫ّا‬ ِ‫لَل‬ ِ‫ک‬ ‫ٌّگاهی‬ ‫سالگ‬ ‫از‬. ‫بط‬ٍ‫سالگ‬ ‫ٍزى‬ ‫هعوَل‬ ‫ر‬5/1‫تا‬2ppg‫باشذ‬ ‫هی‬ ُ‫چا‬ ‫درٍى‬ ‫گل‬ ‫ٍزى‬ ‫از‬ ‫بیشتر‬.‫هقذار‬ ٍ ‫ٍزى‬ ِ‫البت‬‫دقیق‬‫هی‬ ِ‫هحاسب‬ ‫قابل‬ ‫آى‬ ‫باشذ‬. ‫هقذار‬ ‫هعوَال‬‫را‬ ‫گیرد‬ ‫هی‬ ‫حفاری‬ ‫ّای‬ ِ‫لَل‬ ‫در‬ ُ‫شذ‬ ‫پوپ‬ ‫سالگ‬ ِ‫ک‬ ‫ارتفاعی‬ُ‫اًذاز‬ ‫با‬ ‫برابر‬200‫هعادل‬ ِ‫ک‬ ‫فَت‬2‫هی‬ ‫استٌذ‬ ‫قاًَى‬ ‫براساس‬ ‫آًرا‬ ‫حجن‬ ‫تَاى‬ ‫هی‬ ِ‫ک‬ ‫گیرًذ‬ ‫هی‬ ‫درًظر‬ ‫باشذ‬U-Tube‫ًوَد‬ ‫گیری‬ ُ‫اًذاز‬ ‫زیر‬ ‫شکل‬ ٍ. ‫دلخواه‬ ‫طول‬ ‫برای‬ ‫نیاز‬ ‫مورد‬ ‫سالگ‬ ‫حجم‬ ‫محاسبه‬: ‫اٍل‬ ِ‫هرحل‬:ُ‫دلخَا‬ ‫طَل‬ ‫برای‬ ‫الزم‬ ‫ّیذرٍاستاتیک‬ ‫فشار‬ ِ‫هحاسب‬ Hydrostatic Pressure in psi = mud weight in ppg x 0.052 x ft of dry pipe ‫دٍم‬ ِ‫هرحل‬:ُ‫چا‬ ‫درٍى‬ ‫گل‬ ٍ ‫سالگ‬ ‫بیي‬ ‫فشار‬ ‫گرادیاى‬ ‫تفاٍت‬ ِ‫هحاسب‬ Pressure gradient difference in psi/ft = (slug weight in ppg – mud weight in ppg) x 0.052
  • 2. ‫سَم‬ ِ‫هرحل‬:‫حفاری‬ ‫ّای‬ ِ‫لَل‬ ‫در‬ ‫سالگ‬ ‫طَل‬ ِ‫هحاسب‬ Slug length in ft = Hydrostatic Pressure in psi ÷ Pressure gradient difference in psi/ft ‫چْارم‬ ِ‫هرحل‬:ِ‫بشک‬ ِ‫ب‬ ‫ًیاز‬ ‫هَرد‬ ‫سالگ‬ ‫حجن‬ ِ‫هحاسب‬ Slug volume in barrel = Slug length in ft x drill pipe capacity in bbl/ft ‫مثال‬:‫؟‬ ‫ًواییذ‬ ِ‫هحاسب‬ ‫را‬ ‫زیر‬ ‫هشخصات‬ ‫برای‬ ‫ًیاز‬ ‫هَرد‬ ‫سالگ‬ ‫حجن‬ Desired length of dry pipe = 200 ft Drill pipe capacity = 0.016 bbl/ft Mud weight = 10.0 ppg Slug weight = 11.5 ppg Step 1: Hydrostatic pressure required: Hydrostatic Pressure in psi = 10.0 ppg x 0.052 x 200 ft Hydrostatic Pressure in psi = 104 psi Step 2: differences in pressure gradient between slug weight and mud weight: Pressure gradient difference in psi/ft = (11.5 ppg – 10.5 ppg) x 0.052 Pressure gradient difference in psi/ft = 0.078 psi/ft Step 3: length of slug in drill pipe: Slug length in ft = 104psi ÷ 0.078 Slug length in ft = 1,333 ft Step 4: Slug volume required in barrels: Slug volume required = 1333 ft x 0.016 bbl/ft Slug volume required = 21.3 bbl
  • 3. ‫آى‬ ‫از‬ ‫هشخصی‬ ‫حجن‬ ‫اساس‬ ‫بر‬ ‫ًیاز‬ ‫هَرد‬ ‫سالگ‬ ‫ٍزى‬ ِ‫هحاسب‬ ‫ًوَد‬ ِ‫هحاسب‬ ‫آى‬ ‫از‬ ‫هشخصی‬ ‫حجن‬ ‫براساس‬ ‫را‬ ‫آى‬ ‫ٍزى‬ ‫تَاى‬ ‫هی‬ ‫باشیذ‬ ‫حجن‬ ‫هحذٍدیت‬ ‫دارای‬ ‫سالگ‬ ‫از‬ ُ‫استفاد‬ ‫در‬ ِ‫چٌاًچ‬. ‫اٍل‬ ِ‫هرحل‬:‫حفاری‬ ‫ّای‬ ِ‫لَل‬ ‫در‬ ‫سالگ‬ ‫طَل‬ ِ‫هحاسب‬ Length of slug in drill pipe in ft = slug volume in bbl ÷ drill pipe capacity in bbl/ft ‫دٍم‬ ِ‫هرحل‬:‫خشک‬ ‫ّای‬ ِ‫لَل‬ ‫برای‬ ‫الزم‬ ‫ّیذرٍاستاتیک‬ ‫فشار‬ ِ‫هحاسب‬ Hydrostatic Pressure in psi = mud weight in ppg x 0.052 x desired length of dry pipe ‫سَم‬ ِ‫هرحل‬:‫هَردًیاز‬ ‫سالگ‬ ‫ٍزى‬ ِ‫هحاسب‬ Slug weight in ppg = (Hydrostatic Prssure (from step 2) ÷ 0.052 ÷ Length of slug in ft (step1)) + mud weight, ppg, in hole ‫هثال‬:‫؟‬ ‫ًواییذ‬ ِ‫هحاسب‬ ‫زیر‬ ‫هشخصات‬ ‫برای‬ ‫را‬ ‫سالگ‬ ‫ٍزى‬ Desired length of dry pipe = 200 ft Mud weight in hole = 12.0 ppg Drill pipe capacity = 0.016 bbl/ft Volume of slug = 20 bbl Step 1 Determine Length of slug inside drill pipe in ft: Slug length = 20 bbl ÷ 0.016 Slug length = 1250 ft Step 2 Determine hydrostatic pressure required to give desired dry pipe drill pipe Hydrostatic Pressure in psi = 12.0 x 0.052 x 200
  • 4. Hydrostatic Pressure in psi = 124.8 psi Step 3 Determine slug weight needed in ppg: Slug weight in ppg = (124.8 ÷ 0.052 ÷ 1250) + 12.0 Slug weight in ppg = 13.92 ppg ‫حفاری‬ ‫اطالعات‬ ‫هرجع‬ ‫از‬ ِ‫برگرفت‬drlginfo.com ‫هرجع‬:‫کتاب‬Formulas and calculations for Drilling, Production and Workover ‫هترجن‬:‫هَسایی‬ ‫عباس‬