Mohamed Moustafa Saad – Portfolio
Current Project: Sep 12 – till date
Project: Msheireb , Down Town Doha , Phase 1B including Madarin Oriental hotel &
hotel apartments Common areas.
Client: Msheireb Properties a subsidiary of Qatar Foundation
Design Architect: Variant
Consultant: BMD
Contractor: Carillion Qatar Building Company
Value 750 m $ ++
Status: Completion expected September 2015
Role: Senior Design Manager for the JV (Head of Architecture all works including
Madarin oriental Hotel & hotel apartments Fit out)
Previous Projects
Project: Cairo Festival City , Cairo ,Egypt
Client: Al Futtaim Group Real-estate
Design Architect: 5+
Consultant: ECG
Contractor: Al Futtaim Carillion / Orascom Construction Industries JV
Value 400 m $
Status: Completion expected August 2012
Role: Design Manager for the JV (external Works,External
Render,Signage,WP,VT,…)
Project: Culture
Village
Client: Dubai
Properties
Lead Consultant :
WSP
Role: Design
Manager for WSP
Project: Sheikh
Khalifa Specialist
hospital, RAK, UAE
Client: Ministry of
Health,UAE
Design Architect: Perkins Eastman
Contractor: CSCEC / MCM JV
Value 650 m DHS
Status: Completion expected Mar 2012
Role: Technical Manager for JV
Project: Al Fattan – Currency house at DIFC , Dubai ,UAE
Client: Al Fattan Properties
Design Architect: Gensler
Consultant: WSP
Contractor: AFE Al Fattan Engineering
Value 400 m DHS
Status: completed
Role: Senior Architect / ARE for WSP on Behalf of
Gensler
Project: City Hospital at DHCC (Dubai
Health Care City), Dubai,UAE
Client: WWHS (Welcare World Health
Systems)
Design Architect: Ellerbe Becket
Project Manager: Cansult Maunsell | AECOM
Consultant: WSP
Contractor: AAA Al Ahmadiah Aktor
Value 220 m DHS
Status: Completed
Role: Senior Architect / ARE for WSP
Project: Mirdif Villas – Mirdif , Dubai , UAE
Client: DP (Dubai Properties)
Design Architect: Nombela
Project Manager: Mace
Consultant: Kling
Contractor: CSCEC (China State Construction Engineering Corporation)
Value: 1095 m DHS
Status: Completed
Role: Project Architect for CSCEC (till completing the mock up villas & apartment)
Projects I was involved in preparing the tender documents while I was working
in ECO Group, Alexandria, Egypt.
Portfolio 2016

More Related Content

What's hot (20)

Anirban Dutta CV
Anirban Dutta CVAnirban Dutta CV
Anirban Dutta CV
 
ahmed alzoubi portofilo
ahmed alzoubi portofiloahmed alzoubi portofilo
ahmed alzoubi portofilo
 
cv porto2
cv porto2cv porto2
cv porto2
 
Architect mohamed el-tarabily
Architect mohamed el-tarabilyArchitect mohamed el-tarabily
Architect mohamed el-tarabily
 
Talal CV 1.12
Talal CV 1.12Talal CV 1.12
Talal CV 1.12
 
M Salah CV E Photo
M Salah CV E PhotoM Salah CV E Photo
M Salah CV E Photo
 
Hesham Farran - CV june 2016
Hesham Farran - CV june 2016Hesham Farran - CV june 2016
Hesham Farran - CV june 2016
 
ENG Taher CV
ENG Taher CVENG Taher CV
ENG Taher CV
 
shahid
shahidshahid
shahid
 
CV eeeNEW
CV eeeNEWCV eeeNEW
CV eeeNEW
 
Osama structure eng. cv
Osama structure eng. cvOsama structure eng. cv
Osama structure eng. cv
 
CV Nader 29_06_2016 without cover web
CV Nader 29_06_2016 without cover webCV Nader 29_06_2016 without cover web
CV Nader 29_06_2016 without cover web
 
121031 green pm portfolio
121031 green pm portfolio121031 green pm portfolio
121031 green pm portfolio
 
Architecture Engineer C.V
Architecture Engineer C.VArchitecture Engineer C.V
Architecture Engineer C.V
 
Murhef Lotfy CV-Rev-00-NP
Murhef Lotfy CV-Rev-00-NPMurhef Lotfy CV-Rev-00-NP
Murhef Lotfy CV-Rev-00-NP
 
cv-eok
cv-eokcv-eok
cv-eok
 
Eng yehya sharifa cv
Eng  yehya sharifa  cvEng  yehya sharifa  cv
Eng yehya sharifa cv
 
JOVIC GORAN arch CV
JOVIC GORAN arch CVJOVIC GORAN arch CV
JOVIC GORAN arch CV
 
MOHAMED SALAH C.V 2016
MOHAMED SALAH C.V 2016MOHAMED SALAH C.V 2016
MOHAMED SALAH C.V 2016
 
Ayad Fakhery Karass2013
Ayad Fakhery Karass2013Ayad Fakhery Karass2013
Ayad Fakhery Karass2013
 

Viewers also liked

stratummed postcard lasvegas3
stratummed postcard lasvegas3stratummed postcard lasvegas3
stratummed postcard lasvegas3Lulu Kao
 
Reporte Diario Bursátil del 25 de setiembre 2015
Reporte Diario Bursátil del 25 de setiembre 2015Reporte Diario Bursátil del 25 de setiembre 2015
Reporte Diario Bursátil del 25 de setiembre 2015Grupo Coril
 
SAP Training Confirmation.PDF
SAP Training Confirmation.PDFSAP Training Confirmation.PDF
SAP Training Confirmation.PDFGodfrey Setwaba
 
Ejercicio: Producción de electricidad en celdas
Ejercicio: Producción de electricidad en celdasEjercicio: Producción de electricidad en celdas
Ejercicio: Producción de electricidad en celdasangelo26_
 
Using Extron's "TeamWork" for collaborative learning in an FE college - Key E...
Using Extron's "TeamWork" for collaborative learning in an FE college - Key E...Using Extron's "TeamWork" for collaborative learning in an FE college - Key E...
Using Extron's "TeamWork" for collaborative learning in an FE college - Key E...Jisc
 
Agenzia 2.0 - Le Agenzie di Assicurazioni e il Digitale
Agenzia 2.0 - Le Agenzie di Assicurazioni e il DigitaleAgenzia 2.0 - Le Agenzie di Assicurazioni e il Digitale
Agenzia 2.0 - Le Agenzie di Assicurazioni e il DigitaleDigital Academy
 
Fábula de la Hormiga
Fábula de la HormigaFábula de la Hormiga
Fábula de la HormigaSorey García
 

Viewers also liked (12)

stratummed postcard lasvegas3
stratummed postcard lasvegas3stratummed postcard lasvegas3
stratummed postcard lasvegas3
 
Practica 4 tania
Practica 4 taniaPractica 4 tania
Practica 4 tania
 
Reporte Diario Bursátil del 25 de setiembre 2015
Reporte Diario Bursátil del 25 de setiembre 2015Reporte Diario Bursátil del 25 de setiembre 2015
Reporte Diario Bursátil del 25 de setiembre 2015
 
SAP Training Confirmation.PDF
SAP Training Confirmation.PDFSAP Training Confirmation.PDF
SAP Training Confirmation.PDF
 
Ejercicio: Producción de electricidad en celdas
Ejercicio: Producción de electricidad en celdasEjercicio: Producción de electricidad en celdas
Ejercicio: Producción de electricidad en celdas
 
Anteprima Insurance Review 33
Anteprima Insurance Review 33Anteprima Insurance Review 33
Anteprima Insurance Review 33
 
Sirens Song
Sirens SongSirens Song
Sirens Song
 
Using Extron's "TeamWork" for collaborative learning in an FE college - Key E...
Using Extron's "TeamWork" for collaborative learning in an FE college - Key E...Using Extron's "TeamWork" for collaborative learning in an FE college - Key E...
Using Extron's "TeamWork" for collaborative learning in an FE college - Key E...
 
Meningitis y encefalitis
Meningitis y encefalitis Meningitis y encefalitis
Meningitis y encefalitis
 
Agenzia 2.0 - Le Agenzie di Assicurazioni e il Digitale
Agenzia 2.0 - Le Agenzie di Assicurazioni e il DigitaleAgenzia 2.0 - Le Agenzie di Assicurazioni e il Digitale
Agenzia 2.0 - Le Agenzie di Assicurazioni e il Digitale
 
Plants powerpoint
Plants powerpointPlants powerpoint
Plants powerpoint
 
Fábula de la Hormiga
Fábula de la HormigaFábula de la Hormiga
Fábula de la Hormiga
 

Similar to Portfolio 2016

Khaled Essam portfolio
Khaled Essam portfolioKhaled Essam portfolio
Khaled Essam portfolioKhaled Essam
 
Mohamed Nabil Omar - CV
Mohamed Nabil Omar - CVMohamed Nabil Omar - CV
Mohamed Nabil Omar - CVMohamed Omer
 
Khaled essam portfolio
Khaled essam portfolioKhaled essam portfolio
Khaled essam portfolioKhaled Essam
 
Mustafa Hatem Kadry -CV-00
Mustafa Hatem Kadry -CV-00Mustafa Hatem Kadry -CV-00
Mustafa Hatem Kadry -CV-00Mustafa Kadry
 
Hossam Samir (Senior infrastructure Engineer) C (002)
Hossam Samir (Senior infrastructure Engineer) C (002)Hossam Samir (Senior infrastructure Engineer) C (002)
Hossam Samir (Senior infrastructure Engineer) C (002)Hossam Samir
 
MAYAD_RAZOOK_CV__2022.pdf
MAYAD_RAZOOK_CV__2022.pdfMAYAD_RAZOOK_CV__2022.pdf
MAYAD_RAZOOK_CV__2022.pdfmayadrazook1
 
Hamdy hussien cv resident engineer
Hamdy hussien cv resident engineerHamdy hussien cv resident engineer
Hamdy hussien cv resident engineerhamdyhussien
 
smc Profilejune 2014 large-file
smc Profilejune 2014 large-filesmc Profilejune 2014 large-file
smc Profilejune 2014 large-fileZaki Salleh
 
smcdesigninc - the landscape studio
smcdesigninc - the landscape studiosmcdesigninc - the landscape studio
smcdesigninc - the landscape studioZaki Salleh
 
MOHAMMAD HAMID MUSTAFA (Project Manager)
MOHAMMAD HAMID MUSTAFA  (Project Manager)MOHAMMAD HAMID MUSTAFA  (Project Manager)
MOHAMMAD HAMID MUSTAFA (Project Manager)Mouhamad Msto
 
Engr. adnan khan
Engr. adnan khanEngr. adnan khan
Engr. adnan khanAdnan khan
 
Arch. Ahmed Gaber Taaleb 2016
Arch. Ahmed Gaber Taaleb 2016Arch. Ahmed Gaber Taaleb 2016
Arch. Ahmed Gaber Taaleb 2016Ahmed Gaber
 

Similar to Portfolio 2016 (20)

Yousef Abu Alwafa Resume
Yousef Abu Alwafa ResumeYousef Abu Alwafa Resume
Yousef Abu Alwafa Resume
 
JOBS
JOBSJOBS
JOBS
 
Khaled Essam portfolio
Khaled Essam portfolioKhaled Essam portfolio
Khaled Essam portfolio
 
Mohamed Nabil Omar - CV
Mohamed Nabil Omar - CVMohamed Nabil Omar - CV
Mohamed Nabil Omar - CV
 
CV eldashash
CV eldashashCV eldashash
CV eldashash
 
CV eldashash
CV eldashashCV eldashash
CV eldashash
 
Khaled essam portfolio
Khaled essam portfolioKhaled essam portfolio
Khaled essam portfolio
 
CarmeloHermieSJoloya-WORK PORTFOLIO
CarmeloHermieSJoloya-WORK PORTFOLIOCarmeloHermieSJoloya-WORK PORTFOLIO
CarmeloHermieSJoloya-WORK PORTFOLIO
 
Mustafa Hatem Kadry -CV-00
Mustafa Hatem Kadry -CV-00Mustafa Hatem Kadry -CV-00
Mustafa Hatem Kadry -CV-00
 
Hossam Samir (Senior infrastructure Engineer) C (002)
Hossam Samir (Senior infrastructure Engineer) C (002)Hossam Samir (Senior infrastructure Engineer) C (002)
Hossam Samir (Senior infrastructure Engineer) C (002)
 
MAYAD_RAZOOK_CV__2022.pdf
MAYAD_RAZOOK_CV__2022.pdfMAYAD_RAZOOK_CV__2022.pdf
MAYAD_RAZOOK_CV__2022.pdf
 
Hamdy hussien cv resident engineer
Hamdy hussien cv resident engineerHamdy hussien cv resident engineer
Hamdy hussien cv resident engineer
 
MDF profile
MDF profileMDF profile
MDF profile
 
smc Profilejune 2014 large-file
smc Profilejune 2014 large-filesmc Profilejune 2014 large-file
smc Profilejune 2014 large-file
 
smcdesigninc - the landscape studio
smcdesigninc - the landscape studiosmcdesigninc - the landscape studio
smcdesigninc - the landscape studio
 
yasser radwan
yasser radwanyasser radwan
yasser radwan
 
BAHA AL DEN AL JOBOURI, MSc.CV
BAHA AL DEN AL JOBOURI, MSc.CVBAHA AL DEN AL JOBOURI, MSc.CV
BAHA AL DEN AL JOBOURI, MSc.CV
 
MOHAMMAD HAMID MUSTAFA (Project Manager)
MOHAMMAD HAMID MUSTAFA  (Project Manager)MOHAMMAD HAMID MUSTAFA  (Project Manager)
MOHAMMAD HAMID MUSTAFA (Project Manager)
 
Engr. adnan khan
Engr. adnan khanEngr. adnan khan
Engr. adnan khan
 
Arch. Ahmed Gaber Taaleb 2016
Arch. Ahmed Gaber Taaleb 2016Arch. Ahmed Gaber Taaleb 2016
Arch. Ahmed Gaber Taaleb 2016
 

Portfolio 2016

  • 1. Mohamed Moustafa Saad – Portfolio Current Project: Sep 12 – till date Project: Msheireb , Down Town Doha , Phase 1B including Madarin Oriental hotel & hotel apartments Common areas. Client: Msheireb Properties a subsidiary of Qatar Foundation Design Architect: Variant Consultant: BMD Contractor: Carillion Qatar Building Company Value 750 m $ ++ Status: Completion expected September 2015 Role: Senior Design Manager for the JV (Head of Architecture all works including Madarin oriental Hotel & hotel apartments Fit out)
  • 2.
  • 3. Previous Projects Project: Cairo Festival City , Cairo ,Egypt Client: Al Futtaim Group Real-estate Design Architect: 5+ Consultant: ECG Contractor: Al Futtaim Carillion / Orascom Construction Industries JV Value 400 m $
  • 4. Status: Completion expected August 2012 Role: Design Manager for the JV (external Works,External Render,Signage,WP,VT,…) Project: Culture Village Client: Dubai Properties Lead Consultant : WSP Role: Design Manager for WSP Project: Sheikh Khalifa Specialist hospital, RAK, UAE Client: Ministry of Health,UAE Design Architect: Perkins Eastman Contractor: CSCEC / MCM JV Value 650 m DHS Status: Completion expected Mar 2012
  • 5. Role: Technical Manager for JV Project: Al Fattan – Currency house at DIFC , Dubai ,UAE Client: Al Fattan Properties Design Architect: Gensler Consultant: WSP Contractor: AFE Al Fattan Engineering Value 400 m DHS Status: completed Role: Senior Architect / ARE for WSP on Behalf of Gensler Project: City Hospital at DHCC (Dubai Health Care City), Dubai,UAE Client: WWHS (Welcare World Health Systems) Design Architect: Ellerbe Becket
  • 6. Project Manager: Cansult Maunsell | AECOM Consultant: WSP Contractor: AAA Al Ahmadiah Aktor Value 220 m DHS Status: Completed Role: Senior Architect / ARE for WSP Project: Mirdif Villas – Mirdif , Dubai , UAE Client: DP (Dubai Properties) Design Architect: Nombela Project Manager: Mace Consultant: Kling
  • 7. Contractor: CSCEC (China State Construction Engineering Corporation) Value: 1095 m DHS Status: Completed Role: Project Architect for CSCEC (till completing the mock up villas & apartment)
  • 8.
  • 9. Projects I was involved in preparing the tender documents while I was working in ECO Group, Alexandria, Egypt.