SlideShare a Scribd company logo
1 of 12
One Oak Hill Road, Fitchburg. MA 01420     Tel: 978.348.2749
 hfhncm@verizon.net     www.ncmhabitat.org   Fax: 978.343.9386




    Project Portfolio

                 2007 through 2011


         Mike Nobrega
  Construction Project Manager




Building Homes            Building Hope      Building Community
Mike Nobrega – Construction Project Manager
Lancaster, MA – 32 Carter Street - Energy Efficient Case Study (2011)
BSC (November 2011). "Cold Climate: National Grid Deep Energy Retrofit Pilot
Program-Second Floor Reframing Comprehensive Retrofit". Building Science
Corporation, http://www.buildingscience.com/documents/case-studies/cs-ma-
lancaster-ngrid-deep-energy-retrofit-small-colonial/view. Accessed March 6, 2012.
Hudson, MA – 3 Old Bolton Road (2010)
Hudson, MA – Energy Star® Rating
Hudson, MA – Wall Framing (2010)
Gardner, MA – 286 Pine Street (2009)
Ashburnham, MA – 203 Sherbert Road (2008)
Townsend, MA – 14 Apple Drive (2008)
Townsend, MA – Wall & Floor Framing (2008)
Fitchburg, MA – 62 Essex Street (2007)
Acton, MA – 82 River Street (2007)

More Related Content

Similar to MS-2007 Slideshow - MPN Project Portfolio

MacDonald Dan Oct 1 2014 [1130 am Session A] TAC 2014 Montreal [Compat...
MacDonald Dan   Oct 1  2014 [1130 am  Session A]   TAC 2014  Montreal [Compat...MacDonald Dan   Oct 1  2014 [1130 am  Session A]   TAC 2014  Montreal [Compat...
MacDonald Dan Oct 1 2014 [1130 am Session A] TAC 2014 Montreal [Compat...
Dan MacDonald, P.Eng.
 
Big dig powerpoint
Big dig powerpointBig dig powerpoint
Big dig powerpoint
chrisminer01
 
Big dig powerpoint
Big dig powerpointBig dig powerpoint
Big dig powerpoint
chrisminer01
 
02 pipeline systems engineering and routing considerations
02   pipeline systems engineering and routing considerations02   pipeline systems engineering and routing considerations
02 pipeline systems engineering and routing considerations
alco345ua
 

Similar to MS-2007 Slideshow - MPN Project Portfolio (11)

MacDonald Dan Oct 1 2014 [1130 am Session A] TAC 2014 Montreal [Compat...
MacDonald Dan   Oct 1  2014 [1130 am  Session A]   TAC 2014  Montreal [Compat...MacDonald Dan   Oct 1  2014 [1130 am  Session A]   TAC 2014  Montreal [Compat...
MacDonald Dan Oct 1 2014 [1130 am Session A] TAC 2014 Montreal [Compat...
 
Big dig powerpoint
Big dig powerpointBig dig powerpoint
Big dig powerpoint
 
Big dig powerpoint
Big dig powerpointBig dig powerpoint
Big dig powerpoint
 
Study of different type of building envelop
Study of different type of building envelopStudy of different type of building envelop
Study of different type of building envelop
 
SMART International Symposium for Next Generation Infrastructure: A New Appro...
SMART International Symposium for Next Generation Infrastructure: A New Appro...SMART International Symposium for Next Generation Infrastructure: A New Appro...
SMART International Symposium for Next Generation Infrastructure: A New Appro...
 
02 pipeline systems engineering and routing considerations
02   pipeline systems engineering and routing considerations02   pipeline systems engineering and routing considerations
02 pipeline systems engineering and routing considerations
 
Project Complexity (Case study)
Project Complexity (Case study)Project Complexity (Case study)
Project Complexity (Case study)
 
Design of earth-retaining structures - Lecture 8
Design of earth-retaining structures - Lecture 8Design of earth-retaining structures - Lecture 8
Design of earth-retaining structures - Lecture 8
 
KLupdate 2015
KLupdate 2015KLupdate 2015
KLupdate 2015
 
Analysis and Design of PSC post te girder
Analysis and Design of PSC post te girderAnalysis and Design of PSC post te girder
Analysis and Design of PSC post te girder
 
Analysis and Design of Post tensioned girder
Analysis and Design of Post tensioned girderAnalysis and Design of Post tensioned girder
Analysis and Design of Post tensioned girder
 

MS-2007 Slideshow - MPN Project Portfolio

  • 1. One Oak Hill Road, Fitchburg. MA 01420 Tel: 978.348.2749 hfhncm@verizon.net www.ncmhabitat.org Fax: 978.343.9386 Project Portfolio 2007 through 2011 Mike Nobrega Construction Project Manager Building Homes Building Hope Building Community
  • 2. Mike Nobrega – Construction Project Manager
  • 3. Lancaster, MA – 32 Carter Street - Energy Efficient Case Study (2011) BSC (November 2011). "Cold Climate: National Grid Deep Energy Retrofit Pilot Program-Second Floor Reframing Comprehensive Retrofit". Building Science Corporation, http://www.buildingscience.com/documents/case-studies/cs-ma- lancaster-ngrid-deep-energy-retrofit-small-colonial/view. Accessed March 6, 2012.
  • 4. Hudson, MA – 3 Old Bolton Road (2010)
  • 5. Hudson, MA – Energy Star® Rating
  • 6. Hudson, MA – Wall Framing (2010)
  • 7. Gardner, MA – 286 Pine Street (2009)
  • 8. Ashburnham, MA – 203 Sherbert Road (2008)
  • 9. Townsend, MA – 14 Apple Drive (2008)
  • 10. Townsend, MA – Wall & Floor Framing (2008)
  • 11. Fitchburg, MA – 62 Essex Street (2007)
  • 12. Acton, MA – 82 River Street (2007)