© 2013 Chevron
KSI BP LED Valve Cycling
Repacks
Phil Johnson
Joe Marin
Rance Rogers
Michael Job
TTA
SALSA = Short Analysis Lean Sigma Activity
© 2013 Chevron
Lean Sigma SALSA
Short Analysis Lean Sigma Activity
Project Background
 Problem: Valves being replaced when unable to cycle without first
conducting an inspection
 Opportunity: Conducting inspection and maintenance of valves
instead of replacing. Maintenance consists of installing new packing
and cleaning the valve.
2
© 2013 Chevron
Lean Sigma SALSA
Short Analysis Lean Sigma Activity
Before:
 KSI Maintenance
Scheduling Work
 Scoping work: if valve fails
to cycle schedule
replacement and order new
valve
After:
 KSI Maintenance
Scheduling Work
 Scoping work: if valve
fails cycle schedule
inspection and repack
valve
3
Lessons Learned, Predicted AFB, and Scalability Summary:
 Lessons Learned: Importance of valve preventative maintenance
 AFB: $100,000
 Scalability: Promoting proper valve maintenance across the Business Unit
© 2013 Chevron
Lean Sigma SALSA
IPO
4
Maintenance Crews
Equipment
Valve
Replacing Valves /
Isolation
OutputsInputs
Process:
Valve Cycling
Repacks Valves ($)
Labor ($)
© 2013 Chevron
Process Flow Map
5
Valve Fails to
Cycle
CVX Request KSI
to Replace Valve
KSI Order Valve
from MRC
Can Valve be
repacked and
cycled?
Scheduled
Maintenance
Work
Schedule Isolation
and Replacement
Isolate and
Replace Valves
Scheduled
Maintenance
Work
Valve Fails to
Cycle
Request KSI to
Inspect Vavle
Repack Valve and
Cycle
Order New Valve
for Replacement
Isolate and Finish
Work-Order
NO
YES
Before
After
© 2013 Chevron
Financial Verification
6
Month Valves
# of Valves
Repacked
Capital
Avoidance
AFB
November 3,956.83$ 2 3,956.8$ 3,956.8$
December 3,000.00$ 1 3,000.0$ 6,956.83$
January 9,136.32$ 8 9,136.3$ 16,093.15$
February 5,422.30$ 1 5,422.3$ 21,515.45$
March 16,741.02$ 1 16,741.0$ 38,256.47$
April -$ 0 -$ 38,256.47$
May 35,710.90$ 9 35,710.9$ 73,967.37$
June
July
August
September
October
November
December
(3) Valve repack material is between $20-$100 depending on diameter of valve
Assumptions:
(1) Cost of repacking labor is equal to cost of replacing labor
(2) Valve Cost is qouted from MRC

More Related Content

Similar to Valve Repacks

Lungelo Mwelase P2 Report
Lungelo Mwelase P2 ReportLungelo Mwelase P2 Report
Lungelo Mwelase P2 Report
Lungelo Mwelase
 
Continuous Improvement - The Westside Story
Continuous Improvement - The Westside StoryContinuous Improvement - The Westside Story
Continuous Improvement - The Westside Story
Jaideep Chandrasekharan
 
kaizen-sqc-141107041653-conversion-gate01.pdf
kaizen-sqc-141107041653-conversion-gate01.pdfkaizen-sqc-141107041653-conversion-gate01.pdf
kaizen-sqc-141107041653-conversion-gate01.pdf
tbutler123
 
Summer Internship Presentation
Summer Internship PresentationSummer Internship Presentation
Summer Internship Presentation
Tan Quan
 
LYB End of Term Presentation Sean Street
LYB End of Term Presentation Sean StreetLYB End of Term Presentation Sean Street
LYB End of Term Presentation Sean Street
Sean Street
 
GJ Conference Valve Exercise FINAL - RH
GJ Conference Valve Exercise FINAL - RHGJ Conference Valve Exercise FINAL - RH
GJ Conference Valve Exercise FINAL - RH
David Bries
 
W4 0245 agility_v1
W4 0245 agility_v1W4 0245 agility_v1
W4 0245 agility_v1
colleenfry
 
How to Instill a Culture of Reliability - "The Big Bang"
How to Instill a Culture of Reliability - "The Big Bang"How to Instill a Culture of Reliability - "The Big Bang"
How to Instill a Culture of Reliability - "The Big Bang"
ARMS Reliability
 

Similar to Valve Repacks (20)

Kaizen sqc
Kaizen sqcKaizen sqc
Kaizen sqc
 
Cylinders and what to look for
Cylinders and what to look forCylinders and what to look for
Cylinders and what to look for
 
Introduction To Enterprise Agility
Introduction To Enterprise AgilityIntroduction To Enterprise Agility
Introduction To Enterprise Agility
 
Lungelo Mwelase P2 Report
Lungelo Mwelase P2 ReportLungelo Mwelase P2 Report
Lungelo Mwelase P2 Report
 
Chap011
Chap011Chap011
Chap011
 
Chap011
Chap011Chap011
Chap011
 
Transition to online AMS reduces maintenance costs and improves operations
Transition to online AMS reduces maintenance costs and improves operationsTransition to online AMS reduces maintenance costs and improves operations
Transition to online AMS reduces maintenance costs and improves operations
 
Continuous Improvement - The Westside Story
Continuous Improvement - The Westside StoryContinuous Improvement - The Westside Story
Continuous Improvement - The Westside Story
 
kaizen-sqc-141107041653-conversion-gate01.pdf
kaizen-sqc-141107041653-conversion-gate01.pdfkaizen-sqc-141107041653-conversion-gate01.pdf
kaizen-sqc-141107041653-conversion-gate01.pdf
 
Summer Internship Presentation
Summer Internship PresentationSummer Internship Presentation
Summer Internship Presentation
 
Creating a High-Performance and Environmentally Sustainable Building
Creating a High-Performance and Environmentally Sustainable BuildingCreating a High-Performance and Environmentally Sustainable Building
Creating a High-Performance and Environmentally Sustainable Building
 
Final thesis 1
Final thesis 1Final thesis 1
Final thesis 1
 
SunEdison Manages Cash Flow with SAP Business Planning and Consolidations
SunEdison Manages Cash Flow with SAP Business Planning and ConsolidationsSunEdison Manages Cash Flow with SAP Business Planning and Consolidations
SunEdison Manages Cash Flow with SAP Business Planning and Consolidations
 
LYB End of Term Presentation Sean Street
LYB End of Term Presentation Sean StreetLYB End of Term Presentation Sean Street
LYB End of Term Presentation Sean Street
 
How to select the right control valves
How to select the right control valvesHow to select the right control valves
How to select the right control valves
 
GJ Conference Valve Exercise FINAL - RH
GJ Conference Valve Exercise FINAL - RHGJ Conference Valve Exercise FINAL - RH
GJ Conference Valve Exercise FINAL - RH
 
W4 0245 agility_v1
W4 0245 agility_v1W4 0245 agility_v1
W4 0245 agility_v1
 
Maya Nissim: 2013 Sandia Wind Plant Reliability Workshop
Maya Nissim: 2013 Sandia Wind Plant Reliability WorkshopMaya Nissim: 2013 Sandia Wind Plant Reliability Workshop
Maya Nissim: 2013 Sandia Wind Plant Reliability Workshop
 
How to Instill a Culture of Reliability - "The Big Bang"
How to Instill a Culture of Reliability - "The Big Bang"How to Instill a Culture of Reliability - "The Big Bang"
How to Instill a Culture of Reliability - "The Big Bang"
 
PMI-ACP Domain 1 Agile Principles and Mindset
PMI-ACP Domain 1 Agile Principles and MindsetPMI-ACP Domain 1 Agile Principles and Mindset
PMI-ACP Domain 1 Agile Principles and Mindset
 

Valve Repacks

  • 1. © 2013 Chevron KSI BP LED Valve Cycling Repacks Phil Johnson Joe Marin Rance Rogers Michael Job TTA SALSA = Short Analysis Lean Sigma Activity
  • 2. © 2013 Chevron Lean Sigma SALSA Short Analysis Lean Sigma Activity Project Background  Problem: Valves being replaced when unable to cycle without first conducting an inspection  Opportunity: Conducting inspection and maintenance of valves instead of replacing. Maintenance consists of installing new packing and cleaning the valve. 2
  • 3. © 2013 Chevron Lean Sigma SALSA Short Analysis Lean Sigma Activity Before:  KSI Maintenance Scheduling Work  Scoping work: if valve fails to cycle schedule replacement and order new valve After:  KSI Maintenance Scheduling Work  Scoping work: if valve fails cycle schedule inspection and repack valve 3 Lessons Learned, Predicted AFB, and Scalability Summary:  Lessons Learned: Importance of valve preventative maintenance  AFB: $100,000  Scalability: Promoting proper valve maintenance across the Business Unit
  • 4. © 2013 Chevron Lean Sigma SALSA IPO 4 Maintenance Crews Equipment Valve Replacing Valves / Isolation OutputsInputs Process: Valve Cycling Repacks Valves ($) Labor ($)
  • 5. © 2013 Chevron Process Flow Map 5 Valve Fails to Cycle CVX Request KSI to Replace Valve KSI Order Valve from MRC Can Valve be repacked and cycled? Scheduled Maintenance Work Schedule Isolation and Replacement Isolate and Replace Valves Scheduled Maintenance Work Valve Fails to Cycle Request KSI to Inspect Vavle Repack Valve and Cycle Order New Valve for Replacement Isolate and Finish Work-Order NO YES Before After
  • 6. © 2013 Chevron Financial Verification 6 Month Valves # of Valves Repacked Capital Avoidance AFB November 3,956.83$ 2 3,956.8$ 3,956.8$ December 3,000.00$ 1 3,000.0$ 6,956.83$ January 9,136.32$ 8 9,136.3$ 16,093.15$ February 5,422.30$ 1 5,422.3$ 21,515.45$ March 16,741.02$ 1 16,741.0$ 38,256.47$ April -$ 0 -$ 38,256.47$ May 35,710.90$ 9 35,710.9$ 73,967.37$ June July August September October November December (3) Valve repack material is between $20-$100 depending on diameter of valve Assumptions: (1) Cost of repacking labor is equal to cost of replacing labor (2) Valve Cost is qouted from MRC