8. Missions
1) Exploration Mission 1
Unnamed flight to the moon and Beyond Planned 2018
2) Exploration Mission 2 planned 2023-2024?
Manned Flight round the Moon
Rerun of Apollo 8
No Lander
9. Future Missions?
Mars/Saturn/Asteroid
Block 2 SLS planned possibly larger SRB or liquid side
booster rockets and five main engines at base.
Only 20 main engines in storage and another 6 being
built so only enough engines for five flights
Lander need to be designed built and tested.
18. Issues To Be Resolved Before Dragon
Manned Flight
1)Load and Go
2)Turbine Rotors problems
19. Business plan for Mike's Asteroid Mining INC
One Falcon Heavy -$90,000,000.00
Two Second Hand Dragon Capsules -$10,000,000.00
Two Beam Modules -$10,000,000.00
Astronaunt Salaries and other costs -$5,000,000.00
Other equipment -$5,000,000.00
Supplies -$1,000,000.00
contingencies -$10,000,000.00
Mission Support -$10,000,000.00
Cost -$141,000,000.00
9 kilograms of Platinum @ $32,247 a kilo $290,223,000.00
Profit $149,223,000.00