Dr. Ajeet Kumar Pandey
System Assurance, Railway RAMS
and Applicable Standards
Dr. Ajeet Kumar Pandey
▪ Ph.D. (Reliability Engineering): IIT Kharagpur,
Kharagpur, WB, India.
▪ M.Tech (Software Engineering): MNNIT,
Allahabad, UP, India.
▪ Member: IET (UK), IEEE (USA)
Education
Myself in Brief
Current Affiliations
Coordinates
Project Contribution and Assignments
ajeet.mnnit@gmail.com +91 8886411889
Role: Delivery Manager- Rail Business
Function: System Assurance & RAMS
India
Malaysia
Indonesia
Germany
France
UK
USA
Japan
Qatar
Australia
Expolink 2020 (Dubai)
DFCC (India)
LTR 3 (Malaysia)
R2P (Germany)
Jakarta LRT (Indonesia)
Network Rail (UK)
Sao Paulo Line-6 (Brazil)
Jakarta MRT (Indonesia)
Delhi Metro Line-8 (India)
Doha Metro (Qatar)
Sydney Metro (Australia)
Hyderabad Metro (India)
Invensys Rail (UK/USA)
Dr. Ajeet Kumar Pandey
Agenda: System Assurance & RAMS
➔ Introduction: What, Why & How
➔ Practice Overview
➔ Railway RAMS Standards
➔ Issue & Challenges
➔ Proposal: Adaptation of Progressive System Assurance Paradigm
➔ Summary
Dr. Ajeet Kumar Pandey
Introduction: System Assurance & RAMS
 RAM: Deals with the Performance of system under consideration.
 Safety: Deals with the Safety Risk of system under consideration.
 EMI/EMC:EMI have potential to impact both RAM and Safety performance of the systems adversely
 V&V: verification and validation tasks in the context of RAMS..
 Configuration Management: Each RAMS document and deliverable shall be placed under
configuration control from the time of its first release. Any changes to documents under configuration
control shall be recorded.
◆ System Assurance is a management approach to ensure that system are designed and
developed to meet specified RAM, Safety and EMC requirements.
◆ For some projects, Fire and Life Safety, Human Factor and Ergonomics, Earthing & Bonding Studies are
also considered as a part of System Assurance.
Dr. Ajeet Kumar Pandey
Introduction: System Assurance & RAMS
◆ SA does not cover the following aspects:
 Health Safety and Environment (HSE) Management
 Security Management
 Environment Management
 Sustainability Management
 Design and Interface Management
◆ Ii is a holistic engineering management approach multiple units must participate for successful
implementation of System Assurance.
Dr. Ajeet Kumar Pandey
◆ Railway RAMS has a significant impact on Quality of Service through Availability and Safety
improvement.
◆ Availability, Safety and Cost effectiveness are the most important issues for todays MRTS
systems; RAMS Process will help to achieve the specified targets.
◆ Rising Performance Requirements (Punctuality, speed, comfort, etc.).
◆ Balancing Life Cycle Cost: Assets Management; Optimizing Maintenance Cost; etc.
◆ To comply with National/ International Standards and Regulatory Requirements (EN/IEC/etc.).
◆ Technical performance has been dramatically improved over the recent years, but Operational
performance are still progressing.
 Railways Systems has a great potential to improve these (technical & operational) performance.
Therefore, RAMS management becomes a significant issue in today’s railway projects.
RAMS Management: Why?
Dr. Ajeet Kumar Pandey
◆ To minimize and control Random and
Systematic failures across the Project
Lifecycle.
RAMS Management: Why?
◆ RAMS is long term system characteristic. Life Cycle Cost can be optimized through
embellished RAMS process & tools
Dr. Ajeet Kumar Pandey
GS and PS
(Employer Requirements)
System Engineering Requirements
Functional & Non-functional
RAMS Requirements
(tender docs.)
System Requirement Specification
System Engineering and Management
RAMS Management – How?
System Assurance & RAMS Management
✓ Project Management Plan, Design plan/Method
✓ Quality Management Plan
✓ Applying Good Engineering Practices to
implement the Engineering Management Plan, etc.
✓ System Assurance Plan
✓ Safety Plan, RAM Plan, EMC Plan
✓ Implementation of these plan in design
✓ Verification & Validation
Applicable RAMS Stds.
EN 50 [126, 128, 129, 159, etc.]
✓ Implementing RAM & Safety Plan during O&M
✓ Regular audit & assessment of RAMS activities
✓ Implementing findings & recommendations
During design & development
During operation & maintenance
Client (Rail Project)
✓ RAMS Management Process: Requirements Identification/Specification & Implementation
RailwayProjects
Client Contractors Contractors/ Subcontractors
Safety Acceptance & Approval
Client/Contractors/ Subcontractors
Dr. Ajeet Kumar Pandey
Railway RAMS & Applicable Standards
Practice Overview
Dr. Ajeet Kumar Pandey
XYZ Metro
(System Boundary)
State Govt.
Min of Railway
Min. of Defense
Other stakeholders
Emergency Services
Other Rail Network
Operation & Maintenance
(Operational Service Provider/Infra Manager)
Hose pipe, Safety Valve, Circuit Board, Ballcock, etc.
ABC Metro/Rail Project
Systems
Work
Civil
Work
O&M Work
Practice Overview:Typical Breakdown Structure of Railway Project
Dr. Ajeet Kumar Pandey
WPC Contractors
(Individual/Consortium/Govt owned)
Client/Employers/Operators
(mostly Govt owned)
Independent Third Party
checker/reviewer
(DVE/ICE/IV&TE)
Engineering Consulting Cos.
(GC/PMC/Employer’s representative)
Independent Regulatory
Bodies/Certification
(ISA/RDSO/etc.)
Typical Stakeholders
RailwayProjects
Practice Overview: Stakeholders Involvement & Arrangement
Dr. Ajeet Kumar Pandey
RAMS Implementation: RAM & Safety Metrices
◆ RAM and Safety target shall be laid down well advance in the Tender Documents (GS/PS)
◆ RAM and Safety related metric shall be select as per the system and project applicability as
recommended by EN 50126-1:2017
◆ RAM Measures & Metrices:
 Reliability: Failure Rate, MTBF; MTBSAF, MKBSAF, MDBSAF, MCBF, etc.
 Availability (Inherent/y, Achieved/Operational), MUT, MDT, MART, etc.
 Maintainability: Repair Rate, MTTR, MTTSR, etc.
◆ Safety Measures & Metrices
 Hazard, Hazard Probability, Hazard Severity and Risk ( can be classified as R1 to R4)
 Risk Matrix: Defined by Client and vary project to project
 Risk Acceptance Criteria: Defined by Client and vary project to project.
 Risk Acceptance Principle: Defined by Client and vary project to project also it is country specific.
Some risk acceptance principle may be ALARAP; GAMAB; SFAIRP
 Safety Integrity Level (SIL): Based on THR which is also defined by the Client. Many take value from
SIL-1 (lowest) to SIL-4 (highest)
Dr. Ajeet Kumar Pandey
System Assurance & RAMS:Activities and Deliverables
Dr. Ajeet Kumar Pandey
RAMS Standards: IEC & CENELEC
EN 50126
(2017)
IEC 62278
(2002)
EN 50128
(2011)
IEC 62279
(2015)
EN 50129
(2003)
IEC 62425
(2007)
◆ IEC (International Electrotechnical Commission) founded in 1906, the world’s leading organization for the preparation and
publication of International Standards for all electrical, electronic and related technologies.
◆ CENELEC (European Committee for Electrotechnical Standardization) was created in 1973 to prepare Electrotechnical
standard for European markets.
EN 50159
(2010)
IEC 62280
(2014)
EN 50121
(2017)
IEC 62236
(2008)
IEC 61508 (Industrial)
Functional Safety for E/E/PE
Safety Related System
Automotive
ISO 26262
Avionics
DO – 178, DO – 278
DO- 254
Railway
IEC and
CENELEC
Will disused EN 50126, EN 50128 and 129 in detail.
Many domain, many standards ……….
Safety of
Machines
IEC 62061
Industrial
Process
61511
Nuclear
IEC 61513
Generic Standards
Dr. Ajeet Kumar Pandey
Compliance to Railway RAMS Process and Applicable Standards
◆ Four pillars of any Rail/Metro Project may be as:
✓ Infrastructure (e.g., viaduct, track, stations, depot, civil
works, etc.),
✓ Energy (e.g., power supply, overhead traction/ third rail or
power rail, etc.)
✓ Rolling Stock
✓ Control, Command and Signalling.
Applicability of RAMS Standard: Railway Systems
EN50121
• Compliance to international Standards is
demanded today for every railway systems; for
signaling it is compulsory.
• There are many globally accepted standards
around the world such as IEC, EN, AREMA,
along with some county specific standards
• We are currently in the process of converting
(harmonizing) European railways standards
into international standards, and one of those is
the RAMS standard.
Applicability of RAMS Std to different subsystems varies
and depends on various influencing factors.
Dr. Ajeet Kumar Pandey
RAMS Management: Issue & Challenges
◆ Specification and Demonstration of RAMS Requirements (e.g. design-based; performance-based
specification; or data for similar/earlier projects): Recommendation follow EN 50126-1.
◆ Reliability is built-in design, when design is concluded, maximum control over reliability is lost; there are lack
of synchronization between design team and RAMS team.
◆ Lack of subject matter expert (SA/RAMS experts), lack of awareness, lack of , etc.
◆ Lack of Management support to RAMS activities; more focus on project execution/meeting deadline.
◆ Lack of budget allocation ( or no budget) for System Assurance & RAMS.
◆ Documentation centric RAMS activities; commercial of the shelf or historical RAMS data are used in most of
the cases.
Project RAMS
Product RAMS
RAM Safety
RAM Safety
Key Issue and Suggested Recommendation
RAM & Safety studies shall be conducted separately because of:
• Failure behaviors (All failures Vs dangerous failures
• Analysis nature (Supposed to do Vs…)
• Goal nature ( Failure free Vs …)
• Requirements nature (performance & safety related)
• Many more…
Dr. Ajeet Kumar Pandey
◆ Identify the factors influencing Railway RAMS & Plan Accordingly. It may be System Condition,
Operating Condition and Maintenance Condition.
◆ Identify the detailed influencing factors under: RAM and Safety separately
◆ Apply system lifecycle approach progressively to mange RAMS across the project lifecycle.
Progressive RAMS Management
Dr. Ajeet Kumar Pandey
Summary: System Assurance & RAMS
◆ SA/RAMS Requirement shall be specified well before the project is awarded.
◆ RAM and Safety Studies shall be conducted separately.
◆ SA/RAMS deliverables shall be linked with Design Stages of the Project Progress.
◆ SA/RAMS should be considered as holistic team approach, multiple must support.
◆
◆ Its relevance, vastness, benefits and importance is to be recognized and
appreciated.
◆ EN 50126 is the generic RAMS standards; for Railway Application (all systems)
 EN 50126-1: 2017, provides basic requirements and generic RAMS process.
 EN 50126-2: 2017, provides system approach to safety
◆ Progressive System Assurance Shall be followed across the Project Life Cycle.
Dr. Ajeet Kumar Pandey
Thank You!
Any Question??

More Related Content

What's hot

Challenges in Automotive Quality Standards
Challenges in Automotive Quality StandardsChallenges in Automotive Quality Standards
Challenges in Automotive Quality StandardsTimothy Wooi
 
Ch13 Reliability
Ch13  ReliabilityCh13  Reliability
Ch13 Reliabilityzacksazu
 
Pantograph II - Failure Analysis, Monitor & Testing Regime
Pantograph II - Failure Analysis, Monitor & Testing RegimePantograph II - Failure Analysis, Monitor & Testing Regime
Pantograph II - Failure Analysis, Monitor & Testing RegimeKelvin Lam
 
B30 5 ASME-MOBILE AND LOCOMOTIVE CRANES
B30 5 ASME-MOBILE AND LOCOMOTIVE CRANESB30 5 ASME-MOBILE AND LOCOMOTIVE CRANES
B30 5 ASME-MOBILE AND LOCOMOTIVE CRANESANA ISABEL R.R.
 
PPT Presentation on IATF 16949 Documentation
PPT Presentation on IATF 16949 DocumentationPPT Presentation on IATF 16949 Documentation
PPT Presentation on IATF 16949 DocumentationGlobal Manager Group
 
CONDITION MONITORING
CONDITION MONITORINGCONDITION MONITORING
CONDITION MONITORINGlaxtwinsme
 
Road and traffic control
Road and traffic controlRoad and traffic control
Road and traffic controlBRS ENGINEERING
 
Crane Safety Training Presentation
Crane Safety Training PresentationCrane Safety Training Presentation
Crane Safety Training PresentationFAIZ FAREED
 
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical IntegrityWebinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical IntegrityStork
 
Rcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teamsRcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teamsMatthew Clemens
 
ISO 26262 introduction
ISO 26262 introductionISO 26262 introduction
ISO 26262 introductionKoenLeekens
 
Handbook on works contract management
Handbook on works contract managementHandbook on works contract management
Handbook on works contract managementSrinivasaRao Guduru
 
FMEA Introduction.ppt
FMEA Introduction.pptFMEA Introduction.ppt
FMEA Introduction.pptbowerj
 
Weigh-in-Motion (WIM) Systems
Weigh-in-Motion (WIM) SystemsWeigh-in-Motion (WIM) Systems
Weigh-in-Motion (WIM) SystemsVijai Krishnan V
 

What's hot (20)

Predictive maintenance
Predictive maintenancePredictive maintenance
Predictive maintenance
 
Fmea
FmeaFmea
Fmea
 
Challenges in Automotive Quality Standards
Challenges in Automotive Quality StandardsChallenges in Automotive Quality Standards
Challenges in Automotive Quality Standards
 
Unit-1 ME 6012
Unit-1 ME 6012Unit-1 ME 6012
Unit-1 ME 6012
 
Ch13 Reliability
Ch13  ReliabilityCh13  Reliability
Ch13 Reliability
 
Pantograph II - Failure Analysis, Monitor & Testing Regime
Pantograph II - Failure Analysis, Monitor & Testing RegimePantograph II - Failure Analysis, Monitor & Testing Regime
Pantograph II - Failure Analysis, Monitor & Testing Regime
 
B30 5 ASME-MOBILE AND LOCOMOTIVE CRANES
B30 5 ASME-MOBILE AND LOCOMOTIVE CRANESB30 5 ASME-MOBILE AND LOCOMOTIVE CRANES
B30 5 ASME-MOBILE AND LOCOMOTIVE CRANES
 
PPT Presentation on IATF 16949 Documentation
PPT Presentation on IATF 16949 DocumentationPPT Presentation on IATF 16949 Documentation
PPT Presentation on IATF 16949 Documentation
 
CONDITION MONITORING
CONDITION MONITORINGCONDITION MONITORING
CONDITION MONITORING
 
Road and traffic control
Road and traffic controlRoad and traffic control
Road and traffic control
 
Saudi Aramco Inspection Checklist (SAIC)
Saudi Aramco Inspection Checklist (SAIC)Saudi Aramco Inspection Checklist (SAIC)
Saudi Aramco Inspection Checklist (SAIC)
 
Crane Safety Training Presentation
Crane Safety Training PresentationCrane Safety Training Presentation
Crane Safety Training Presentation
 
Functional safety standards_for_machinery
Functional safety standards_for_machineryFunctional safety standards_for_machinery
Functional safety standards_for_machinery
 
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical IntegrityWebinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
 
Rcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teamsRcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teams
 
Rbi
RbiRbi
Rbi
 
ISO 26262 introduction
ISO 26262 introductionISO 26262 introduction
ISO 26262 introduction
 
Handbook on works contract management
Handbook on works contract managementHandbook on works contract management
Handbook on works contract management
 
FMEA Introduction.ppt
FMEA Introduction.pptFMEA Introduction.ppt
FMEA Introduction.ppt
 
Weigh-in-Motion (WIM) Systems
Weigh-in-Motion (WIM) SystemsWeigh-in-Motion (WIM) Systems
Weigh-in-Motion (WIM) Systems
 

Similar to System Assurance & RAMS

Seven_RAMS_Presentation_EN_04
Seven_RAMS_Presentation_EN_04Seven_RAMS_Presentation_EN_04
Seven_RAMS_Presentation_EN_04Marco Addino
 
SIAM Study - Comparing the Introduction of New IT Services via Simple and Com...
SIAM Study - Comparing the Introduction of New IT Services via Simple and Com...SIAM Study - Comparing the Introduction of New IT Services via Simple and Com...
SIAM Study - Comparing the Introduction of New IT Services via Simple and Com...Ken Blunt
 
Final MPCL KOM Presentation-22-Nov -2021.pptx
Final MPCL KOM Presentation-22-Nov -2021.pptxFinal MPCL KOM Presentation-22-Nov -2021.pptx
Final MPCL KOM Presentation-22-Nov -2021.pptxMoeidIqbal2
 
Study & career paths for Maintenance people (Ray Beebe)
Study & career paths for Maintenance people (Ray Beebe)Study & career paths for Maintenance people (Ray Beebe)
Study & career paths for Maintenance people (Ray Beebe)Ray Beebe
 
Reliability Centered Maintenance Implementation and Case Study
Reliability Centered Maintenance Implementation and Case StudyReliability Centered Maintenance Implementation and Case Study
Reliability Centered Maintenance Implementation and Case StudyWaseem Akram
 
Systems Reliability in Automotive Engineering Workshop - Tonex Training
Systems Reliability in Automotive Engineering Workshop - Tonex TrainingSystems Reliability in Automotive Engineering Workshop - Tonex Training
Systems Reliability in Automotive Engineering Workshop - Tonex TrainingBryan Len
 
Oak Systems - When you build Software, we build Quality in it
Oak Systems - When you build Software, we build Quality in it Oak Systems - When you build Software, we build Quality in it
Oak Systems - When you build Software, we build Quality in it Oak Systems
 
Overview of Business Processes
Overview of Business ProcessesOverview of Business Processes
Overview of Business ProcessesAyub Qureshi
 
Sr Electrical Designer Engineer_wiring harness (EWIS) _Chandram Narayana
Sr Electrical Designer Engineer_wiring harness (EWIS) _Chandram NarayanaSr Electrical Designer Engineer_wiring harness (EWIS) _Chandram Narayana
Sr Electrical Designer Engineer_wiring harness (EWIS) _Chandram NarayanaChandram Narayana
 
IBM ALM for aviation safety compliance aerospace
IBM ALM for aviation safety compliance aerospaceIBM ALM for aviation safety compliance aerospace
IBM ALM for aviation safety compliance aerospaceImran Hashmi
 
IBM Detailed ALM/ELM for Aerospace & Defence overview
IBM Detailed ALM/ELM  for Aerospace & Defence overviewIBM Detailed ALM/ELM  for Aerospace & Defence overview
IBM Detailed ALM/ELM for Aerospace & Defence overviewImran Hashmi
 
Sanjit samal resume
Sanjit samal resumeSanjit samal resume
Sanjit samal resumesanjit samal
 
IRJET- Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
IRJET-  	  Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...IRJET-  	  Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
IRJET- Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...IRJET Journal
 

Similar to System Assurance & RAMS (20)

Seven_RAMS_Presentation_EN_04
Seven_RAMS_Presentation_EN_04Seven_RAMS_Presentation_EN_04
Seven_RAMS_Presentation_EN_04
 
EESS 2018 Day 1 - Tim Gray
EESS 2018 Day 1 - Tim GrayEESS 2018 Day 1 - Tim Gray
EESS 2018 Day 1 - Tim Gray
 
Rameez cv1
Rameez cv1Rameez cv1
Rameez cv1
 
SIAM Study - Comparing the Introduction of New IT Services via Simple and Com...
SIAM Study - Comparing the Introduction of New IT Services via Simple and Com...SIAM Study - Comparing the Introduction of New IT Services via Simple and Com...
SIAM Study - Comparing the Introduction of New IT Services via Simple and Com...
 
Railway gamification 02
Railway gamification 02Railway gamification 02
Railway gamification 02
 
Final MPCL KOM Presentation-22-Nov -2021.pptx
Final MPCL KOM Presentation-22-Nov -2021.pptxFinal MPCL KOM Presentation-22-Nov -2021.pptx
Final MPCL KOM Presentation-22-Nov -2021.pptx
 
Study & career paths for Maintenance people (Ray Beebe)
Study & career paths for Maintenance people (Ray Beebe)Study & career paths for Maintenance people (Ray Beebe)
Study & career paths for Maintenance people (Ray Beebe)
 
Reliability Centered Maintenance Implementation and Case Study
Reliability Centered Maintenance Implementation and Case StudyReliability Centered Maintenance Implementation and Case Study
Reliability Centered Maintenance Implementation and Case Study
 
Systems Reliability in Automotive Engineering Workshop - Tonex Training
Systems Reliability in Automotive Engineering Workshop - Tonex TrainingSystems Reliability in Automotive Engineering Workshop - Tonex Training
Systems Reliability in Automotive Engineering Workshop - Tonex Training
 
Oak Systems - When you build Software, we build Quality in it
Oak Systems - When you build Software, we build Quality in it Oak Systems - When you build Software, we build Quality in it
Oak Systems - When you build Software, we build Quality in it
 
ANIRUDDHA DEV_CV
ANIRUDDHA DEV_CVANIRUDDHA DEV_CV
ANIRUDDHA DEV_CV
 
Overview of Business Processes
Overview of Business ProcessesOverview of Business Processes
Overview of Business Processes
 
CV
CVCV
CV
 
Sr Electrical Designer Engineer_wiring harness (EWIS) _Chandram Narayana
Sr Electrical Designer Engineer_wiring harness (EWIS) _Chandram NarayanaSr Electrical Designer Engineer_wiring harness (EWIS) _Chandram Narayana
Sr Electrical Designer Engineer_wiring harness (EWIS) _Chandram Narayana
 
Genisision – Sales – 012 – Capability Statement Expanded
Genisision – Sales – 012 – Capability Statement ExpandedGenisision – Sales – 012 – Capability Statement Expanded
Genisision – Sales – 012 – Capability Statement Expanded
 
IBM ALM for aviation safety compliance aerospace
IBM ALM for aviation safety compliance aerospaceIBM ALM for aviation safety compliance aerospace
IBM ALM for aviation safety compliance aerospace
 
IBM Detailed ALM/ELM for Aerospace & Defence overview
IBM Detailed ALM/ELM  for Aerospace & Defence overviewIBM Detailed ALM/ELM  for Aerospace & Defence overview
IBM Detailed ALM/ELM for Aerospace & Defence overview
 
Sanjit samal resume
Sanjit samal resumeSanjit samal resume
Sanjit samal resume
 
Rabi Kumar Purohita
Rabi Kumar PurohitaRabi Kumar Purohita
Rabi Kumar Purohita
 
IRJET- Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
IRJET-  	  Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...IRJET-  	  Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
IRJET- Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
 

Recently uploaded

JohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptxJohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptxJohnPollard37
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
AI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAnitaRaj43
 
Modernizing Legacy Systems Using Ballerina
Modernizing Legacy Systems Using BallerinaModernizing Legacy Systems Using Ballerina
Modernizing Legacy Systems Using BallerinaWSO2
 
Simplifying Mobile A11y Presentation.pptx
Simplifying Mobile A11y Presentation.pptxSimplifying Mobile A11y Presentation.pptx
Simplifying Mobile A11y Presentation.pptxMarkSteadman7
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Victor Rentea
 
ChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps ProductivityChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps ProductivityVictorSzoltysek
 
Stronger Together: Developing an Organizational Strategy for Accessible Desig...
Stronger Together: Developing an Organizational Strategy for Accessible Desig...Stronger Together: Developing an Organizational Strategy for Accessible Desig...
Stronger Together: Developing an Organizational Strategy for Accessible Desig...caitlingebhard1
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)Samir Dash
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Victor Rentea
 
JavaScript Usage Statistics 2024 - The Ultimate Guide
JavaScript Usage Statistics 2024 - The Ultimate GuideJavaScript Usage Statistics 2024 - The Ultimate Guide
JavaScript Usage Statistics 2024 - The Ultimate GuidePixlogix Infotech
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Bhuvaneswari Subramani
 
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...TrustArc
 
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....rightmanforbloodline
 
Navigating Identity and Access Management in the Modern Enterprise
Navigating Identity and Access Management in the Modern EnterpriseNavigating Identity and Access Management in the Modern Enterprise
Navigating Identity and Access Management in the Modern EnterpriseWSO2
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Orbitshub
 
Choreo: Empowering the Future of Enterprise Software Engineering
Choreo: Empowering the Future of Enterprise Software EngineeringChoreo: Empowering the Future of Enterprise Software Engineering
Choreo: Empowering the Future of Enterprise Software EngineeringWSO2
 

Recently uploaded (20)

JohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptxJohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptx
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
AI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by Anitaraj
 
Modernizing Legacy Systems Using Ballerina
Modernizing Legacy Systems Using BallerinaModernizing Legacy Systems Using Ballerina
Modernizing Legacy Systems Using Ballerina
 
Simplifying Mobile A11y Presentation.pptx
Simplifying Mobile A11y Presentation.pptxSimplifying Mobile A11y Presentation.pptx
Simplifying Mobile A11y Presentation.pptx
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
ChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps ProductivityChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps Productivity
 
Stronger Together: Developing an Organizational Strategy for Accessible Desig...
Stronger Together: Developing an Organizational Strategy for Accessible Desig...Stronger Together: Developing an Organizational Strategy for Accessible Desig...
Stronger Together: Developing an Organizational Strategy for Accessible Desig...
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
JavaScript Usage Statistics 2024 - The Ultimate Guide
JavaScript Usage Statistics 2024 - The Ultimate GuideJavaScript Usage Statistics 2024 - The Ultimate Guide
JavaScript Usage Statistics 2024 - The Ultimate Guide
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
 
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....
 
Navigating Identity and Access Management in the Modern Enterprise
Navigating Identity and Access Management in the Modern EnterpriseNavigating Identity and Access Management in the Modern Enterprise
Navigating Identity and Access Management in the Modern Enterprise
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Choreo: Empowering the Future of Enterprise Software Engineering
Choreo: Empowering the Future of Enterprise Software EngineeringChoreo: Empowering the Future of Enterprise Software Engineering
Choreo: Empowering the Future of Enterprise Software Engineering
 

System Assurance & RAMS

  • 1. Dr. Ajeet Kumar Pandey System Assurance, Railway RAMS and Applicable Standards
  • 2. Dr. Ajeet Kumar Pandey ▪ Ph.D. (Reliability Engineering): IIT Kharagpur, Kharagpur, WB, India. ▪ M.Tech (Software Engineering): MNNIT, Allahabad, UP, India. ▪ Member: IET (UK), IEEE (USA) Education Myself in Brief Current Affiliations Coordinates Project Contribution and Assignments ajeet.mnnit@gmail.com +91 8886411889 Role: Delivery Manager- Rail Business Function: System Assurance & RAMS India Malaysia Indonesia Germany France UK USA Japan Qatar Australia Expolink 2020 (Dubai) DFCC (India) LTR 3 (Malaysia) R2P (Germany) Jakarta LRT (Indonesia) Network Rail (UK) Sao Paulo Line-6 (Brazil) Jakarta MRT (Indonesia) Delhi Metro Line-8 (India) Doha Metro (Qatar) Sydney Metro (Australia) Hyderabad Metro (India) Invensys Rail (UK/USA)
  • 3. Dr. Ajeet Kumar Pandey Agenda: System Assurance & RAMS ➔ Introduction: What, Why & How ➔ Practice Overview ➔ Railway RAMS Standards ➔ Issue & Challenges ➔ Proposal: Adaptation of Progressive System Assurance Paradigm ➔ Summary
  • 4. Dr. Ajeet Kumar Pandey Introduction: System Assurance & RAMS  RAM: Deals with the Performance of system under consideration.  Safety: Deals with the Safety Risk of system under consideration.  EMI/EMC:EMI have potential to impact both RAM and Safety performance of the systems adversely  V&V: verification and validation tasks in the context of RAMS..  Configuration Management: Each RAMS document and deliverable shall be placed under configuration control from the time of its first release. Any changes to documents under configuration control shall be recorded. ◆ System Assurance is a management approach to ensure that system are designed and developed to meet specified RAM, Safety and EMC requirements. ◆ For some projects, Fire and Life Safety, Human Factor and Ergonomics, Earthing & Bonding Studies are also considered as a part of System Assurance.
  • 5. Dr. Ajeet Kumar Pandey Introduction: System Assurance & RAMS ◆ SA does not cover the following aspects:  Health Safety and Environment (HSE) Management  Security Management  Environment Management  Sustainability Management  Design and Interface Management ◆ Ii is a holistic engineering management approach multiple units must participate for successful implementation of System Assurance.
  • 6. Dr. Ajeet Kumar Pandey ◆ Railway RAMS has a significant impact on Quality of Service through Availability and Safety improvement. ◆ Availability, Safety and Cost effectiveness are the most important issues for todays MRTS systems; RAMS Process will help to achieve the specified targets. ◆ Rising Performance Requirements (Punctuality, speed, comfort, etc.). ◆ Balancing Life Cycle Cost: Assets Management; Optimizing Maintenance Cost; etc. ◆ To comply with National/ International Standards and Regulatory Requirements (EN/IEC/etc.). ◆ Technical performance has been dramatically improved over the recent years, but Operational performance are still progressing.  Railways Systems has a great potential to improve these (technical & operational) performance. Therefore, RAMS management becomes a significant issue in today’s railway projects. RAMS Management: Why?
  • 7. Dr. Ajeet Kumar Pandey ◆ To minimize and control Random and Systematic failures across the Project Lifecycle. RAMS Management: Why? ◆ RAMS is long term system characteristic. Life Cycle Cost can be optimized through embellished RAMS process & tools
  • 8. Dr. Ajeet Kumar Pandey GS and PS (Employer Requirements) System Engineering Requirements Functional & Non-functional RAMS Requirements (tender docs.) System Requirement Specification System Engineering and Management RAMS Management – How? System Assurance & RAMS Management ✓ Project Management Plan, Design plan/Method ✓ Quality Management Plan ✓ Applying Good Engineering Practices to implement the Engineering Management Plan, etc. ✓ System Assurance Plan ✓ Safety Plan, RAM Plan, EMC Plan ✓ Implementation of these plan in design ✓ Verification & Validation Applicable RAMS Stds. EN 50 [126, 128, 129, 159, etc.] ✓ Implementing RAM & Safety Plan during O&M ✓ Regular audit & assessment of RAMS activities ✓ Implementing findings & recommendations During design & development During operation & maintenance Client (Rail Project) ✓ RAMS Management Process: Requirements Identification/Specification & Implementation RailwayProjects Client Contractors Contractors/ Subcontractors Safety Acceptance & Approval Client/Contractors/ Subcontractors
  • 9. Dr. Ajeet Kumar Pandey Railway RAMS & Applicable Standards Practice Overview
  • 10. Dr. Ajeet Kumar Pandey XYZ Metro (System Boundary) State Govt. Min of Railway Min. of Defense Other stakeholders Emergency Services Other Rail Network Operation & Maintenance (Operational Service Provider/Infra Manager) Hose pipe, Safety Valve, Circuit Board, Ballcock, etc. ABC Metro/Rail Project Systems Work Civil Work O&M Work Practice Overview:Typical Breakdown Structure of Railway Project
  • 11. Dr. Ajeet Kumar Pandey WPC Contractors (Individual/Consortium/Govt owned) Client/Employers/Operators (mostly Govt owned) Independent Third Party checker/reviewer (DVE/ICE/IV&TE) Engineering Consulting Cos. (GC/PMC/Employer’s representative) Independent Regulatory Bodies/Certification (ISA/RDSO/etc.) Typical Stakeholders RailwayProjects Practice Overview: Stakeholders Involvement & Arrangement
  • 12. Dr. Ajeet Kumar Pandey RAMS Implementation: RAM & Safety Metrices ◆ RAM and Safety target shall be laid down well advance in the Tender Documents (GS/PS) ◆ RAM and Safety related metric shall be select as per the system and project applicability as recommended by EN 50126-1:2017 ◆ RAM Measures & Metrices:  Reliability: Failure Rate, MTBF; MTBSAF, MKBSAF, MDBSAF, MCBF, etc.  Availability (Inherent/y, Achieved/Operational), MUT, MDT, MART, etc.  Maintainability: Repair Rate, MTTR, MTTSR, etc. ◆ Safety Measures & Metrices  Hazard, Hazard Probability, Hazard Severity and Risk ( can be classified as R1 to R4)  Risk Matrix: Defined by Client and vary project to project  Risk Acceptance Criteria: Defined by Client and vary project to project.  Risk Acceptance Principle: Defined by Client and vary project to project also it is country specific. Some risk acceptance principle may be ALARAP; GAMAB; SFAIRP  Safety Integrity Level (SIL): Based on THR which is also defined by the Client. Many take value from SIL-1 (lowest) to SIL-4 (highest)
  • 13. Dr. Ajeet Kumar Pandey System Assurance & RAMS:Activities and Deliverables
  • 14. Dr. Ajeet Kumar Pandey RAMS Standards: IEC & CENELEC EN 50126 (2017) IEC 62278 (2002) EN 50128 (2011) IEC 62279 (2015) EN 50129 (2003) IEC 62425 (2007) ◆ IEC (International Electrotechnical Commission) founded in 1906, the world’s leading organization for the preparation and publication of International Standards for all electrical, electronic and related technologies. ◆ CENELEC (European Committee for Electrotechnical Standardization) was created in 1973 to prepare Electrotechnical standard for European markets. EN 50159 (2010) IEC 62280 (2014) EN 50121 (2017) IEC 62236 (2008) IEC 61508 (Industrial) Functional Safety for E/E/PE Safety Related System Automotive ISO 26262 Avionics DO – 178, DO – 278 DO- 254 Railway IEC and CENELEC Will disused EN 50126, EN 50128 and 129 in detail. Many domain, many standards ………. Safety of Machines IEC 62061 Industrial Process 61511 Nuclear IEC 61513 Generic Standards
  • 15. Dr. Ajeet Kumar Pandey Compliance to Railway RAMS Process and Applicable Standards ◆ Four pillars of any Rail/Metro Project may be as: ✓ Infrastructure (e.g., viaduct, track, stations, depot, civil works, etc.), ✓ Energy (e.g., power supply, overhead traction/ third rail or power rail, etc.) ✓ Rolling Stock ✓ Control, Command and Signalling. Applicability of RAMS Standard: Railway Systems EN50121 • Compliance to international Standards is demanded today for every railway systems; for signaling it is compulsory. • There are many globally accepted standards around the world such as IEC, EN, AREMA, along with some county specific standards • We are currently in the process of converting (harmonizing) European railways standards into international standards, and one of those is the RAMS standard. Applicability of RAMS Std to different subsystems varies and depends on various influencing factors.
  • 16. Dr. Ajeet Kumar Pandey RAMS Management: Issue & Challenges ◆ Specification and Demonstration of RAMS Requirements (e.g. design-based; performance-based specification; or data for similar/earlier projects): Recommendation follow EN 50126-1. ◆ Reliability is built-in design, when design is concluded, maximum control over reliability is lost; there are lack of synchronization between design team and RAMS team. ◆ Lack of subject matter expert (SA/RAMS experts), lack of awareness, lack of , etc. ◆ Lack of Management support to RAMS activities; more focus on project execution/meeting deadline. ◆ Lack of budget allocation ( or no budget) for System Assurance & RAMS. ◆ Documentation centric RAMS activities; commercial of the shelf or historical RAMS data are used in most of the cases. Project RAMS Product RAMS RAM Safety RAM Safety Key Issue and Suggested Recommendation RAM & Safety studies shall be conducted separately because of: • Failure behaviors (All failures Vs dangerous failures • Analysis nature (Supposed to do Vs…) • Goal nature ( Failure free Vs …) • Requirements nature (performance & safety related) • Many more…
  • 17. Dr. Ajeet Kumar Pandey ◆ Identify the factors influencing Railway RAMS & Plan Accordingly. It may be System Condition, Operating Condition and Maintenance Condition. ◆ Identify the detailed influencing factors under: RAM and Safety separately ◆ Apply system lifecycle approach progressively to mange RAMS across the project lifecycle. Progressive RAMS Management
  • 18. Dr. Ajeet Kumar Pandey Summary: System Assurance & RAMS ◆ SA/RAMS Requirement shall be specified well before the project is awarded. ◆ RAM and Safety Studies shall be conducted separately. ◆ SA/RAMS deliverables shall be linked with Design Stages of the Project Progress. ◆ SA/RAMS should be considered as holistic team approach, multiple must support. ◆ ◆ Its relevance, vastness, benefits and importance is to be recognized and appreciated. ◆ EN 50126 is the generic RAMS standards; for Railway Application (all systems)  EN 50126-1: 2017, provides basic requirements and generic RAMS process.  EN 50126-2: 2017, provides system approach to safety ◆ Progressive System Assurance Shall be followed across the Project Life Cycle.
  • 19. Dr. Ajeet Kumar Pandey Thank You! Any Question??