Future Shipbuilding & Offshore Opportunities in Myanmar Shipyards
MARK-GUINAN-WORK-PHOTOS
1. Page 1 of 12
Various examples of work produced: Mark Guinan
High Articulation launch and Recovery System.
15 Tonne SWL, to DNV specification 4 G Design Factor. Incorporating ROV
Transport System and Turntable.
3. Page 3 of 12
Graphic Arts Equipment Developed at Heights Design, including Developers,
Du Pont Cromalin, Punching and Laminating Machines.
Production Aid for Electronics industry. Pressure Whisk, Confectionary.
4. Page 4 of 12
Continuous Forming Machine for Extruder, Multiple Proofing Machine, Robot Welding
Jig, 700 Bar Hydrostatic Test Unit, Cable Pre-Tensioning Machine.
5. Page 5 of 12
Level-Wind Tether Management System, Bale Arm "Top-Hat" TMS Deployed with
ROV, All Stainless Steel Compact TMS.
6. Page 6 of 12
Bale-Arm and Level Wind Tether Management Systems, Deployment in Luanda Bay,
Angola.
7. Page 7 of 12
Level Wind Tether Management System, 1600 metre Excursion, Equipped with
Positioning Hydraulic Thrusters.
8. Page 8 of 12
Concept, General Assembly and Detail Component Drawings for Manufacture.
9. Page 9 of 12
15 Tonne SWL, Launch and Recovery Systems, to DNV standard. 45 tonne Test
load. Air Transport by "Antanov -124-100" to East Africa. Commissioning aboard
"Bourbonne Helene" Two Complete Systems.