SlideShare a Scribd company logo
1 of 16
1
advices for advancing the productivity of the construction industry:
• 1. Widespread deployment of Building Information Modeling (BIM)
• 2. Improved job-site efficiency
• 3. Greater use of prefabrication, preassembly, modularization, and off-site
fabrication techniques.
• 4. Innovative, widespread use of demonstration installations
• 5. Effective performance measurement to drive efficiency and support
innovation.
2
Manufacturing building components off-site:
• More controlled conditions for weather, quality control, improved supervision of
labor, easier access to tools, and fewer material deliveries.
• Fewer job-site environmental impacts
• Compressed project schedules
• Fewer conflicts in work crew scheduling and better sequencing of crafts persons.
• Reduced requirements for on-site materials storage, and fewer losses of materials.
• Increased workers safety.
3
Definition of Modular Construction:
• A resource efficient, off-site delivery method to construct code-compliant
buildings in a quality-controlled setting
4
Advantages of Modular Construction:
• Less Materials Waste
• Less Material Exposure to Inclement Weather
• Less Site Disturbance
• Safer Construction
• Flexibility
• Adaptability
• Built to Code With Shorter Build Times
5
Modular Building Usage:
Permanent Modular Construction
Temporary Buildings
• Education
• Healthcare
• Commercial Housing
• Office Administration
• Security
• Emergency
• Workforce housing
Assembling the entire fleet of modules rely on optimization of the crane position
Based on one case study in Muhlenberg college in Pennsylvania , over 90 modular
units were delivered in a record time of 10 days by optimizing of crane position. 6
7
8
9
Issues and Impediments about Modular Construction:
• Typically 40-50% of modular building construction is left to be completed in the field
• Geographic location of the factory
• Engineering requirements
• Specific dimension or loading limitations due to transportation constraints
• Changes in design during manufacturing can be difficult and expensive to
accommodate.
• the complexity of transportation activity is increased in modular construction.
• The increased demand for very effective coordination and communication among
participants
• For a factory and manufacturer the repetition of prefabricated components is essential
in order to meet quantity for cost effectiveness.
10
The regulations set down by transport Quebec:
11
Suitable project delivery system in Modular Construction:
• Most modular building projects are fixed-price contracts
• many modular construction projects are being completed faster and for less money
by utilizing Design-Build or Construction Manager at Risk(CMR).
• most architects are not experienced enough in the modular construction
• when modular manufacturing is responsible for the design or is involved the
project is more likely to be successful.
If projects use Design-Build:
direct line of communication between the owner and modular manufacturer
costs are easier to control
workload upon the owner is increased
publicly funded projects
12
• In case of using Design-Bid-Build:
amount of involvement of owner in the project is reduced
if the designer firm is not familiar with modular construction it could bring high initial cost to
the project
because of additional layers of communication the project duration would be increased
• in case of using CMR:
it works very well when the modular company is either the construction manager or is a key
subcontractor with a design assist role.
13
Implementation of BIM in Modular Construction:
• The MEP coordination and fabrication process
• extensive demand of pre project planning
• Implementation of BIM systems in modular construction:
Visualization
Modeling
Code reviews
Fabrication/ shop drawings
Communication
Cost estimating
Construction sequences
Conflict, interference and collision detection
14
six factors which influence the productivity of Nuclear Power Plants:
• low material availability
• low tool availability
• high rework rates
• needless interference with other crews
• overcrowded work areas and time consuming inspection delays
Reducing the amount of on-site labor with factory produced power plant modules
15
References:
• “Improving Construction efficiency & productivity with Modular Construction” , by Modular Building
Institute
• Christopher W.Lapp , Michael W.Golay,1997, “ Modular Design and Construction techniques for nuclear
power plants”,nuclear engineering and design
• Na Lu ,Thomas Korman , 2010 , “Implementation of Building Information Modeling (BIM)in Modular
Construction: Benefits and Challenges” , Construction Research Congress 2010
• J.Olearczyk,Mohamed Al-Hussein,Ahmed Bouferguène,2014, “Evolution of the crane selection and on-site
utilization process for modular construction multilifts” , Automation in Construction 43 (2014) 59–72
• Calvin van Mulligen, 2012, Master thesis, “Improving the efficiency, productivity and cost-effectiveness of
modular design and construction processes”, University of Alberta
• Lara Jaillon,C.S.Poon, 2009, “ the evolution of prefabricated residential building systems in Hong Kong: A
review of the public and private sector’, Automation in Construction18(2009)239-248
• Thesis by Stefan J. Wiedeman ,McGill University, “ Modular prefabrication versus conventional construction
as a cost effective alternative for the construction of single family detached housing in the Montreal area”
• Thesis by Yasir Kadhim, University of New Brunswick,” Analysis of the adoption and implementation of
virtual reality technologies for modular construction”
16

More Related Content

Similar to Modular Construction.pptx

PreFab_Whitepaper-TheMorseGroup
PreFab_Whitepaper-TheMorseGroupPreFab_Whitepaper-TheMorseGroup
PreFab_Whitepaper-TheMorseGroupTodd Sullivan
 
Capitalizing on modular construction as the next frontier for innovation
Capitalizing on modular construction as the  next frontier for innovationCapitalizing on modular construction as the  next frontier for innovation
Capitalizing on modular construction as the next frontier for innovationSJVijay
 
Change Management For Building Information Modelling (BIM)
Change Management For Building Information Modelling (BIM)Change Management For Building Information Modelling (BIM)
Change Management For Building Information Modelling (BIM)Ir. Abdul Aziz Abas
 
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015Aconex
 
Modularization: How Going Modular Can Mitigate Project Risk and Deliver Proje...
Modularization: How Going Modular Can Mitigate Project Risk and Deliver Proje...Modularization: How Going Modular Can Mitigate Project Risk and Deliver Proje...
Modularization: How Going Modular Can Mitigate Project Risk and Deliver Proje...Koch Modular Process Systems, LLC.
 
Mechanized construction
Mechanized constructionMechanized construction
Mechanized constructionsrinivas2036
 
Selection of an appropriate project approach
Selection of an appropriate project approachSelection of an appropriate project approach
Selection of an appropriate project approachtumetr1
 
Structural BIM Services | Offshore Outsourcing India.pptx
Structural BIM Services | Offshore Outsourcing India.pptxStructural BIM Services | Offshore Outsourcing India.pptx
Structural BIM Services | Offshore Outsourcing India.pptxOffshore outsourcing India
 
Early contractor involvement (eci) procurement approach spm talk 2016
Early contractor involvement (eci) procurement approach   spm talk 2016Early contractor involvement (eci) procurement approach   spm talk 2016
Early contractor involvement (eci) procurement approach spm talk 2016teohwooisin
 
Benefits of a Company-wide Project Management Platform - Webinar, July 2016
Benefits of a Company-wide Project Management Platform - Webinar, July 2016Benefits of a Company-wide Project Management Platform - Webinar, July 2016
Benefits of a Company-wide Project Management Platform - Webinar, July 2016Aconex
 
bim and project controls
 bim and project controls bim and project controls
bim and project controlsOmar Selim
 
Viasys VDC City Models
Viasys VDC City Models Viasys VDC City Models
Viasys VDC City Models Viasys VDC
 
What is bim, building information modeling
What is bim, building information modelingWhat is bim, building information modeling
What is bim, building information modelingNI BT
 

Similar to Modular Construction.pptx (20)

076 Modular Construction
076 Modular Construction076 Modular Construction
076 Modular Construction
 
PreFab_Whitepaper-TheMorseGroup
PreFab_Whitepaper-TheMorseGroupPreFab_Whitepaper-TheMorseGroup
PreFab_Whitepaper-TheMorseGroup
 
Innovation technique in construction
Innovation technique in constructionInnovation technique in construction
Innovation technique in construction
 
Modular construction ppt
Modular construction pptModular construction ppt
Modular construction ppt
 
Capitalizing on modular construction as the next frontier for innovation
Capitalizing on modular construction as the  next frontier for innovationCapitalizing on modular construction as the  next frontier for innovation
Capitalizing on modular construction as the next frontier for innovation
 
Change Management For Building Information Modelling (BIM)
Change Management For Building Information Modelling (BIM)Change Management For Building Information Modelling (BIM)
Change Management For Building Information Modelling (BIM)
 
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
 
Modular Construction
Modular ConstructionModular Construction
Modular Construction
 
Modularization: How Going Modular Can Mitigate Project Risk and Deliver Proje...
Modularization: How Going Modular Can Mitigate Project Risk and Deliver Proje...Modularization: How Going Modular Can Mitigate Project Risk and Deliver Proje...
Modularization: How Going Modular Can Mitigate Project Risk and Deliver Proje...
 
Mechanized construction
Mechanized constructionMechanized construction
Mechanized construction
 
Selection of an appropriate project approach
Selection of an appropriate project approachSelection of an appropriate project approach
Selection of an appropriate project approach
 
Structural BIM Services | Offshore Outsourcing India.pptx
Structural BIM Services | Offshore Outsourcing India.pptxStructural BIM Services | Offshore Outsourcing India.pptx
Structural BIM Services | Offshore Outsourcing India.pptx
 
Early contractor involvement (eci) procurement approach spm talk 2016
Early contractor involvement (eci) procurement approach   spm talk 2016Early contractor involvement (eci) procurement approach   spm talk 2016
Early contractor involvement (eci) procurement approach spm talk 2016
 
bim ppt 2 final
bim ppt 2 finalbim ppt 2 final
bim ppt 2 final
 
Benefits of a Company-wide Project Management Platform - Webinar, July 2016
Benefits of a Company-wide Project Management Platform - Webinar, July 2016Benefits of a Company-wide Project Management Platform - Webinar, July 2016
Benefits of a Company-wide Project Management Platform - Webinar, July 2016
 
Lecture 1.pptx
Lecture 1.pptxLecture 1.pptx
Lecture 1.pptx
 
bim and project controls
 bim and project controls bim and project controls
bim and project controls
 
Nathan Hildebrandt
Nathan HildebrandtNathan Hildebrandt
Nathan Hildebrandt
 
Viasys VDC City Models
Viasys VDC City Models Viasys VDC City Models
Viasys VDC City Models
 
What is bim, building information modeling
What is bim, building information modelingWhat is bim, building information modeling
What is bim, building information modeling
 

Recently uploaded

(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一Fi sss
 
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...Amil baba
 
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...narwatsonia7
 
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一lvtagr7
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`dajasot375
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfSumit Lathwal
 
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130Suhani Kapoor
 
ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case StudySophia Viganò
 
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Gariahat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Roomdivyansh0kumar0
 
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Narsimha murthy
 
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiVIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiSuhani Kapoor
 
WAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsWAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsCharles Obaleagbon
 
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts ServiceCall Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Servicejennyeacort
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdfSwaraliBorhade
 
SCRIP Lua HTTP PROGRACMACION PLC WECON CA
SCRIP Lua HTTP PROGRACMACION PLC  WECON CASCRIP Lua HTTP PROGRACMACION PLC  WECON CA
SCRIP Lua HTTP PROGRACMACION PLC WECON CANestorGamez6
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一Fi L
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一F La
 

Recently uploaded (20)

(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
 
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
 
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
 
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
 
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
 
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk GurgaonCheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdf
 
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
 
ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case Study
 
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Gariahat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Room
 
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
 
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiVIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
 
WAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsWAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past Questions
 
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts ServiceCall Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf
 
SCRIP Lua HTTP PROGRACMACION PLC WECON CA
SCRIP Lua HTTP PROGRACMACION PLC  WECON CASCRIP Lua HTTP PROGRACMACION PLC  WECON CA
SCRIP Lua HTTP PROGRACMACION PLC WECON CA
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
 

Modular Construction.pptx

  • 1. 1
  • 2. advices for advancing the productivity of the construction industry: • 1. Widespread deployment of Building Information Modeling (BIM) • 2. Improved job-site efficiency • 3. Greater use of prefabrication, preassembly, modularization, and off-site fabrication techniques. • 4. Innovative, widespread use of demonstration installations • 5. Effective performance measurement to drive efficiency and support innovation. 2
  • 3. Manufacturing building components off-site: • More controlled conditions for weather, quality control, improved supervision of labor, easier access to tools, and fewer material deliveries. • Fewer job-site environmental impacts • Compressed project schedules • Fewer conflicts in work crew scheduling and better sequencing of crafts persons. • Reduced requirements for on-site materials storage, and fewer losses of materials. • Increased workers safety. 3
  • 4. Definition of Modular Construction: • A resource efficient, off-site delivery method to construct code-compliant buildings in a quality-controlled setting 4
  • 5. Advantages of Modular Construction: • Less Materials Waste • Less Material Exposure to Inclement Weather • Less Site Disturbance • Safer Construction • Flexibility • Adaptability • Built to Code With Shorter Build Times 5
  • 6. Modular Building Usage: Permanent Modular Construction Temporary Buildings • Education • Healthcare • Commercial Housing • Office Administration • Security • Emergency • Workforce housing Assembling the entire fleet of modules rely on optimization of the crane position Based on one case study in Muhlenberg college in Pennsylvania , over 90 modular units were delivered in a record time of 10 days by optimizing of crane position. 6
  • 7. 7
  • 8. 8
  • 9. 9
  • 10. Issues and Impediments about Modular Construction: • Typically 40-50% of modular building construction is left to be completed in the field • Geographic location of the factory • Engineering requirements • Specific dimension or loading limitations due to transportation constraints • Changes in design during manufacturing can be difficult and expensive to accommodate. • the complexity of transportation activity is increased in modular construction. • The increased demand for very effective coordination and communication among participants • For a factory and manufacturer the repetition of prefabricated components is essential in order to meet quantity for cost effectiveness. 10
  • 11. The regulations set down by transport Quebec: 11
  • 12. Suitable project delivery system in Modular Construction: • Most modular building projects are fixed-price contracts • many modular construction projects are being completed faster and for less money by utilizing Design-Build or Construction Manager at Risk(CMR). • most architects are not experienced enough in the modular construction • when modular manufacturing is responsible for the design or is involved the project is more likely to be successful. If projects use Design-Build: direct line of communication between the owner and modular manufacturer costs are easier to control workload upon the owner is increased publicly funded projects 12
  • 13. • In case of using Design-Bid-Build: amount of involvement of owner in the project is reduced if the designer firm is not familiar with modular construction it could bring high initial cost to the project because of additional layers of communication the project duration would be increased • in case of using CMR: it works very well when the modular company is either the construction manager or is a key subcontractor with a design assist role. 13
  • 14. Implementation of BIM in Modular Construction: • The MEP coordination and fabrication process • extensive demand of pre project planning • Implementation of BIM systems in modular construction: Visualization Modeling Code reviews Fabrication/ shop drawings Communication Cost estimating Construction sequences Conflict, interference and collision detection 14
  • 15. six factors which influence the productivity of Nuclear Power Plants: • low material availability • low tool availability • high rework rates • needless interference with other crews • overcrowded work areas and time consuming inspection delays Reducing the amount of on-site labor with factory produced power plant modules 15
  • 16. References: • “Improving Construction efficiency & productivity with Modular Construction” , by Modular Building Institute • Christopher W.Lapp , Michael W.Golay,1997, “ Modular Design and Construction techniques for nuclear power plants”,nuclear engineering and design • Na Lu ,Thomas Korman , 2010 , “Implementation of Building Information Modeling (BIM)in Modular Construction: Benefits and Challenges” , Construction Research Congress 2010 • J.Olearczyk,Mohamed Al-Hussein,Ahmed Bouferguène,2014, “Evolution of the crane selection and on-site utilization process for modular construction multilifts” , Automation in Construction 43 (2014) 59–72 • Calvin van Mulligen, 2012, Master thesis, “Improving the efficiency, productivity and cost-effectiveness of modular design and construction processes”, University of Alberta • Lara Jaillon,C.S.Poon, 2009, “ the evolution of prefabricated residential building systems in Hong Kong: A review of the public and private sector’, Automation in Construction18(2009)239-248 • Thesis by Stefan J. Wiedeman ,McGill University, “ Modular prefabrication versus conventional construction as a cost effective alternative for the construction of single family detached housing in the Montreal area” • Thesis by Yasir Kadhim, University of New Brunswick,” Analysis of the adoption and implementation of virtual reality technologies for modular construction” 16