CV Liaqat Ali telecom engineer experience Ericsson NEC projects
1. CURRICULUM –VITAE
PPEERRSSOONNAALL IINNFFOORRMMAATTIIOONN
Name: Liaqat Ali
Father’s Name: M. Rafique
N.I.C No.: 36102-7184472-9
Date of Birth: 04-09-1987
Religion: Islam
E-mail: liaqat1431@gmail.com
Cell No. : +92-336-6100428
OOBBJJEECCTTIIVVEE
Seeking a challenging position, where my enthusiasm and ‘can do’ attitude will add value to the
business.
PPRROOFFEEEESSIIOONNAALL EEXXPPEERRIIEENNCCEE
Currently working in Konnect Holden Pvt Ltd Hyderabad As BSS Technician on Mobilink-
Ericsson FLM O&M Project from June-2014 to Date.
Responsibilities:
Troubleshooting issues related Ericsson BTS & MW link.
MW link alignment & installation.
BTS installation & troubleshooting.
Hands on experience of Ericsson BTS software OMT-P49,50 & MW Link Minicraft
(CN-210, 2P, 6P, 20P )
Have the ability to provide help during link alignment and m/w equipment installation
of Ericsson's all types according to link budget.
Installation of link Up Gradation.RUA(Radio Unit)
Hands on experience of installation of MMU2H (Access Module Magazine), LTU155
(Line Termination Unit)and NPU3C(Node Processor Unit) mini link.
Installation of (2+0) XPIC link (Cross Polar Interference Canceller), while maintaining
XPD value.
Installation of SD link (Space Diversity).
Installation PDH and SDH Microwave Transmission Systems.
Have the ability to provide help during link alignment and m/w equipment installation
of NEC's all types according to link budget.
Installation of link Up Gradation.
E1 Patching of NEC V4, NEC paso, phase1, phase2 and I Paso .
Installation of (NEC iPaso 200mb.400mb,1000mb)
Installation of XPIC link (Cross Polar Interference Canceller)
Installation of SD link (Space Diversity).
Installation PDH and SDH Microwave Transmission Systems.
Hands on experience on BSS.
Experience on Ericsson RBS 6000 series
Responsibilities:
Installation of RBS 6000 family (900/1800).
Installation of RBS 6301, 6101, 6201, 6102 TRM.
Installation of Test RBS in MSC.
Troubleshooting of RBS, DUG, RRU, RRUS faults.
2. Expansion of RBS.
Expansion of TRX (900/1800).
Alarm verification.
Technician in Rellàcom Moblink Ericsson swap Project 14 Aug 2013 in Multan.
Configuration Installation Microwave, BSS, BTS, Emerson Rectifier.
Worked in unicell Lahore as installation supervisor on Ericsson Mobilink swap project.
Professional Engineering Services PVT Ltd Islamabad. As Associate Engineer Micro Wave
NEC iPasolink troubleshooting & installation and configuration ZTE Telenor Vega Project
Microwave and SDR Installation.
Orient Electronics as a Production Technician, from 9th Nov 2011 to 12 Sep 2012.
AACCAADDEEMMIICC QQUUAALLIIFFIICCAATTIIOONNSS
DAE of Electronics.
Degree: DAE Electronics.
University: Swedish Institute of Technology Multan
Course duration: 3 - Year
Percentage: 70.00% (Aggregate)
Passing Year: 2010
Diploma G-II Electronics.
Degree: G-II Electronics.
University: TEVTA GTTI Khanewal.
Course duration: 2 - Year
Passing Year: 2007
SSC
School: Govt. Boys High School Abdul Hakim Disst Khanewal
Board: Board of Intermediate and Secondary Education, Multan
FFIINNAALL YYEEAARR PPRROOJJEECCTT
Building of amplifier circuit. D-313. D-1047
Making of Power supply
RREEFFEERREENNCCEESS
To be provided on demand.