More Related Content
Similar to Kevin@Boeing (20)
Kevin@Boeing
- 1. 1Copyright ©2014 Infor. All rights reserved.
1
Kevin Pardew Brief History @ Boeing
Included are some but not all of the activities I have been involved in during my tenure for BaaN,
SSA and Infor at Boeing. This does not cover the numerous development, standardization co-
development methodologies implemented at Boeing, nor application enhancements co-
developed at Boeing such as the original A&D IVc1 release, COLT, Cross docking,
purchaseSales scheduling, Configurator or the hundreds of toolsperformance enhancements.
- 2. 2Copyright ©2014 Infor. All rights reserved.
Boeing Sites Worked 1997 - 2016
Irving
BDS BDS
Kent
BDS
Decatur
BCA
Puget
Sound
BCA
Salt Lake
City
Boeing Spares
Renton
BCA
Wichita
20161997
- 3. 3Copyright ©2014 Infor. All rights reserved.
Roles Undertaken at Boeing
• Oracle DB Analyst
• BaaN 3GL4GL Developer
• Defect Analyst
• Solutions Architect
• PTAB Representative
• SSA and Infor R&D liaison
• Project Manager Special Projects
• Migrations Solutions ArchitectDesigner
• Project Manager Migration (all versions)
• Outsource Manager
• Technical Account Manager
- 4. 4Copyright ©2014 Infor. All rights reserved.
Noticeable Major Projects at Boeing
• Implementation IVa1 BCA
• Implementation IVa1 Wichita
• PM Migration BCA IVa1 to BaaN V
• PM Implementation Irving IVa1
• Lead Analyst Performance study BaaN V Apps
• PM Migration Irving IVa1 to BaaN V
• PM Implementation PM Decatur IVc4
• PM Migrations PM BCA BaaN V to Infor LN
• Lead architect Definition study LN Boeing Spares
• Solutions Architect Boeing Infor Zero Outage
• PM Scalability and Performance RAC
• PM Offshore Development (Custom and standard
co-developed BR)
• PM SSAInfor System Test LN FP5 and FP7
• PM Boeing customizations to Standard LN FP7
- 5. 5Copyright ©2014 Infor. All rights reserved.
Noticeable Achievements Adopted
to Standard
• Multi-site relational model design
• Requirements engine parallelization design
• DEM sub application modeling design
• Migration content pack BaaN V to LN FP5
• OpenWorld adoption and introduction of CORBA
• Migration tools re-architecture (studio and engine)
• UI Central Deployment design
• SLM Single license code design
• Zero Outage design (Not implemented)
• Stand-alone LN UI Conceptual design
• C4WS Queuing enhancement 10.4.2
• Fujitsu Iflow enhancement LN FP5
• RAC implementation and IBM Scalability study
• Sensitivity labeling
• Data Upgrade Enhancements (Multiple)