PRESENTATION OF Q1 2023 RESULTS
18 MAY 2023
DOM DEVELOPMENT S.A. CONSOLIDATED GROUP
Q1 2023 AT DOM DEVELOPMENT GROUP
• 914 units sold represent a 21% increase on Q1 2022 across all markets: Warsaw, Wroclaw, Tri-City
and Cracow
• Cracow market share increased to 6.4%, sales up 127% QoQ, up 140% YoY, the fourth position in Cracow
• Commencement of 10 new projects with 1,375 units at four locations
• Growth of ”mortgage loan” customers - 40% of all transactions in the Group
• PLN 485m cash as of 31 March 2023 and negative gearing
• Recommendation of record dividend from the 2022 profit: PLN 11.00 per share
3
Q1 2023 FINANCIAL SUMMARY
REVENUE
Q1 2023 Q1 2022 Change
PLN 822m PLN 727m PLN 95m
13%
31% GROSS MARGIN
Q1 2022: 32%
30% ROE 12M
Q1 2022: 22%
-11% GEARING
31.03.2022: -11%
NET PROFIT
Q1 2023 Q1 2022 Change
PLN 159m PLN 142m PLN 17m
12%
NET CASH
31.03.2023 31.03.2022 Change
PLN 172m PLN 158m PLN 14m
9%
4
MARKET SITUATION IN Q1 2023
• Growing demand – resulted from loosening lending criteria by KNF (Polish Financial Supervision
Authority) and stabilization of interest rates
• Households feeling more optimistic about buying flats
• Gradual increase in mortgage volume – 40% of all Group sales compared to 30% throughout 2022
• Stable construction costs – stabilisation of building materials costs and subcontractors’ services
eliminated a threat to margins
• High inflation rate and negative real interest rates of bank deposits – still entice savers to
invest in real estate
5
758 801
703
831
914
Q1 2022 Q2 2022 Q3 2022 Q4 2022 Q1 2023
SALES
No. of units
STRENGTHENING THE GROUP’S POSITION ON THE NATIONWIDE MARKET
Net sales (units)
Q1
2023
Q1
2022
Change
YoY
Warsaw 488 385 27%
Tri-City 180 236 (24)%
Wroclaw 119 84 42%
Cracow 127 53 140%
Dom Development
Group
914 758 21%
6
Average transaction
value (PLN k)
Q1
2023
Q1
2022
Change
YoY
Warsaw 764 709 8%
Tri-City 575 641 (10)%
Wroclaw 654 522 25%
Cracow 623 571 9%
Dom Development
Group
692 659 5%
Q1 2023 SALES SEGMENTATION
STRONG MARKET POSITION OF THE GROUP IS REFLECTED IN THE SIGNIFICANT PROPORTION OF
SALES IN UPPER-STANDARD SEGMENT
Unit sale value includes price of flat with fit-out (if purchased), storage room (if purchased) and parking space (if purchased).
7%
17%
21%
18%
14%
23%
up to PLN 400k
PLN 500-400k
PLN 600-500k
PLN 700-600k
PLN 800-700k
over PLN 800k
Dom Development Group
Q1 2023 sales value segmentation
7
UNITS AVAILABLE FOR SALE - UNDER CONSTRUCTION AND FINISHED
2,381
2,657
2,280
2,082
2,312
31/03/2022 30/06/2022 30/09/2022 31/12/2022 31/03/2023
No. of units available for sale
OUR OFFER LEVEL IS TAILORED TO MARKET CONDITIONS
Group offer
by location
31.03.
2023
31.12.
2022
Change
QoQ
Warsaw 618 794 (22)%
Tri-City 840 586 43%
Wroclaw 555 383 45%
Cracow 299 319 (6)%
Dom Development
Group
2 312 2 082 11%
8
LAUNCHES IN Q1 2023
180 units
600 m from the Al. Jerozolimskie
railway station in Włochy district
182 units
900 m from the Starzyński roundabout
in the vicinity of the Vistula river
151 units
5 min from the Main Square
147 units
in the Prądnik district
72 units in Wroclaw
near the railway station
101 units in Gdansk in Piecki-
Migowo district, commonly
known as Morena
152 units in Wroclaw
near the Old Town
189 units in Gdansk in Piecki-
Migowo district, commonly
known as Morena
114 units
in Gdansk young district -
Ujeścisko
87 units in the seaside area in
Pogórze
WARSAW
CRACOW WROCLAW
TRI-CITY
9
UNITS UNDER CONSTRUCTION
6,977 7,245 7,059
5,779
6,375
31/03/2022 30/06/2022 30/09/2022 31/12/2022 31/03/2023
No. of units
WE ARE DEVELOPING PROJECTS AS PER THE PLAN
Units under
construction
31.03.
2023
31.03.
2022
Change
YoY
Warsaw 2 747 3 199 (14)%
Tri-City 2 182 2 345 (7)%
Wroclaw 821 1 019 (19)%
Cracow 625 414 51%
Dom Development
Group
6 375 6 977 (9)%
10
LAND BANK – OWNED AND CONTROLLED
OVER 16,000 UNITS TO BE BUILT IN THE SECURED LAND BANK
11,585 11,309 11,657
13,048 12,402
7,034 6,562 5,433
4,077
3,676
18,619
17,871
17,090 17,125
16,078
31/03/2022 30/06/2022 30/09/2022 31/12/2022 31/03/2023
Plots owned Plots controlled
Land Bank Owned Controlled Total
Change
QoQ
Warsaw 6 371 2 720 9 091 (4)%
Tri-City 4 030 416 4 446 (10)%
Wroclaw 1 202 540 1 742 5%
Cracow 799 0 799 (24)%
Dom Development
Group
12 402 3 676 16 078 (6)%
11
DELIVERIES
WE DELIVER HIGH-QUALITY APARTMENTS ON TIME, WHICH ATTRACT HIGH CUSTOMER SATISFACTION
RATINGS
No. of units
Deliveries in units
Q1
2023
Q1
2022
Change
YoY
Warsaw 907 829 9%
Tri-City 205 179 15%
Wroclaw 109 1 -
Cracow 129 85 52%
Dom Development
Group
1 350 1 094 23%
1094 1084
420
1068
1350
70 70
74
68 69
31/03/2022 30/06/2022 30/09/2022 31/12/2022 31/03/2023
NPS*
*NPS (Net Promoter Score – customer satisfaction benchmark)
12
CUMULATIVE NET SALES TO BE RECOGNIZED IN P&L
(UNITS SOLD BUT NOT DELIVERED - PRESALES)
PLN m
Value
4 793 units PLN 2 835m
4 119 units, including: PLN 2 768m
• 318 finished units;
• 3 681 units under construction,
with 2 755 completing in 2023
HIGH LEVEL OF UNREALISED REVENUE DESPITE HIGH REVENUES RECOGNIZED IN Q1
0
500
1,000
1,500
2,000
2,500
3,000
I III V VII IX XI I III V VII IX XI I III V VII IX XI I III V VII IX XI I III V VII IX XI I III V VII IX XI I III V VII IX XI I III V VII IX XI I III V VII IX XI I III V VII IX XI I III
2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
31.03.2022
31.03.2023
13
PROFIT AND LOSS ACCOUNT
HIGH PROFITABILITY AND AVERAGE VALUE OF A UNIT DELIVERED
*IAS 15 (revenue from sale of finished goods recognized on deliveries), figures in PLN m
Profit and Loss Account Q1 2023 Q1 2022 Change
Sales Revenues, including 822.0 727.0 13%
Revenue from the sale of finished
goods*
804.8 713 13%
Deliveries (units) 1 350 1 094 23%
Revenue from sale of finished
goods per unit (PLN’000)
596 652 (9)%
Gross Profit on Sales 257.4 233.8 10%
Gross Profit Margin 31.3% 32.2% (0.9) pp
Operating Profit 197.3 173.9 13%
Operating Profit Margin 24.0% 23.9% 0.1pp
Profit Before Tax 200.9 178.0 13%
Profit Before Tax Margin 24.4% 24.5% (0.1) pp
Net Profit 158.8 141.8 12%
Net Profit Margin 19.3% 19.5% (0.2) pp
EPS (PLN) 6.21 5.57 11%
14
BALANCE SHEET
STRONG BALANCE SHEET SUPPORTS GROWTH AND DEVELOPMENT OF THE GROUP
PLN m
ASSETS 31.03.2023 31.03.2022 Change
Current Assets, including 3 880 3 897 (0.4)%
Cash 485 535 (9.3)%
Incl. escrow accounts 91 87 4.6%
Inventory, including: 3 283 3 188 3.0%
Land and phases under construction 2 950 2 819 4.6%
Finished units, parking places and storage cells 224 143 56.6%
Fixed Assets 159 112 42.0%
TOTAL ASSETS 4 039 4 009 0.7%
EQUITY AND LIABILITIES 31.03.2023 31.03.2022 Change
Equity 1 572 1 407 11.7%
Total Liabilities 2 467 2 602 (5.2)%
Long-term liabilities, including 450 536 (16.0)%
Interest-bearing debt (bonds and loans) 260 326 (20.2)%
Short-term liabilities, including: 2 017 2 066 (2.4)%
Deferred income 1 347 1 449 (7.0)%
Interest-bearing debt (bonds and loans) 52 52 0,0%
TOTAL EQUITY AND LIABILITIES 4 039 4 009 0.7% FIXED
OTHER
INVENTO
RY
CASH
EQUITY
EQUITY
LONG-TERM
LIABILITIES
BONDS
AND
LOANS
OTHER
SHORT-TERM
LIABILITIES
TRADE
PAYABLE
S AND
OTHER
BONDS AND…
LEASING
DEFFERED
INCOME
0
200
400
600
800
1,000
1,200
1,400
1,600
1,800
2,000
2,200
2,400
2,600
2,800
3,000
3,200
3,400
3,600
3,800
4,000
4,200
ASSETS LIABILITIES LIABILITIES
PLN m
15
DEBT MATURITY STRUCTURE
LOW SHORT-TERM DEBT AND HIGH AVAILABILITY OF BANK LOANS ENABLE OPERATIONAL AGILITY
485 PLN m
CASH
438 PLN m
UNDRAWN CREDIT LINES
50
50
100
110
2
2023 2024 2025 2026 2027
Bonds Bank loans
PLN m
As of 31.03.2023
16
DIVIDENDS
PLN 11 PER SHARE – RECOMMENDATION OF RECORD DIVIDEND FROM 2022 PROFIT
*Management Board’s recommendation
Dividend yield (right scale) calculated on closing price on last day of trading cum dividend
0.15
2.04
0.80 0.80 0.90
1.50
3.68
2.20 2.25
3.25
5.05
7,60
9,05
9,50
10.00
10.50
11.00*
0.1%
3.3%
2.5%
1.5%
1.9%
4.9%
8.5%
4.4% 4.5%
6.3% 6.4%
8.9%
10.5%
8.3%
6.6%
10.8%
0%
2%
4%
6%
8%
10%
12%
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Dividend yield
Dividend per share (PLN)
17
SUMMARY: Q1 2023
• Households feeling more optimistic
• Threefold increase in sales YoY secures fourth place on Cracow market
• Growth of ”mortgage loan” customers as a result of loosened lending criteria
• Delivery of 1 350 units with an average value of PLN 596m
• 31% gross margin and PLN 159m net profit
• PLN 485m cash with negative gearing (-11%)
ZAŁĄCZNIKI
APPENDICES
19
COMMENCEMENT OF HANDOVERS IN Q2-Q4 2023
PROJECT / PHASE LOCATION
NO. OF
UNITS
COMMENCEMENT OF
HANDOVERS
PROJECT / PHASE LOCATION
ZIELONY POŁUDNIK BUILDINGS. 24-25 TRI-CITY 124 APR'23 NOWODWORSKA 43 WROCLAW
WYDMA TRI-CITY 153 MAY’23 KONSTELACJA C1-C2 TRI-CITY
OSIEDLE PRZY BŁONIACH B4 TRI-CITY 158 MAY’23 APARTAMENTY LUDWIKI PHASE 1 BUILDINGS. C WARSAW
DYNAMIKA C-D TRI-CITY 234 MAY’23 APARTAMENTY LUDWIKI PHASE 2 BUILDINGS A,B,D,E WARSAW
DOKI -PHASE 2 (B) TRI-CITY 188 JUN’23 METRO ZACHÓD 4 PHASE (SZ PH 2, BUILDINGS. A2) WARSAW
OSIEDLE BEAUFORTA 2 BUILDINGS. A1-A4 TRI-CITY 158 JUN’23 METRO ZACHÓD 11 PHASE 1 WARSAW
KOMEDY PHASE 4 (BUFOROWA BC) WROCLAW 88 JUN’23 APARTAMENTY SOLIPSKA PHASE 1 (FASOLOWA PH 1) WARSAW
DOM NA SŁUŻEWCU (KŁOBUCKA) WARSAW 108 JUL'23 APARTAMENTY SOLIPSKA PHASE 2 (FASOLOWA PH 2) WARSAW
ZIELONY POŁUDNIK BUILDINGS. 26-27 TRI-CITY 93 AUG’23 DOKI -PHASE 3 (EF) TRI-CITY
OSIEDLE ZIELNA PHASE 2 WROCLAW 146 AUG’23 LAS TRI-CITY
Q2
Q3
Q4
20
PROJECT IN PREPARATION
PROJECT UNDER CONSTRUCTION
1
2
3
14
16
PROJECTS UNDER CONSTRUCTION AND IN PREPARATION: WARSAW
NO. OF UNITS, AS OF 31/03/2023
5
4
11
9
13
6
7
8
10
12
6
5
15
17
NO PROJECT
UNDER
CONSTRUCTION
IN
PREPARATION
1 METRO ZACHÓD 1 152 1 670
2 LITERACKA --- 530
3 APARTAMENTY KOŁO PARKÓW (CIOŁKA) 133 ---
4 APARTAMENTY LUDWIKI 432 ---
5 URBINO 180 535
6 ALEJE JEROZOLIMSKIE --- 383
7 APARTAMENTY SOLIPSKA 187 ---
8 OSIEDLE PRZY FORCIE --- 125
9 OSIEDLE PRZY RYŻOWEJ --- 412
10 DOM NA SŁUŻEWCU 108 ---
11 APARTAMENTY BIAŁEJ KONICZYNY (PORY) 129 70
12 OSIEDLE MOKOTÓW SPORTOWY (ANTONIEWSKA) --- 1 384
13 PALLADIUM (AKACJE) --- 351
14 OSIEDLE JAGIELLOŃSKA 316 --
15 WILNO --- 233
16 PRZYSTANEK MIĘDZYLESIE 110 108
17 BEETHOVENA --- 570
TOTAL WARSAW 2 747 6 371
21
PROJECT IN PREPARATION
PROJECT UNDER CONSTRUCTION
16
1 2
3
14
4
11
9
PROJECTS UNDER CONSTRUCTION AND IN PREPARATION: TRI-CITY
NO. OF UNITS, AS OF 31/03/2023
NO PROJECT
UNDER
CONSTRUCTION
IN
PREPARATION
1 PERSPEKTYWA 306 ---
2 DOKI 632 489
3 DOLNE MIASTO --- 999
4 SYNTEZA 101 407
5 LEMA 189 ---
6 GDAŃSK WARSZAWSKA --- 350
7 GDAŃSK KARTUSKA --- 110
8 DYNAMIKA 220 ---
9 ZIELONY POŁUDNIK 137 ---
10 OSIEDLE BEAUFORTA 2 273 141
11 KONSTELACJA 113 537
12 GÓRA MARKOWCA --- 178
13 LOCUS 2 --- 150
14 OSIEDLE PRZY BŁONIACH 3 --- 545
15 WIDOKI 92 124
16 WYDMA 59 ---
16 LAS 60 ---
TOTAL TRI-CITY 2 182 4 030
13
8
10
8
5
6 7
12
15
22
1
2
3
4
NO PROJECT
UNDER
CONSTRUCTION
IN
PREPARATION
1 OSIEDLE CHOCIEBUSKA 11 196 ---
2 BRANIBORSKA --- 397
3 OSIEDLE KOMEDY 131 115
4 ZIELNA 218 123
5 APARTAMENTY NAD RZEKĄ (CENTRUM) 152 ---
6 OSOBOWICKA 114 88 ---
7 NOWODWORSKA 43 36 ---
8 MIĘDZYLESKA --- 391
9 STODOLNA --- 176
TOTAL WROCLAW 821 1 202
5
6
6
6
7
8
PROJECT IN PREPARATION
PROJECT UNDER CONSTRUCTION
9
PROJECTS UNDER CONSTRUCTION AND IN PREPARATION: WROCLAW
NO. OF UNITS, AS OF 31/03/2023
6
2
5
23
PROJECT IN PREPARATION
PROJECT UNDER CONSTRUCTION
NO PROJECT
UNDER
CONSTRUCTION
IN
PREPARATION
1 GÓRKA NARODOWA 386 432
2 29 ALEJA 149 300
3 MALBORSKA 90 67
TOTAL CRACOW 625 799
1
3
2
PROJECTS UNDER CONSTRUCTION AND IN PREPARATION: CRACOW
NO. OF UNITS, AS OF 31/03/2023

More Related Content

Similar to Prezentacja Q1 2023_FINAL V2 WWW.pptx

Presentation FY 2022_15 03 2023_EN_FINAL.pptx
Presentation FY 2022_15 03 2023_EN_FINAL.pptxPresentation FY 2022_15 03 2023_EN_FINAL.pptx
Presentation FY 2022_15 03 2023_EN_FINAL.pptxKasia152556
 

Similar to Prezentacja Q1 2023_FINAL V2 WWW.pptx (20)

Dom Development Group 2021 Results Presentation
Dom Development Group 2021 Results PresentationDom Development Group 2021 Results Presentation
Dom Development Group 2021 Results Presentation
 
Q1 2019 results presentation Dom Development S.A.
Q1 2019 results presentation Dom Development S.A.Q1 2019 results presentation Dom Development S.A.
Q1 2019 results presentation Dom Development S.A.
 
Presentation Q1 2020
Presentation Q1 2020Presentation Q1 2020
Presentation Q1 2020
 
Dom Development Group H1 2021 Results Presentation
Dom Development Group H1 2021 Results PresentationDom Development Group H1 2021 Results Presentation
Dom Development Group H1 2021 Results Presentation
 
H1 2019 results presentation Dom Development
H1 2019 results presentation Dom Development H1 2019 results presentation Dom Development
H1 2019 results presentation Dom Development
 
Presentation FY 2022_15 03 2023_EN_FINAL.pptx
Presentation FY 2022_15 03 2023_EN_FINAL.pptxPresentation FY 2022_15 03 2023_EN_FINAL.pptx
Presentation FY 2022_15 03 2023_EN_FINAL.pptx
 
Dom Development S.A. H1 2022 results presentation
Dom Development S.A. H1 2022 results presentationDom Development S.A. H1 2022 results presentation
Dom Development S.A. H1 2022 results presentation
 
Presentation FY 2020
Presentation FY 2020 Presentation FY 2020
Presentation FY 2020
 
FY 2019 results presentation Dom Development S.A.
FY 2019 results presentation Dom Development S.A. FY 2019 results presentation Dom Development S.A.
FY 2019 results presentation Dom Development S.A.
 
Presentation Q3 2018
Presentation Q3 2018Presentation Q3 2018
Presentation Q3 2018
 
Dom Development Group Q1 2021 Results Presentation
Dom Development Group Q1 2021 Results PresentationDom Development Group Q1 2021 Results Presentation
Dom Development Group Q1 2021 Results Presentation
 
Q3 2019 results presentation Dom Development S.A.
Q3 2019 results presentation Dom Development S.A.Q3 2019 results presentation Dom Development S.A.
Q3 2019 results presentation Dom Development S.A.
 
Presentation h1 2018
Presentation h1 2018Presentation h1 2018
Presentation h1 2018
 
Presentation Q1 2016
Presentation Q1 2016Presentation Q1 2016
Presentation Q1 2016
 
FY 2018 results presentation Dom Development S.A.
FY 2018 results presentation Dom Development S.A. FY 2018 results presentation Dom Development S.A.
FY 2018 results presentation Dom Development S.A.
 
FY 2016 Financial Results Presentation
FY 2016 Financial Results PresentationFY 2016 Financial Results Presentation
FY 2016 Financial Results Presentation
 
FY 2017 results presentation Dom Development S.A.
FY 2017  results presentation Dom Development S.A.FY 2017  results presentation Dom Development S.A.
FY 2017 results presentation Dom Development S.A.
 
Presentation H1 2014
Presentation H1 2014 Presentation H1 2014
Presentation H1 2014
 
Presentation FY 2015
Presentation FY 2015Presentation FY 2015
Presentation FY 2015
 
Presentation Q1 2017
Presentation Q1 2017Presentation Q1 2017
Presentation Q1 2017
 

Recently uploaded

rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfmuskan1121w
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCRsoniya singh
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...lizamodels9
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedKaiNexus
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 

Recently uploaded (20)

rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdf
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 

Prezentacja Q1 2023_FINAL V2 WWW.pptx

  • 1. PRESENTATION OF Q1 2023 RESULTS 18 MAY 2023 DOM DEVELOPMENT S.A. CONSOLIDATED GROUP
  • 2. Q1 2023 AT DOM DEVELOPMENT GROUP • 914 units sold represent a 21% increase on Q1 2022 across all markets: Warsaw, Wroclaw, Tri-City and Cracow • Cracow market share increased to 6.4%, sales up 127% QoQ, up 140% YoY, the fourth position in Cracow • Commencement of 10 new projects with 1,375 units at four locations • Growth of ”mortgage loan” customers - 40% of all transactions in the Group • PLN 485m cash as of 31 March 2023 and negative gearing • Recommendation of record dividend from the 2022 profit: PLN 11.00 per share
  • 3. 3 Q1 2023 FINANCIAL SUMMARY REVENUE Q1 2023 Q1 2022 Change PLN 822m PLN 727m PLN 95m 13% 31% GROSS MARGIN Q1 2022: 32% 30% ROE 12M Q1 2022: 22% -11% GEARING 31.03.2022: -11% NET PROFIT Q1 2023 Q1 2022 Change PLN 159m PLN 142m PLN 17m 12% NET CASH 31.03.2023 31.03.2022 Change PLN 172m PLN 158m PLN 14m 9%
  • 4. 4 MARKET SITUATION IN Q1 2023 • Growing demand – resulted from loosening lending criteria by KNF (Polish Financial Supervision Authority) and stabilization of interest rates • Households feeling more optimistic about buying flats • Gradual increase in mortgage volume – 40% of all Group sales compared to 30% throughout 2022 • Stable construction costs – stabilisation of building materials costs and subcontractors’ services eliminated a threat to margins • High inflation rate and negative real interest rates of bank deposits – still entice savers to invest in real estate
  • 5. 5 758 801 703 831 914 Q1 2022 Q2 2022 Q3 2022 Q4 2022 Q1 2023 SALES No. of units STRENGTHENING THE GROUP’S POSITION ON THE NATIONWIDE MARKET Net sales (units) Q1 2023 Q1 2022 Change YoY Warsaw 488 385 27% Tri-City 180 236 (24)% Wroclaw 119 84 42% Cracow 127 53 140% Dom Development Group 914 758 21%
  • 6. 6 Average transaction value (PLN k) Q1 2023 Q1 2022 Change YoY Warsaw 764 709 8% Tri-City 575 641 (10)% Wroclaw 654 522 25% Cracow 623 571 9% Dom Development Group 692 659 5% Q1 2023 SALES SEGMENTATION STRONG MARKET POSITION OF THE GROUP IS REFLECTED IN THE SIGNIFICANT PROPORTION OF SALES IN UPPER-STANDARD SEGMENT Unit sale value includes price of flat with fit-out (if purchased), storage room (if purchased) and parking space (if purchased). 7% 17% 21% 18% 14% 23% up to PLN 400k PLN 500-400k PLN 600-500k PLN 700-600k PLN 800-700k over PLN 800k Dom Development Group Q1 2023 sales value segmentation
  • 7. 7 UNITS AVAILABLE FOR SALE - UNDER CONSTRUCTION AND FINISHED 2,381 2,657 2,280 2,082 2,312 31/03/2022 30/06/2022 30/09/2022 31/12/2022 31/03/2023 No. of units available for sale OUR OFFER LEVEL IS TAILORED TO MARKET CONDITIONS Group offer by location 31.03. 2023 31.12. 2022 Change QoQ Warsaw 618 794 (22)% Tri-City 840 586 43% Wroclaw 555 383 45% Cracow 299 319 (6)% Dom Development Group 2 312 2 082 11%
  • 8. 8 LAUNCHES IN Q1 2023 180 units 600 m from the Al. Jerozolimskie railway station in Włochy district 182 units 900 m from the Starzyński roundabout in the vicinity of the Vistula river 151 units 5 min from the Main Square 147 units in the Prądnik district 72 units in Wroclaw near the railway station 101 units in Gdansk in Piecki- Migowo district, commonly known as Morena 152 units in Wroclaw near the Old Town 189 units in Gdansk in Piecki- Migowo district, commonly known as Morena 114 units in Gdansk young district - Ujeścisko 87 units in the seaside area in Pogórze WARSAW CRACOW WROCLAW TRI-CITY
  • 9. 9 UNITS UNDER CONSTRUCTION 6,977 7,245 7,059 5,779 6,375 31/03/2022 30/06/2022 30/09/2022 31/12/2022 31/03/2023 No. of units WE ARE DEVELOPING PROJECTS AS PER THE PLAN Units under construction 31.03. 2023 31.03. 2022 Change YoY Warsaw 2 747 3 199 (14)% Tri-City 2 182 2 345 (7)% Wroclaw 821 1 019 (19)% Cracow 625 414 51% Dom Development Group 6 375 6 977 (9)%
  • 10. 10 LAND BANK – OWNED AND CONTROLLED OVER 16,000 UNITS TO BE BUILT IN THE SECURED LAND BANK 11,585 11,309 11,657 13,048 12,402 7,034 6,562 5,433 4,077 3,676 18,619 17,871 17,090 17,125 16,078 31/03/2022 30/06/2022 30/09/2022 31/12/2022 31/03/2023 Plots owned Plots controlled Land Bank Owned Controlled Total Change QoQ Warsaw 6 371 2 720 9 091 (4)% Tri-City 4 030 416 4 446 (10)% Wroclaw 1 202 540 1 742 5% Cracow 799 0 799 (24)% Dom Development Group 12 402 3 676 16 078 (6)%
  • 11. 11 DELIVERIES WE DELIVER HIGH-QUALITY APARTMENTS ON TIME, WHICH ATTRACT HIGH CUSTOMER SATISFACTION RATINGS No. of units Deliveries in units Q1 2023 Q1 2022 Change YoY Warsaw 907 829 9% Tri-City 205 179 15% Wroclaw 109 1 - Cracow 129 85 52% Dom Development Group 1 350 1 094 23% 1094 1084 420 1068 1350 70 70 74 68 69 31/03/2022 30/06/2022 30/09/2022 31/12/2022 31/03/2023 NPS* *NPS (Net Promoter Score – customer satisfaction benchmark)
  • 12. 12 CUMULATIVE NET SALES TO BE RECOGNIZED IN P&L (UNITS SOLD BUT NOT DELIVERED - PRESALES) PLN m Value 4 793 units PLN 2 835m 4 119 units, including: PLN 2 768m • 318 finished units; • 3 681 units under construction, with 2 755 completing in 2023 HIGH LEVEL OF UNREALISED REVENUE DESPITE HIGH REVENUES RECOGNIZED IN Q1 0 500 1,000 1,500 2,000 2,500 3,000 I III V VII IX XI I III V VII IX XI I III V VII IX XI I III V VII IX XI I III V VII IX XI I III V VII IX XI I III V VII IX XI I III V VII IX XI I III V VII IX XI I III V VII IX XI I III 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 31.03.2022 31.03.2023
  • 13. 13 PROFIT AND LOSS ACCOUNT HIGH PROFITABILITY AND AVERAGE VALUE OF A UNIT DELIVERED *IAS 15 (revenue from sale of finished goods recognized on deliveries), figures in PLN m Profit and Loss Account Q1 2023 Q1 2022 Change Sales Revenues, including 822.0 727.0 13% Revenue from the sale of finished goods* 804.8 713 13% Deliveries (units) 1 350 1 094 23% Revenue from sale of finished goods per unit (PLN’000) 596 652 (9)% Gross Profit on Sales 257.4 233.8 10% Gross Profit Margin 31.3% 32.2% (0.9) pp Operating Profit 197.3 173.9 13% Operating Profit Margin 24.0% 23.9% 0.1pp Profit Before Tax 200.9 178.0 13% Profit Before Tax Margin 24.4% 24.5% (0.1) pp Net Profit 158.8 141.8 12% Net Profit Margin 19.3% 19.5% (0.2) pp EPS (PLN) 6.21 5.57 11%
  • 14. 14 BALANCE SHEET STRONG BALANCE SHEET SUPPORTS GROWTH AND DEVELOPMENT OF THE GROUP PLN m ASSETS 31.03.2023 31.03.2022 Change Current Assets, including 3 880 3 897 (0.4)% Cash 485 535 (9.3)% Incl. escrow accounts 91 87 4.6% Inventory, including: 3 283 3 188 3.0% Land and phases under construction 2 950 2 819 4.6% Finished units, parking places and storage cells 224 143 56.6% Fixed Assets 159 112 42.0% TOTAL ASSETS 4 039 4 009 0.7% EQUITY AND LIABILITIES 31.03.2023 31.03.2022 Change Equity 1 572 1 407 11.7% Total Liabilities 2 467 2 602 (5.2)% Long-term liabilities, including 450 536 (16.0)% Interest-bearing debt (bonds and loans) 260 326 (20.2)% Short-term liabilities, including: 2 017 2 066 (2.4)% Deferred income 1 347 1 449 (7.0)% Interest-bearing debt (bonds and loans) 52 52 0,0% TOTAL EQUITY AND LIABILITIES 4 039 4 009 0.7% FIXED OTHER INVENTO RY CASH EQUITY EQUITY LONG-TERM LIABILITIES BONDS AND LOANS OTHER SHORT-TERM LIABILITIES TRADE PAYABLE S AND OTHER BONDS AND… LEASING DEFFERED INCOME 0 200 400 600 800 1,000 1,200 1,400 1,600 1,800 2,000 2,200 2,400 2,600 2,800 3,000 3,200 3,400 3,600 3,800 4,000 4,200 ASSETS LIABILITIES LIABILITIES PLN m
  • 15. 15 DEBT MATURITY STRUCTURE LOW SHORT-TERM DEBT AND HIGH AVAILABILITY OF BANK LOANS ENABLE OPERATIONAL AGILITY 485 PLN m CASH 438 PLN m UNDRAWN CREDIT LINES 50 50 100 110 2 2023 2024 2025 2026 2027 Bonds Bank loans PLN m As of 31.03.2023
  • 16. 16 DIVIDENDS PLN 11 PER SHARE – RECOMMENDATION OF RECORD DIVIDEND FROM 2022 PROFIT *Management Board’s recommendation Dividend yield (right scale) calculated on closing price on last day of trading cum dividend 0.15 2.04 0.80 0.80 0.90 1.50 3.68 2.20 2.25 3.25 5.05 7,60 9,05 9,50 10.00 10.50 11.00* 0.1% 3.3% 2.5% 1.5% 1.9% 4.9% 8.5% 4.4% 4.5% 6.3% 6.4% 8.9% 10.5% 8.3% 6.6% 10.8% 0% 2% 4% 6% 8% 10% 12% 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Dividend yield Dividend per share (PLN)
  • 17. 17 SUMMARY: Q1 2023 • Households feeling more optimistic • Threefold increase in sales YoY secures fourth place on Cracow market • Growth of ”mortgage loan” customers as a result of loosened lending criteria • Delivery of 1 350 units with an average value of PLN 596m • 31% gross margin and PLN 159m net profit • PLN 485m cash with negative gearing (-11%)
  • 19. 19 COMMENCEMENT OF HANDOVERS IN Q2-Q4 2023 PROJECT / PHASE LOCATION NO. OF UNITS COMMENCEMENT OF HANDOVERS PROJECT / PHASE LOCATION ZIELONY POŁUDNIK BUILDINGS. 24-25 TRI-CITY 124 APR'23 NOWODWORSKA 43 WROCLAW WYDMA TRI-CITY 153 MAY’23 KONSTELACJA C1-C2 TRI-CITY OSIEDLE PRZY BŁONIACH B4 TRI-CITY 158 MAY’23 APARTAMENTY LUDWIKI PHASE 1 BUILDINGS. C WARSAW DYNAMIKA C-D TRI-CITY 234 MAY’23 APARTAMENTY LUDWIKI PHASE 2 BUILDINGS A,B,D,E WARSAW DOKI -PHASE 2 (B) TRI-CITY 188 JUN’23 METRO ZACHÓD 4 PHASE (SZ PH 2, BUILDINGS. A2) WARSAW OSIEDLE BEAUFORTA 2 BUILDINGS. A1-A4 TRI-CITY 158 JUN’23 METRO ZACHÓD 11 PHASE 1 WARSAW KOMEDY PHASE 4 (BUFOROWA BC) WROCLAW 88 JUN’23 APARTAMENTY SOLIPSKA PHASE 1 (FASOLOWA PH 1) WARSAW DOM NA SŁUŻEWCU (KŁOBUCKA) WARSAW 108 JUL'23 APARTAMENTY SOLIPSKA PHASE 2 (FASOLOWA PH 2) WARSAW ZIELONY POŁUDNIK BUILDINGS. 26-27 TRI-CITY 93 AUG’23 DOKI -PHASE 3 (EF) TRI-CITY OSIEDLE ZIELNA PHASE 2 WROCLAW 146 AUG’23 LAS TRI-CITY Q2 Q3 Q4
  • 20. 20 PROJECT IN PREPARATION PROJECT UNDER CONSTRUCTION 1 2 3 14 16 PROJECTS UNDER CONSTRUCTION AND IN PREPARATION: WARSAW NO. OF UNITS, AS OF 31/03/2023 5 4 11 9 13 6 7 8 10 12 6 5 15 17 NO PROJECT UNDER CONSTRUCTION IN PREPARATION 1 METRO ZACHÓD 1 152 1 670 2 LITERACKA --- 530 3 APARTAMENTY KOŁO PARKÓW (CIOŁKA) 133 --- 4 APARTAMENTY LUDWIKI 432 --- 5 URBINO 180 535 6 ALEJE JEROZOLIMSKIE --- 383 7 APARTAMENTY SOLIPSKA 187 --- 8 OSIEDLE PRZY FORCIE --- 125 9 OSIEDLE PRZY RYŻOWEJ --- 412 10 DOM NA SŁUŻEWCU 108 --- 11 APARTAMENTY BIAŁEJ KONICZYNY (PORY) 129 70 12 OSIEDLE MOKOTÓW SPORTOWY (ANTONIEWSKA) --- 1 384 13 PALLADIUM (AKACJE) --- 351 14 OSIEDLE JAGIELLOŃSKA 316 -- 15 WILNO --- 233 16 PRZYSTANEK MIĘDZYLESIE 110 108 17 BEETHOVENA --- 570 TOTAL WARSAW 2 747 6 371
  • 21. 21 PROJECT IN PREPARATION PROJECT UNDER CONSTRUCTION 16 1 2 3 14 4 11 9 PROJECTS UNDER CONSTRUCTION AND IN PREPARATION: TRI-CITY NO. OF UNITS, AS OF 31/03/2023 NO PROJECT UNDER CONSTRUCTION IN PREPARATION 1 PERSPEKTYWA 306 --- 2 DOKI 632 489 3 DOLNE MIASTO --- 999 4 SYNTEZA 101 407 5 LEMA 189 --- 6 GDAŃSK WARSZAWSKA --- 350 7 GDAŃSK KARTUSKA --- 110 8 DYNAMIKA 220 --- 9 ZIELONY POŁUDNIK 137 --- 10 OSIEDLE BEAUFORTA 2 273 141 11 KONSTELACJA 113 537 12 GÓRA MARKOWCA --- 178 13 LOCUS 2 --- 150 14 OSIEDLE PRZY BŁONIACH 3 --- 545 15 WIDOKI 92 124 16 WYDMA 59 --- 16 LAS 60 --- TOTAL TRI-CITY 2 182 4 030 13 8 10 8 5 6 7 12 15
  • 22. 22 1 2 3 4 NO PROJECT UNDER CONSTRUCTION IN PREPARATION 1 OSIEDLE CHOCIEBUSKA 11 196 --- 2 BRANIBORSKA --- 397 3 OSIEDLE KOMEDY 131 115 4 ZIELNA 218 123 5 APARTAMENTY NAD RZEKĄ (CENTRUM) 152 --- 6 OSOBOWICKA 114 88 --- 7 NOWODWORSKA 43 36 --- 8 MIĘDZYLESKA --- 391 9 STODOLNA --- 176 TOTAL WROCLAW 821 1 202 5 6 6 6 7 8 PROJECT IN PREPARATION PROJECT UNDER CONSTRUCTION 9 PROJECTS UNDER CONSTRUCTION AND IN PREPARATION: WROCLAW NO. OF UNITS, AS OF 31/03/2023 6 2 5
  • 23. 23 PROJECT IN PREPARATION PROJECT UNDER CONSTRUCTION NO PROJECT UNDER CONSTRUCTION IN PREPARATION 1 GÓRKA NARODOWA 386 432 2 29 ALEJA 149 300 3 MALBORSKA 90 67 TOTAL CRACOW 625 799 1 3 2 PROJECTS UNDER CONSTRUCTION AND IN PREPARATION: CRACOW NO. OF UNITS, AS OF 31/03/2023