Existing Situation – Sea Defence damage
The site at Tonfanau near Tywyn (Sandilands) is situated on the Cambrian Coast, North West Wales.
Following the extreme storm events of January 2014 many sea defences along the whole of the West
Wales coastline from North to South suffered extensive damage following a combination of high tidal
surges and Force 8, Westerly gales.
These photos were taken immediately following the extreme storm events and illustrate the damage that
these extreme events have on our coastal assets such as damage to the sea defence revetment wall,
embankment erosion and extensive damage to the existing ‘Gabion baskets’ sea defence structure.
/24 Apr 2015 3
The Solution
Due to logistical constraints and difficult beach access AMCO derived the following solution:
• Located a Shotcrete pumping station in a field adjacent to the cliffs (stakeholder involvement)
• Placed ducts under the track to accommodate feed hoses
• Spray filled the voids with AAA40 dry concrete (added steel fibres to mix) – 250 tonne used
• Provided tie-in dowels and mesh to create a bond to the existing asset and steep embankment
The ‘Ramwall’ system was originally designed for the
mining industry and has been modified by AMCO as an
alternative to the typical ‘Gabion wall’ sections found
along many areas of coastline. The system has proved
to be an excellent choice, especially as the design can
be modified to suit any location, erected quickly with
each element designed as a ‘one-man’ lift. This not
only improves productivity but has a superior structural
capability that satisfies a permanent design structural
life. Each element is ‘hog ringed’ together and a
substantial front face meshing added and the whole
retaining system is infilled with granite ballast which
was transported to site by a RRV and transferred from
the Cess via a builders chute and the ‘Ramwall’ infilled
safely from above (>400 tonnes of ballast).
/
‘Ramwall’ Building Procedure
Lee Green. Area Delivery Manager
24 Apr 2015 4
/
Application of Hog rings
24 Apr 2015 5
/
‘Ramwall’ Infilling Procedure
24 Apr 2015 6
/
The Permanent Solution ‘Ramwall’
L
24 Apr 2015 7
/
General view of overall area where damage occurred
Lee Green. Area Delivery Manager
24 Apr 2015 8
/24 Apr 2015 9
Benefits
Permanent Solution
• A quick permanent solution that can be designed for any application (ISS in house design team)
• Minimal plant required
• Environmental friendly - No Contamination (NRW requirement)
• Improved risk mitigation to installation team i.e. Manual handling/HAVS etc.
• 3965 ‘Accident free’ man hours without incidents.
• An excellent robust and versatile permanent design solution that can be used in many scenarios.
/
Future Sea Level Estimations
24 Apr 2015 10
/
SUMMARY - ‘RAMWALL specification’

Permanent Solution

Raw material supplied by Rom-tech

8mm-35mm dia bar sizes

Matrix (200 x 200mm)

Manufactured to BS 448 -2005

Manufactured to ‘Cares standards for welded mesh’

Welds designed to 4 tonne diametrically opposed pull load

Galvanizing to BS ISO 1461-2009 to 87 microns

Longevity in Sea Defence environment (60 years).

Versatility (Can be adapted to suit location)

Steel diameters to suit location and environment

ISS internal design team

Environmental Friendly

AMCO fully trained installation team (ready and able to assist in any
situation).
24 Apr 2015 11

More Related Content

What's hot

Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Crosstown TO
 
Chaplin - Avenue Construction Liaison Committee Meeting - June 2017
Chaplin - Avenue Construction Liaison Committee Meeting - June 2017Chaplin - Avenue Construction Liaison Committee Meeting - June 2017
Chaplin - Avenue Construction Liaison Committee Meeting - June 2017Crosstown TO
 
S2 s presentation180515
S2 s presentation180515S2 s presentation180515
S2 s presentation180515Naoise
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017Crosstown TO
 
Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Crosstown TO
 
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...Crosstown TO
 
Evermay Sec. 7b Underground Detention Facility Replacement Project
Evermay Sec. 7b Underground Detention Facility Replacement ProjectEvermay Sec. 7b Underground Detention Facility Replacement Project
Evermay Sec. 7b Underground Detention Facility Replacement ProjectFairfax County
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017
Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017
Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017Crosstown TO
 
Chaplin-Avenue Construction Liaison Committee Meeting - October 2017
Chaplin-Avenue Construction Liaison Committee Meeting - October 2017Chaplin-Avenue Construction Liaison Committee Meeting - October 2017
Chaplin-Avenue Construction Liaison Committee Meeting - October 2017Crosstown TO
 
Pharmacy-Kennedy Construction Liaison Committee Meeting - June 2017
Pharmacy-Kennedy Construction Liaison Committee Meeting - June 2017Pharmacy-Kennedy Construction Liaison Committee Meeting - June 2017
Pharmacy-Kennedy Construction Liaison Committee Meeting - June 2017Crosstown TO
 
Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017
Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017
Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017Crosstown TO
 
Wlrt com-grand linq-technical-briefing-2015-02-23
Wlrt com-grand linq-technical-briefing-2015-02-23Wlrt com-grand linq-technical-briefing-2015-02-23
Wlrt com-grand linq-technical-briefing-2015-02-23Darren Shaw, SIOR
 
Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017Crosstown TO
 
Western Works Construction Liaison Committee Meeting - September 2017
Western Works Construction Liaison Committee Meeting - September 2017Western Works Construction Liaison Committee Meeting - September 2017
Western Works Construction Liaison Committee Meeting - September 2017Crosstown TO
 
UpdateonNorthArterialWatermain
UpdateonNorthArterialWatermainUpdateonNorthArterialWatermain
UpdateonNorthArterialWatermainNaoise
 
Leaside & Laird Stations Open House - October 2017
Leaside & Laird Stations Open House - October 2017Leaside & Laird Stations Open House - October 2017
Leaside & Laird Stations Open House - October 2017Crosstown TO
 
Chad Irvine's CV
Chad Irvine's CVChad Irvine's CV
Chad Irvine's CVChad Irvine
 
Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Crosstown TO
 

What's hot (20)

SPP M1 Case Study
SPP M1 Case StudySPP M1 Case Study
SPP M1 Case Study
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
 
Chaplin - Avenue Construction Liaison Committee Meeting - June 2017
Chaplin - Avenue Construction Liaison Committee Meeting - June 2017Chaplin - Avenue Construction Liaison Committee Meeting - June 2017
Chaplin - Avenue Construction Liaison Committee Meeting - June 2017
 
S2 s presentation180515
S2 s presentation180515S2 s presentation180515
S2 s presentation180515
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
 
Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017
 
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
 
Evermay Sec. 7b Underground Detention Facility Replacement Project
Evermay Sec. 7b Underground Detention Facility Replacement ProjectEvermay Sec. 7b Underground Detention Facility Replacement Project
Evermay Sec. 7b Underground Detention Facility Replacement Project
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017
Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017
Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017
 
Chaplin-Avenue Construction Liaison Committee Meeting - October 2017
Chaplin-Avenue Construction Liaison Committee Meeting - October 2017Chaplin-Avenue Construction Liaison Committee Meeting - October 2017
Chaplin-Avenue Construction Liaison Committee Meeting - October 2017
 
Pharmacy-Kennedy Construction Liaison Committee Meeting - June 2017
Pharmacy-Kennedy Construction Liaison Committee Meeting - June 2017Pharmacy-Kennedy Construction Liaison Committee Meeting - June 2017
Pharmacy-Kennedy Construction Liaison Committee Meeting - June 2017
 
Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017
Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017
Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017
 
Wlrt com-grand linq-technical-briefing-2015-02-23
Wlrt com-grand linq-technical-briefing-2015-02-23Wlrt com-grand linq-technical-briefing-2015-02-23
Wlrt com-grand linq-technical-briefing-2015-02-23
 
Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017
 
Western Works Construction Liaison Committee Meeting - September 2017
Western Works Construction Liaison Committee Meeting - September 2017Western Works Construction Liaison Committee Meeting - September 2017
Western Works Construction Liaison Committee Meeting - September 2017
 
UpdateonNorthArterialWatermain
UpdateonNorthArterialWatermainUpdateonNorthArterialWatermain
UpdateonNorthArterialWatermain
 
Leaside & Laird Stations Open House - October 2017
Leaside & Laird Stations Open House - October 2017Leaside & Laird Stations Open House - October 2017
Leaside & Laird Stations Open House - October 2017
 
Chad Irvine's CV
Chad Irvine's CVChad Irvine's CV
Chad Irvine's CV
 
Narrow Pavement Widening - Atlanta District
Narrow Pavement Widening - Atlanta DistrictNarrow Pavement Widening - Atlanta District
Narrow Pavement Widening - Atlanta District
 
Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Avenue Station Open House - May 2017
Avenue Station Open House - May 2017
 

Viewers also liked

Untitled Presentation
Untitled PresentationUntitled Presentation
Untitled Presentationcpphmao
 
2014_BKCS Lee and Baek
2014_BKCS Lee and Baek2014_BKCS Lee and Baek
2014_BKCS Lee and BaekJe-Hyun Baek
 
CV FOR SB MAHOMED - EXTENSIVE
CV FOR SB MAHOMED - EXTENSIVECV FOR SB MAHOMED - EXTENSIVE
CV FOR SB MAHOMED - EXTENSIVEMahomed Shakera
 
3 Major Marketing Takeaways From the 2015 State of Inbound Report
3 Major Marketing Takeaways From the 2015 State of Inbound Report3 Major Marketing Takeaways From the 2015 State of Inbound Report
3 Major Marketing Takeaways From the 2015 State of Inbound ReportSevenAtoms Inc.
 
Objection handling sept 2015
Objection handling sept 2015Objection handling sept 2015
Objection handling sept 2015Mark Whitehead
 
Resetting of Oct. 23 CSE-PPT - Exam advisory no. 17s2016
Resetting of Oct. 23 CSE-PPT - Exam advisory no. 17s2016Resetting of Oct. 23 CSE-PPT - Exam advisory no. 17s2016
Resetting of Oct. 23 CSE-PPT - Exam advisory no. 17s2016Civil Service Exam Info
 

Viewers also liked (10)

NOWCorp Overview v2 (5)
NOWCorp Overview v2 (5)NOWCorp Overview v2 (5)
NOWCorp Overview v2 (5)
 
Untitled Presentation
Untitled PresentationUntitled Presentation
Untitled Presentation
 
Cognitive Radio
Cognitive RadioCognitive Radio
Cognitive Radio
 
2014_BKCS Lee and Baek
2014_BKCS Lee and Baek2014_BKCS Lee and Baek
2014_BKCS Lee and Baek
 
CV FOR SB MAHOMED - EXTENSIVE
CV FOR SB MAHOMED - EXTENSIVECV FOR SB MAHOMED - EXTENSIVE
CV FOR SB MAHOMED - EXTENSIVE
 
3 Major Marketing Takeaways From the 2015 State of Inbound Report
3 Major Marketing Takeaways From the 2015 State of Inbound Report3 Major Marketing Takeaways From the 2015 State of Inbound Report
3 Major Marketing Takeaways From the 2015 State of Inbound Report
 
5-10-2016
5-10-20165-10-2016
5-10-2016
 
Diplom
DiplomDiplom
Diplom
 
Objection handling sept 2015
Objection handling sept 2015Objection handling sept 2015
Objection handling sept 2015
 
Resetting of Oct. 23 CSE-PPT - Exam advisory no. 17s2016
Resetting of Oct. 23 CSE-PPT - Exam advisory no. 17s2016Resetting of Oct. 23 CSE-PPT - Exam advisory no. 17s2016
Resetting of Oct. 23 CSE-PPT - Exam advisory no. 17s2016
 

Similar to Share with Pride IP Wales Tonfanau Rev1 - Revised

Similar to Share with Pride IP Wales Tonfanau Rev1 - Revised (20)

UKWP Case study - Mauchline Final copy 23 06 15
UKWP Case study - Mauchline Final copy 23 06 15UKWP Case study - Mauchline Final copy 23 06 15
UKWP Case study - Mauchline Final copy 23 06 15
 
4RVanoh .pptx
4RVanoh .pptx4RVanoh .pptx
4RVanoh .pptx
 
brochure pss
brochure pssbrochure pss
brochure pss
 
Neptune solutions brochure
Neptune solutions brochure Neptune solutions brochure
Neptune solutions brochure
 
Resume KV 2015
Resume KV 2015Resume KV 2015
Resume KV 2015
 
Abfad Ltd General Services Presentation
Abfad Ltd General Services PresentationAbfad Ltd General Services Presentation
Abfad Ltd General Services Presentation
 
SSCS Track Record
SSCS Track RecordSSCS Track Record
SSCS Track Record
 
London Flood Risk Management Strategy Adam Hosking
London Flood Risk Management Strategy   Adam HoskingLondon Flood Risk Management Strategy   Adam Hosking
London Flood Risk Management Strategy Adam Hosking
 
Nathan Mudd Resume
Nathan Mudd ResumeNathan Mudd Resume
Nathan Mudd Resume
 
Neptune solutions brochure jm mike
Neptune solutions brochure jm mikeNeptune solutions brochure jm mike
Neptune solutions brochure jm mike
 
GW Amec Foster Wheeler
GW Amec Foster WheelerGW Amec Foster Wheeler
GW Amec Foster Wheeler
 
YH profile (E)
YH profile (E)YH profile (E)
YH profile (E)
 
MPC Capability Brochure_V6_2016_Digital
MPC Capability Brochure_V6_2016_DigitalMPC Capability Brochure_V6_2016_Digital
MPC Capability Brochure_V6_2016_Digital
 
PIC 2 Display Boards
PIC 2 Display BoardsPIC 2 Display Boards
PIC 2 Display Boards
 
Neptune solutions brochure may 2017
Neptune solutions brochure may 2017Neptune solutions brochure may 2017
Neptune solutions brochure may 2017
 
Swansea lagoon presentation by ioan jenkins
Swansea lagoon presentation by ioan jenkinsSwansea lagoon presentation by ioan jenkins
Swansea lagoon presentation by ioan jenkins
 
SRT Final Report
SRT Final ReportSRT Final Report
SRT Final Report
 
May 2016 M37 RH Milner AS PUBLISHED
May 2016 M37 RH Milner AS PUBLISHEDMay 2016 M37 RH Milner AS PUBLISHED
May 2016 M37 RH Milner AS PUBLISHED
 
Newest
NewestNewest
Newest
 
Enviro Excavations Capability Statement
Enviro Excavations Capability StatementEnviro Excavations Capability Statement
Enviro Excavations Capability Statement
 

Share with Pride IP Wales Tonfanau Rev1 - Revised

  • 1. /24 Apr 2015 1 Share with Pride Wales Route - Infrastructure Projects RAMWALL System: Tomorrows Future Today ‘The Permanent solution’ Innovative Value Engineering
  • 2. /24 Apr 2015 2 Existing Situation – Sea Defence damage The site at Tonfanau near Tywyn (Sandilands) is situated on the Cambrian Coast, North West Wales. Following the extreme storm events of January 2014 many sea defences along the whole of the West Wales coastline from North to South suffered extensive damage following a combination of high tidal surges and Force 8, Westerly gales. These photos were taken immediately following the extreme storm events and illustrate the damage that these extreme events have on our coastal assets such as damage to the sea defence revetment wall, embankment erosion and extensive damage to the existing ‘Gabion baskets’ sea defence structure.
  • 3. /24 Apr 2015 3 The Solution Due to logistical constraints and difficult beach access AMCO derived the following solution: • Located a Shotcrete pumping station in a field adjacent to the cliffs (stakeholder involvement) • Placed ducts under the track to accommodate feed hoses • Spray filled the voids with AAA40 dry concrete (added steel fibres to mix) – 250 tonne used • Provided tie-in dowels and mesh to create a bond to the existing asset and steep embankment The ‘Ramwall’ system was originally designed for the mining industry and has been modified by AMCO as an alternative to the typical ‘Gabion wall’ sections found along many areas of coastline. The system has proved to be an excellent choice, especially as the design can be modified to suit any location, erected quickly with each element designed as a ‘one-man’ lift. This not only improves productivity but has a superior structural capability that satisfies a permanent design structural life. Each element is ‘hog ringed’ together and a substantial front face meshing added and the whole retaining system is infilled with granite ballast which was transported to site by a RRV and transferred from the Cess via a builders chute and the ‘Ramwall’ infilled safely from above (>400 tonnes of ballast).
  • 4. / ‘Ramwall’ Building Procedure Lee Green. Area Delivery Manager 24 Apr 2015 4
  • 5. / Application of Hog rings 24 Apr 2015 5
  • 7. / The Permanent Solution ‘Ramwall’ L 24 Apr 2015 7
  • 8. / General view of overall area where damage occurred Lee Green. Area Delivery Manager 24 Apr 2015 8
  • 9. /24 Apr 2015 9 Benefits Permanent Solution • A quick permanent solution that can be designed for any application (ISS in house design team) • Minimal plant required • Environmental friendly - No Contamination (NRW requirement) • Improved risk mitigation to installation team i.e. Manual handling/HAVS etc. • 3965 ‘Accident free’ man hours without incidents. • An excellent robust and versatile permanent design solution that can be used in many scenarios.
  • 10. / Future Sea Level Estimations 24 Apr 2015 10
  • 11. / SUMMARY - ‘RAMWALL specification’  Permanent Solution  Raw material supplied by Rom-tech  8mm-35mm dia bar sizes  Matrix (200 x 200mm)  Manufactured to BS 448 -2005  Manufactured to ‘Cares standards for welded mesh’  Welds designed to 4 tonne diametrically opposed pull load  Galvanizing to BS ISO 1461-2009 to 87 microns  Longevity in Sea Defence environment (60 years).  Versatility (Can be adapted to suit location)  Steel diameters to suit location and environment  ISS internal design team  Environmental Friendly  AMCO fully trained installation team (ready and able to assist in any situation). 24 Apr 2015 11