Share with Pride
Wales Route - Infrastructure Projects
RAMWALL System: Tomorrows Future Today
‘The Permanent solution’
Innovative Value Engineering
2. /24 Apr 2015 2
Existing Situation – Sea Defence damage
The site at Tonfanau near Tywyn (Sandilands) is situated on the Cambrian Coast, North West Wales.
Following the extreme storm events of January 2014 many sea defences along the whole of the West
Wales coastline from North to South suffered extensive damage following a combination of high tidal
surges and Force 8, Westerly gales.
These photos were taken immediately following the extreme storm events and illustrate the damage that
these extreme events have on our coastal assets such as damage to the sea defence revetment wall,
embankment erosion and extensive damage to the existing ‘Gabion baskets’ sea defence structure.
3. /24 Apr 2015 3
The Solution
Due to logistical constraints and difficult beach access AMCO derived the following solution:
• Located a Shotcrete pumping station in a field adjacent to the cliffs (stakeholder involvement)
• Placed ducts under the track to accommodate feed hoses
• Spray filled the voids with AAA40 dry concrete (added steel fibres to mix) – 250 tonne used
• Provided tie-in dowels and mesh to create a bond to the existing asset and steep embankment
The ‘Ramwall’ system was originally designed for the
mining industry and has been modified by AMCO as an
alternative to the typical ‘Gabion wall’ sections found
along many areas of coastline. The system has proved
to be an excellent choice, especially as the design can
be modified to suit any location, erected quickly with
each element designed as a ‘one-man’ lift. This not
only improves productivity but has a superior structural
capability that satisfies a permanent design structural
life. Each element is ‘hog ringed’ together and a
substantial front face meshing added and the whole
retaining system is infilled with granite ballast which
was transported to site by a RRV and transferred from
the Cess via a builders chute and the ‘Ramwall’ infilled
safely from above (>400 tonnes of ballast).
8. /
General view of overall area where damage occurred
Lee Green. Area Delivery Manager
24 Apr 2015 8
9. /24 Apr 2015 9
Benefits
Permanent Solution
• A quick permanent solution that can be designed for any application (ISS in house design team)
• Minimal plant required
• Environmental friendly - No Contamination (NRW requirement)
• Improved risk mitigation to installation team i.e. Manual handling/HAVS etc.
• 3965 ‘Accident free’ man hours without incidents.
• An excellent robust and versatile permanent design solution that can be used in many scenarios.
11. /
SUMMARY - ‘RAMWALL specification’
Permanent Solution
Raw material supplied by Rom-tech
8mm-35mm dia bar sizes
Matrix (200 x 200mm)
Manufactured to BS 448 -2005
Manufactured to ‘Cares standards for welded mesh’
Welds designed to 4 tonne diametrically opposed pull load
Galvanizing to BS ISO 1461-2009 to 87 microns
Longevity in Sea Defence environment (60 years).
Versatility (Can be adapted to suit location)
Steel diameters to suit location and environment
ISS internal design team
Environmental Friendly
AMCO fully trained installation team (ready and able to assist in any
situation).
24 Apr 2015 11