SlideShare a Scribd company logo
1 of 3
Kamilya Sadykova
Dr. Kamilya Sadykova is a Principal Consultant of ERM
Eurasia Ltd Almaty branch office. She has over 15 years
of professional experience in the environmental sector
with emphasis on environmental and social impact
assessment of industrial activities.
Her professional skills cover baseline surveys,
environmental impact assessments, environmental
management and environmental audits on
compliance with national and international
requirements, health and safety auditing.
Kamilya knows requirements of Kazakhstan
environmental legislation as well as international laws
and regulations.
Dr. Sadykova has gotten a State License Issued by the
Ministry of Environment of the Republic of
Kazakhstan certifying that she is authorized to carry
out works in the field of environmental designing,
control and ecological expertise.
Prior to entering the consultancy, Kamilya was a leader
of environmental NGO where she was responsible for
both development and implementation of programs
and projects directed on environment protection and
social development.
Fields of Competence
• Environmental audit
• Environmental assessments of industrial sites
• Environmental, Sanitary and Safety Legislation
• Environmental impact assessment
• ISO 14001– Independent Audit and Implementation
• OHSAS 18001 - Independent Audit and Implementation
•
Education
• Institute of Developmental Biology, Moscow, Russia,
PhD, Biology, 1987,
• Kazakh State University, Diploma, Biology, 1980
• ISO 14001, Certificate of the course of environmental
management system’s manager, Intercertifica Central
Asia, 2007
• OHSAS 18001:2007, Certificate of the course on audit of
management system, Intercertifica Central Asia,
Almaty, 2012
• Qualified Internal OHSAS 18001:2007 Auditor
Certificate with entering into the InterSert Register,
2012
• Qualified ESHIA facilitator training course, TCO, 2009
• IHAZID training course, Chevron, 2010
Languages
• Russian
• Kazakh
• English
Key Projects
• Dr. Sadykova was involved in implementation of the
following projects:
• Regulation Registers update on Kazakhstan, for Rio-
Tinto, 2016
• Phase I assessment and EHS DD of sites of Halliburton
in Aktobe and Aktau, 2015
• Development of Legal Register and Permitting Road
map for Tenaris LLP, Aktau, 2015
• Phase 1 site assessment in Langepas, Russia, 2015
• EHS Due Diligence of two sites in Kokshetau
(Kazakhstan) and Tokmok (Kyrgyzstan) for
confidential client, 2015
• ESDD of Shoba oil field in Aktobe oblast, EBRD, 2014
• EHS Due Diligence of Tomskneftechem, Russia for
confidential client, 2014
• ESDD of the Kiyanly Petrochemical Project,
Turkmenistan;2014
• Baseline survey for Caspian Pipeline Consortium
CPC, 2013;
• SEP and Strategic Environmental Review for the
Kazakhstan Renewable Energy Financing Facility,
EBRD , 2013
• Environmental Due Diligence and Compliance audit
of sulfur processing plant at Tengiz for confidential
client, 2013
• EH&S assessment of gold mine facility in Tadjikistan
on compliance with IFC standards, 2012
• EH&S Due Diligence of industrial facility in Tolyatti,
Russia, for confidential client, 2012
• Development of ESIA for Caspian Pipeline
Consortium according to International Bank
Requirements (Equator Principles), 2011-2012
(ongoing);
• EHHS assessment of CPC pipeline extension project,
2011
• Development of legal registers on applicable EHS
Uzbekistan legislation for Rio-Tinto Inc, 2011
• Environmental and Social Due Diligence of Aktobe
Bypass Road Construction Project, (EBRD), 2011
• Water issues assessment for ESHIA study,
AltynAlmas Gold Project, Eastern Kazakhstan, 2011;
• Environmental Project Standards, Legislation Register
for TCO, 2011
• Environmental Site Assessment of electro lamp
plant for IPO portfolio, JSC OSRAM, Smolensk,
Russia
• EHHS assessment of INVIVO laboratory in Almaty,
for EBRD, 2011
• EHSS assessment of RV facilities for Tengizchevroil,
2010
• Environmental Due Diligence of petrol-filling stations
in Ekaterinburg and Svedlovskaya oblasts for TNK-
BP, Russia, 2010
• H&S Compliance audit of General Electric’s
locomotive depots in Atyrau oblast and Almaty, 2010
• Environmental and Social Due Diligence of the
Almaty Bus Sector Reform Project and Almaty
Trolleybus Projects to establish compliance with
EBRD’s Performance Requirements (“PRs”) under
EBRD’s 2008 Environmental and Social Policy
(EBRD), 2010
• Environmental Due Diligence of facilities of a Gas
distributing company of Udmurt Republic for TNK-
BP, Russia, 2010
• EH&S Due Diligence of the Mineral Fertilizers Plant
for HSBC, Taraz, Kazakhstan, 2010
• Gap Analysis for compliance with Equator Principles
of Sulfuric Acid Plant Construction Project for HSBC ,
Taraz, Kazakhstan, 2010
• Development of EH&S Registers on Kazakhstan,
Kyrgyzstan and Uzbekistan for confidential client,
2010
• GHG emissions policy and regulation in Kazakhstan,
for TCO, October 2009
• Phase I Environmental Site Assessment on ASTM
E1527-05 requirements, Aktau, for Halliburton,
2009;
• EH& S Due Diligence of a site in Kumkol of
Kyzylorda oblast for Baker Hughes, 2009
• Executive Summary of EIA documentation of
construction of the Upstream Supply Pipeline for
the North-European gas pipeline», Vologda oblast,
2009;
• EH&S Due Diligence of Kulzhan and Arystan oil
fields in Mangystau oblast, for confidential client,
2009
• Due Diligence of “O’zelektroapparat –
Electroshield” in Tashkent, Uzbekistan, June 2009
• Regulatory framework for Evaluation of creation of
National Sulfure Storage Center, for KazMunaiGaz,
2009
• Health and Social Impact Assessment and Public
Consultation and Disclosure Plan (PCDP) for
Kazakhstan-China railway construction, for
confidential client, 2009
• Development of H&S E Register for CISCO Int.,
2009
• Due Diligence of Baker Hughes site in Aktau, 2009
• Legal Review Governing the Establishment of a
Trust/Foundation in Kazakhstan, BG Group, 2009
• Gap Analysis for compliance with Equator Principles
of Project documentation on Kazakhstan-China
railway construction, for confidential client, 2009
• Due Diligence audit of Kazpromgeophizika facilities,
Chymkent, for Shlumberger, 2009
• Karachaganak RAP Guidance, Agip KPO, 2009
• Assessment on Equator Principles Compliance of
China – Central Asia Gas Pipeline for consortium of
banks, 2008
• EIA review of Sulfuric Acid Plant construction in
Kyzyl-orda region, for JBIC, 2008;
• Due Diligence audit of Almaty ElectroTrans for EBRD,
2008;
• Project Puma. Due-Diligence of oilfields in Aktobe oblast,
EBRD, 2008.
• Pre-Due Diligence of oilfield in Mangystau oblast for
confidential client (UK), 2008
• ENRC Project on closing of polygons, 2008
• ENRC Waste Management Project, 2008
• Development of EHS&S Permit Register for oil and
gas exploration activities in Kyrgyzstan for
confidential client, 2008
• Environmental Assessment of construction sites,
Antropov project, Almaty, 2007
• AGIP KPO Kazakhstan Health Management and
Mitigation Plan, 2007
• Phase I Environmental Site Assessment of Caspian
Downhole Services Facilities (Atyrau, Aktobe,
Aktau, Almaty) for Smith International, 2007
• Phase I Environmental Site Assessment for office
premises of Pfizer Co., 2007
• Environmental, key health and safety and social due
diligence assessments of Mining Complex “Bogatyr
Access Komyr ” for Kandinsky Project (RUSAL) ,
IPO, 2007, 2008
• Environmental Audits of Eurasian Natural
Resources Company (mining and smelter sites) for
IPO, 2006-2007.
• Environmental Site Assessment, Phase I&II, Outline
EIA for Pilkington, Kzylorda oblast, 2006
• Environmental Site Assessment, Phase I&II for
Henkel, Almaty oblast, Kapchagai city, Zarechnyi
village, 2006
• Resettlement project for TengizChevroil, Atyrau
oblast, 2007
• Environmental Audit of Ust-Kamenogorsk HPS,
2006
• Environmental Audit, Juices and Soft Drinks
Manufacture, RG Brands, ERDR, 2006
• Environmental Audit and Summary EIA for AES
Ekibastuz, Asian Development Bank, 2006
• HSE Management System according ISO 14001 and
OHSAS 18001 for Kurmangazy Petroleum, 2006
• HSE Management System according ISO 14001 and
OHSAS 18001 for Tub-Karagan Operating Company,
2004 -2005.
• Data Gap Analysis of Environmental, Health and Safety
Issues of Shagyrly – Shomyshty gas field, Mangistau
Oblast, Republic of Kazakhstan, Baring Vostok
Capital Partners, 2005
• Environmental Audit and Environmental Management
System Audit of the Kenkiyak-Atyrau oil pipeline
(Kazakhstan) – for EBRD, 2004
• Environmental Audit and EIA of Tasbulat, Aktas and
Turkmenoi Oil fields , Mangistau Oblast, Republic of
Kazakhsatn EERD, 2003 - 2004
• Environmental Impact Assessment (EIA) of exploratory
drilling wells in Аtyrau oblast, Kazakhstan for
Tengizchevroil company, (2002).
• Environmental Monitoring program for the construction
of the 1,500 km crude oil pipeline from Tengiz
(Kazakhstan) to Novorossiysk (the Black Sea) for Fluor
Daniel/Caspian Pipeline Consortium) 2001-2002.

More Related Content

Similar to CV_Kamilya Sadykova_ 2016_eng

Aurora Minerals Group EN
Aurora Minerals Group ENAurora Minerals Group EN
Aurora Minerals Group ENidrissov22
 
Презентация ОАО «НТЦ электроэнергетики» (eng)
Презентация ОАО «НТЦ электроэнергетики» (eng)Презентация ОАО «НТЦ электроэнергетики» (eng)
Презентация ОАО «НТЦ электроэнергетики» (eng)Rivets
 
UBI Consulting - 15_ENG
UBI Consulting - 15_ENGUBI Consulting - 15_ENG
UBI Consulting - 15_ENGJamshid Ganiev
 
Resume - Suncor
Resume - SuncorResume - Suncor
Resume - SuncorSyed Rizvi
 
Ali Hashim _SGS Pakistan_
Ali Hashim _SGS Pakistan_Ali Hashim _SGS Pakistan_
Ali Hashim _SGS Pakistan_Ali Hashim
 
Jacopo Licheri_EN Oct 2016
Jacopo Licheri_EN Oct 2016Jacopo Licheri_EN Oct 2016
Jacopo Licheri_EN Oct 2016Jacopo Licheri
 
EIA Report on Ring road lahore
EIA Report on Ring road lahoreEIA Report on Ring road lahore
EIA Report on Ring road lahoreAyesha Akhtar
 
Enhancing Competitiveness and Attracting FDI to the Mining Sector
Enhancing Competitiveness and Attracting FDI to the Mining SectorEnhancing Competitiveness and Attracting FDI to the Mining Sector
Enhancing Competitiveness and Attracting FDI to the Mining SectorOECD Environment
 
AK-BIODATA-Sep-2016
AK-BIODATA-Sep-2016AK-BIODATA-Sep-2016
AK-BIODATA-Sep-2016ANIYAN KUNJU
 

Similar to CV_Kamilya Sadykova_ 2016_eng (20)

Carbon center ang system 2019
Carbon center ang system 2019Carbon center ang system 2019
Carbon center ang system 2019
 
CV of JC Saha for Power Plant 290516
CV of JC Saha for Power Plant 290516CV of JC Saha for Power Plant 290516
CV of JC Saha for Power Plant 290516
 
SHAKIROV Ayrat 2015
SHAKIROV Ayrat 2015SHAKIROV Ayrat 2015
SHAKIROV Ayrat 2015
 
Aurora Minerals Group EN
Aurora Minerals Group ENAurora Minerals Group EN
Aurora Minerals Group EN
 
Resume
ResumeResume
Resume
 
CV-khodaee-revised
CV-khodaee-revisedCV-khodaee-revised
CV-khodaee-revised
 
Презентация ОАО «НТЦ электроэнергетики» (eng)
Презентация ОАО «НТЦ электроэнергетики» (eng)Презентация ОАО «НТЦ электроэнергетики» (eng)
Презентация ОАО «НТЦ электроэнергетики» (eng)
 
UBI Consulting - 15_ENG
UBI Consulting - 15_ENGUBI Consulting - 15_ENG
UBI Consulting - 15_ENG
 
azhar new
azhar newazhar new
azhar new
 
azhar new
azhar newazhar new
azhar new
 
Resume - Suncor
Resume - SuncorResume - Suncor
Resume - Suncor
 
Ali Hashim _SGS Pakistan_
Ali Hashim _SGS Pakistan_Ali Hashim _SGS Pakistan_
Ali Hashim _SGS Pakistan_
 
Jacopo Licheri_EN Oct 2016
Jacopo Licheri_EN Oct 2016Jacopo Licheri_EN Oct 2016
Jacopo Licheri_EN Oct 2016
 
EIA Report on Ring road lahore
EIA Report on Ring road lahoreEIA Report on Ring road lahore
EIA Report on Ring road lahore
 
Enhancing Competitiveness and Attracting FDI to the Mining Sector
Enhancing Competitiveness and Attracting FDI to the Mining SectorEnhancing Competitiveness and Attracting FDI to the Mining Sector
Enhancing Competitiveness and Attracting FDI to the Mining Sector
 
AK-BIODATA-Sep-2016
AK-BIODATA-Sep-2016AK-BIODATA-Sep-2016
AK-BIODATA-Sep-2016
 
SDP Presentation.pptx
SDP Presentation.pptxSDP Presentation.pptx
SDP Presentation.pptx
 
Projects done
Projects doneProjects done
Projects done
 
Resume_-_Muthalib_Mohammad1
Resume_-_Muthalib_Mohammad1Resume_-_Muthalib_Mohammad1
Resume_-_Muthalib_Mohammad1
 
CONPOLOX-AOP PPT
CONPOLOX-AOP PPTCONPOLOX-AOP PPT
CONPOLOX-AOP PPT
 

CV_Kamilya Sadykova_ 2016_eng

  • 1. Kamilya Sadykova Dr. Kamilya Sadykova is a Principal Consultant of ERM Eurasia Ltd Almaty branch office. She has over 15 years of professional experience in the environmental sector with emphasis on environmental and social impact assessment of industrial activities. Her professional skills cover baseline surveys, environmental impact assessments, environmental management and environmental audits on compliance with national and international requirements, health and safety auditing. Kamilya knows requirements of Kazakhstan environmental legislation as well as international laws and regulations. Dr. Sadykova has gotten a State License Issued by the Ministry of Environment of the Republic of Kazakhstan certifying that she is authorized to carry out works in the field of environmental designing, control and ecological expertise. Prior to entering the consultancy, Kamilya was a leader of environmental NGO where she was responsible for both development and implementation of programs and projects directed on environment protection and social development. Fields of Competence • Environmental audit • Environmental assessments of industrial sites • Environmental, Sanitary and Safety Legislation • Environmental impact assessment • ISO 14001– Independent Audit and Implementation • OHSAS 18001 - Independent Audit and Implementation • Education • Institute of Developmental Biology, Moscow, Russia, PhD, Biology, 1987, • Kazakh State University, Diploma, Biology, 1980 • ISO 14001, Certificate of the course of environmental management system’s manager, Intercertifica Central Asia, 2007 • OHSAS 18001:2007, Certificate of the course on audit of management system, Intercertifica Central Asia, Almaty, 2012 • Qualified Internal OHSAS 18001:2007 Auditor Certificate with entering into the InterSert Register, 2012 • Qualified ESHIA facilitator training course, TCO, 2009 • IHAZID training course, Chevron, 2010 Languages • Russian • Kazakh • English
  • 2. Key Projects • Dr. Sadykova was involved in implementation of the following projects: • Regulation Registers update on Kazakhstan, for Rio- Tinto, 2016 • Phase I assessment and EHS DD of sites of Halliburton in Aktobe and Aktau, 2015 • Development of Legal Register and Permitting Road map for Tenaris LLP, Aktau, 2015 • Phase 1 site assessment in Langepas, Russia, 2015 • EHS Due Diligence of two sites in Kokshetau (Kazakhstan) and Tokmok (Kyrgyzstan) for confidential client, 2015 • ESDD of Shoba oil field in Aktobe oblast, EBRD, 2014 • EHS Due Diligence of Tomskneftechem, Russia for confidential client, 2014 • ESDD of the Kiyanly Petrochemical Project, Turkmenistan;2014 • Baseline survey for Caspian Pipeline Consortium CPC, 2013; • SEP and Strategic Environmental Review for the Kazakhstan Renewable Energy Financing Facility, EBRD , 2013 • Environmental Due Diligence and Compliance audit of sulfur processing plant at Tengiz for confidential client, 2013 • EH&S assessment of gold mine facility in Tadjikistan on compliance with IFC standards, 2012 • EH&S Due Diligence of industrial facility in Tolyatti, Russia, for confidential client, 2012 • Development of ESIA for Caspian Pipeline Consortium according to International Bank Requirements (Equator Principles), 2011-2012 (ongoing); • EHHS assessment of CPC pipeline extension project, 2011 • Development of legal registers on applicable EHS Uzbekistan legislation for Rio-Tinto Inc, 2011 • Environmental and Social Due Diligence of Aktobe Bypass Road Construction Project, (EBRD), 2011 • Water issues assessment for ESHIA study, AltynAlmas Gold Project, Eastern Kazakhstan, 2011; • Environmental Project Standards, Legislation Register for TCO, 2011 • Environmental Site Assessment of electro lamp plant for IPO portfolio, JSC OSRAM, Smolensk, Russia • EHHS assessment of INVIVO laboratory in Almaty, for EBRD, 2011 • EHSS assessment of RV facilities for Tengizchevroil, 2010 • Environmental Due Diligence of petrol-filling stations in Ekaterinburg and Svedlovskaya oblasts for TNK- BP, Russia, 2010 • H&S Compliance audit of General Electric’s locomotive depots in Atyrau oblast and Almaty, 2010 • Environmental and Social Due Diligence of the Almaty Bus Sector Reform Project and Almaty Trolleybus Projects to establish compliance with EBRD’s Performance Requirements (“PRs”) under EBRD’s 2008 Environmental and Social Policy (EBRD), 2010 • Environmental Due Diligence of facilities of a Gas distributing company of Udmurt Republic for TNK- BP, Russia, 2010 • EH&S Due Diligence of the Mineral Fertilizers Plant for HSBC, Taraz, Kazakhstan, 2010 • Gap Analysis for compliance with Equator Principles of Sulfuric Acid Plant Construction Project for HSBC , Taraz, Kazakhstan, 2010 • Development of EH&S Registers on Kazakhstan, Kyrgyzstan and Uzbekistan for confidential client, 2010 • GHG emissions policy and regulation in Kazakhstan, for TCO, October 2009 • Phase I Environmental Site Assessment on ASTM E1527-05 requirements, Aktau, for Halliburton, 2009; • EH& S Due Diligence of a site in Kumkol of Kyzylorda oblast for Baker Hughes, 2009 • Executive Summary of EIA documentation of construction of the Upstream Supply Pipeline for the North-European gas pipeline», Vologda oblast, 2009; • EH&S Due Diligence of Kulzhan and Arystan oil fields in Mangystau oblast, for confidential client, 2009 • Due Diligence of “O’zelektroapparat – Electroshield” in Tashkent, Uzbekistan, June 2009 • Regulatory framework for Evaluation of creation of National Sulfure Storage Center, for KazMunaiGaz, 2009 • Health and Social Impact Assessment and Public Consultation and Disclosure Plan (PCDP) for Kazakhstan-China railway construction, for confidential client, 2009 • Development of H&S E Register for CISCO Int., 2009 • Due Diligence of Baker Hughes site in Aktau, 2009 • Legal Review Governing the Establishment of a Trust/Foundation in Kazakhstan, BG Group, 2009 • Gap Analysis for compliance with Equator Principles of Project documentation on Kazakhstan-China railway construction, for confidential client, 2009 • Due Diligence audit of Kazpromgeophizika facilities, Chymkent, for Shlumberger, 2009 • Karachaganak RAP Guidance, Agip KPO, 2009 • Assessment on Equator Principles Compliance of China – Central Asia Gas Pipeline for consortium of banks, 2008
  • 3. • EIA review of Sulfuric Acid Plant construction in Kyzyl-orda region, for JBIC, 2008; • Due Diligence audit of Almaty ElectroTrans for EBRD, 2008; • Project Puma. Due-Diligence of oilfields in Aktobe oblast, EBRD, 2008. • Pre-Due Diligence of oilfield in Mangystau oblast for confidential client (UK), 2008 • ENRC Project on closing of polygons, 2008 • ENRC Waste Management Project, 2008 • Development of EHS&S Permit Register for oil and gas exploration activities in Kyrgyzstan for confidential client, 2008 • Environmental Assessment of construction sites, Antropov project, Almaty, 2007 • AGIP KPO Kazakhstan Health Management and Mitigation Plan, 2007 • Phase I Environmental Site Assessment of Caspian Downhole Services Facilities (Atyrau, Aktobe, Aktau, Almaty) for Smith International, 2007 • Phase I Environmental Site Assessment for office premises of Pfizer Co., 2007 • Environmental, key health and safety and social due diligence assessments of Mining Complex “Bogatyr Access Komyr ” for Kandinsky Project (RUSAL) , IPO, 2007, 2008 • Environmental Audits of Eurasian Natural Resources Company (mining and smelter sites) for IPO, 2006-2007. • Environmental Site Assessment, Phase I&II, Outline EIA for Pilkington, Kzylorda oblast, 2006 • Environmental Site Assessment, Phase I&II for Henkel, Almaty oblast, Kapchagai city, Zarechnyi village, 2006 • Resettlement project for TengizChevroil, Atyrau oblast, 2007 • Environmental Audit of Ust-Kamenogorsk HPS, 2006 • Environmental Audit, Juices and Soft Drinks Manufacture, RG Brands, ERDR, 2006 • Environmental Audit and Summary EIA for AES Ekibastuz, Asian Development Bank, 2006 • HSE Management System according ISO 14001 and OHSAS 18001 for Kurmangazy Petroleum, 2006 • HSE Management System according ISO 14001 and OHSAS 18001 for Tub-Karagan Operating Company, 2004 -2005. • Data Gap Analysis of Environmental, Health and Safety Issues of Shagyrly – Shomyshty gas field, Mangistau Oblast, Republic of Kazakhstan, Baring Vostok Capital Partners, 2005 • Environmental Audit and Environmental Management System Audit of the Kenkiyak-Atyrau oil pipeline (Kazakhstan) – for EBRD, 2004 • Environmental Audit and EIA of Tasbulat, Aktas and Turkmenoi Oil fields , Mangistau Oblast, Republic of Kazakhsatn EERD, 2003 - 2004 • Environmental Impact Assessment (EIA) of exploratory drilling wells in Аtyrau oblast, Kazakhstan for Tengizchevroil company, (2002). • Environmental Monitoring program for the construction of the 1,500 km crude oil pipeline from Tengiz (Kazakhstan) to Novorossiysk (the Black Sea) for Fluor Daniel/Caspian Pipeline Consortium) 2001-2002.