For	all	the	projects	below	I	have	been	involved	in	the	full	life	cycle	of	the	roll	
out		project:		
Gap	Analysis,	Development	and	Customizing,	Integration	testing,	Production	of	
User	Guides,	Training	of		Process	Owners	and	End	Users,	Preparation	of	Go	Live,	
Go	Live,	Support	and	Improvement	Follow	up.		
	
My	main	roles	were	:		
	
Project	Management	:	
	
§ Managing	internal	(projects	manager	assistants	and	developpers)	and	external	
project	resources	(SAP	Consultants	and	third	party	subcontractors).	
§ Advising	stakeholders	on	project	governance,	animation	of	Steering	commitee	and	
presentation	of	the	SAP	Project	at	the	Group	Meeting.		
§ Establish	a	clear	and	honnest	communication	between	the	subsidiaries	and	the	
headquarter	managers	
§ Training	two	project	manager	assistants	
	
SAP	Architect	:		
	
§ Explaining	in	a	clear	manner	technical	SAP	issues	to	non-technical	people.		
§ Understanding	subsidiaries	requirements	and	its	business	implications,	
conducting	researchs	on	legal	requirement	and	SAP	best	practices.	
§ Analysing	the	gaps	between	requirements	and	core	model	or	SAP	functionalities		
and	define	workable	solutions	to	bridge	the	gaps		
§ Designing	the	solutions	:	arbitrage	of	internal	or	external	realisation,	testing	and	
validation	of	the	solution	
§ Customizing	of	all	solutions	produced	internally	that	do	not	require	ABAP	
	
Training	and	Support	:		
§ Production	of	User	guides	tailored	on	each	subsidiary	processes		
§ Elaboration	of	a	training	plan	and	training	of	end	users		(all	modules)	
§ Managing	change	and	helping	end	users	in	their	acceptance	and	learning	
processes.		
§ Providing	support	during	the	Go	Live	(e.g.	Data	migration	of	static	and	dynamic	
data)	and	after,	insuring	continuous	learning	and	improvement	of	the	solution.		
	
Birmingham			
January	2013	/	September	2014	(Go	Live	June	2014)		
Modules	implemented	:	SD	/	MM	/	CS	/	FI/CO	
	
SD	:		
- Customizing:	New	pricing	procedure	for	margin	computation	taking	into	account	group	royalties		
MM	:		
- Data	migration	of	material	data	base	:	ensuring	that	no	duplicate	was	done	with	the	headquarter	data	
base		
- Creation	of	a	new	serial	number	profil	to	follow	up	serial	number	from	reception	of	the	material	
onward.		
- Creation	of	service	items	that	automatically	create	service	order		(planning	strategy	82)
CS	:		
- Adaptation	of	the	intervention	form	:	Interactive	PDF	filled	by	the	engineers	on	site	and	synchronized	
with	SAP	via	PI	servor	:		
• Redesigning	the	form	to	include	needed	information	and	to	take	into	account	different	
pricing	policies		
• Establish	the	specifications	for	external	consultant,	test	solutions	and	train	end	users.		
- New	solution	of	using	the	equipment	hierarchy	and	automatic	mantle/	dismantle	of	equipment	to	
update	equipment	data	base.	
- Maintenance	Contract	:	Creation	of	the	configurable	item	(KMAT)	for	contract	purposes	:	
• Selected	answers	are	driving	creation	of	service	orders	for	routine	visits	;	pricing	policy	(	e.g.	
breakdown	included,	spare	part	included)		
- Adaptation	of	the	graphical	planner	(	CM21)	to	local	calendar	and	working	hour.	
FI	/CO	:		
- Matching	UK	chart	of	account	to	the	French	chart	of	account		
- Creation	of	a	specific	analytical	structure	:	profit	centers,		cost	centers,	internal	orders	
- Adaptation	of	automatic	bank	import	and	production	of		automatic	bank	transfer	order	(MT101)		
- Training	of	end-users	in	FI/AP,	FI/AR,	FI/AA	
	
	
Krakow		
September	2014/	March	2015	(Go	Live	January	2014)		
Modules	implemented	:	SD	/	MM	/	FI/CO	
	
SD	:		
- Customizing:		Creation	of	sales	bill	of	material	with	header	item	billable	but	subitems	deliverable	:	
creation	and	configuration	of	new	item	categories	to	meet	the	client	requirements	
- Local	requirements	developped	by	local	consultant	but	testing,	documentation	and	training	of	end	
users	by	project	team	:			Down	Payment	request	with	VAT,	Down	payment	invoice	,	Correction	of	
Down	Payment,	Correction	of	Invoice,	Correction	of	Correction	(and	exchange	rate	related	issues)	
MM	:	
- Ensuring	that	the	data	migration	would	take	into	account	the	new	functionnalities	of	sales	bill	of	
material	and	have	the	correct	information	(e.g.	Material	type,	item	category	group	…)	
FI/CO	:		
- Managing	complex	relationship	between	management	in	place,	futur	manager	(	and	current	and	
future	accountant),	external	consultant	and	local	subcontractor.		
- Creation	of	an	alternative	Polish	chart	of	account	and	matching	it	with	the	French	chart	of	account	
- Taking	into	account	all	the	tax	specificities	and	changing	legislation	(creation	of	VAT	period	openning	
and	closing)		
- Training	of	end-users	in	FI/AP,	FI/AR,	FI/AA	
	
Edinburgh	
April	2015	/	September	2015	(Go	Live	July	2015)	
Integration	of	a	newly	acquired	entity	into	the	UK	company.		
Modules	implemented	:	SD	/	MM	/	PP/	CS	/	FI/CO	
	
MM	:		
- Integrate	subcontracting	to	the	purchasing	process.		
- Integrate	forecasting	in	the	Material	Ressources	Planning	(MRP)		
- Coordination	of	new	group	policy	on	the	serial	number	generation.		
PP	:		
- Roll	out	of	the	core	model	for	Production	Bill	of	Material		
- Creation	of	routing		
- Creation	of	Work	centers	with	two	different	capacities		(Hour	man	/	Hour	Machine)		
FI/CO	:		
- Customization	:	Creation	of	new	costing	variants			
- Training	of	end-users	in	FI/AP,	FI/AR,	FI/AA	
	
	
Dublin	
September	2015	/	December	2015	
Modules	implemented	:	SD	/	MM	/	CS	/	FI/CO	
I	only	worked	on	the	Fit	Gap	analysis	and	beginning	of	the	Development	phasis	on	that	project.		
	
FI/CO	:		
- Customization	:	Creation	of	tax	codes	for	double	tax	reporting	:	Northem	Ireland	and	Republic	of	
Ireland.

More Related Content

Similar to Julie CHEN project list

Similar to Julie CHEN project list (20)

Stoyan Atanasov “How crucial is the BA role in an IT Project"
Stoyan Atanasov “How crucial is the BA role in an IT Project"Stoyan Atanasov “How crucial is the BA role in an IT Project"
Stoyan Atanasov “How crucial is the BA role in an IT Project"
 
Resume_2015 PM_BA
Resume_2015 PM_BAResume_2015 PM_BA
Resume_2015 PM_BA
 
Ankit rathi
Ankit rathiAnkit rathi
Ankit rathi
 
Pallavi Chaturvedi cv
Pallavi Chaturvedi cvPallavi Chaturvedi cv
Pallavi Chaturvedi cv
 
Agile methodologiesvswaterfall
Agile methodologiesvswaterfallAgile methodologiesvswaterfall
Agile methodologiesvswaterfall
 
Danforth Media Capabilities
Danforth Media CapabilitiesDanforth Media Capabilities
Danforth Media Capabilities
 
Satish Deshpande
Satish DeshpandeSatish Deshpande
Satish Deshpande
 
Jimmy_CV
Jimmy_CVJimmy_CV
Jimmy_CV
 
JobDescription.pdf
JobDescription.pdfJobDescription.pdf
JobDescription.pdf
 
Pole emploi at Agile Cambridge
Pole emploi at Agile CambridgePole emploi at Agile Cambridge
Pole emploi at Agile Cambridge
 
UI/UX Design in Agile process
UI/UX Design in Agile process  UI/UX Design in Agile process
UI/UX Design in Agile process
 
Kavithe_Res.doc
Kavithe_Res.docKavithe_Res.doc
Kavithe_Res.doc
 
The role of project managers in SAP S4HANA Conversion.pdf
The role of project managers in SAP S4HANA Conversion.pdfThe role of project managers in SAP S4HANA Conversion.pdf
The role of project managers in SAP S4HANA Conversion.pdf
 
Agile = scrum = no project managers
Agile =  scrum =  no project managersAgile =  scrum =  no project managers
Agile = scrum = no project managers
 
AnnMarieDeNeen Resume 20164
AnnMarieDeNeen Resume 20164AnnMarieDeNeen Resume 20164
AnnMarieDeNeen Resume 20164
 
Sunitha Palakode
Sunitha PalakodeSunitha Palakode
Sunitha Palakode
 
Joginder Singh_SL
Joginder Singh_SLJoginder Singh_SL
Joginder Singh_SL
 
SAP_Functional_Tester_Kavita Pandey
SAP_Functional_Tester_Kavita PandeySAP_Functional_Tester_Kavita Pandey
SAP_Functional_Tester_Kavita Pandey
 
masVenta Business Analysis Skills
masVenta Business Analysis SkillsmasVenta Business Analysis Skills
masVenta Business Analysis Skills
 
14400121029_Anshika Das_Software Engineering.pdf
14400121029_Anshika Das_Software Engineering.pdf14400121029_Anshika Das_Software Engineering.pdf
14400121029_Anshika Das_Software Engineering.pdf
 

Julie CHEN project list

  • 1. For all the projects below I have been involved in the full life cycle of the roll out project: Gap Analysis, Development and Customizing, Integration testing, Production of User Guides, Training of Process Owners and End Users, Preparation of Go Live, Go Live, Support and Improvement Follow up. My main roles were : Project Management : § Managing internal (projects manager assistants and developpers) and external project resources (SAP Consultants and third party subcontractors). § Advising stakeholders on project governance, animation of Steering commitee and presentation of the SAP Project at the Group Meeting. § Establish a clear and honnest communication between the subsidiaries and the headquarter managers § Training two project manager assistants SAP Architect : § Explaining in a clear manner technical SAP issues to non-technical people. § Understanding subsidiaries requirements and its business implications, conducting researchs on legal requirement and SAP best practices. § Analysing the gaps between requirements and core model or SAP functionalities and define workable solutions to bridge the gaps § Designing the solutions : arbitrage of internal or external realisation, testing and validation of the solution § Customizing of all solutions produced internally that do not require ABAP Training and Support : § Production of User guides tailored on each subsidiary processes § Elaboration of a training plan and training of end users (all modules) § Managing change and helping end users in their acceptance and learning processes. § Providing support during the Go Live (e.g. Data migration of static and dynamic data) and after, insuring continuous learning and improvement of the solution. Birmingham January 2013 / September 2014 (Go Live June 2014) Modules implemented : SD / MM / CS / FI/CO SD : - Customizing: New pricing procedure for margin computation taking into account group royalties MM : - Data migration of material data base : ensuring that no duplicate was done with the headquarter data base - Creation of a new serial number profil to follow up serial number from reception of the material onward. - Creation of service items that automatically create service order (planning strategy 82)
  • 2. CS : - Adaptation of the intervention form : Interactive PDF filled by the engineers on site and synchronized with SAP via PI servor : • Redesigning the form to include needed information and to take into account different pricing policies • Establish the specifications for external consultant, test solutions and train end users. - New solution of using the equipment hierarchy and automatic mantle/ dismantle of equipment to update equipment data base. - Maintenance Contract : Creation of the configurable item (KMAT) for contract purposes : • Selected answers are driving creation of service orders for routine visits ; pricing policy ( e.g. breakdown included, spare part included) - Adaptation of the graphical planner ( CM21) to local calendar and working hour. FI /CO : - Matching UK chart of account to the French chart of account - Creation of a specific analytical structure : profit centers, cost centers, internal orders - Adaptation of automatic bank import and production of automatic bank transfer order (MT101) - Training of end-users in FI/AP, FI/AR, FI/AA Krakow September 2014/ March 2015 (Go Live January 2014) Modules implemented : SD / MM / FI/CO SD : - Customizing: Creation of sales bill of material with header item billable but subitems deliverable : creation and configuration of new item categories to meet the client requirements - Local requirements developped by local consultant but testing, documentation and training of end users by project team : Down Payment request with VAT, Down payment invoice , Correction of Down Payment, Correction of Invoice, Correction of Correction (and exchange rate related issues) MM : - Ensuring that the data migration would take into account the new functionnalities of sales bill of material and have the correct information (e.g. Material type, item category group …) FI/CO : - Managing complex relationship between management in place, futur manager ( and current and future accountant), external consultant and local subcontractor. - Creation of an alternative Polish chart of account and matching it with the French chart of account - Taking into account all the tax specificities and changing legislation (creation of VAT period openning and closing) - Training of end-users in FI/AP, FI/AR, FI/AA Edinburgh April 2015 / September 2015 (Go Live July 2015) Integration of a newly acquired entity into the UK company. Modules implemented : SD / MM / PP/ CS / FI/CO MM : - Integrate subcontracting to the purchasing process. - Integrate forecasting in the Material Ressources Planning (MRP) - Coordination of new group policy on the serial number generation. PP : - Roll out of the core model for Production Bill of Material - Creation of routing - Creation of Work centers with two different capacities (Hour man / Hour Machine) FI/CO : - Customization : Creation of new costing variants - Training of end-users in FI/AP, FI/AR, FI/AA Dublin September 2015 / December 2015 Modules implemented : SD / MM / CS / FI/CO I only worked on the Fit Gap analysis and beginning of the Development phasis on that project. FI/CO : - Customization : Creation of tax codes for double tax reporting : Northem Ireland and Republic of Ireland.