Record Notes of Partial Discharge Test Carried out by MIS Logic ++ Naida
Date:07.05.2014
Mis. NTPC LTD Mis. LOGIC PLUS PLUS INDIA PVT. LTD.
Shri B.Maharana, AGM (EM) I/C Shri.Sunil Kumar Bhami (Manager)
Shri.K. Ravinder, AGM (EM)
Shri.Ch.Venkateswara Rao, DGM (EM)
Shri.M.V. Reddy, Manager (EM)
1. Generator Transformer-1 has developed H2 gas In DGA. the level of H2 has gone up to
293PPM.
2. The DGA report indicates different gas levels as below:
H2-293ppm,N2-1.11%, 02-0.2%, CH4-14ppm, C2H4-1ppm, C2 H6-1ppm, C2H2-0ppm, CO-88ppm,
C02-1009ppm & TGC-1.45% (DGA Trend chart attached)
Seeing the critica lity of H2 level in DGA which may be because of P.D, P.D has been planned to
identify the location of P.O.
-I:
3. Mis Logic ++ Naida, who are t he exper.s in this field oft P.D analysis has been contacted for
carring out the test . Mr. Sunil Kumar Bhami, Manager of Mis Logic plus Plus visited to Mis NTPC Ltd
from 06.05.2014 to 07.05.2014 for measurement of Partial Discharge in Generator Transformer#l.
4. Partial Discharge measurement was carried out with the help of TP SOOA Power PO Test
Equipment by using AE Sensors & HFCT Sensor. AE Sensors were mounted at various locations to
find out the location of PO inside the transformers & HFCT was clamped at the grounding of the
transformers & data acquired for analysis.
5. The Partial Discharge observations of GT#l are as follows.
A. Side-1 (HV side) R-ph near to lead connection with P.D amplitude-20Il volts.
B. Side -2 west side of transformer P.D amplitude-30Il volts.
e. Side-3 (LV side) R-ph LV connection area P.D amplitude-251l volts.
D. Side-4 Radiator sideof the transformer P.D amplitude-20Il volts.
E. No P.D observed in other locations of the transformer.
Based on t he above PO test & the DGA results, Mis Logic ++ Pvt Ltd opined that the PO activities
observed in GT-1 is not of alarming nature & it will not affect the operation of the transformer.
Hence the transformer may remain in service with further monitoring. Mis logic ++ Pvt Ltd
recommended for re testing of PO test after 2 months.
6. Testing of the transformers is completed on 07th May, 2014.
7. The detailed report shall be submitted by 20.05.14.
NTPC LOGIC PLUS PLUS INDIA PVT. LTD.

More Related Content

Viewers also liked

Partial Discharge Techniques For Measuring Condition Of MV & HV Switchgear
Partial Discharge Techniques For Measuring Condition Of MV & HV SwitchgearPartial Discharge Techniques For Measuring Condition Of MV & HV Switchgear
Partial Discharge Techniques For Measuring Condition Of MV & HV SwitchgearThorne & Derrick International
 
Nidec asi service partial discharge basic diagnostic
Nidec asi service partial discharge basic diagnosticNidec asi service partial discharge basic diagnostic
Nidec asi service partial discharge basic diagnosticNidec Corporation
 
Assuring Reliability of Critical Power Cable Systems
Assuring Reliability of Critical Power Cable SystemsAssuring Reliability of Critical Power Cable Systems
Assuring Reliability of Critical Power Cable Systemsmichaeljmack
 
International Journal of Electrical Machines & Drives vol 2 issue 1
International Journal of Electrical Machines & Drives vol 2 issue 1International Journal of Electrical Machines & Drives vol 2 issue 1
International Journal of Electrical Machines & Drives vol 2 issue 1JournalsPub www.journalspub.com
 
Seminar on Partial Discharge detection methods
Seminar on Partial Discharge detection methodsSeminar on Partial Discharge detection methods
Seminar on Partial Discharge detection methodsHarshit Bhandari
 
Partial Discharge Detection Products by EA Technology
Partial Discharge Detection Products by EA TechnologyPartial Discharge Detection Products by EA Technology
Partial Discharge Detection Products by EA TechnologyRyan McFallo
 
demand side management
demand side managementdemand side management
demand side managementKomal Nigam
 
Dissolved Gas Analysis in Transformer Oil
Dissolved Gas Analysis in Transformer OilDissolved Gas Analysis in Transformer Oil
Dissolved Gas Analysis in Transformer OilSatish Patel
 
Dissolved gas analysis of power transformer oil
Dissolved gas analysis of power transformer oilDissolved gas analysis of power transformer oil
Dissolved gas analysis of power transformer oilSHIVAJI CHOUDHURY
 
Transformer Maintenance and Testing
Transformer Maintenance and TestingTransformer Maintenance and Testing
Transformer Maintenance and TestingGPTraining
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHShankar Singh
 

Viewers also liked (13)

Partial Discharge Techniques For Measuring Condition Of MV & HV Switchgear
Partial Discharge Techniques For Measuring Condition Of MV & HV SwitchgearPartial Discharge Techniques For Measuring Condition Of MV & HV Switchgear
Partial Discharge Techniques For Measuring Condition Of MV & HV Switchgear
 
Nidec asi service partial discharge basic diagnostic
Nidec asi service partial discharge basic diagnosticNidec asi service partial discharge basic diagnostic
Nidec asi service partial discharge basic diagnostic
 
Assuring Reliability of Critical Power Cable Systems
Assuring Reliability of Critical Power Cable SystemsAssuring Reliability of Critical Power Cable Systems
Assuring Reliability of Critical Power Cable Systems
 
IEEE_2011_Conference
IEEE_2011_ConferenceIEEE_2011_Conference
IEEE_2011_Conference
 
International Journal of Electrical Machines & Drives vol 2 issue 1
International Journal of Electrical Machines & Drives vol 2 issue 1International Journal of Electrical Machines & Drives vol 2 issue 1
International Journal of Electrical Machines & Drives vol 2 issue 1
 
Seminar on Partial Discharge detection methods
Seminar on Partial Discharge detection methodsSeminar on Partial Discharge detection methods
Seminar on Partial Discharge detection methods
 
Partial Discharge Detection Products by EA Technology
Partial Discharge Detection Products by EA TechnologyPartial Discharge Detection Products by EA Technology
Partial Discharge Detection Products by EA Technology
 
Demand Side Management
Demand Side ManagementDemand Side Management
Demand Side Management
 
demand side management
demand side managementdemand side management
demand side management
 
Dissolved Gas Analysis in Transformer Oil
Dissolved Gas Analysis in Transformer OilDissolved Gas Analysis in Transformer Oil
Dissolved Gas Analysis in Transformer Oil
 
Dissolved gas analysis of power transformer oil
Dissolved gas analysis of power transformer oilDissolved gas analysis of power transformer oil
Dissolved gas analysis of power transformer oil
 
Transformer Maintenance and Testing
Transformer Maintenance and TestingTransformer Maintenance and Testing
Transformer Maintenance and Testing
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
 

Partial Discharge Test Record Notes

  • 1. Record Notes of Partial Discharge Test Carried out by MIS Logic ++ Naida Date:07.05.2014 Mis. NTPC LTD Mis. LOGIC PLUS PLUS INDIA PVT. LTD. Shri B.Maharana, AGM (EM) I/C Shri.Sunil Kumar Bhami (Manager) Shri.K. Ravinder, AGM (EM) Shri.Ch.Venkateswara Rao, DGM (EM) Shri.M.V. Reddy, Manager (EM) 1. Generator Transformer-1 has developed H2 gas In DGA. the level of H2 has gone up to 293PPM. 2. The DGA report indicates different gas levels as below: H2-293ppm,N2-1.11%, 02-0.2%, CH4-14ppm, C2H4-1ppm, C2 H6-1ppm, C2H2-0ppm, CO-88ppm, C02-1009ppm & TGC-1.45% (DGA Trend chart attached) Seeing the critica lity of H2 level in DGA which may be because of P.D, P.D has been planned to identify the location of P.O. -I: 3. Mis Logic ++ Naida, who are t he exper.s in this field oft P.D analysis has been contacted for carring out the test . Mr. Sunil Kumar Bhami, Manager of Mis Logic plus Plus visited to Mis NTPC Ltd from 06.05.2014 to 07.05.2014 for measurement of Partial Discharge in Generator Transformer#l. 4. Partial Discharge measurement was carried out with the help of TP SOOA Power PO Test Equipment by using AE Sensors & HFCT Sensor. AE Sensors were mounted at various locations to find out the location of PO inside the transformers & HFCT was clamped at the grounding of the transformers & data acquired for analysis. 5. The Partial Discharge observations of GT#l are as follows. A. Side-1 (HV side) R-ph near to lead connection with P.D amplitude-20Il volts. B. Side -2 west side of transformer P.D amplitude-30Il volts. e. Side-3 (LV side) R-ph LV connection area P.D amplitude-251l volts. D. Side-4 Radiator sideof the transformer P.D amplitude-20Il volts. E. No P.D observed in other locations of the transformer. Based on t he above PO test & the DGA results, Mis Logic ++ Pvt Ltd opined that the PO activities observed in GT-1 is not of alarming nature & it will not affect the operation of the transformer. Hence the transformer may remain in service with further monitoring. Mis logic ++ Pvt Ltd recommended for re testing of PO test after 2 months. 6. Testing of the transformers is completed on 07th May, 2014. 7. The detailed report shall be submitted by 20.05.14. NTPC LOGIC PLUS PLUS INDIA PVT. LTD.