PPH Basics
• When an applicant receives a ruling from a first office
that at least one claim in their application is
allowable, the applicant can request to enter the PPH
program in a second office
• If the request is granted, the second office can use
the work done by the first office as a starting point
• That PPH case is then fast-tracked in the second
office
• The second office is now looking at a case where
most, if not all, of the major issues should already
have been addressed
2
33
AIPLA
Firm Logo
3
• Background; Backlogs in offices around the world began
to explode in the late 1990s
• The number of applications filed in multiple offices also
started to steadily increase
• Offices began discussing potential ways to improve
efficiencies – focusing on worksharing
• PPH began as a pilot in between the JPO and USPTO in
2006
• Today - 30 offices worldwide; 27 with USPTO
44
AIPLA
Firm Logo
Global/IP5 PPH pilot program at the USPTO
• Start date: January 6, 2014 (so in effect now even though
OG Notice and forms are not out yet but will be very soon).
Any eligible PPH Request filed now (even using older PPH
forms ) will be treated under new Global/IP5 Pilot Program.
• Big news is:
• Harmonizes the various PPH programs into one USPTO
program (no more separate PCT-PPH and PPH programs).
• Uses one standardized USPTO PPH Request form (to be
released soon). Not one for each country as now.
• Uses the common first date rule for related applications
(easier to comply with than chain of priority rule).
• Uses streamlined procedures like PPH 2.0 did.
55
AIPLA
Firm Logo
Global/IP5 PPH pilot program at the USPTO
• Recent developments leading to USPTO
Global/IP5 PPH pilot program implementation:
• During the past year, the IP5 offices, agreed to
fully engage in the IP5 PPH process.
• while at the same time a number of other offices
stated their intention to participate in a uniform,
harmonized process now known as the Global
PPH.
66
AIPLA
Firm Logo
Benefits
1. Cost savings from fewer Office Actions, RCE’s,
etc.
2. Higher quality shared search results. For example,
a JP Examiner is better at searching JP art in
Japanese than an English speaking USPTO
examiner is. Then the JP results are shared with the
USPTO Examiner.
3. Faster allowances.
4. Claims should be stronger (validity) because of
multiple offices reviewing same claims.
77
AIPLA
Firm Logo
Who are the IP5?
• The European Patent Office (EPO),
• The Japan Patent Office (JPO),
• The Korean Intellectual Property Office (KIPO),
• The State Intellectual Property Office of the People's Republic of China
(SIPO),
• The United States Patent and Trademark Office (USPTO).
• The IP5 Offices account for 90% of all patent applications filed
worldwide. See http://www.fiveipoffices.org/about-us.html
88
AIPLA
Firm Logo
Global PPH Principles
• Global PPH Principles
• As a result of the success of the PPH Program, the maintenance of the
many individual bilateral agreements between countries has become
challenging.
• With that in mind, both applicants and participating offices would
benefit from a single set of principles that form a world-wide PPH
system. In addition, a common framework provides a baseline to which
new PPH offices can subscribe without varying from the guidelines
established by longstanding PPH partners. The following principles set
the foundation for a global PPH system.
99
AIPLA
Firm Logo
Who are the Global PPH participants?
1010
AIPLA
Firm Logo
Strange but so far EPO is not Global PPH but is
IP5
Remember: So far EPO is not in Global PPH but is
in IP5.
•
1111
AIPLA
Firm Logo
Useful benefits and examples
• China was still using regular PPH (not mottanai, not PPH
2.0 and not Global PPH).
• So case had to be allowed in China first (OFF) before PPH
Request to USPTO could be filed.
• Also no PPH 2.0 so costly translations needed of claims
and copy of SIPO OA needed costly certificate of
translator’s accuracy (no machine translation).
• China is in IP5, Japan is IP5, and US in IP5
• So now OSF allowance (Japan) can be used at USPTO
using 2.0 like translation requirements and fewer need
papers. See next slide:
1212
AIPLA
Firm Logo
Example
• File in China first (SIPO) = OFF.
• One year later file at JPO and USPTO
• Get allowance at JPO (OEE= Office of early
Examination)). Maybe also use JPO free
accelerated examination.
• File PPH Global IP5 Pilot Request at USPTO using
easy PPH 2.0 like requirements.
• = a lot cheaper for Chinese companies than before
1313
AIPLA
Firm Logo
Same earliest date can filing or priority date = very good
• III. Requirements for Requesting Participation in the Global PPH or IP5 PPH
(“Global/IP5 PPH”) Pilot Program in the USPTO
• A. Eligibility
• In order to be eligible to participate in the Global/IP5 PPH pilot program at the
USPTO, the following requirements must be met:
• (1) The U.S. application for which participation in the Global/IP5 PPH pilot
program is requested must have the same earliest date, whether this is the
priority date or filing date, as that of a corresponding national or regional
application filed with another Global/IP5 PPH participating office or a
corresponding PCT international application for which one of the Global/ IP5
PPH participating offices was the International Searching Authority (ISA) or the
International Preliminary Examining Authority (IPEA).
1414
AIPLA
Firm Logo
Eligibility continued
• (2) The corresponding application has at least one
claim indicated by the OEE in its capacity as a
national or regional Office, ISA, or IPEA, to be
allowable/patentable. A claim determined as
novel, inventive, and industrially applicable by the
ISA or IPEA has the meaning of
allowable/patentable for the purposes of this
program.
1515
AIPLA
Firm Logo
Eligibility continued
• (3) All claims in the U.S. application for which participation in the Global/IP5 PPH pilot
program is requested must sufficiently correspond to the allowable/patentable claims in
the corresponding OEE application. A claim is considered to sufficiently correspond
where, accounting for differences due to claim format requirements, the claim is of the
same or similar scope as an allowable/patentable claim in the corresponding OEE
application. A claim in the U.S. application which is narrower in scope than the claims
indicated as allowable/patentable in the OEE application will also sufficiently correspond
if presented as a claim dependent upon a claim which is of the same or similar scope as
a claim indicated as allowable/patentable in the OEE application. In this regard, a claim
that is narrower in scope occurs when an OEE claim is amended to be further limited by
an additional feature that is supported by the written description of the U.S. application.
Additionally, a claim in the U.S. application which introduces a new/different category of
claims than those indicated to be allowable/patentable by the OEE is not considered to
sufficiently correspond. For example, where the OEE application contains only claims
relating to a process of manufacturing a product, then any product claims in the U.S.
application are not considered to sufficiently correspond, even if the product claims are
dependent on process claims which sufficiently correspond to allowable/patentable
claims in the OEE application.
1616
AIPLA
Firm Logo
Eligibility continued
• (4) Substantive examination of the U.S. application
for which participation in the Global/IP5 PPH pilot
program is requested has not begun.
1717
AIPLA
Firm Logo
Mr. Lent’s actual PPH case examples
  Filed Appl PPH filed Granted Current Status Time Lapse between Filing Date
and Issue Date (months)
1 WPA0028US 06/18/2010 09/20/2010 Denied:
06/13/2011
ISSUED: 
02/15/2012
20
2 SGI0019US 08/31/2009 06/17/2011 07/11/2011 ISSUED: 
10/12/2012
40
(16 months between PPH filing and 
issue date)
3 LTI0024US 04/18/2012 09/24/2012 11/14/2012 ISSUED: 
05/21/2013
13
4 KOY0152US 09/28/2009 07/27/2012 09/07/2012 ISSUED: 
05/22/2013
 
44
(10 months between PPH filing and 
issue date)
5 ELL0003US 08/20/2012 08/27/2012 11/01/2012 ISSUED: 
05/22/2013
9
6 YKI0376US 03/22/2012 09/05/2012 10/02/2012 ISSUED:
09/11/2013
18
7 YKI0371US 03/22/2012 06/22/2012 08/31/2012 ISSUED: 
10/22/2013
19
8 MZP0002US 03/20/2012 06/19/2012 8/17/2012 ISSUED: 
11/26/2013
20
9 SGI0043US 03/24/2011 03/24/2011 09/07/2011 Client 
Abandoned: 
07/13/2012
 
 
10 WPA0038US 09/23/2011 01/28/2013 03/12/2013 Client 
Abandoned: 
08/27/2013
 
11 YKI0374US 03/22/2012 09/17/2012 09/24/2012 Allowed: 12/9/13  
12 IWP0029US 02/25/2011 06/07/2011 06/22/2011 FOA 02/08/2012; 
Nguyen, Jimmy 
H.
 
13 UNT0060US 03/14/2013 06/12/2013 07/18/2013 Ex Parte Quayle: 
05/28/2013
Vu, Jimmy T. 
 
14 YUA0020US 03/01/2013 04/29/2013 Denied:
07/10/2013
   
15 YKI0399US 01/25/2013 01/25/2013 Denied:
03/12/2013
   
16 KKP0028US 07/22/2013 01/07/2014   Pending  
17 SAS0254US 11/27/2013 01/07/2014   Pending  
1818
AIPLA
Firm Logo
USPTO Focus
• USPTO’s goal is to continually improve the
program for stakeholders
• Increase awareness of the program and its
benefits
• Results to date:
– 25,316 requests for PPH filed since 2006
– In CY13, the average number of new requests per
month was up approximately 20% from the previous
year
18
1919
AIPLA
Firm Logo
19
PPH Benefits
USPTO stats on PPH results compared with all
cases:
Paris-PPH PCT-PPH All Cases
Grant Rate (Allowances/Total
Number of Disposals)
86% 88% 51%
First Action Allowance Rate 26% 20% 14%
Actions per Disposal 2.3 1.6 2.6 - 3.5
2020
AIPLA
Firm Logo
PLT
• On October 21, 2013, the USPTO published
final rules changes to implement Title II of the Patent
Law Treaties Implementation Act of 2012 (PLTIA),
which was enacted as Public Law 112 -211 on
December 18, 2012.
• Effective date is December 18, 2013.
• See “Changes to Implement the Patent Law
Treaty” Final Rule 78 Fed Reg. 62368 (October
21, 2013)
2121
AIPLA
Firm Logo
PLT
• History:
• The PLT was concluded on June 1, 2000, and
entered into force on April 28, 2005. Ratified by US
Senate in 2007 but not self-executing treaty.
Legislation (Title II of the PLTIA) to amend 35 USC
was enacted on December 18, 2012 which was
enacted as Public Law 112 -211 on December 18,
2012.
2222
AIPLA
Firm Logo
PLT
• First part of PLTIA implements the Hague
Agreement Design Treaty (not this discussed in
this presentation) at Title I.
• Second part (Title II) of PLTIA (discussed in this
presentation) implements the Patent Law Treaty
(PLT):
2323
AIPLA
Firm Logo
PLT
The Patent Law Treaty (PLT):
•Goals: Harmonizes and streamlines procedures
such as:
•(1) Relaxed the formal procedures for filing patent
applications to obtain a filing date.
•(2) Restoration of priority rights up to 14 months
•(8 months for design patent) by granted petition.
•(3) Time to reply to some OA’s extended.
2424
AIPLA
Firm Logo
PLT
Not best practices – instead emergency procedures
for filing patent applications and obtaining a filing
date. Can have 112 support and misidentification
problems.
A non-provisional application(other than a design)
with a specification may be filed without claims
and/or without drawings or may be filed “by
reference” to a previously filed application.
See new USPTO ADS form PTO/AIA/14 (12-13) at
page 2.
* Provisionals never needed a claim (but good idea to include for support in related EP cases
for example).
2525
AIPLA
Firm Logo
New USPTO ADS Form has filing by reference section
• Language from new Application Data Sheet (ADS) for PTO/AIA/14(12-
13) filing by reference section:
• “Only complete this section when filing an application by reference
under 35 U.S.C. 111(c) and 37 CFR 1.57(a). Do not complete this
section if application papers including a specification and any drawings
are being filed. Any domestic benefit or foreign priority information must
be provided in the appropriate section(s) below (i.e., “Domestic
Benefit/National Stage Information” and “Foreign Priority Information”).
• For the purposes of a filing date under 37 CFR 1.53(b), the description
and any drawings of the present application are replaced by this
reference to the previously filed application, subject to conditions and
requirements of 37 CFR 1.57(a).”
2626
AIPLA
Firm Logo
Nonprovisional applications
• For non-provisional applications filed after
December 18, 2013 (not design applications)
• The US filing date is the date the USPTO receives
a specification with or without claims. Drawings
also not required to be filed to be entitled to filing
date.
• However, requirements must be met later and fees
paid to avoid abandonment.
• See USPTO memo to Examiner’s dated December
13, 2013 at
http://www.uspto.gov/patents/init_events/PLT_Memo_to_Examiners_12-13-2013.pd
2727
AIPLA
Firm Logo
Design applications still need spec and figures at filing
No changes to filing date requirements for design
applications.
Need specification and required drawings are
required at filing as normal for design
applications.
However, 6 month priority claim deadline can be
extended 2 more months (see restoration of
priority below)
2828
AIPLA
Firm Logo
PLT
• Restoration of the right of priority to foreign application or a
provisional application.
• Previous to PLT, mistakenly missing the 12 month drop-
dead deadline was not extendible (6 month for design).
• Now, via a petition with fee to the Office of Petitions and file
your application later, i.e., up to 14 months ( 8 months for
Design app). 119(e) (Provisional app priority) and 119(a)
foreign priority may be extended up an additional 2 months
if the delay in filing the application claiming priority was
“unintentional.”
2929
AIPLA
Firm Logo
Some Office Action response times changed
• Response to Restriction Requirement increased to
2 months from 1 month.
• see
http://www.uspto.gov/patents/init_events/PLT_Memo_
3030
AIPLA
Firm Logo
Late priority claiming up to 2 months later
• New 37 CFR § 1.55(c) (for foreign priority claims) and 37 CFR §1.78(b)
(for priority claims to provisional applications), which provide for
petitions for the restoration of the right of priority when a subsequent
application is filed after but within 2 months of the expiration of the
priority period. As set forth in the rules, such a petition must include:
• The priority claim … in an application data sheet … unless
previously submitted;
• The petition fee as set forth in Sec. 1.17(m); and
• A statement that the delay in filing the subsequent application
beyond the priority period was unintentional.
• These changes take effect December 18, 2013, and apply to patent
applications filed before, on, or after that date. See “Changes to
Implement the Patent Law Treaty” Final Rule 78 Fed Reg. 62368
(October 21, 2013).
3131
AIPLA
Firm Logo
Patent Term Adjustment (PTA) Provision
• The PLTIA provides “applicants with additional
opportunities to delay the examination process (e.g., the
ability to file an application without any claims and to file an
application merely by reference to a prior-filed application).”
The USPTO has determined that it is appropriate to require
“that an application should be placed in condition for
examination within eight months of its filing date (or date of
commencement of national stage in an international
application)” or else be subject to PTA deduction. Thus, 37
CFR § 1.704 is amended to insert new paragraph (c)(11)
(and redesignate current paragraphs (c)(11) and (c)(12) as
paragraphs (c)(12) and (c)(13), respectively) and add new
paragraph (f) to provide for PTA deductions if an
application is not complete within 8 months of its filing date.
3232
AIPLA
Firm Logo
Thanks for your attention! Questions?
Daniel P. Lent
Partner,
Japanese Practice Group Leader
Cantor Colburn LLP
dlent@cantorcolburn.com

More Related Content

Viewers also liked

Noe Guevara Resume
Noe Guevara ResumeNoe Guevara Resume
Noe Guevara Resumenoe guevara
 
Osservatorio introduzione all'investimento immobiliare in ungheria 2016
Osservatorio introduzione all'investimento immobiliare in ungheria 2016Osservatorio introduzione all'investimento immobiliare in ungheria 2016
Osservatorio introduzione all'investimento immobiliare in ungheria 2016Economia.hu
 
Luhacovice.cz - Mediainfo 2016
Luhacovice.cz - Mediainfo 2016Luhacovice.cz - Mediainfo 2016
Luhacovice.cz - Mediainfo 2016Avonet, s.r.o.
 
Vinci project nature's ally
Vinci project nature's allyVinci project nature's ally
Vinci project nature's allysrashti12
 
Skola bankarenja prof erstesteina
Skola bankarenja prof erstesteinaSkola bankarenja prof erstesteina
Skola bankarenja prof erstesteinaMiro Marasović
 
Bangga Indonesia
Bangga IndonesiaBangga Indonesia
Bangga Indonesiarcvaganza
 
WHC_CenterScope_Spring 2015_FINAL_LoRes
WHC_CenterScope_Spring 2015_FINAL_LoResWHC_CenterScope_Spring 2015_FINAL_LoRes
WHC_CenterScope_Spring 2015_FINAL_LoResBarry Eisenberg
 
Castle Resorts & Hotels Premieres in Thailand Market; Acquires Hotel Contract...
Castle Resorts & Hotels Premieres in Thailand Market; Acquires Hotel Contract...Castle Resorts & Hotels Premieres in Thailand Market; Acquires Hotel Contract...
Castle Resorts & Hotels Premieres in Thailand Market; Acquires Hotel Contract...villaphuket8
 

Viewers also liked (11)

Noe Guevara Resume
Noe Guevara ResumeNoe Guevara Resume
Noe Guevara Resume
 
Osservatorio introduzione all'investimento immobiliare in ungheria 2016
Osservatorio introduzione all'investimento immobiliare in ungheria 2016Osservatorio introduzione all'investimento immobiliare in ungheria 2016
Osservatorio introduzione all'investimento immobiliare in ungheria 2016
 
Resume
ResumeResume
Resume
 
Luhacovice.cz - Mediainfo 2016
Luhacovice.cz - Mediainfo 2016Luhacovice.cz - Mediainfo 2016
Luhacovice.cz - Mediainfo 2016
 
Vinci project nature's ally
Vinci project nature's allyVinci project nature's ally
Vinci project nature's ally
 
Skola bankarenja prof erstesteina
Skola bankarenja prof erstesteinaSkola bankarenja prof erstesteina
Skola bankarenja prof erstesteina
 
#Virtualization
#Virtualization#Virtualization
#Virtualization
 
Bangga Indonesia
Bangga IndonesiaBangga Indonesia
Bangga Indonesia
 
WHC_CenterScope_Spring 2015_FINAL_LoRes
WHC_CenterScope_Spring 2015_FINAL_LoResWHC_CenterScope_Spring 2015_FINAL_LoRes
WHC_CenterScope_Spring 2015_FINAL_LoRes
 
Castle Resorts & Hotels Premieres in Thailand Market; Acquires Hotel Contract...
Castle Resorts & Hotels Premieres in Thailand Market; Acquires Hotel Contract...Castle Resorts & Hotels Premieres in Thailand Market; Acquires Hotel Contract...
Castle Resorts & Hotels Premieres in Thailand Market; Acquires Hotel Contract...
 
Dietary effect of prebiotic supplementation on fish
Dietary effect of prebiotic  supplementation on fishDietary effect of prebiotic  supplementation on fish
Dietary effect of prebiotic supplementation on fish
 

Similar to Daniel lent uspto update

Navigating the Patent Prosecution Highway
Navigating the Patent Prosecution HighwayNavigating the Patent Prosecution Highway
Navigating the Patent Prosecution HighwayWorkman Nydegger
 
PPH Pilot Program between japan and vietnam
PPH Pilot Program between japan and vietnamPPH Pilot Program between japan and vietnam
PPH Pilot Program between japan and vietnamNguyen Hoa Binh (Bill)
 
March 2011 Newsletter
March 2011 NewsletterMarch 2011 Newsletter
March 2011 Newsletterkhorton123
 
Three options to accelerate patent examination in Vietnam.pdf
Three options to accelerate patent examination in Vietnam.pdfThree options to accelerate patent examination in Vietnam.pdf
Three options to accelerate patent examination in Vietnam.pdfKENFOX IP & Law Office
 
PCT - the international route to getting your patent
PCT - the international route to getting your patentPCT - the international route to getting your patent
PCT - the international route to getting your patentTechHub Bucharest
 
Taking Advantage of the PCT: Strategies, Tips, and Best Practices
Taking Advantage of the PCT: Strategies, Tips, and Best PracticesTaking Advantage of the PCT: Strategies, Tips, and Best Practices
Taking Advantage of the PCT: Strategies, Tips, and Best PracticesPatterson Thuente IP
 
ANALYSIS OF PATENTS POST APPROVAL
ANALYSIS OF PATENTS POST APPROVALANALYSIS OF PATENTS POST APPROVAL
ANALYSIS OF PATENTS POST APPROVALARPUTHA SELVARAJ A
 
Leeds inventors group
Leeds inventors groupLeeds inventors group
Leeds inventors groupJane Lambert
 
Guide for effectively utilizing patent information for business needs
Guide for effectively utilizing patent information for business needsGuide for effectively utilizing patent information for business needs
Guide for effectively utilizing patent information for business needsIntepat IP
 
December 2011 Newsletter
December 2011 NewsletterDecember 2011 Newsletter
December 2011 Newsletterkhorton123
 
20141105_energy-law-advisor-nov-2014_track-1_article
20141105_energy-law-advisor-nov-2014_track-1_article20141105_energy-law-advisor-nov-2014_track-1_article
20141105_energy-law-advisor-nov-2014_track-1_articleCraig Buschmann
 
Overseas protection & patent search
Overseas protection & patent searchOverseas protection & patent search
Overseas protection & patent searchfungfung Chen
 
IPR UNIT-5 intellectual property rights fifth unit power point presentation.
IPR UNIT-5 intellectual property rights fifth unit power point presentation.IPR UNIT-5 intellectual property rights fifth unit power point presentation.
IPR UNIT-5 intellectual property rights fifth unit power point presentation.Mahesh Kolloju
 
The patent prosecution system of india, us assignment
The patent prosecution system of india, us assignmentThe patent prosecution system of india, us assignment
The patent prosecution system of india, us assignmentAbhishek Mishra
 
Protecting Your Intellectual Property: Cost-Saving Techniques, Legal Updates ...
Protecting Your Intellectual Property: Cost-Saving Techniques, Legal Updates ...Protecting Your Intellectual Property: Cost-Saving Techniques, Legal Updates ...
Protecting Your Intellectual Property: Cost-Saving Techniques, Legal Updates ...Knobbe Martens - Intellectual Property Law
 
The Quest for Global Patent Protection: How Close Are We Getting?
The Quest for Global Patent Protection: How Close Are We Getting?The Quest for Global Patent Protection: How Close Are We Getting?
The Quest for Global Patent Protection: How Close Are We Getting?Patterson Thuente IP
 
UPC Land Presentation 03/2023
UPC Land Presentation 03/2023UPC Land Presentation 03/2023
UPC Land Presentation 03/2023Martin Schweiger
 
Unlocking the Power of Patents: A Guide to Types and Procedures
Unlocking the Power of Patents: A Guide to Types and ProceduresUnlocking the Power of Patents: A Guide to Types and Procedures
Unlocking the Power of Patents: A Guide to Types and ProceduresMuhammed Ameer P
 
Patent introduction and overview atlanta january 2014
Patent introduction and overview atlanta january 2014Patent introduction and overview atlanta january 2014
Patent introduction and overview atlanta january 2014Melanie Brandt
 

Similar to Daniel lent uspto update (20)

Navigating the Patent Prosecution Highway
Navigating the Patent Prosecution HighwayNavigating the Patent Prosecution Highway
Navigating the Patent Prosecution Highway
 
PPH Pilot Program between japan and vietnam
PPH Pilot Program between japan and vietnamPPH Pilot Program between japan and vietnam
PPH Pilot Program between japan and vietnam
 
March 2011 Newsletter
March 2011 NewsletterMarch 2011 Newsletter
March 2011 Newsletter
 
Three options to accelerate patent examination in Vietnam.pdf
Three options to accelerate patent examination in Vietnam.pdfThree options to accelerate patent examination in Vietnam.pdf
Three options to accelerate patent examination in Vietnam.pdf
 
PCT - the international route to getting your patent
PCT - the international route to getting your patentPCT - the international route to getting your patent
PCT - the international route to getting your patent
 
Taking Advantage of the PCT: Strategies, Tips, and Best Practices
Taking Advantage of the PCT: Strategies, Tips, and Best PracticesTaking Advantage of the PCT: Strategies, Tips, and Best Practices
Taking Advantage of the PCT: Strategies, Tips, and Best Practices
 
ANALYSIS OF PATENTS POST APPROVAL
ANALYSIS OF PATENTS POST APPROVALANALYSIS OF PATENTS POST APPROVAL
ANALYSIS OF PATENTS POST APPROVAL
 
Leeds inventors group
Leeds inventors groupLeeds inventors group
Leeds inventors group
 
Guide for effectively utilizing patent information for business needs
Guide for effectively utilizing patent information for business needsGuide for effectively utilizing patent information for business needs
Guide for effectively utilizing patent information for business needs
 
December 2011 Newsletter
December 2011 NewsletterDecember 2011 Newsletter
December 2011 Newsletter
 
20141105_energy-law-advisor-nov-2014_track-1_article
20141105_energy-law-advisor-nov-2014_track-1_article20141105_energy-law-advisor-nov-2014_track-1_article
20141105_energy-law-advisor-nov-2014_track-1_article
 
(IPR) Patent filing
(IPR) Patent filing(IPR) Patent filing
(IPR) Patent filing
 
Overseas protection & patent search
Overseas protection & patent searchOverseas protection & patent search
Overseas protection & patent search
 
IPR UNIT-5 intellectual property rights fifth unit power point presentation.
IPR UNIT-5 intellectual property rights fifth unit power point presentation.IPR UNIT-5 intellectual property rights fifth unit power point presentation.
IPR UNIT-5 intellectual property rights fifth unit power point presentation.
 
The patent prosecution system of india, us assignment
The patent prosecution system of india, us assignmentThe patent prosecution system of india, us assignment
The patent prosecution system of india, us assignment
 
Protecting Your Intellectual Property: Cost-Saving Techniques, Legal Updates ...
Protecting Your Intellectual Property: Cost-Saving Techniques, Legal Updates ...Protecting Your Intellectual Property: Cost-Saving Techniques, Legal Updates ...
Protecting Your Intellectual Property: Cost-Saving Techniques, Legal Updates ...
 
The Quest for Global Patent Protection: How Close Are We Getting?
The Quest for Global Patent Protection: How Close Are We Getting?The Quest for Global Patent Protection: How Close Are We Getting?
The Quest for Global Patent Protection: How Close Are We Getting?
 
UPC Land Presentation 03/2023
UPC Land Presentation 03/2023UPC Land Presentation 03/2023
UPC Land Presentation 03/2023
 
Unlocking the Power of Patents: A Guide to Types and Procedures
Unlocking the Power of Patents: A Guide to Types and ProceduresUnlocking the Power of Patents: A Guide to Types and Procedures
Unlocking the Power of Patents: A Guide to Types and Procedures
 
Patent introduction and overview atlanta january 2014
Patent introduction and overview atlanta january 2014Patent introduction and overview atlanta january 2014
Patent introduction and overview atlanta january 2014
 

Recently uploaded

result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Recently uploaded (20)

result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 

Daniel lent uspto update

  • 1. 11 AIPLA Firm Logo American Intellectual Property Law Association Updates regarding: Global/IP5 PPH pilot program at the USPTO and Patent Law Treaty (PLT) Daniel P. Lent AIPLA JAPAN PRACTICE COMMITEE Pre-Meeting of AIPLA Mid-Winter Institute Phoenix, AZ Tuesday, January 28th
  • 2. 22 AIPLA Firm Logo PPH Basics • When an applicant receives a ruling from a first office that at least one claim in their application is allowable, the applicant can request to enter the PPH program in a second office • If the request is granted, the second office can use the work done by the first office as a starting point • That PPH case is then fast-tracked in the second office • The second office is now looking at a case where most, if not all, of the major issues should already have been addressed 2
  • 3. 33 AIPLA Firm Logo 3 • Background; Backlogs in offices around the world began to explode in the late 1990s • The number of applications filed in multiple offices also started to steadily increase • Offices began discussing potential ways to improve efficiencies – focusing on worksharing • PPH began as a pilot in between the JPO and USPTO in 2006 • Today - 30 offices worldwide; 27 with USPTO
  • 4. 44 AIPLA Firm Logo Global/IP5 PPH pilot program at the USPTO • Start date: January 6, 2014 (so in effect now even though OG Notice and forms are not out yet but will be very soon). Any eligible PPH Request filed now (even using older PPH forms ) will be treated under new Global/IP5 Pilot Program. • Big news is: • Harmonizes the various PPH programs into one USPTO program (no more separate PCT-PPH and PPH programs). • Uses one standardized USPTO PPH Request form (to be released soon). Not one for each country as now. • Uses the common first date rule for related applications (easier to comply with than chain of priority rule). • Uses streamlined procedures like PPH 2.0 did.
  • 5. 55 AIPLA Firm Logo Global/IP5 PPH pilot program at the USPTO • Recent developments leading to USPTO Global/IP5 PPH pilot program implementation: • During the past year, the IP5 offices, agreed to fully engage in the IP5 PPH process. • while at the same time a number of other offices stated their intention to participate in a uniform, harmonized process now known as the Global PPH.
  • 6. 66 AIPLA Firm Logo Benefits 1. Cost savings from fewer Office Actions, RCE’s, etc. 2. Higher quality shared search results. For example, a JP Examiner is better at searching JP art in Japanese than an English speaking USPTO examiner is. Then the JP results are shared with the USPTO Examiner. 3. Faster allowances. 4. Claims should be stronger (validity) because of multiple offices reviewing same claims.
  • 7. 77 AIPLA Firm Logo Who are the IP5? • The European Patent Office (EPO), • The Japan Patent Office (JPO), • The Korean Intellectual Property Office (KIPO), • The State Intellectual Property Office of the People's Republic of China (SIPO), • The United States Patent and Trademark Office (USPTO). • The IP5 Offices account for 90% of all patent applications filed worldwide. See http://www.fiveipoffices.org/about-us.html
  • 8. 88 AIPLA Firm Logo Global PPH Principles • Global PPH Principles • As a result of the success of the PPH Program, the maintenance of the many individual bilateral agreements between countries has become challenging. • With that in mind, both applicants and participating offices would benefit from a single set of principles that form a world-wide PPH system. In addition, a common framework provides a baseline to which new PPH offices can subscribe without varying from the guidelines established by longstanding PPH partners. The following principles set the foundation for a global PPH system.
  • 9. 99 AIPLA Firm Logo Who are the Global PPH participants?
  • 10. 1010 AIPLA Firm Logo Strange but so far EPO is not Global PPH but is IP5 Remember: So far EPO is not in Global PPH but is in IP5. •
  • 11. 1111 AIPLA Firm Logo Useful benefits and examples • China was still using regular PPH (not mottanai, not PPH 2.0 and not Global PPH). • So case had to be allowed in China first (OFF) before PPH Request to USPTO could be filed. • Also no PPH 2.0 so costly translations needed of claims and copy of SIPO OA needed costly certificate of translator’s accuracy (no machine translation). • China is in IP5, Japan is IP5, and US in IP5 • So now OSF allowance (Japan) can be used at USPTO using 2.0 like translation requirements and fewer need papers. See next slide:
  • 12. 1212 AIPLA Firm Logo Example • File in China first (SIPO) = OFF. • One year later file at JPO and USPTO • Get allowance at JPO (OEE= Office of early Examination)). Maybe also use JPO free accelerated examination. • File PPH Global IP5 Pilot Request at USPTO using easy PPH 2.0 like requirements. • = a lot cheaper for Chinese companies than before
  • 13. 1313 AIPLA Firm Logo Same earliest date can filing or priority date = very good • III. Requirements for Requesting Participation in the Global PPH or IP5 PPH (“Global/IP5 PPH”) Pilot Program in the USPTO • A. Eligibility • In order to be eligible to participate in the Global/IP5 PPH pilot program at the USPTO, the following requirements must be met: • (1) The U.S. application for which participation in the Global/IP5 PPH pilot program is requested must have the same earliest date, whether this is the priority date or filing date, as that of a corresponding national or regional application filed with another Global/IP5 PPH participating office or a corresponding PCT international application for which one of the Global/ IP5 PPH participating offices was the International Searching Authority (ISA) or the International Preliminary Examining Authority (IPEA).
  • 14. 1414 AIPLA Firm Logo Eligibility continued • (2) The corresponding application has at least one claim indicated by the OEE in its capacity as a national or regional Office, ISA, or IPEA, to be allowable/patentable. A claim determined as novel, inventive, and industrially applicable by the ISA or IPEA has the meaning of allowable/patentable for the purposes of this program.
  • 15. 1515 AIPLA Firm Logo Eligibility continued • (3) All claims in the U.S. application for which participation in the Global/IP5 PPH pilot program is requested must sufficiently correspond to the allowable/patentable claims in the corresponding OEE application. A claim is considered to sufficiently correspond where, accounting for differences due to claim format requirements, the claim is of the same or similar scope as an allowable/patentable claim in the corresponding OEE application. A claim in the U.S. application which is narrower in scope than the claims indicated as allowable/patentable in the OEE application will also sufficiently correspond if presented as a claim dependent upon a claim which is of the same or similar scope as a claim indicated as allowable/patentable in the OEE application. In this regard, a claim that is narrower in scope occurs when an OEE claim is amended to be further limited by an additional feature that is supported by the written description of the U.S. application. Additionally, a claim in the U.S. application which introduces a new/different category of claims than those indicated to be allowable/patentable by the OEE is not considered to sufficiently correspond. For example, where the OEE application contains only claims relating to a process of manufacturing a product, then any product claims in the U.S. application are not considered to sufficiently correspond, even if the product claims are dependent on process claims which sufficiently correspond to allowable/patentable claims in the OEE application.
  • 16. 1616 AIPLA Firm Logo Eligibility continued • (4) Substantive examination of the U.S. application for which participation in the Global/IP5 PPH pilot program is requested has not begun.
  • 17. 1717 AIPLA Firm Logo Mr. Lent’s actual PPH case examples   Filed Appl PPH filed Granted Current Status Time Lapse between Filing Date and Issue Date (months) 1 WPA0028US 06/18/2010 09/20/2010 Denied: 06/13/2011 ISSUED:  02/15/2012 20 2 SGI0019US 08/31/2009 06/17/2011 07/11/2011 ISSUED:  10/12/2012 40 (16 months between PPH filing and  issue date) 3 LTI0024US 04/18/2012 09/24/2012 11/14/2012 ISSUED:  05/21/2013 13 4 KOY0152US 09/28/2009 07/27/2012 09/07/2012 ISSUED:  05/22/2013   44 (10 months between PPH filing and  issue date) 5 ELL0003US 08/20/2012 08/27/2012 11/01/2012 ISSUED:  05/22/2013 9 6 YKI0376US 03/22/2012 09/05/2012 10/02/2012 ISSUED: 09/11/2013 18 7 YKI0371US 03/22/2012 06/22/2012 08/31/2012 ISSUED:  10/22/2013 19 8 MZP0002US 03/20/2012 06/19/2012 8/17/2012 ISSUED:  11/26/2013 20 9 SGI0043US 03/24/2011 03/24/2011 09/07/2011 Client  Abandoned:  07/13/2012     10 WPA0038US 09/23/2011 01/28/2013 03/12/2013 Client  Abandoned:  08/27/2013   11 YKI0374US 03/22/2012 09/17/2012 09/24/2012 Allowed: 12/9/13   12 IWP0029US 02/25/2011 06/07/2011 06/22/2011 FOA 02/08/2012;  Nguyen, Jimmy  H.   13 UNT0060US 03/14/2013 06/12/2013 07/18/2013 Ex Parte Quayle:  05/28/2013 Vu, Jimmy T.    14 YUA0020US 03/01/2013 04/29/2013 Denied: 07/10/2013     15 YKI0399US 01/25/2013 01/25/2013 Denied: 03/12/2013     16 KKP0028US 07/22/2013 01/07/2014   Pending   17 SAS0254US 11/27/2013 01/07/2014   Pending  
  • 18. 1818 AIPLA Firm Logo USPTO Focus • USPTO’s goal is to continually improve the program for stakeholders • Increase awareness of the program and its benefits • Results to date: – 25,316 requests for PPH filed since 2006 – In CY13, the average number of new requests per month was up approximately 20% from the previous year 18
  • 19. 1919 AIPLA Firm Logo 19 PPH Benefits USPTO stats on PPH results compared with all cases: Paris-PPH PCT-PPH All Cases Grant Rate (Allowances/Total Number of Disposals) 86% 88% 51% First Action Allowance Rate 26% 20% 14% Actions per Disposal 2.3 1.6 2.6 - 3.5
  • 20. 2020 AIPLA Firm Logo PLT • On October 21, 2013, the USPTO published final rules changes to implement Title II of the Patent Law Treaties Implementation Act of 2012 (PLTIA), which was enacted as Public Law 112 -211 on December 18, 2012. • Effective date is December 18, 2013. • See “Changes to Implement the Patent Law Treaty” Final Rule 78 Fed Reg. 62368 (October 21, 2013)
  • 21. 2121 AIPLA Firm Logo PLT • History: • The PLT was concluded on June 1, 2000, and entered into force on April 28, 2005. Ratified by US Senate in 2007 but not self-executing treaty. Legislation (Title II of the PLTIA) to amend 35 USC was enacted on December 18, 2012 which was enacted as Public Law 112 -211 on December 18, 2012.
  • 22. 2222 AIPLA Firm Logo PLT • First part of PLTIA implements the Hague Agreement Design Treaty (not this discussed in this presentation) at Title I. • Second part (Title II) of PLTIA (discussed in this presentation) implements the Patent Law Treaty (PLT):
  • 23. 2323 AIPLA Firm Logo PLT The Patent Law Treaty (PLT): •Goals: Harmonizes and streamlines procedures such as: •(1) Relaxed the formal procedures for filing patent applications to obtain a filing date. •(2) Restoration of priority rights up to 14 months •(8 months for design patent) by granted petition. •(3) Time to reply to some OA’s extended.
  • 24. 2424 AIPLA Firm Logo PLT Not best practices – instead emergency procedures for filing patent applications and obtaining a filing date. Can have 112 support and misidentification problems. A non-provisional application(other than a design) with a specification may be filed without claims and/or without drawings or may be filed “by reference” to a previously filed application. See new USPTO ADS form PTO/AIA/14 (12-13) at page 2. * Provisionals never needed a claim (but good idea to include for support in related EP cases for example).
  • 25. 2525 AIPLA Firm Logo New USPTO ADS Form has filing by reference section • Language from new Application Data Sheet (ADS) for PTO/AIA/14(12- 13) filing by reference section: • “Only complete this section when filing an application by reference under 35 U.S.C. 111(c) and 37 CFR 1.57(a). Do not complete this section if application papers including a specification and any drawings are being filed. Any domestic benefit or foreign priority information must be provided in the appropriate section(s) below (i.e., “Domestic Benefit/National Stage Information” and “Foreign Priority Information”). • For the purposes of a filing date under 37 CFR 1.53(b), the description and any drawings of the present application are replaced by this reference to the previously filed application, subject to conditions and requirements of 37 CFR 1.57(a).”
  • 26. 2626 AIPLA Firm Logo Nonprovisional applications • For non-provisional applications filed after December 18, 2013 (not design applications) • The US filing date is the date the USPTO receives a specification with or without claims. Drawings also not required to be filed to be entitled to filing date. • However, requirements must be met later and fees paid to avoid abandonment. • See USPTO memo to Examiner’s dated December 13, 2013 at http://www.uspto.gov/patents/init_events/PLT_Memo_to_Examiners_12-13-2013.pd
  • 27. 2727 AIPLA Firm Logo Design applications still need spec and figures at filing No changes to filing date requirements for design applications. Need specification and required drawings are required at filing as normal for design applications. However, 6 month priority claim deadline can be extended 2 more months (see restoration of priority below)
  • 28. 2828 AIPLA Firm Logo PLT • Restoration of the right of priority to foreign application or a provisional application. • Previous to PLT, mistakenly missing the 12 month drop- dead deadline was not extendible (6 month for design). • Now, via a petition with fee to the Office of Petitions and file your application later, i.e., up to 14 months ( 8 months for Design app). 119(e) (Provisional app priority) and 119(a) foreign priority may be extended up an additional 2 months if the delay in filing the application claiming priority was “unintentional.”
  • 29. 2929 AIPLA Firm Logo Some Office Action response times changed • Response to Restriction Requirement increased to 2 months from 1 month. • see http://www.uspto.gov/patents/init_events/PLT_Memo_
  • 30. 3030 AIPLA Firm Logo Late priority claiming up to 2 months later • New 37 CFR § 1.55(c) (for foreign priority claims) and 37 CFR §1.78(b) (for priority claims to provisional applications), which provide for petitions for the restoration of the right of priority when a subsequent application is filed after but within 2 months of the expiration of the priority period. As set forth in the rules, such a petition must include: • The priority claim … in an application data sheet … unless previously submitted; • The petition fee as set forth in Sec. 1.17(m); and • A statement that the delay in filing the subsequent application beyond the priority period was unintentional. • These changes take effect December 18, 2013, and apply to patent applications filed before, on, or after that date. See “Changes to Implement the Patent Law Treaty” Final Rule 78 Fed Reg. 62368 (October 21, 2013).
  • 31. 3131 AIPLA Firm Logo Patent Term Adjustment (PTA) Provision • The PLTIA provides “applicants with additional opportunities to delay the examination process (e.g., the ability to file an application without any claims and to file an application merely by reference to a prior-filed application).” The USPTO has determined that it is appropriate to require “that an application should be placed in condition for examination within eight months of its filing date (or date of commencement of national stage in an international application)” or else be subject to PTA deduction. Thus, 37 CFR § 1.704 is amended to insert new paragraph (c)(11) (and redesignate current paragraphs (c)(11) and (c)(12) as paragraphs (c)(12) and (c)(13), respectively) and add new paragraph (f) to provide for PTA deductions if an application is not complete within 8 months of its filing date.