1. Ian Rogerson Tech IOSH
Profile
I am a highly qualified,motivated and experienced safety professional;with extensive experience in the rail industry.
Skilled in safety management and training, an excellent communicator at all levels and cultures, including client,
contractors, government departments (HSE and Environmental Inspectors & ORR) and trade unions.
Professional Membership
2012 Tech IOSH Technician Member of the Institute of Occupational Safety and Health
Qualifications
2014 Basic OffshoreSafety Induction & Emergency TrainingIncludingHUET & EBS Training
2012 LRQA Lead Auditor Trained (ISO9001)
2012 ECDL (European Computer Drivers License) - MicrosoftWord / PowerPoint / Excel
2011 PTS
2010 NEBOSH General Certificate(Distinction)
2010 City & Guilds Manual Handling - Train the Trainer Certificate
2010 Street Works Supervisor Qualifications Highway/Road Excavation/ Reinstatement - Hot & Cold
Bitumen & Modular Surfaces
2004 Network Rail Controller of SiteSafety
2001 Network Rail Lookout/Site Warden
2000 Network Rail Personal Track Safety Pass
November 2015-Present,Interim SHE Advisor, ABC Electrification, GWRM Swindon- Bristol
Reviewing of SSOW and CPP documents
Reviewing Task Briefings
Attending regular meetings with Network Rail safety team
Writing and delivering project induction
Chairing monthly meeting with contractors and suppliers
Collating periodic KPI data
Following up on close call information to close out
Promotion of site safety through regular safety stand downs
Delivering monthly safety briefing to project leadership team
Conducting and closing out accident/incident investigations
September- November 2015, East Kent Resignalling Phase 2 Interim SHEQ Advisor
A predominantly office based role, duties included :
Reviewing of task briefs
Reviewing Safe System of Work Packs
Weekly Safety Briefingto Project Team
CollatingKPI's for Network Rail
Attending various safety meetings with alliancepartners
Site Visits and safety tours
WritingReports
Accident investigations
Closecall followup and closeout
July 2015- September 2015.
West Coast Mainline Power Upgrade ABC Electrification. Interim HSQE Advisor.
A site based role, visiting various work sites on west Coast Mainline on a nightly basis
2. September 2014- July 2015 Balfour Beatty Rail Interim HSQE Advisor
North WestElectrification Project,InstallingOLE0f 25Kv
Site Inductions and tool box talks
Regular sitevisits and inspections
Particular attention to Working atHeight and workingwith electricity
Ensuringall on siteactivities wereundertaken as per Safe system of work details
Creatingdaily shiftreports
Promotion of safeworkingand closecall reporting
Checking of all on sitepersonnel competencies
Review and amending of work packageplans and liftingplans
Regular safety presentations and discussionswith work force
May 2014- September 2014 Spencer Ltd (Rail) Interim HSQE Advisor
Workingon Wessex project, in and around London, consistingof more than 50 Railway Stations,having
platformextensions to enable 10 carriagetrainsto use these stations.Also installation of drivers walkways
and retainingwalls
Tool box talks
Inductions
Preparingmethod statements and task briefings
Site Inspections and audits
Chair of safety action Group with contractors
Presentations on related matters, HAV’s “Working at heights, Workingin excavations and Workingin noisy
environment.
Oct 2013 - May 2014 Stobart Rail Interim HSE Advisor
A nationwiderole,coveringall of Stobart’s rail projects
Assistingsitemanagers with all aspects of sitesafety and siteset-up
Instrumental in rollingoutcompanies behavioural safety programmeand promoting use of the closecall
reporting system
Writingof siteinductions,producingand deliveringPowerPointpresentations on varioustopics such as,
HAVS, Working at Heights, Workingwith Excavations and ALO working
Involved with followingprojects ensuringall on-sitepersonnel received appropriatemanual handling
training
Eden Brow Embankment Stabilisation
Courteen Hall Embankment Stabilisation
Honiton Station DrainageRenewals
Caldew Valley River RetainingWall Re-Instatement
Yorkshire& Cumbria CableHardening
Lower Dove Scour Flood Protection
BirminghamCurzon Street
Sept 2012 – Sept 2013 Buckingham Group Construction Ltd
Rail Division Interim HSEQ Advisor
Currently working on several projects throughout the North of England and North Wales
Offeringproject supportand assistingwith tool box talks,siteinductions,projectdocumentation, safety
tours,reporting of incidents and accidents and accidentinvestigation and reportwriting
Advisingon site set up and CDM regulations and assistingprojectmanagers in keepingsitesafety
documentation up to date and relevant
Trainingof on-sitepersonnel in safemanual handlingtechniques.
3. Assistingtheroll outof company Behavioural Safety Programme and assistingsitemanagers with siteset up
and fire safety.
Projectsafety audits
ProvidingSafety Advice & Support to followingprojects
Northern Hub - Upgrade of track and stations throughoutNorth WestEngland
Todmorden Curve - Installation of new section of track and track sidestructures,including
signal bases,location bases and troughing
Salford Crescent Station Rebuild - Complete modernization of all station facilities including
extension to platform,installation of disabled accesslift,new ticket office and pedestrian
footbridge
Wakefield Westgate Station Rebuild - Complete modernization of station facilities
includingcommercial outlets,car park,footbridgeand disabled accesslift
Huyton to Roby Re-Generation - Modernization of two existingstationsand installation of
approximately 2 miles of new track to open up 2 new lines
Hope Valley - Modernization of several stationsand upgradeof existinglines
Llandudno Station Re-build - Removal of redundant platforms to allowinstallation of large
car park. Extension of platforms, introduction of new retail outlets and new ticket office,
waiting rooms and other station facilities
North-West Platform Extension Programme - Extending and upgrading existing platforms
at numerous stations throughout north-west England to accommodate larger trains on
these routes
Jun 2012 –Sep 2012 C&G power Solutions
Workingalongsidesafety manager; bringingsafety management systemup to date and making fitfor
purpose
Attending sitevisits and writingreports on Health & safety issues
All siterelated safety activities including:
Site Inductions and tool box talks
Regular sitevisits and inspections
Particular attention to Working atHeight and workingwith electricity
Ensuringall on siteactivities wereundertaken as per Safe system of work details
Creatingdaily shiftreports
Promotion of safeworkingand closecall reporting
Checking of all on sitepersonnel competencies
Review and amending of work package plans and liftingplans
Regular safety presentations and discussionswith work force
Oct 2011 – May 2012 Babcock Rail Interim HSQE Advisor
Workingwithin track division
Presenting monthly reports for management review meetings
4. Auditing other Babcock depots againstISO 9001 standard
Accident investigationsand Investigation reportwriting
CDM and siteset up advisingagainstNetwork Rail and ORR standards.
Site visits and spotchecks
Environmental and safety tool box talks
Trainingof contractors and Babcock personnel in SiteAccess Management Procedures.
Liaisingwith Network Rail Safety personnel
Conducting pre-works sitevisits at50,40, and 22 week stages,for environmental and CDM planning.
Monthly KPI reporting.
Site Inductions
2010 – Sep 2011 ISS Labour- Manchester Site Safety Supervisor
Ensuringall activities on worksiteis undertaken within company safety policy and legal guidelines.
Givingtoolbox talks
Carry out site inductions,
Daily activity briefings
2006 – 2010 Hayley Rail – Manchester Health & Safety Advisor
Workingon projects with London Underground, South West Trains,EastCoastMainlineand Freightliner
Attending Health & Safety and PPE Meetings atall levels with London Underground Management & Unions
SourcingappropriatePPE & Tools for specific tasks
Risk Assessmentreports for over 30 branches throughout the UK, this included both warehouse and office
alongwith DSE assessments
Trainingof staff in Manual Handling& WarehouseSafety Awareness
Arranged trainingof FireMarshalls,FirstAiders,and appointment of competent person, all of which helped
to savethe company a considerableamountof money
Ensuringcompany complied with Health & Safety Legislation,and reportingto Director of the Rail Division
2003 - 2006 AMEC Controller of Site Safety
Route 7 major renewals project(West Coast).
Modernisation of 29mls of track and all tracksidestructures includingsignal boxes,signalling,cabling,
troughing, location bases (concrete& steel frame).
Facilitator in behavioural based safety programme.
Attended Health & Safety meetings with management and other safety critical workers,as well as Network
Rail safety personnel.
2000 - 2003 Vital Rail – Manchester Look Out/ Controller of Site Safety
Worked on major renewals and modernisation programmes in the North West of England
Involved in Civilsprojects,which included layingof concrete bases,erection of tracksidesub-stations,
concrete troughing, fence erecting, cablelayingalongwith drainagejob
1999 – 2000 Renown Rail – Staffordshire PTS Track Labourer
Working on track maintenance contract which included relaying of tracks, changing of sleepers and all aspects of
P-Way related work.
Additional Information
Full Driving Licence