Image Update

                                       GEAE Account


Project Leader:   Brian Boyce Jr.                          Master Black Belt:
                                                           Steven Bonacorsi
                  Customer Engineer/ Certified Greenbelt
Start Date:
                  April 30, 2002
Six Sigma in Action
                                                                                                                                       Image Updates
Customer Profile – 18,000-Seat Aircraft Engine Manufacturing and Service Company
Business Problem & Impact                                                                                                    Process Capability – Before (0 Sigma)
All PC Equipment issued to GEAE end-users is preloaded
by GE ITS with a standard image. These images are
updated & maintained by GEAE. All released images must
be replicated to the GE ITS servers so they can be loaded
on end-user equipment. The current process could take as
long as one week with extensive administration involvement.
Measure & Analyze
Data Collection: The time it took to transfer an image was
measured at 34.78 Hours. The existing process sigma was 0.
Root Causes: No notification by GEAE Image Group and no                                                                Pr o c e s s Ca p a b ility A n a ly s is f o r Cy c le Time
clear process documentation were identified as the main root                                                                 Process Capability – After (Over 6 Sigma)
causes.                                             P roc es s D at a
                                                                                                                                                                                                                   U SL

Improve & Control                                              US L
                                                               T arget
                                                                                           17. 0000
                                                                                                       *
                                                                                                                                                                                                                            W it

Robocopy program implemented and scheduledean run daily
                                                   M
                                                        to     LS L
                                                                          0. 3888
                                                                                                       *                                                                                                                    O ve

with automatic e-mail notification. Team set up to ple N
                                                   S am receive e- 40
                                                   S t D ev (W it hin) 0. 000000
mail notification and will be alerted if update didS tnot voccur.
                                                       D ev (O erall)  0. 147566

Cycletime Improved to 0.39 Hours!
                                                                P ot ent ial (W it hin) C apabilit y

Results/Benefits                                               Cp
                                                               CP U                     7. 47E + 16
                                                                                                       *


Eliminated administration cost due to process automation.      CP L                               *
                                               C pk    7. 47E + 16
All equipment now issued to end users with current images.                                                 0.0.30
                                                                                                           0.1040
                                                                                                            0.1550
                                                                                                            0.2055
                                                                                                             05 45
                                                                                                             0.35
                                                                                                              0.
                                                                                                              0.
                                                                                                               25
                                                               C pm                                    *

                                                                      O v erall C apabilit y                     O bs erv ed P erf orm anc e             E x p. "W it hin" P erf orm anc e         E x p. "O v erall" P erf orm an


                          A Total Savings of US $11K Annually! Pp
                                                               PPU
                                                               PPL
                                                                                               37. 52
                                                                                                       *


                                                                                                       *
                                                                                                             P P M < LS L
                                                                                                             P P M > US L
                                                                                                             P P M T ot al
                                                                                                                                                   *
                                                                                                                                               0. 00
                                                                                                                                               0. 00
                                                                                                                                                       P P M < LS L
                                                                                                                                                       P P M > US L
                                                                                                                                                       P P M T ot al
                                                                                                                                                                                       0. 00
                                                                                                                                                                                       0. 00
                                                                                                                                                                                             *   P P M < LS L
                                                                                                                                                                                                 P P M > US L
                                                                                                                                                                                                 P P M T ot al

More Related Content

Viewers also liked

Small Print - Baker & Coffee Maker
Small Print - Baker & Coffee MakerSmall Print - Baker & Coffee Maker
Small Print - Baker & Coffee MakerPrintHall
 
Multi-Mission Advanced Sensor Testbed
Multi-Mission Advanced Sensor TestbedMulti-Mission Advanced Sensor Testbed
Multi-Mission Advanced Sensor Testbedpwynns
 
무방문신용대출//BU797。СΟΜ//배낭여행사 PIC
무방문신용대출//BU797。СΟΜ//배낭여행사 PIC무방문신용대출//BU797。СΟΜ//배낭여행사 PIC
무방문신용대출//BU797。СΟΜ//배낭여행사 PICgiefheoie
 
Cellular provider-manages-change
Cellular provider-manages-changeCellular provider-manages-change
Cellular provider-manages-changeMahshar Shaikh
 
100311 EEOC Press Release (Pitre Matter)
100311  EEOC Press Release (Pitre Matter)100311  EEOC Press Release (Pitre Matter)
100311 EEOC Press Release (Pitre Matter)VogelDenise
 
Relatório 320 maquinas agricolas rafic na mg 295
Relatório 320 maquinas agricolas rafic na mg 295Relatório 320 maquinas agricolas rafic na mg 295
Relatório 320 maquinas agricolas rafic na mg 295Luiz Alberto Braga
 
전기장판
전기장판전기장판
전기장판giefheoie
 

Viewers also liked (9)

Small Print - Baker & Coffee Maker
Small Print - Baker & Coffee MakerSmall Print - Baker & Coffee Maker
Small Print - Baker & Coffee Maker
 
Multi-Mission Advanced Sensor Testbed
Multi-Mission Advanced Sensor TestbedMulti-Mission Advanced Sensor Testbed
Multi-Mission Advanced Sensor Testbed
 
무방문신용대출//BU797。СΟΜ//배낭여행사 PIC
무방문신용대출//BU797。СΟΜ//배낭여행사 PIC무방문신용대출//BU797。СΟΜ//배낭여행사 PIC
무방문신용대출//BU797。СΟΜ//배낭여행사 PIC
 
Periodica del Meta April 2016 - COTELCO article
Periodica del Meta April 2016 - COTELCO articlePeriodica del Meta April 2016 - COTELCO article
Periodica del Meta April 2016 - COTELCO article
 
Cellular provider-manages-change
Cellular provider-manages-changeCellular provider-manages-change
Cellular provider-manages-change
 
100311 EEOC Press Release (Pitre Matter)
100311  EEOC Press Release (Pitre Matter)100311  EEOC Press Release (Pitre Matter)
100311 EEOC Press Release (Pitre Matter)
 
Relatório 320 maquinas agricolas rafic na mg 295
Relatório 320 maquinas agricolas rafic na mg 295Relatório 320 maquinas agricolas rafic na mg 295
Relatório 320 maquinas agricolas rafic na mg 295
 
전기장판
전기장판전기장판
전기장판
 
TIMOTHY ARMSTRONG
TIMOTHY ARMSTRONGTIMOTHY ARMSTRONG
TIMOTHY ARMSTRONG
 

Similar to Serrver Imaging Six Sigma Case Study

Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case StudySteven Bonacorsi
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case StudySteven Bonacorsi
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case StudyKevin Egan
 
Deploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case StudyDeploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case StudySteven Bonacorsi
 
Deploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case StudyDeploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case StudySteven Bonacorsi
 
Web Page Load Cycle Time Six Sigma Case Study
Web Page Load Cycle Time Six Sigma Case StudyWeb Page Load Cycle Time Six Sigma Case Study
Web Page Load Cycle Time Six Sigma Case StudySteven Bonacorsi
 
Web Page Load Cycle Time Six Sigma Case Study
Web Page Load Cycle Time Six Sigma Case StudyWeb Page Load Cycle Time Six Sigma Case Study
Web Page Load Cycle Time Six Sigma Case StudySteven Bonacorsi
 
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to PracticeFiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to PracticeCCT International
 
Splunk 4 Ninja ITSI Workshop
Splunk 4 Ninja ITSI WorkshopSplunk 4 Ninja ITSI Workshop
Splunk 4 Ninja ITSI WorkshopMarc Serieys
 
Zimmerman.mary
Zimmerman.maryZimmerman.mary
Zimmerman.maryNASAPMC
 
Gillette Six Sigma Case Study
Gillette Six Sigma Case StudyGillette Six Sigma Case Study
Gillette Six Sigma Case StudySteven Bonacorsi
 
Gillette Six Sigma Case Study
Gillette Six Sigma Case StudyGillette Six Sigma Case Study
Gillette Six Sigma Case StudySteven Bonacorsi
 
Gillette Six Sigma Case Study
Gillette Six Sigma Case StudyGillette Six Sigma Case Study
Gillette Six Sigma Case StudySteven Bonacorsi
 
Gillette Six Sigma Case Study
Gillette Six Sigma Case StudyGillette Six Sigma Case Study
Gillette Six Sigma Case StudyKevin Egan
 
Comparative Analysis of P-I, I-P, PID and Fuzzy Controllers for Speed Control...
Comparative Analysis of P-I, I-P, PID and Fuzzy Controllers for Speed Control...Comparative Analysis of P-I, I-P, PID and Fuzzy Controllers for Speed Control...
Comparative Analysis of P-I, I-P, PID and Fuzzy Controllers for Speed Control...IRJET Journal
 
Deep Dive: More Oracle Data Pump Performance Tips and Tricks
Deep Dive: More Oracle Data Pump Performance Tips and TricksDeep Dive: More Oracle Data Pump Performance Tips and Tricks
Deep Dive: More Oracle Data Pump Performance Tips and TricksGuatemala User Group
 
NEXT generation enterprise applications
NEXT generation enterprise applicationsNEXT generation enterprise applications
NEXT generation enterprise applicationsDr. Jimmy Schwarzkopf
 
3. project charter, check sheet, pareto analysis & c&e diagram & matrix
3. project charter, check sheet, pareto analysis & c&e diagram & matrix3. project charter, check sheet, pareto analysis & c&e diagram & matrix
3. project charter, check sheet, pareto analysis & c&e diagram & matrixHakeem-Ur- Rehman
 

Similar to Serrver Imaging Six Sigma Case Study (20)

Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case Study
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case Study
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case Study
 
Deploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case StudyDeploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case Study
 
Deploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case StudyDeploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case Study
 
Web Page Load Cycle Time Six Sigma Case Study
Web Page Load Cycle Time Six Sigma Case StudyWeb Page Load Cycle Time Six Sigma Case Study
Web Page Load Cycle Time Six Sigma Case Study
 
Web Page Load Cycle Time Six Sigma Case Study
Web Page Load Cycle Time Six Sigma Case StudyWeb Page Load Cycle Time Six Sigma Case Study
Web Page Load Cycle Time Six Sigma Case Study
 
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to PracticeFiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
 
Splunk 4 Ninja ITSI Workshop
Splunk 4 Ninja ITSI WorkshopSplunk 4 Ninja ITSI Workshop
Splunk 4 Ninja ITSI Workshop
 
Zimmerman.mary
Zimmerman.maryZimmerman.mary
Zimmerman.mary
 
Gillette Six Sigma Case Study
Gillette Six Sigma Case StudyGillette Six Sigma Case Study
Gillette Six Sigma Case Study
 
Gillette Six Sigma Case Study
Gillette Six Sigma Case StudyGillette Six Sigma Case Study
Gillette Six Sigma Case Study
 
Gillette Six Sigma Case Study
Gillette Six Sigma Case StudyGillette Six Sigma Case Study
Gillette Six Sigma Case Study
 
Gillette Six Sigma Case Study
Gillette Six Sigma Case StudyGillette Six Sigma Case Study
Gillette Six Sigma Case Study
 
System X - About Benchmarks
System X - About BenchmarksSystem X - About Benchmarks
System X - About Benchmarks
 
Comparative Analysis of P-I, I-P, PID and Fuzzy Controllers for Speed Control...
Comparative Analysis of P-I, I-P, PID and Fuzzy Controllers for Speed Control...Comparative Analysis of P-I, I-P, PID and Fuzzy Controllers for Speed Control...
Comparative Analysis of P-I, I-P, PID and Fuzzy Controllers for Speed Control...
 
Deep Dive: More Oracle Data Pump Performance Tips and Tricks
Deep Dive: More Oracle Data Pump Performance Tips and TricksDeep Dive: More Oracle Data Pump Performance Tips and Tricks
Deep Dive: More Oracle Data Pump Performance Tips and Tricks
 
NEXT generation enterprise applications
NEXT generation enterprise applicationsNEXT generation enterprise applications
NEXT generation enterprise applications
 
3. project charter, check sheet, pareto analysis & c&e diagram & matrix
3. project charter, check sheet, pareto analysis & c&e diagram & matrix3. project charter, check sheet, pareto analysis & c&e diagram & matrix
3. project charter, check sheet, pareto analysis & c&e diagram & matrix
 
Moving Early Stage Technologies
Moving Early Stage TechnologiesMoving Early Stage Technologies
Moving Early Stage Technologies
 

More from Steven Bonacorsi

Lean Six Sigma Tollgate Template Videos Only
Lean Six Sigma Tollgate Template Videos OnlyLean Six Sigma Tollgate Template Videos Only
Lean Six Sigma Tollgate Template Videos OnlySteven Bonacorsi
 
Analyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate TemplatesAnalyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate TemplatesSteven Bonacorsi
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate templateSteven Bonacorsi
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklistsSteven Bonacorsi
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate templateSteven Bonacorsi
 
Bringing program excellence to process excellence
Bringing program excellence to process excellenceBringing program excellence to process excellence
Bringing program excellence to process excellenceSteven Bonacorsi
 
14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement Summit14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement SummitSteven Bonacorsi
 
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...Steven Bonacorsi
 
Performance Strategy &amp; Change Management Brochure 11 13 2012
Performance Strategy &amp; Change Management Brochure 11 13 2012Performance Strategy &amp; Change Management Brochure 11 13 2012
Performance Strategy &amp; Change Management Brochure 11 13 2012Steven Bonacorsi
 
Is There Any Strategy In Your Strategic Plan
Is There Any Strategy In Your Strategic PlanIs There Any Strategy In Your Strategic Plan
Is There Any Strategy In Your Strategic PlanSteven Bonacorsi
 
Make Performance Improvement Strategic
Make Performance Improvement StrategicMake Performance Improvement Strategic
Make Performance Improvement StrategicSteven Bonacorsi
 
Improve Your Performance News
Improve Your Performance NewsImprove Your Performance News
Improve Your Performance NewsSteven Bonacorsi
 
Bsci Strategic Management Maturity Model
Bsci Strategic Management Maturity ModelBsci Strategic Management Maturity Model
Bsci Strategic Management Maturity ModelSteven Bonacorsi
 
Using The Balanced Scorecard To Align
Using The Balanced Scorecard To AlignUsing The Balanced Scorecard To Align
Using The Balanced Scorecard To AlignSteven Bonacorsi
 
Ultimate Bsc Sports Metaphor
Ultimate Bsc Sports MetaphorUltimate Bsc Sports Metaphor
Ultimate Bsc Sports MetaphorSteven Bonacorsi
 
Technology Company Balanced Scorecard Systems 06222010 Final
Technology Company Balanced Scorecard Systems 06222010 FinalTechnology Company Balanced Scorecard Systems 06222010 Final
Technology Company Balanced Scorecard Systems 06222010 FinalSteven Bonacorsi
 
Build Innovation Into Your Strategy
Build Innovation Into Your StrategyBuild Innovation Into Your Strategy
Build Innovation Into Your StrategySteven Bonacorsi
 

More from Steven Bonacorsi (20)

Lean Six Sigma Tollgate Template Videos Only
Lean Six Sigma Tollgate Template Videos OnlyLean Six Sigma Tollgate Template Videos Only
Lean Six Sigma Tollgate Template Videos Only
 
Analyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate TemplatesAnalyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate Templates
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklists
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
 
Bringing program excellence to process excellence
Bringing program excellence to process excellenceBringing program excellence to process excellence
Bringing program excellence to process excellence
 
14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement Summit14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement Summit
 
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
 
Performance Strategy &amp; Change Management Brochure 11 13 2012
Performance Strategy &amp; Change Management Brochure 11 13 2012Performance Strategy &amp; Change Management Brochure 11 13 2012
Performance Strategy &amp; Change Management Brochure 11 13 2012
 
Is There Any Strategy In Your Strategic Plan
Is There Any Strategy In Your Strategic PlanIs There Any Strategy In Your Strategic Plan
Is There Any Strategy In Your Strategic Plan
 
Make Performance Improvement Strategic
Make Performance Improvement StrategicMake Performance Improvement Strategic
Make Performance Improvement Strategic
 
Improve Your Performance News
Improve Your Performance NewsImprove Your Performance News
Improve Your Performance News
 
A Balancing Act
A Balancing ActA Balancing Act
A Balancing Act
 
Bsci Strategic Management Maturity Model
Bsci Strategic Management Maturity ModelBsci Strategic Management Maturity Model
Bsci Strategic Management Maturity Model
 
Using The Balanced Scorecard To Align
Using The Balanced Scorecard To AlignUsing The Balanced Scorecard To Align
Using The Balanced Scorecard To Align
 
Ultimate Bsc Sports Metaphor
Ultimate Bsc Sports MetaphorUltimate Bsc Sports Metaphor
Ultimate Bsc Sports Metaphor
 
Themes Of Confusion
Themes Of ConfusionThemes Of Confusion
Themes Of Confusion
 
Technology Company Balanced Scorecard Systems 06222010 Final
Technology Company Balanced Scorecard Systems 06222010 FinalTechnology Company Balanced Scorecard Systems 06222010 Final
Technology Company Balanced Scorecard Systems 06222010 Final
 
Build Innovation Into Your Strategy
Build Innovation Into Your StrategyBuild Innovation Into Your Strategy
Build Innovation Into Your Strategy
 

Serrver Imaging Six Sigma Case Study

  • 1. Image Update GEAE Account Project Leader: Brian Boyce Jr. Master Black Belt: Steven Bonacorsi Customer Engineer/ Certified Greenbelt Start Date: April 30, 2002
  • 2. Six Sigma in Action Image Updates Customer Profile – 18,000-Seat Aircraft Engine Manufacturing and Service Company Business Problem & Impact Process Capability – Before (0 Sigma) All PC Equipment issued to GEAE end-users is preloaded by GE ITS with a standard image. These images are updated & maintained by GEAE. All released images must be replicated to the GE ITS servers so they can be loaded on end-user equipment. The current process could take as long as one week with extensive administration involvement. Measure & Analyze Data Collection: The time it took to transfer an image was measured at 34.78 Hours. The existing process sigma was 0. Root Causes: No notification by GEAE Image Group and no Pr o c e s s Ca p a b ility A n a ly s is f o r Cy c le Time clear process documentation were identified as the main root Process Capability – After (Over 6 Sigma) causes. P roc es s D at a U SL Improve & Control US L T arget 17. 0000 * W it Robocopy program implemented and scheduledean run daily M to LS L 0. 3888 * O ve with automatic e-mail notification. Team set up to ple N S am receive e- 40 S t D ev (W it hin) 0. 000000 mail notification and will be alerted if update didS tnot voccur. D ev (O erall) 0. 147566 Cycletime Improved to 0.39 Hours! P ot ent ial (W it hin) C apabilit y Results/Benefits Cp CP U 7. 47E + 16 * Eliminated administration cost due to process automation. CP L * C pk 7. 47E + 16 All equipment now issued to end users with current images. 0.0.30 0.1040 0.1550 0.2055 05 45 0.35 0. 0. 25 C pm * O v erall C apabilit y O bs erv ed P erf orm anc e E x p. "W it hin" P erf orm anc e E x p. "O v erall" P erf orm an A Total Savings of US $11K Annually! Pp PPU PPL 37. 52 * * P P M < LS L P P M > US L P P M T ot al * 0. 00 0. 00 P P M < LS L P P M > US L P P M T ot al 0. 00 0. 00 * P P M < LS L P P M > US L P P M T ot al