Six Sigma DMAIC Project




                                                   Gillette



                                  Project Leader/Green Belt: Ilya Rubinshteyn
                                Project Leader Title: Desk Side Support Engineer
                                       Project Start Date: July 24th, 2003

Master Black Belt: Steven Bonacorsi
Six Sigma in Action
                                                           IMAC – General Workstation-PC Setup

 Customer Profile – 1700 Gillette Employees at Prudential and Copley in                                                      Before
 Boston, MA, 2200 users In SBMC, 170 users in Woburn, 300 users at AMC,                                  UCL

 500 Users in Bethel, CT, and about 500 in the field.                                   150
 Business Problem & Impact
 Gillette employees submitting cases through Help Desk have to wait                                                               Z_ST = 0.78




                                                                            Frequency
                                                                                        100
 about 12 hours before they are contacted by Desk side Support, resulting
 in a tremendous amount of down time.
                                                                                        50
 Measure & Analyze
 Data Collection: Time it took to complete a PC setup for the user after
 case was opened in Clarify. The existing process sigma was 0.11.                          0

 Root Causes: Lack of technician training was identified as the root                                     0                 5000
                                                                                                                     opentime(mins)
                                                                                                                                            10000

 cause.
 Improve & Control                                                                                                          After
 • IMAC case creation and completion process was completely                                                                                         USL
 overhauled, process maps were created and distributed to technicians
 • IMAC teams were created to enhance specialization and performance
 • Appropriate training for faster PC setup process completed, and                              20                           Z_ST = 4.69
 methods for handling were implemented. Clarify metrics are reviewed




                                                                                         Frequency
 weekly.
Results/Benefits                                                                                10
 ITS Productivity Savings = $21,000 Annually
 Customer Productivity Savings = $2,730,000 Annually
• Improving process from 4122 to 222 minutes, to meet customer CTQ                                   0

<= 1800 minutes!                                                                                             0   200 400 600 800 100012001400160018002000
                                                                                                                          Rtime (Minutes)




                         PC Setup time is Critical to Clients!! $2.7M

More Related Content

Similar to Gillette Six Sigma Case Study

Hitesh Summan _CV_New
Hitesh Summan _CV_NewHitesh Summan _CV_New
Hitesh Summan _CV_New
Hitesh Summan
 
Smart Case Study 001
Smart Case Study 001Smart Case Study 001
Smart Case Study 001
agbagb
 

Similar to Gillette Six Sigma Case Study (20)

Deploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case StudyDeploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case Study
 
Deploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case StudyDeploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case Study
 
Geae Tech Support Website Six Sigma Case Study
Geae Tech Support Website Six Sigma Case StudyGeae Tech Support Website Six Sigma Case Study
Geae Tech Support Website Six Sigma Case Study
 
Geae Tech Support Website Six Sigma Case Study
Geae Tech Support Website Six Sigma Case StudyGeae Tech Support Website Six Sigma Case Study
Geae Tech Support Website Six Sigma Case Study
 
Geae Tech Support Website Six Sigma Case Study
Geae Tech Support Website Six Sigma Case StudyGeae Tech Support Website Six Sigma Case Study
Geae Tech Support Website Six Sigma Case Study
 
The User Revolution - DWCNZ2023
The User Revolution - DWCNZ2023The User Revolution - DWCNZ2023
The User Revolution - DWCNZ2023
 
Cisco Connect 2018 Thailand - Introducing cisco dna assurance the future of n...
Cisco Connect 2018 Thailand - Introducing cisco dna assurance the future of n...Cisco Connect 2018 Thailand - Introducing cisco dna assurance the future of n...
Cisco Connect 2018 Thailand - Introducing cisco dna assurance the future of n...
 
Hitesh Summan _CV_New
Hitesh Summan _CV_NewHitesh Summan _CV_New
Hitesh Summan _CV_New
 
Why Managed Services
Why Managed ServicesWhy Managed Services
Why Managed Services
 
Kaseya Connect 2012 - Migration
Kaseya Connect 2012 - MigrationKaseya Connect 2012 - Migration
Kaseya Connect 2012 - Migration
 
Cck company profile
Cck company profileCck company profile
Cck company profile
 
Cck Company Profile
Cck Company ProfileCck Company Profile
Cck Company Profile
 
Service Desk Now! Product Outline 2010 07 01
Service Desk Now! Product Outline 2010 07 01Service Desk Now! Product Outline 2010 07 01
Service Desk Now! Product Outline 2010 07 01
 
Database performance improvement, a six sigma project (4 block) by nirav shah
Database performance improvement, a six sigma project (4 block) by nirav shah Database performance improvement, a six sigma project (4 block) by nirav shah
Database performance improvement, a six sigma project (4 block) by nirav shah
 
Cisco on Cisco. Defining the NG Cloud & Data Center Services
Cisco on Cisco. Defining the NG Cloud & Data Center ServicesCisco on Cisco. Defining the NG Cloud & Data Center Services
Cisco on Cisco. Defining the NG Cloud & Data Center Services
 
Smart Case Study 001
Smart Case Study 001Smart Case Study 001
Smart Case Study 001
 
Ankita_Garg_CV
Ankita_Garg_CVAnkita_Garg_CV
Ankita_Garg_CV
 
VMworld 2013: The Transformative Power and Business Case for Cloud Automation
VMworld 2013: The Transformative Power and Business Case for Cloud Automation VMworld 2013: The Transformative Power and Business Case for Cloud Automation
VMworld 2013: The Transformative Power and Business Case for Cloud Automation
 
Maximize Citrix Performance Complementing Citrix Director and Edgesight
Maximize Citrix Performance Complementing Citrix Director and EdgesightMaximize Citrix Performance Complementing Citrix Director and Edgesight
Maximize Citrix Performance Complementing Citrix Director and Edgesight
 
Beakbane safeguards future with ERP - ready infrastructure upgrade.
Beakbane safeguards future with ERP - ready infrastructure upgrade.Beakbane safeguards future with ERP - ready infrastructure upgrade.
Beakbane safeguards future with ERP - ready infrastructure upgrade.
 

More from Steven Bonacorsi

Analyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate TemplatesAnalyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate Templates
Steven Bonacorsi
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
Steven Bonacorsi
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
Steven Bonacorsi
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklists
Steven Bonacorsi
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
Steven Bonacorsi
 
Bringing program excellence to process excellence
Bringing program excellence to process excellenceBringing program excellence to process excellence
Bringing program excellence to process excellence
Steven Bonacorsi
 

More from Steven Bonacorsi (20)

Lean Six Sigma Tollgate Template Videos Only
Lean Six Sigma Tollgate Template Videos OnlyLean Six Sigma Tollgate Template Videos Only
Lean Six Sigma Tollgate Template Videos Only
 
Analyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate TemplatesAnalyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate Templates
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklists
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
 
Bringing program excellence to process excellence
Bringing program excellence to process excellenceBringing program excellence to process excellence
Bringing program excellence to process excellence
 
14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement Summit14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement Summit
 
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
 
Performance Strategy &amp; Change Management Brochure 11 13 2012
Performance Strategy &amp; Change Management Brochure 11 13 2012Performance Strategy &amp; Change Management Brochure 11 13 2012
Performance Strategy &amp; Change Management Brochure 11 13 2012
 
Is There Any Strategy In Your Strategic Plan
Is There Any Strategy In Your Strategic PlanIs There Any Strategy In Your Strategic Plan
Is There Any Strategy In Your Strategic Plan
 
Make Performance Improvement Strategic
Make Performance Improvement StrategicMake Performance Improvement Strategic
Make Performance Improvement Strategic
 
Improve Your Performance News
Improve Your Performance NewsImprove Your Performance News
Improve Your Performance News
 
A Balancing Act
A Balancing ActA Balancing Act
A Balancing Act
 
Bsci Strategic Management Maturity Model
Bsci Strategic Management Maturity ModelBsci Strategic Management Maturity Model
Bsci Strategic Management Maturity Model
 
Using The Balanced Scorecard To Align
Using The Balanced Scorecard To AlignUsing The Balanced Scorecard To Align
Using The Balanced Scorecard To Align
 
Ultimate Bsc Sports Metaphor
Ultimate Bsc Sports MetaphorUltimate Bsc Sports Metaphor
Ultimate Bsc Sports Metaphor
 
Themes Of Confusion
Themes Of ConfusionThemes Of Confusion
Themes Of Confusion
 
Technology Company Balanced Scorecard Systems 06222010 Final
Technology Company Balanced Scorecard Systems 06222010 FinalTechnology Company Balanced Scorecard Systems 06222010 Final
Technology Company Balanced Scorecard Systems 06222010 Final
 
Build Innovation Into Your Strategy
Build Innovation Into Your StrategyBuild Innovation Into Your Strategy
Build Innovation Into Your Strategy
 

Gillette Six Sigma Case Study

  • 1. Six Sigma DMAIC Project Gillette Project Leader/Green Belt: Ilya Rubinshteyn Project Leader Title: Desk Side Support Engineer Project Start Date: July 24th, 2003 Master Black Belt: Steven Bonacorsi
  • 2. Six Sigma in Action IMAC – General Workstation-PC Setup Customer Profile – 1700 Gillette Employees at Prudential and Copley in Before Boston, MA, 2200 users In SBMC, 170 users in Woburn, 300 users at AMC, UCL 500 Users in Bethel, CT, and about 500 in the field. 150 Business Problem & Impact Gillette employees submitting cases through Help Desk have to wait Z_ST = 0.78 Frequency 100 about 12 hours before they are contacted by Desk side Support, resulting in a tremendous amount of down time. 50 Measure & Analyze Data Collection: Time it took to complete a PC setup for the user after case was opened in Clarify. The existing process sigma was 0.11. 0 Root Causes: Lack of technician training was identified as the root 0 5000 opentime(mins) 10000 cause. Improve & Control After • IMAC case creation and completion process was completely USL overhauled, process maps were created and distributed to technicians • IMAC teams were created to enhance specialization and performance • Appropriate training for faster PC setup process completed, and 20 Z_ST = 4.69 methods for handling were implemented. Clarify metrics are reviewed Frequency weekly. Results/Benefits 10  ITS Productivity Savings = $21,000 Annually  Customer Productivity Savings = $2,730,000 Annually • Improving process from 4122 to 222 minutes, to meet customer CTQ 0 <= 1800 minutes! 0 200 400 600 800 100012001400160018002000 Rtime (Minutes) PC Setup time is Critical to Clients!! $2.7M