Comm training program_aqua_barrier_avb_insallation_vertical_web-video
1.
2. • The correct installation
techniques for AquaBarrier AVB
• The correct materials required for the
installation of AquaBarrier AVB
• The required tools for the installation for
AquaBarrier AVB
This video covers:
4. • All substrates must be primed with IKO
S.A.M. adhesive primer, IKO S.A.M. LVC
adhesive primer, or IKO Water Based
adhesive primer to the application of the
membrane products.
• IKO S.A.M. Adhesive primer, or other IKO
options, are applied using a 10 mm nap
roller at an approximate rate of 122 sq. ft.
per gallon.
• A minimal flash off time of 30 minutes is
required prior to the installation of the
membrane product.
5. • Measure the height of the wall for coverage.
• Cut the AquaBarrier AVB membrane to the
appropriate length, leaving a couple of extra
inches at the bottom.
• Remove approximately 8 inches of the release
paper from the back of the membrane prior to
installation.
• Position the top of the membrane on the wall
section, remembering the membrane courses
should be installed starting at the bottom of
the wall and working upward.
6. • Apply sufficient hand pressure to ensure
adhesion to the substrate.
• Remove the release paper by pulling from
behind, parallel to the membrane.
• Complete adhesion by rolling the membrane
with a pressure roller being sure to remove
any wrinkles or "fish-mouths".
7. • Install successive courses of membrane in
the same fashion ensuring all ends are
overlapped by a minimum of 6 inches and all
sides are overlapped by 3 inches. End and
side laps must be primed with IKO S.A.M.
Adhesive or IKO S.A.M. LVC Adhesive primer
prior to application of the membrane.
• Trim the excess membrane at the base of
the wall.
• The result is an attractive, properly
installed IKO AquaBarrier AVB Vapour
Barrier membrane for your next vertical
wall assembly. A job well done!