EFFECTIVE
BUDGETING AND
COST CONTROL
PRESENTED BY, I GEDE IWAN SURYADI
PERENCANAAN MENYELURUH PERUSAHAAN DILAKSANAKAN
MELALUI EMPAT TAHAP
1. PENETAPAN VISI, DAN MISI
2. PENETAPAN SASARAN DAN
STRATEGI
3. PENYUSUNAN PROGRAM
4. PENYUSUNAN ANGGARAN
EFFECTIVE BUDGETING
• BUDGET ATAU ANGGARAN ADALAH
SUATU PERENCANAAN OPERATIONAL YANG DISUSUN
SECARA;
A.SISTEMATIK
B.MELIPUTI SELURUH KEGIATAN PERUSAHAAN
C.DINYATAKAN DALAM SUATU UNIT (SATUAN)
MONETER
D.BERLAKU UNTUK JANGKA WAKTU ATAU PERIODE
TERTENTU YANG AKAN DATANG
EFFECTIVE BUDGETING
FUNGSI BUDGET
1. ALAT UNTUK MENELITI PERKEMBANGAN USAHA HINGGA
MENJADI EFISIEN DAN EFECTIVE
2. KERANGKA KERJA STRATEGI BISNIS
3. PENGAWASAN – MONITORING DAN MOTIVASI KERJA
4. EVALUASI KINERJA DENGAN PERBANDINGAN DARI TAHUN KE
TAHUN
PENYUSUNAN BUDGET
1. SISTEMATIS
2. REALISTIS
3. FLEKSIBEL
4. KONTINYU
EFFECTIVE BUDGETING
MASTER BUDGET
A. OPERATING BUDGET (ANGGARAN OPERATIONAL)
BERKAITAN DENGAN AKTIVITAS UNTUK MENGHASILKAN
LABA PERUSAHAAN, PENYUSUNAN AKHIR DARI
OPERATING BUDGET ADALAH PROYEKSI LABA RUGI
(PROJECTED INCOME STATEMENT)
B. FINANCIAL BUDGET (ANGGARAN KEUANGAN)
BERKAITAN DENGAN ALIRAN KAS MASUK DAN KAS KELUAR
C. CAPITAL BUDGET (ANGGARAN MODAL)
BERKAITAN DENGAN TAMBAHAN ATAU PENGURANGAN
AKTIVA TETAP PERUSAHAAN, DISUSUN BERDASARKAN
PRAKIRAAN PENJUALAN JK PANJANG
COST CONTROL
• COST ADALAH
SEMUA BIAYA YANG DIKELUARKAN ATAU POTENSIAL
DIANGGAP MEMBERI MANFAAT DI MASA AKAN
DATANG, DENGAN KLASIFIKASI BERDASARKAN
FUNGSI, SEBAGAI BERIKUT;
A. PRODUKSI
B. PEMASARAN
C. ADMINISTRASI
D. KEUANGAN
KEGIATAN USAHA POKOK DALAM
INDUSTRI PERTAMBANGAN UMUM
A. EXPLORATION (EKSPLORASI)
B. DEVELOPMENT AND CONSTRUCTION
(PENGEMBANGAN DAN KONSTRUKSI)
C. PRODUCTION (PRODUKSI)
D. PENGOLAHAN
COAL MINING
HOW TO CONTROL COST WITH
EFFECTIVE BUDGETING AT COAL
MINING PROJECT?
HOW TO CONTROL COST WITH EFFECTIVE
BUDGETING AT COAL MINING PROJECT?
MENELUSURI SEMUA BIAYA-BIAYA YANG BERKAITAN DENGAN
KEGIATAN INDUSTRI PERTAMBANGAN BESERTA RUANG
LINGKUPNYA
MENGHITUNG PERKIRAAN PENDAPATAN DAN BIAYA KONTRAK
SERTA TAKSIRAN KERUGIAN (EXPECTED LOSS)
ANALISA FAKTOR-FAKTOR YANG MEMPENGARUHI
PERKEMBANGAN USAHA DAN PENYUSUNAN RENCANA
USAHA
MENERAPKAN SISTEM MANAJEMEN BIAYA DAN TEKNOLOGI
BARU DALAM PELAKSANAAN PEKERJAAN DAN IMPLEMENTASI
ANGGARAN
BIAYA – BIAYA INDUSTRI PERTAMBANGAN
1. EKSPLORASI
A. PENYELIDIKAN UMUM
• BIAYA STUDI LITERATUR
• BIAYA PEROLEHAN DATA SATELIT DAN FOTO UDARA
• BIAYA PEMETAAN GEOLOGI
• BIAYA PENGAMBILAN CONTOH
• BIAYA ANALISIS CONTOH PERMUKAAN
HOW TO CONTROL COST WITH EFFECTIVE
BUDGETING AT COAL MINING PROJECT?
BIAYA – BIAYA INDUSTRI PERTAMBANGAN
1. EKSPLORASI
B. PERIZINAN DAN BIAYA ADMINISTRASI
• BIAYA PEROLEHAN KUASA PERTAMBANGAN
• BIAYA PEROLEHAN KONTRAK KERJA SAMA
• BIAYA PEROLEHAN KONTRAK KERJA KARYA
• BIAYA PEMBEBASAN TANAH/ TANAM TUMBUH
• BIAYA ADMINISTRASI EKSPLORASI
HOW TO CONTROL COST WITH EFFECTIVE
BUDGETING AT COAL MINING PROJECT?
BIAYA – BIAYA INDUSTRI PERTAMBANGAN
1. EKSPLORASI
C. GEOLOGI DAN GEOFISIKA
• BIAYA SIDE LOOKING AIR RADAR (SLAR)
• BIAYA GEOLOGI LAPANGAN
• BIAYA GEOLOGI KIMIA, TERMASUK ANALISIS PENGUJIAN LABORATORIUM
• BIAYA PENYELIDIKAN GRAVITASI
• BIAYA PENYELIDIKAN MAGNETIK
• BIAYA PENYELIDIKAN SEISMIK
HOW TO CONTROL COST WITH EFFECTIVE
BUDGETING AT COAL MINING PROJECT?
BIAYA – BIAYA INDUSTRI PERTAMBANGAN
1. EKSPLORASI
D. PEMBORAN EKSPLORASI
• BIAYA PERSIAPAN LAHAN TERMASUK BIAYA PEMBUATAN JALAN MASUK
KE LOKASI PEMBORAN
• BIAYA PEMBORAN TERMASUK PERALATAN BOR
• BIAYA MOBILISASI DAN DEMOBILISASI
• BIAYA PENGUJIAN DAN PERAMPUNGAN
• BIAYA LOGISTIK SELAMA DILAKSANAKAN PEMBORAN
HOW TO CONTROL COST WITH EFFECTIVE
BUDGETING AT COAL MINING PROJECT?
BIAYA – BIAYA INDUSTRI PERTAMBANGAN
1. EKSPLORASI
E. EVALUASI
• SEMUA BIAYA YANG BERKAITAN DENGAN KEGIATAN
EVALUASI
HOW TO CONTROL COST WITH EFFECTIVE
BUDGETING AT COAL MINING PROJECT?
BIAYA – BIAYA INDUSTRI PERTAMBANGAN
2. PENGEMBANGAN DAN KONSTRUKSI
A. BIAYA PENGEMBANGAN
• BIAYA ADMINISTRASI
• BIAYA PENGURUSAN PERIZINAN DAN KUASA
PERTAMBANGAN
• BIAYA PEMBEBASAN TANAH
• BIAYA PEMBERSIHAN LAHAN (LAND CLEARING)
• BIAYA PEMBUKAAN TAMBANG, TERMASUK
PENGUPASAN LAPISAN TANAH (SEBELUM PRODUKSI)
HOW TO CONTROL COST WITH EFFECTIVE
BUDGETING AT COAL MINING PROJECT?
BIAYA – BIAYA INDUSTRI PERTAMBANGAN
2. PENGEMBANGAN DAN KONSTRUKSI
B. BIAYA KONSTRUKSI
• BIAYA PEMBUATAN PRASARANA
• BIAYA PEMBUATAN ATAU PENGADAAN BANGUNAN
• BIAYA PEMBUATAN ATAU PENGADAAN MESIN DAN
PERALATAN
HOW TO CONTROL COST WITH EFFECTIVE
BUDGETING AT COAL MINING PROJECT?
BIAYA – BIAYA INDUSTRI PERTAMBANGAN
3. PRODUKSI
A. PENGUPASAN LAPISAN TANAH
(STRIPPING) SELAMA MASA PRODUKSI
• BIAYA PENGELUPASAN TANAH
• BIAYA PENYEDIAAN LAHAN UNTUK PENIMBUNAN
TANAH
• BIAYA PENBIMBUNAN TANAH HASIL PENGUPASAN
HOW TO CONTROL COST WITH EFFECTIVE
BUDGETING AT COAL MINING PROJECT?
BIAYA – BIAYA INDUSTRI PERTAMBANGAN
3. PRODUKSI
B. PENGAMBILAN BAHAN GALIAN
• BIAYA PENGGALIAN
• BIAYA PENYEMPROTAN
• BIAYA PENGERUKAN, ATAU BIAYA PELEDAKAN
• PENIMBUNAN BAHAN GALIAN
HOW TO CONTROL COST WITH EFFECTIVE
BUDGETING AT COAL MINING PROJECT?
BIAYA – BIAYA INDUSTRI PERTAMBANGAN
3. PRODUKSI
C. PENCUCIAN BAHAN GALIAN
• BIAYA PEMBERSIHAN DAN PEMISAHAN BAHAN GALIAN
UTAMA DARI BAHAN GALIAN IKUTANNYA
• BIAYA PEMBENTUKAN UKURAN/ BESARNYA BAHAN
GALIAN SESUAI DENGAN YANG DITETAPKAN
PERUSAHAAN
D. PENGANGKUTAN BAHAN GALIAN
E. PENGELOLAAN LINGKUNGAN HIDUP
HOW TO CONTROL COST WITH EFFECTIVE
BUDGETING AT COAL MINING PROJECT?
BIAYA – BIAYA INDUSTRI PERTAMBANGAN
4. PENGELOLAAN LINGKUNGAN HIDUP
BIAYA YANG BERKAITAN DENGAN PENGADAAN
PRASARANA PLH, BIAYA YANG TIMBUL ATAS USAHA
MENGURANGI DAN MENGENDALIKAN DAMPAK NEGATIF
KEGIATAN PERTAMBANGAN, DAN BIAYA RUTIN LAINNYA
HOW TO CONTROL COST WITH EFFECTIVE
BUDGETING AT COAL MINING PROJECT?
HOW TO CONTROL COST WITH EFFECTIVE
BUDGETING AT COAL MINING PROJECT?
MENELUSURI SEMUA BIAYA-BIAYA YANG BERKAITAN DENGAN
KEGIATAN INDUSTRI PERTAMBANGAN BESERTA RUANG
LINGKUPNYA
MENGHITUNG PERKIRAAN PENDAPATAN DAN BIAYA KONTRAK
SERTA TAKSIRAN KERUGIAN (EXPECTED LOSS)
ANALISA FAKTOR-FAKTOR YANG MEMPENGARUHI
PERKEMBANGAN USAHA DAN PENYUSUNAN RENCANA
USAHA
MENERAPKAN SISTEM MANAJEMEN BIAYA DAN TEKNOLOGI
BARU DALAM PELAKSANAAN PEKERJAAN DAN IMPLEMENTASI
ANGGARAN
PENDAPATAN KONTRAK KONSTRUKSI
1. NILAI PENDAPATAN SEMULA YANG DISETUJUI DALAM
KONTRAK
2. PENYIMPANGAN DALAM PEKERJAAN KONTRAK, KLAIM,
DAN PEMBAYARAN INSENTIF
3. SEPANJANG HAL INI MEMUNGKINKAN UNTUK
MENGHASILKAN PENDAPATAN
4. DAPAT DIUKUR SECARA ANDAL
HOW TO CONTROL COST WITH EFFECTIVE
BUDGETING AT COAL MINING PROJECT?
BIAYA KONTRAK KONSTRUKSI
1. BIAYA YANG BERHUBUNGAN LANGSUNG DENGAN
KONTRAK TERTENTU
2. BIAYA YANG DAPAT DIATRIBUSIKAN PADA AKTIVITAS
KONTRAK PADA UMUMNYA DAN DAPAT DIALOKASIKAN KE
KONTRAK TERSEBUT
3. BIAYA LAIN YANG SECARA KHUSUS DAPAT DITAGIHKAN KE
PEMBERI KERJA SESUAI KONTRAK
HOW TO CONTROL COST WITH EFFECTIVE
BUDGETING AT COAL MINING PROJECT?
TAKSIRAN RUGI (EXPECTED LOSS)
PREDIKSI KEMUNGKINAN TERJADI TOTAL BIAYA
KONTRAK AKAN MELEBIHI TOTAL
PENDAPATAN KONTRAK
HOW TO CONTROL COST WITH EFFECTIVE
BUDGETING AT COAL MINING PROJECT?
HOW TO CONTROL COST WITH EFFECTIVE
BUDGETING AT COAL MINING PROJECT?
MENELUSURI SEMUA BIAYA-BIAYA YANG BERKAITAN DENGAN
KEGIATAN INDUSTRI PERTAMBANGAN BESERTA RUANG
LINGKUPNYA
MENGHITUNG PERKIRAAN PENDAPATAN DAN BIAYA KONTRAK
SERTA TAKSIRAN KERUGIAN (EXPECTED LOSS)
MENGANALISA FAKTOR-FAKTOR YANG MEMPENGARUHI
PERKEMBANGAN USAHA DAN PENYUSUNAN RENCANA
USAHA
MENERAPKAN SISTEM MANAJEMEN BIAYA DAN TEKNOLOGI
BARU DALAM PELAKSANAAN PEKERJAAN DAN IMPLEMENTASI
ANGGARAN
FAKTOR-FAKTOR YANG MEMPENGARUHI
PERKEMBANGAN USAHA DAN PENYUSUNAN
RENCANA USAHA
1. FAKTOR-FAKTOR INTERNAL (CONTROLLABLE)
A. PENDAPATAN 2-3 TAHUN TERAKHIR (POSISI PERSAINGAN, DLL)
B. BEBIJAKSANAAN PENETAPAN NILAI KONTRAK, PEMILIHAN
VENDOR, DAN SEBAGAINYA
C. KAPASITAS KONSTRUKSI
D. TENAGA KERJA, JUMLAH MAUPUN KETERAMPILAN DAN
KEAHLIANNYA
E. MODAL KERJA/ POSISI KEUANGAN (NERACA, R/L, SHU DAN CASH
FLOW)
F. FASILITAS-FASILITAS LAIN YANG DIMILIKI PERUSAHAAN
G. HASIL EVALUASI REALISASI BUDGET TAHUN SEBELUMNYA
HOW TO CONTROL COST WITH EFFECTIVE
BUDGETING AT COAL MINING PROJECT?
FAKTOR-FAKTOR YANG MEMPENGARUHI
PERKEMBANGAN USAHA DAN PENYUSUNAN
RENCANA USAHA
2. FAKTOR-FAKTOR EKSTERNAL (UNCONTROLLABLE)
A. KEADAAN PERSAINGAN
B. BEBIJAKSANAAN PEMERINTAH, DAN LAINNYA
HOW TO CONTROL COST WITH EFFECTIVE
BUDGETING AT COAL MINING PROJECT?
HOW TO CONTROL COST WITH EFFECTIVE
BUDGETING AT COAL MINING PROJECT?
MENELUSURI SEMUA BIAYA-BIAYA YANG BERKAITAN DENGAN
KEGIATAN INDUSTRI PERTAMBANGAN BESERTA RUANG
LINGKUPNYA
MENGHITUNG PERKIRAAN PENDAPATAN DAN BIAYA KONTRAK
SERTA TAKSIRAN KERUGIAN (EXPECTED LOSS)
MENGANALISA FAKTOR-FAKTOR YANG MEMPENGARUHI
PERKEMBANGAN USAHA DAN PENYUSUNAN RENCANA
USAHA
MENERAPKAN SISTEM MANAJEMEN BIAYA DAN TEKNOLOGI
BARU DALAM PELAKSANAAN PEKERJAAN DAN IMPLEMENTASI
ANGGARAN
SISTEM MANAJEMEN BIAYA
1. ZERO DEFECT PROGRAM
2. NON VALUE ADDED TIME
3. JUST IN TIME CONCEPT
4. ACTIVITY BASED MANAGEMENT/ ABM
5. LIFE CYCLE COSTING
6. TARGET COSTING
HOW TO CONTROL COST WITH EFFECTIVE
BUDGETING AT COAL MINING PROJECT?
SISTEM MANAJEMEN BIAYA
1. ZERO DEFECT PROGRAM
• MAINTAIN QUALITY
• TO DO THE RIGHT AT THE FIRST TIME
2. NON VALUE ADDED TIME
• REDUCE WASTE TIME: MOVE TIME, INSPECTION TIME,
WAIT TIME
3. JUST IN TIME CONCEPT
• FIXED SCHEDULING
HOW TO CONTROL COST WITH EFFECTIVE
BUDGETING AT COAL MINING PROJECT?
SISTEM MANAJEMEN BIAYA
4. ACTIVITY BASED MANAGEMENT/ ABM
• COST PLANNING SYSTEM OF ACTIVITY RELATED TO
PRODUCTION
5. LIFE CYCLE COSTING
• CRADLE TO GRAVE COSTING
6. TARGET COSTING
• LIMITED BUDGET PRODUCTION
HOW TO CONTROL COST WITH EFFECTIVE
BUDGETING AT COAL MINING PROJECT?
RESUME
• DAPAT MENETAPKAN ANGGARAN YANG
TEPAT (TODAY)
• DAPAT MENGIMPLEMENTASIKAN
ANGGARAN SE EFISIEN MUNGKIN
(TOMORROW)
• DAPAT MENETAPKAN TARGET
PERUSAHAAN BERIKUTNYA (FUTURE)

More Related Content

Similar to Effective Cost Control for Coal Mining Projects

Assessment of Project Monitoring and Control Techniques in Ondo State Agency ...
Assessment of Project Monitoring and Control Techniques in Ondo State Agency ...Assessment of Project Monitoring and Control Techniques in Ondo State Agency ...
Assessment of Project Monitoring and Control Techniques in Ondo State Agency ...Dr. Amarjeet Singh
 
039 integrating constructability-short
039 integrating constructability-short039 integrating constructability-short
039 integrating constructability-shortdrdej19
 
039 Integrating Constructability-short
039 Integrating Constructability-short039 Integrating Constructability-short
039 Integrating Constructability-shortDr Fereidoun Dejahang
 
Quality control inspection reports and outcomes wrt contract management
Quality control inspection reports and outcomes wrt contract managementQuality control inspection reports and outcomes wrt contract management
Quality control inspection reports and outcomes wrt contract managementEdwinJacob5
 
Webinar - Slimme besluitvorming over project-portfolio’s in asset management
Webinar - Slimme besluitvorming over project-portfolio’s in asset managementWebinar - Slimme besluitvorming over project-portfolio’s in asset management
Webinar - Slimme besluitvorming over project-portfolio’s in asset managementStork
 
Strategic Project Selection in Oil & Gas Industry
Strategic Project Selection in Oil & Gas IndustryStrategic Project Selection in Oil & Gas Industry
Strategic Project Selection in Oil & Gas Industrynaveen_ncn
 
IIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction ProjectIIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction ProjectIRJET Journal
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management Rajat Nainwal
 
EJMCM_Volume 7_Issue 4_Pages 310-318.pdf
EJMCM_Volume 7_Issue 4_Pages 310-318.pdfEJMCM_Volume 7_Issue 4_Pages 310-318.pdf
EJMCM_Volume 7_Issue 4_Pages 310-318.pdfkripeshdubey1
 
055 kpi's-success factor
055 kpi's-success factor055 kpi's-success factor
055 kpi's-success factordrdej19
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and controlShubhamChikhale8
 
3rd party independant reviews
3rd party independant reviews3rd party independant reviews
3rd party independant reviewsNick Pelham
 
Cost management-plan template
Cost management-plan templateCost management-plan template
Cost management-plan templateVivek Srivastava
 
CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerSankar Sundaram PMP
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineerSankar Sundaram PMP
 
Research study on Optimization of Cost and Duration with Line of Balance by U...
Research study on Optimization of Cost and Duration with Line of Balance by U...Research study on Optimization of Cost and Duration with Line of Balance by U...
Research study on Optimization of Cost and Duration with Line of Balance by U...IRJET Journal
 
Earned value
Earned valueEarned value
Earned valueOliver
 

Similar to Effective Cost Control for Coal Mining Projects (20)

Assessment of Project Monitoring and Control Techniques in Ondo State Agency ...
Assessment of Project Monitoring and Control Techniques in Ondo State Agency ...Assessment of Project Monitoring and Control Techniques in Ondo State Agency ...
Assessment of Project Monitoring and Control Techniques in Ondo State Agency ...
 
039 integrating constructability-short
039 integrating constructability-short039 integrating constructability-short
039 integrating constructability-short
 
039 Integrating Constructability-short
039 Integrating Constructability-short039 Integrating Constructability-short
039 Integrating Constructability-short
 
Quality control inspection reports and outcomes wrt contract management
Quality control inspection reports and outcomes wrt contract managementQuality control inspection reports and outcomes wrt contract management
Quality control inspection reports and outcomes wrt contract management
 
Webinar - Slimme besluitvorming over project-portfolio’s in asset management
Webinar - Slimme besluitvorming over project-portfolio’s in asset managementWebinar - Slimme besluitvorming over project-portfolio’s in asset management
Webinar - Slimme besluitvorming over project-portfolio’s in asset management
 
Strategic Project Selection in Oil & Gas Industry
Strategic Project Selection in Oil & Gas IndustryStrategic Project Selection in Oil & Gas Industry
Strategic Project Selection in Oil & Gas Industry
 
IIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction ProjectIIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction Project
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management
 
Change management
Change managementChange management
Change management
 
EJMCM_Volume 7_Issue 4_Pages 310-318.pdf
EJMCM_Volume 7_Issue 4_Pages 310-318.pdfEJMCM_Volume 7_Issue 4_Pages 310-318.pdf
EJMCM_Volume 7_Issue 4_Pages 310-318.pdf
 
055 KPI'S Success Factor
055 KPI'S Success Factor 055 KPI'S Success Factor
055 KPI'S Success Factor
 
055 kpi's-success factor
055 kpi's-success factor055 kpi's-success factor
055 kpi's-success factor
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
3rd party independant reviews
3rd party independant reviews3rd party independant reviews
3rd party independant reviews
 
Cost management-plan template
Cost management-plan templateCost management-plan template
Cost management-plan template
 
Final er slides 3 2 15_2_pm
Final er slides 3 2  15_2_pmFinal er slides 3 2  15_2_pm
Final er slides 3 2 15_2_pm
 
CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning Engineer
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
 
Research study on Optimization of Cost and Duration with Line of Balance by U...
Research study on Optimization of Cost and Duration with Line of Balance by U...Research study on Optimization of Cost and Duration with Line of Balance by U...
Research study on Optimization of Cost and Duration with Line of Balance by U...
 
Earned value
Earned valueEarned value
Earned value
 

Recently uploaded

Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCRsoniya singh
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadAyesha Khan
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckHajeJanKamps
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 

Recently uploaded (20)

Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 

Effective Cost Control for Coal Mining Projects

  • 2. PERENCANAAN MENYELURUH PERUSAHAAN DILAKSANAKAN MELALUI EMPAT TAHAP 1. PENETAPAN VISI, DAN MISI 2. PENETAPAN SASARAN DAN STRATEGI 3. PENYUSUNAN PROGRAM 4. PENYUSUNAN ANGGARAN
  • 3. EFFECTIVE BUDGETING • BUDGET ATAU ANGGARAN ADALAH SUATU PERENCANAAN OPERATIONAL YANG DISUSUN SECARA; A.SISTEMATIK B.MELIPUTI SELURUH KEGIATAN PERUSAHAAN C.DINYATAKAN DALAM SUATU UNIT (SATUAN) MONETER D.BERLAKU UNTUK JANGKA WAKTU ATAU PERIODE TERTENTU YANG AKAN DATANG
  • 4. EFFECTIVE BUDGETING FUNGSI BUDGET 1. ALAT UNTUK MENELITI PERKEMBANGAN USAHA HINGGA MENJADI EFISIEN DAN EFECTIVE 2. KERANGKA KERJA STRATEGI BISNIS 3. PENGAWASAN – MONITORING DAN MOTIVASI KERJA 4. EVALUASI KINERJA DENGAN PERBANDINGAN DARI TAHUN KE TAHUN PENYUSUNAN BUDGET 1. SISTEMATIS 2. REALISTIS 3. FLEKSIBEL 4. KONTINYU
  • 5. EFFECTIVE BUDGETING MASTER BUDGET A. OPERATING BUDGET (ANGGARAN OPERATIONAL) BERKAITAN DENGAN AKTIVITAS UNTUK MENGHASILKAN LABA PERUSAHAAN, PENYUSUNAN AKHIR DARI OPERATING BUDGET ADALAH PROYEKSI LABA RUGI (PROJECTED INCOME STATEMENT) B. FINANCIAL BUDGET (ANGGARAN KEUANGAN) BERKAITAN DENGAN ALIRAN KAS MASUK DAN KAS KELUAR C. CAPITAL BUDGET (ANGGARAN MODAL) BERKAITAN DENGAN TAMBAHAN ATAU PENGURANGAN AKTIVA TETAP PERUSAHAAN, DISUSUN BERDASARKAN PRAKIRAAN PENJUALAN JK PANJANG
  • 6. COST CONTROL • COST ADALAH SEMUA BIAYA YANG DIKELUARKAN ATAU POTENSIAL DIANGGAP MEMBERI MANFAAT DI MASA AKAN DATANG, DENGAN KLASIFIKASI BERDASARKAN FUNGSI, SEBAGAI BERIKUT; A. PRODUKSI B. PEMASARAN C. ADMINISTRASI D. KEUANGAN
  • 7. KEGIATAN USAHA POKOK DALAM INDUSTRI PERTAMBANGAN UMUM A. EXPLORATION (EKSPLORASI) B. DEVELOPMENT AND CONSTRUCTION (PENGEMBANGAN DAN KONSTRUKSI) C. PRODUCTION (PRODUKSI) D. PENGOLAHAN COAL MINING
  • 8. HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?
  • 9. HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT? MENELUSURI SEMUA BIAYA-BIAYA YANG BERKAITAN DENGAN KEGIATAN INDUSTRI PERTAMBANGAN BESERTA RUANG LINGKUPNYA MENGHITUNG PERKIRAAN PENDAPATAN DAN BIAYA KONTRAK SERTA TAKSIRAN KERUGIAN (EXPECTED LOSS) ANALISA FAKTOR-FAKTOR YANG MEMPENGARUHI PERKEMBANGAN USAHA DAN PENYUSUNAN RENCANA USAHA MENERAPKAN SISTEM MANAJEMEN BIAYA DAN TEKNOLOGI BARU DALAM PELAKSANAAN PEKERJAAN DAN IMPLEMENTASI ANGGARAN
  • 10. BIAYA – BIAYA INDUSTRI PERTAMBANGAN 1. EKSPLORASI A. PENYELIDIKAN UMUM • BIAYA STUDI LITERATUR • BIAYA PEROLEHAN DATA SATELIT DAN FOTO UDARA • BIAYA PEMETAAN GEOLOGI • BIAYA PENGAMBILAN CONTOH • BIAYA ANALISIS CONTOH PERMUKAAN HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?
  • 11. BIAYA – BIAYA INDUSTRI PERTAMBANGAN 1. EKSPLORASI B. PERIZINAN DAN BIAYA ADMINISTRASI • BIAYA PEROLEHAN KUASA PERTAMBANGAN • BIAYA PEROLEHAN KONTRAK KERJA SAMA • BIAYA PEROLEHAN KONTRAK KERJA KARYA • BIAYA PEMBEBASAN TANAH/ TANAM TUMBUH • BIAYA ADMINISTRASI EKSPLORASI HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?
  • 12. BIAYA – BIAYA INDUSTRI PERTAMBANGAN 1. EKSPLORASI C. GEOLOGI DAN GEOFISIKA • BIAYA SIDE LOOKING AIR RADAR (SLAR) • BIAYA GEOLOGI LAPANGAN • BIAYA GEOLOGI KIMIA, TERMASUK ANALISIS PENGUJIAN LABORATORIUM • BIAYA PENYELIDIKAN GRAVITASI • BIAYA PENYELIDIKAN MAGNETIK • BIAYA PENYELIDIKAN SEISMIK HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?
  • 13. BIAYA – BIAYA INDUSTRI PERTAMBANGAN 1. EKSPLORASI D. PEMBORAN EKSPLORASI • BIAYA PERSIAPAN LAHAN TERMASUK BIAYA PEMBUATAN JALAN MASUK KE LOKASI PEMBORAN • BIAYA PEMBORAN TERMASUK PERALATAN BOR • BIAYA MOBILISASI DAN DEMOBILISASI • BIAYA PENGUJIAN DAN PERAMPUNGAN • BIAYA LOGISTIK SELAMA DILAKSANAKAN PEMBORAN HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?
  • 14. BIAYA – BIAYA INDUSTRI PERTAMBANGAN 1. EKSPLORASI E. EVALUASI • SEMUA BIAYA YANG BERKAITAN DENGAN KEGIATAN EVALUASI HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?
  • 15. BIAYA – BIAYA INDUSTRI PERTAMBANGAN 2. PENGEMBANGAN DAN KONSTRUKSI A. BIAYA PENGEMBANGAN • BIAYA ADMINISTRASI • BIAYA PENGURUSAN PERIZINAN DAN KUASA PERTAMBANGAN • BIAYA PEMBEBASAN TANAH • BIAYA PEMBERSIHAN LAHAN (LAND CLEARING) • BIAYA PEMBUKAAN TAMBANG, TERMASUK PENGUPASAN LAPISAN TANAH (SEBELUM PRODUKSI) HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?
  • 16. BIAYA – BIAYA INDUSTRI PERTAMBANGAN 2. PENGEMBANGAN DAN KONSTRUKSI B. BIAYA KONSTRUKSI • BIAYA PEMBUATAN PRASARANA • BIAYA PEMBUATAN ATAU PENGADAAN BANGUNAN • BIAYA PEMBUATAN ATAU PENGADAAN MESIN DAN PERALATAN HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?
  • 17. BIAYA – BIAYA INDUSTRI PERTAMBANGAN 3. PRODUKSI A. PENGUPASAN LAPISAN TANAH (STRIPPING) SELAMA MASA PRODUKSI • BIAYA PENGELUPASAN TANAH • BIAYA PENYEDIAAN LAHAN UNTUK PENIMBUNAN TANAH • BIAYA PENBIMBUNAN TANAH HASIL PENGUPASAN HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?
  • 18. BIAYA – BIAYA INDUSTRI PERTAMBANGAN 3. PRODUKSI B. PENGAMBILAN BAHAN GALIAN • BIAYA PENGGALIAN • BIAYA PENYEMPROTAN • BIAYA PENGERUKAN, ATAU BIAYA PELEDAKAN • PENIMBUNAN BAHAN GALIAN HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?
  • 19. BIAYA – BIAYA INDUSTRI PERTAMBANGAN 3. PRODUKSI C. PENCUCIAN BAHAN GALIAN • BIAYA PEMBERSIHAN DAN PEMISAHAN BAHAN GALIAN UTAMA DARI BAHAN GALIAN IKUTANNYA • BIAYA PEMBENTUKAN UKURAN/ BESARNYA BAHAN GALIAN SESUAI DENGAN YANG DITETAPKAN PERUSAHAAN D. PENGANGKUTAN BAHAN GALIAN E. PENGELOLAAN LINGKUNGAN HIDUP HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?
  • 20. BIAYA – BIAYA INDUSTRI PERTAMBANGAN 4. PENGELOLAAN LINGKUNGAN HIDUP BIAYA YANG BERKAITAN DENGAN PENGADAAN PRASARANA PLH, BIAYA YANG TIMBUL ATAS USAHA MENGURANGI DAN MENGENDALIKAN DAMPAK NEGATIF KEGIATAN PERTAMBANGAN, DAN BIAYA RUTIN LAINNYA HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?
  • 21. HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT? MENELUSURI SEMUA BIAYA-BIAYA YANG BERKAITAN DENGAN KEGIATAN INDUSTRI PERTAMBANGAN BESERTA RUANG LINGKUPNYA MENGHITUNG PERKIRAAN PENDAPATAN DAN BIAYA KONTRAK SERTA TAKSIRAN KERUGIAN (EXPECTED LOSS) ANALISA FAKTOR-FAKTOR YANG MEMPENGARUHI PERKEMBANGAN USAHA DAN PENYUSUNAN RENCANA USAHA MENERAPKAN SISTEM MANAJEMEN BIAYA DAN TEKNOLOGI BARU DALAM PELAKSANAAN PEKERJAAN DAN IMPLEMENTASI ANGGARAN
  • 22. PENDAPATAN KONTRAK KONSTRUKSI 1. NILAI PENDAPATAN SEMULA YANG DISETUJUI DALAM KONTRAK 2. PENYIMPANGAN DALAM PEKERJAAN KONTRAK, KLAIM, DAN PEMBAYARAN INSENTIF 3. SEPANJANG HAL INI MEMUNGKINKAN UNTUK MENGHASILKAN PENDAPATAN 4. DAPAT DIUKUR SECARA ANDAL HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?
  • 23. BIAYA KONTRAK KONSTRUKSI 1. BIAYA YANG BERHUBUNGAN LANGSUNG DENGAN KONTRAK TERTENTU 2. BIAYA YANG DAPAT DIATRIBUSIKAN PADA AKTIVITAS KONTRAK PADA UMUMNYA DAN DAPAT DIALOKASIKAN KE KONTRAK TERSEBUT 3. BIAYA LAIN YANG SECARA KHUSUS DAPAT DITAGIHKAN KE PEMBERI KERJA SESUAI KONTRAK HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?
  • 24. TAKSIRAN RUGI (EXPECTED LOSS) PREDIKSI KEMUNGKINAN TERJADI TOTAL BIAYA KONTRAK AKAN MELEBIHI TOTAL PENDAPATAN KONTRAK HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?
  • 25. HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT? MENELUSURI SEMUA BIAYA-BIAYA YANG BERKAITAN DENGAN KEGIATAN INDUSTRI PERTAMBANGAN BESERTA RUANG LINGKUPNYA MENGHITUNG PERKIRAAN PENDAPATAN DAN BIAYA KONTRAK SERTA TAKSIRAN KERUGIAN (EXPECTED LOSS) MENGANALISA FAKTOR-FAKTOR YANG MEMPENGARUHI PERKEMBANGAN USAHA DAN PENYUSUNAN RENCANA USAHA MENERAPKAN SISTEM MANAJEMEN BIAYA DAN TEKNOLOGI BARU DALAM PELAKSANAAN PEKERJAAN DAN IMPLEMENTASI ANGGARAN
  • 26. FAKTOR-FAKTOR YANG MEMPENGARUHI PERKEMBANGAN USAHA DAN PENYUSUNAN RENCANA USAHA 1. FAKTOR-FAKTOR INTERNAL (CONTROLLABLE) A. PENDAPATAN 2-3 TAHUN TERAKHIR (POSISI PERSAINGAN, DLL) B. BEBIJAKSANAAN PENETAPAN NILAI KONTRAK, PEMILIHAN VENDOR, DAN SEBAGAINYA C. KAPASITAS KONSTRUKSI D. TENAGA KERJA, JUMLAH MAUPUN KETERAMPILAN DAN KEAHLIANNYA E. MODAL KERJA/ POSISI KEUANGAN (NERACA, R/L, SHU DAN CASH FLOW) F. FASILITAS-FASILITAS LAIN YANG DIMILIKI PERUSAHAAN G. HASIL EVALUASI REALISASI BUDGET TAHUN SEBELUMNYA HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?
  • 27. FAKTOR-FAKTOR YANG MEMPENGARUHI PERKEMBANGAN USAHA DAN PENYUSUNAN RENCANA USAHA 2. FAKTOR-FAKTOR EKSTERNAL (UNCONTROLLABLE) A. KEADAAN PERSAINGAN B. BEBIJAKSANAAN PEMERINTAH, DAN LAINNYA HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?
  • 28. HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT? MENELUSURI SEMUA BIAYA-BIAYA YANG BERKAITAN DENGAN KEGIATAN INDUSTRI PERTAMBANGAN BESERTA RUANG LINGKUPNYA MENGHITUNG PERKIRAAN PENDAPATAN DAN BIAYA KONTRAK SERTA TAKSIRAN KERUGIAN (EXPECTED LOSS) MENGANALISA FAKTOR-FAKTOR YANG MEMPENGARUHI PERKEMBANGAN USAHA DAN PENYUSUNAN RENCANA USAHA MENERAPKAN SISTEM MANAJEMEN BIAYA DAN TEKNOLOGI BARU DALAM PELAKSANAAN PEKERJAAN DAN IMPLEMENTASI ANGGARAN
  • 29. SISTEM MANAJEMEN BIAYA 1. ZERO DEFECT PROGRAM 2. NON VALUE ADDED TIME 3. JUST IN TIME CONCEPT 4. ACTIVITY BASED MANAGEMENT/ ABM 5. LIFE CYCLE COSTING 6. TARGET COSTING HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?
  • 30. SISTEM MANAJEMEN BIAYA 1. ZERO DEFECT PROGRAM • MAINTAIN QUALITY • TO DO THE RIGHT AT THE FIRST TIME 2. NON VALUE ADDED TIME • REDUCE WASTE TIME: MOVE TIME, INSPECTION TIME, WAIT TIME 3. JUST IN TIME CONCEPT • FIXED SCHEDULING HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?
  • 31. SISTEM MANAJEMEN BIAYA 4. ACTIVITY BASED MANAGEMENT/ ABM • COST PLANNING SYSTEM OF ACTIVITY RELATED TO PRODUCTION 5. LIFE CYCLE COSTING • CRADLE TO GRAVE COSTING 6. TARGET COSTING • LIMITED BUDGET PRODUCTION HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?
  • 32. RESUME • DAPAT MENETAPKAN ANGGARAN YANG TEPAT (TODAY) • DAPAT MENGIMPLEMENTASIKAN ANGGARAN SE EFISIEN MUNGKIN (TOMORROW) • DAPAT MENETAPKAN TARGET PERUSAHAAN BERIKUTNYA (FUTURE)