28. 参考文献
[1] Ranjbar, M., Davari, M., & Leus, R. (2012). Two branch-and-bound algorithms for the robust
parallel machine scheduling problem. Computers & Operations Research, 39(7), 1652-1660.
[2] Stec, R., Novak, A., Sucha, P., & Hanzalek, Z. (2019). Scheduling Jobs with Stochastic
Processing Time on Parallel Identical Machines. In IJCAI (pp. 5628-5634).
[3] Williams, C. K., & Rasmussen, C. E. (1996). Gaussian processes for regression. In Advances in
neural information processing systems(pp. 514–520).
28