1. HARISH S. GORASIYA
B.E. (Civil Engineering),
From Faculty of Technology,
Dharmsinh Desai University,
Nadiad, Gujarat,india
Email: gorasiyaharish@gmail.com.
Career Aim:
I want to handle the growing challenges in the technical world and fulfill the wishes of
My parents. I want to be a part of an Environment that promotes team effort and provides us
Opportunity to come up with our skills.
Personal Information:
Address:
S/o Mr. Harish S. Gorasiya
Ghanshyam nagar,
Navavas, Sukhpar,
Bhuj, Kutch, Gujarat(India).
370040.
Contact: (1) +918530598434, (2) +919924840387(Home).
Hobbies: Traveling, Reading, Exercise.
Languages known: English, Hindi, Gujarati.
Date of Birth: 11
th
March, 1987.
Educational Background:
Examination Board/University Year of Passing Percentage
S.S.C. G.S.E.B, Gujarat April 2002 72.29%
H.S.C. G.S.E.B, Gujarat March 2004 55.55%
B.E.(C.L.) DDU, Nadiad April 2009 59.52%
2. Academic Performance:
Semester Year of Passing Percentage
VIII Apr, 2009 63.40%
VII Dec, 2008 58.66%
VI Apr, 2007 58.22%
V Dec, 2007 59.44%
IV Apr ,2006 60.00%
III Nov, 2005 57.56%
II May, 2005 48.13%
I Feb, 2005 51.20%
COMPUTER SKILLS:
• AUTOCAD
• PROGRAMING LANGUAGE: C.
• PLATFORMS: windows 98/XP/2000/vista/windows 7/windows 8.
STRENGTH:
• Faith in GOD.
• Team Work
• Positive and Calm attitude during Challenging condition.
EXPERIANCE:
(1) Worked as a Project engineer to build a power station at brikama, The gambia (West Africa).
• Project name: Brikama power supplyIBD.
• Client: Gov. of Gambia.
• Contractor: WARTSILA Finland.
• Sub contractor: SWAMI INDIA INTERNATIONAL LTD.
• Project Cost: $ 20 million.
• Project Duration: 1 year but we finished in 9 month.
• Working standard: EUROPIAN STANDARD.
(2) Worked as a senior engineer for rural water supply phase 3, the gambia (West Africa)..
• Project name: Rural water supply Phase 3.
• Client: Gambia Water Company.
• Contractor: EBARA JAPAN.
• Sub contractor: SWAMI INDIA INTERNATIONAL LTD.
• Project Cost: $ 25 million.
• Project Duration: 1 year but we finished in 11 month.
• Working standard: JAPANIES STANDARD.
• Project Detail: We build 15 concrete water tank with average capacity of 60000 liter water, 60
km pipe line for water distribution, 15 solar pumping system unit with concrete fence protected,
350 faucet unit with 2 tap and 4 tap with drainage system.
3. (3) Worked as a senior engineer to build 20000 sq mt SHADES, The gambia (West Africa)..
• Project name: Shades for animal.
• Client: President of Gambia.
• Contractor: SWAMI INDIA INTERNATIONAL LTD.
• Project Cost: $ 2 million.
• Project Duration: 6 month
• Working standard: GAMBIAN STANDARD.
(4) Worked as a Senior engineer to build 20 bungles in paradies estate, The gambia (West Africa).
• Project name: Paradies Estate.
• Contractor: SWAMI INDIA INTERNATIONAL LTD.
• Project Cost: $ 1.5 million.
• Project Duration: 6 month
• Working standard: GAMBIAN STANDARD.
(5) Worked as a Senior engineer to build 4 storey building at Kampala, Uganda (East Africa).
• Project name: Munyono hotel(Kampala).
• Contractor: Neeta Builder.
• Project Cost: $ 500,000 .
• Project Duration: 6 month
• Working standard: UGANDA STANDARD.
(6) Worked as a coutry manager(Secratory) for Swami india ghana ltd at Accra, Ghana(West Africa).
• Perform- act as site engineer.
• Do all correspondence behalf of company.
• To control the purchase of building material.
• To find any new scope of work.
• Find the land on good location for purchase and negotiate the pries.
• Do all necessary payment for land and prepare land document.
• Construct 10 bunglows.
• Duretion: 2 Year.
• Working standard: Ghanian standard.
HARISH S. GORASIYA
B.E.CIVIL