1. PHOTOGRAPHY SHOOT RISK ASSESSMENT
This document is intended as a basic template to assist in the completion of a risk assessment for film production activities.
Detailed information is available from a variety of risk management and risk assessment specialists. Useful information can also be obtained
from the Health & Safety Executive www.hse.gov.uk
When conducting a risk assessment, consider all the likely hazards; who may be harmed, property which may be damaged, and the controls
already in place. Then, for each likely hazard, bearing in mind the controls already in place, record the ‘risk assessment’ level. The further
action(s) to be considered will be determined by the level of risk assessment.
HAZARD IN WHICH SCENE
IS THIS HAZARD
PRESENT?
PERSON WHO MAY
BE HARMED
PROPERTY THAT
COULD BE
DAMAGED
RISK CONTROLS
ALREADY INPLACE
RISK ASSESSMENT
*See chart
FURTHER ACTION
TO BE TAKEN
Falling on concrete Images taken
outside
Any of models Camera Wear non-slip shoes
when outside
Low Will ensure tobe
carefulwhen
standingoutside
(e.g:notin puddles)
Tripping over object Images taken
indoors/outdoors
Any of models Camera Clearing objects
fromlocations when
taking images
Low Making sure
nothing is on the
floor before taking
the images
2. Risk AssessmentChart
Hazard likelihood/Consequences RISK ASSESSMENT
VERY LIKELY TO HAPPEN or SEVERE CONSEQUENCES(ie. Someone couldget
seriouslyhurt)
EXTREME
Couldhappenormildconsequences(i.e.someone couldsufferaminor
injury)
HIGH
Unlikelytohappenorminorconsequences(i.e.productioncouldbe slightly
delayed)
MODERATE
Rarelyhappensandveryinsignificantconsequences LOW