BEDROOM
GROUND FLOOR PLAN 1:50
SECTION A-A 1:50
200 CONC BLOCK WALL
WITH BRICKFORCE EVERY
COURSE AND GIVEN A
BAG WASH FINISH ON
BOTH SIDES
800x350 REINFORCED CONC
STRIP FOUNDATION @ MIN
1100 DEPTH BELOW NGL ON
150 COMPACTED STABILISED
BASE LAYER TO SUIT
203x203
STEEL
H-COLUMN
TO SPEC
100 NON
STRUCTURAL
PREFAB
INTERNAL
WALLS
built in
cupboards
built in
cupboards
CHROMADEK IBR ROOF SHEETING ON
DPM FIXED TO 40x40 STEEL
PURLOINS BOLTED TO STEEL
BRACKETS BOLTED @ MAX 1000 CS
TO 150x75 STEEL SQUARE SECTION
TRUSSES FRAME BOLTED TO TOP OF
H-COLUMNS
50x50 STEEL
BALUSTRADE
WITH TIMBER
RAIL
19 TIMBER
BARGEBOARD
WITH DECORATIVE
CUT TO SUIT
19 PLY CEILING FIXED WITH
POSIDRIVE SCREWS TO
U/SIDE OF TRUSS FRAME
22 T+G FLOORING FIXED TO 19 PLYBOARD
FIXED TO 150x50 STEEL SQUARE SECTION
JOISTS FIXED WITH STEEL BRACKETS @ 600
CS TO WALL AND IPE180 BEARER
PRECAST
LINTEL
ALU. WINDOW
FRAMES TO SPEC
ALU. SLIDING
DOORS TO SPEC
1000x1000x715 RC PAD
FOUNDATIONS @ MIN
DEPTH 1100 BELOW NGL
ON MIN 150 COMPACTED
BASE LAYER TO SUIT
SMOOTH FLOATED 85
RC FLOORSLAB ON
COMPACTED EARTH
FILL TO SUIT
TILES TO CLIENTS
SPEC ON 85 RC
FLOORSLAB ON
COMPACTED
EARTH FILL TO
SUIT
203x203 STEEL
H-COLUMN
TO SPEC
200 CONC BLOCK
FOOTING WALL ON
400X200 CONC STRIP
FOUNDATION @ MIN
600 BELOW NGL
203x203
STEEL
H-COLUMN
TO SPEC
FFL1 +0150
FFL2 +2785
MAX +6000
NGL 0000
FOUND. -1100
BASE -1250
RC
RINGBEAM
TO SPEC
+2650
+5550
RAINWATER GUTTER
TO SUIT
FIRST FLOOR PLAN 1:50
FRONT ELEVATION 1:100
REAR ELEVATION 1:100
SIDE ELEVATION 1:100
SIDE ELEVATION 1:100
100 NON STRUCTURAL
PREFAB DRY WALL
FIXED IN PLACE WITH
ALUMINIUM ANGLE
IPE200 BOLTED TO
203 H-COLUMN
WITH 4xM18 BOLTS
150x50 STEEL BOX
SECTION FLOOR JOISTS
FIXED @ 600 CS TO
IPE200 WITH STEEL
BRACKETS TO SUIT
19 PLYWOOD SCREWED TO JOISTS
22 T+G FLOORING NAILED TO PLYWOOD
203 H-COLUMN
1000x1000x715
REINFORCED
CONCRETE
FOUNDATION TO
ENG. SPEC
RC PILE
Y12
REINFORCING
TO ENG.
SPEC
203 H-COLUMN WITH
WELDED BASE PLATE
TO SUIT
150
COMPACTED
BASE
LAYER TO
SUIT
200 CONCRETE
BLOCK WALL
Y12
REINFORCING
85 SMOOTH FLOATED
RC FLOOR SLAB
WELL
COMPACTED
EARTH FILL
TO SUIT
250 HARD
COMPACTED
BACKFILL
BASE LAYER
150
COMPACTED
BASE LAYER
DATE: PROJECT: DRAWING: SCALE:
DRAWN BY:CLIENT/APPLICANT:
PLOT: CHECKED:
1:5/1:10/1:50/1:100
G H
CLIENT ADDRESS:
SUBMITTED:REVISIONS
PAGE #:
PAGE FORMAT: A1L
DRAWING NUMBER:
/
HOUSE APPROVAL SET
GROUND FLOOR PLAN 1:50
FIRST FLOOR PLAN 1:50
SECTION A-A 1:50
ELEVATIONS 1:100
FOUNDATION DETAILS 1:10
UPPER FLOOR DETAIL 1:5
BM/HP/01
JULY 2014
2 BEDROOM HOUSE
1804, PLATEAU, KASANE
B MACDONALD
UPPER FLOOR DETAIL 1:5
PAD FOUNDATION DETAIL 1:10
STRIP FOUNDTION DETAIL 1:10
AREAS
SITE AREA = 450 sqm
MAIN HOUSE = 132 sqm (29.3%)
STAFF = 18 sqm (4%)
TOTAL = 150 sqm (33.3%)
PLEASE NOTE
A SETBACK OF 1.5m HAS BEEN MAINTAINED FROM
ADJOINING BOUNDARIES - RESULTING IN THE
BUILDING HAVING A MAX HEIGHT OF 6m.
1.5m X 4 = 6m
P.O. BOX 368
KASANE
BEDROOM
PARKING
STAFF
MAIN HOUSE
EXIST.
TREE
GATE
GARDEN
COUNCIL
SEWER
CONNECT.
MH
STONE
PATH
PAVED REAR
AREA
SITE ACCESS
SITE PLAN 1:75
PLOT
1805PLOT
1803
15m ROAD
1 3 0 0 w a l l
1800wall
1800wall
1 8 0 0 w a l l
COUNCIL SEWER LINE
RE
RE
G
G
G
G
W A S T E
A R E A
ICIC
LOCATION PLAN 1:5000
TO KAZUNGULA
TO NGOMA
KASANE
VILLAGE
CHOBE RIVER
COLLEGE
BUS
RANK
RAC
OFFICES
MABELE
ROAD
CHILW
ERO
ROAD
THOLO
CRESECENT
PLATEAU
ROAD
A33
200 CONC BLOCK
WALLS BAGWASHED
ON BOTH SIDES
200x600 RC STRIP
FOUNDATION ON
COMPACTED BASE
TO SUIT
SMOOTH FLOATED
85 RC FLOOR SLAB
ON COMPACTED
EARTH FILL TO SUIT
19 PLY CEILING
FIXED TO U/SIDE
OF RAFTERS
CHROMADEK IBR
ROOF SHEETING
FIXED TO 25 STEEL
PULOINS FIXED @
1500 CS TO 150x50
STEEL RAFTERS
19 TIMBER
BARGEBOARD FIXED
TO RAFTER ENDS
MAX +3100
+2530
+2300
FFL +0200
NGL 0000
FOUND. -0900
SECTION A-A 1:50
FLOOR PLAN 1:50
RAINWATER GUTTER
TO SUIT
FRONT ELEVATION 1:50
SIDE ELEVATION 1:50
REAR ELEVATION 1:50
SIDE ELEVATION 1:50
DATE: PROJECT: DRAWING: SCALE:
DRAWN BY:CLIENT/APPLICANT:
PLOT: CHECKED:
APPROVAL PLANS
LOCATION PLAN 1:5000
SITE PLAN 1:75
STAFF UNIT
PLAN 1:50
SECTION A-A 1:50
ELEVATIONS 1:50
1:50/1:75/1:5000
G H
CLIENT ADDRESS:
P.O. BOX 368
KASANE
SUBMITTED:REVISIONS
PAGE #:
PAGE FORMAT: A1L
DRAWING NUMBER:
/
BM/SP/01
JULY 2014
2 BEDROOM HOUSE
1804, PLATEAU, KASANE
B MACDONALD
AREAS
SITE AREA = 450 sqm
MAIN HOUSE = 132 sqm (29.3%)
STAFF = 18 sqm (4%)
TOTAL = 150 sqm (33.3%)
                   
PLEASE NOTE
A SETBACK OF 1.5m HAS BEEN MAINTAINED FROM
ADJOINING BOUNDARIES - RESULTING IN THE
BUILDING HAVING A MAX HEIGHT OF 6m.
1.5m X 4 = 6m
A 5m SETBACK HAS BEEN MAINTAINED FROM THE
FRONT OF THE SITE.

More Related Content

What's hot

Elevations & sections-Architecture school 4th yr project 3
Elevations & sections-Architecture school 4th yr project  3Elevations & sections-Architecture school 4th yr project  3
Elevations & sections-Architecture school 4th yr project 3Aden Saitabau Kumary
 
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction DrawingBUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction DrawingAngeline KH
 
Restoration, extension and upgradation of protected structures
Restoration, extension and upgradation of protected structuresRestoration, extension and upgradation of protected structures
Restoration, extension and upgradation of protected structuresEdel Fox
 
Leisure Centre
Leisure CentreLeisure Centre
Leisure CentreEdel Fox
 
School Buildings of the Future
School Buildings of the FutureSchool Buildings of the Future
School Buildings of the FutureEdel Fox
 
Mill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANS
Mill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANSMill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANS
Mill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANSSin Byrne
 
Building Technology 2 P2
Building Technology 2 P2Building Technology 2 P2
Building Technology 2 P2XingYue0907
 
Penn Road Presentation compressed
Penn Road Presentation compressedPenn Road Presentation compressed
Penn Road Presentation compressedchris milczanowski
 
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONSMill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONSSin Byrne
 
ebrochure, listed manor house, Lincolnshire, easy reach of London, tranquil, ...
ebrochure, listed manor house, Lincolnshire, easy reach of London, tranquil, ...ebrochure, listed manor house, Lincolnshire, easy reach of London, tranquil, ...
ebrochure, listed manor house, Lincolnshire, easy reach of London, tranquil, ...Mike Finn
 
Rivergreen residences presentation(1)
Rivergreen residences presentation(1)Rivergreen residences presentation(1)
Rivergreen residences presentation(1)Jean Borromeo
 
Affordable House and lot For Sale Vivienne (Murang Bahay at LUpa)
Affordable House and lot For Sale Vivienne (Murang Bahay at LUpa)Affordable House and lot For Sale Vivienne (Murang Bahay at LUpa)
Affordable House and lot For Sale Vivienne (Murang Bahay at LUpa)Affordable House and Lot
 
Rivergreen Residences
Rivergreen ResidencesRivergreen Residences
Rivergreen ResidencesDivine Diaz
 
Whitefriars Presentation 2 A1
Whitefriars Presentation 2 A1Whitefriars Presentation 2 A1
Whitefriars Presentation 2 A1Vincent Doherty
 

What's hot (18)

Elevations & sections
Elevations & sectionsElevations & sections
Elevations & sections
 
Elevations & sections-Architecture school 4th yr project 3
Elevations & sections-Architecture school 4th yr project  3Elevations & sections-Architecture school 4th yr project  3
Elevations & sections-Architecture school 4th yr project 3
 
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction DrawingBUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
 
Floor plans
Floor plansFloor plans
Floor plans
 
Restoration, extension and upgradation of protected structures
Restoration, extension and upgradation of protected structuresRestoration, extension and upgradation of protected structures
Restoration, extension and upgradation of protected structures
 
T30 HOTEL CHINA
T30 HOTEL CHINAT30 HOTEL CHINA
T30 HOTEL CHINA
 
Leisure Centre
Leisure CentreLeisure Centre
Leisure Centre
 
School Buildings of the Future
School Buildings of the FutureSchool Buildings of the Future
School Buildings of the Future
 
Mill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANS
Mill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANSMill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANS
Mill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANS
 
Building Technology 2 P2
Building Technology 2 P2Building Technology 2 P2
Building Technology 2 P2
 
Penn Road Presentation compressed
Penn Road Presentation compressedPenn Road Presentation compressed
Penn Road Presentation compressed
 
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONSMill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
 
Sections and details
Sections and detailsSections and details
Sections and details
 
ebrochure, listed manor house, Lincolnshire, easy reach of London, tranquil, ...
ebrochure, listed manor house, Lincolnshire, easy reach of London, tranquil, ...ebrochure, listed manor house, Lincolnshire, easy reach of London, tranquil, ...
ebrochure, listed manor house, Lincolnshire, easy reach of London, tranquil, ...
 
Rivergreen residences presentation(1)
Rivergreen residences presentation(1)Rivergreen residences presentation(1)
Rivergreen residences presentation(1)
 
Affordable House and lot For Sale Vivienne (Murang Bahay at LUpa)
Affordable House and lot For Sale Vivienne (Murang Bahay at LUpa)Affordable House and lot For Sale Vivienne (Murang Bahay at LUpa)
Affordable House and lot For Sale Vivienne (Murang Bahay at LUpa)
 
Rivergreen Residences
Rivergreen ResidencesRivergreen Residences
Rivergreen Residences
 
Whitefriars Presentation 2 A1
Whitefriars Presentation 2 A1Whitefriars Presentation 2 A1
Whitefriars Presentation 2 A1
 

Similar to Brett Macdonald House

Kwena Camping Proposal
Kwena Camping ProposalKwena Camping Proposal
Kwena Camping ProposalGrant Hepburn
 
MARA - Design Development Portfolio
MARA - Design Development PortfolioMARA - Design Development Portfolio
MARA - Design Development PortfolioChinh Phan Duc
 
Kopane Courts Mixed Use
Kopane Courts Mixed UseKopane Courts Mixed Use
Kopane Courts Mixed UseGrant Hepburn
 
Chobe River College School Hall + Master Site Plan
Chobe River College School Hall + Master Site PlanChobe River College School Hall + Master Site Plan
Chobe River College School Hall + Master Site PlanGrant Hepburn
 
Amadu Residential Extension
Amadu Residential ExtensionAmadu Residential Extension
Amadu Residential ExtensionGrant Hepburn
 
Red Reedbuck Bush Lodge
Red Reedbuck Bush LodgeRed Reedbuck Bush Lodge
Red Reedbuck Bush LodgeGrant Hepburn
 
SJN Portfolio - Abbreviated 005 reduced
SJN Portfolio - Abbreviated 005 reducedSJN Portfolio - Abbreviated 005 reduced
SJN Portfolio - Abbreviated 005 reducedSteve Newman
 
MARK THORNTON EXHIBITION DRAWING
MARK THORNTON EXHIBITION DRAWINGMARK THORNTON EXHIBITION DRAWING
MARK THORNTON EXHIBITION DRAWINGMark Thornton
 
Build Something That Lasts
Build Something That LastsBuild Something That Lasts
Build Something That Lastslharback
 

Similar to Brett Macdonald House (13)

Lesoma Farm Houses
Lesoma Farm HousesLesoma Farm Houses
Lesoma Farm Houses
 
Kwena Camping Proposal
Kwena Camping ProposalKwena Camping Proposal
Kwena Camping Proposal
 
MARA - Design Development Portfolio
MARA - Design Development PortfolioMARA - Design Development Portfolio
MARA - Design Development Portfolio
 
Kopane Courts Mixed Use
Kopane Courts Mixed UseKopane Courts Mixed Use
Kopane Courts Mixed Use
 
Khupe River Lodge
Khupe River LodgeKhupe River Lodge
Khupe River Lodge
 
Chobe River College School Hall + Master Site Plan
Chobe River College School Hall + Master Site PlanChobe River College School Hall + Master Site Plan
Chobe River College School Hall + Master Site Plan
 
Lot 280 Bogdanich way
Lot 280 Bogdanich wayLot 280 Bogdanich way
Lot 280 Bogdanich way
 
Amadu Residential Extension
Amadu Residential ExtensionAmadu Residential Extension
Amadu Residential Extension
 
Red Reedbuck Bush Lodge
Red Reedbuck Bush LodgeRed Reedbuck Bush Lodge
Red Reedbuck Bush Lodge
 
SJN Portfolio - Abbreviated 005 reduced
SJN Portfolio - Abbreviated 005 reducedSJN Portfolio - Abbreviated 005 reduced
SJN Portfolio - Abbreviated 005 reduced
 
Bo q for shelter
Bo q  for shelterBo q  for shelter
Bo q for shelter
 
MARK THORNTON EXHIBITION DRAWING
MARK THORNTON EXHIBITION DRAWINGMARK THORNTON EXHIBITION DRAWING
MARK THORNTON EXHIBITION DRAWING
 
Build Something That Lasts
Build Something That LastsBuild Something That Lasts
Build Something That Lasts
 

Brett Macdonald House

  • 1. BEDROOM GROUND FLOOR PLAN 1:50 SECTION A-A 1:50 200 CONC BLOCK WALL WITH BRICKFORCE EVERY COURSE AND GIVEN A BAG WASH FINISH ON BOTH SIDES 800x350 REINFORCED CONC STRIP FOUNDATION @ MIN 1100 DEPTH BELOW NGL ON 150 COMPACTED STABILISED BASE LAYER TO SUIT 203x203 STEEL H-COLUMN TO SPEC 100 NON STRUCTURAL PREFAB INTERNAL WALLS built in cupboards built in cupboards CHROMADEK IBR ROOF SHEETING ON DPM FIXED TO 40x40 STEEL PURLOINS BOLTED TO STEEL BRACKETS BOLTED @ MAX 1000 CS TO 150x75 STEEL SQUARE SECTION TRUSSES FRAME BOLTED TO TOP OF H-COLUMNS 50x50 STEEL BALUSTRADE WITH TIMBER RAIL 19 TIMBER BARGEBOARD WITH DECORATIVE CUT TO SUIT 19 PLY CEILING FIXED WITH POSIDRIVE SCREWS TO U/SIDE OF TRUSS FRAME 22 T+G FLOORING FIXED TO 19 PLYBOARD FIXED TO 150x50 STEEL SQUARE SECTION JOISTS FIXED WITH STEEL BRACKETS @ 600 CS TO WALL AND IPE180 BEARER PRECAST LINTEL ALU. WINDOW FRAMES TO SPEC ALU. SLIDING DOORS TO SPEC 1000x1000x715 RC PAD FOUNDATIONS @ MIN DEPTH 1100 BELOW NGL ON MIN 150 COMPACTED BASE LAYER TO SUIT SMOOTH FLOATED 85 RC FLOORSLAB ON COMPACTED EARTH FILL TO SUIT TILES TO CLIENTS SPEC ON 85 RC FLOORSLAB ON COMPACTED EARTH FILL TO SUIT 203x203 STEEL H-COLUMN TO SPEC 200 CONC BLOCK FOOTING WALL ON 400X200 CONC STRIP FOUNDATION @ MIN 600 BELOW NGL 203x203 STEEL H-COLUMN TO SPEC FFL1 +0150 FFL2 +2785 MAX +6000 NGL 0000 FOUND. -1100 BASE -1250 RC RINGBEAM TO SPEC +2650 +5550 RAINWATER GUTTER TO SUIT FIRST FLOOR PLAN 1:50 FRONT ELEVATION 1:100 REAR ELEVATION 1:100 SIDE ELEVATION 1:100 SIDE ELEVATION 1:100 100 NON STRUCTURAL PREFAB DRY WALL FIXED IN PLACE WITH ALUMINIUM ANGLE IPE200 BOLTED TO 203 H-COLUMN WITH 4xM18 BOLTS 150x50 STEEL BOX SECTION FLOOR JOISTS FIXED @ 600 CS TO IPE200 WITH STEEL BRACKETS TO SUIT 19 PLYWOOD SCREWED TO JOISTS 22 T+G FLOORING NAILED TO PLYWOOD 203 H-COLUMN 1000x1000x715 REINFORCED CONCRETE FOUNDATION TO ENG. SPEC RC PILE Y12 REINFORCING TO ENG. SPEC 203 H-COLUMN WITH WELDED BASE PLATE TO SUIT 150 COMPACTED BASE LAYER TO SUIT 200 CONCRETE BLOCK WALL Y12 REINFORCING 85 SMOOTH FLOATED RC FLOOR SLAB WELL COMPACTED EARTH FILL TO SUIT 250 HARD COMPACTED BACKFILL BASE LAYER 150 COMPACTED BASE LAYER DATE: PROJECT: DRAWING: SCALE: DRAWN BY:CLIENT/APPLICANT: PLOT: CHECKED: 1:5/1:10/1:50/1:100 G H CLIENT ADDRESS: SUBMITTED:REVISIONS PAGE #: PAGE FORMAT: A1L DRAWING NUMBER: / HOUSE APPROVAL SET GROUND FLOOR PLAN 1:50 FIRST FLOOR PLAN 1:50 SECTION A-A 1:50 ELEVATIONS 1:100 FOUNDATION DETAILS 1:10 UPPER FLOOR DETAIL 1:5 BM/HP/01 JULY 2014 2 BEDROOM HOUSE 1804, PLATEAU, KASANE B MACDONALD UPPER FLOOR DETAIL 1:5 PAD FOUNDATION DETAIL 1:10 STRIP FOUNDTION DETAIL 1:10 AREAS SITE AREA = 450 sqm MAIN HOUSE = 132 sqm (29.3%) STAFF = 18 sqm (4%) TOTAL = 150 sqm (33.3%) PLEASE NOTE A SETBACK OF 1.5m HAS BEEN MAINTAINED FROM ADJOINING BOUNDARIES - RESULTING IN THE BUILDING HAVING A MAX HEIGHT OF 6m. 1.5m X 4 = 6m P.O. BOX 368 KASANE
  • 2. BEDROOM PARKING STAFF MAIN HOUSE EXIST. TREE GATE GARDEN COUNCIL SEWER CONNECT. MH STONE PATH PAVED REAR AREA SITE ACCESS SITE PLAN 1:75 PLOT 1805PLOT 1803 15m ROAD 1 3 0 0 w a l l 1800wall 1800wall 1 8 0 0 w a l l COUNCIL SEWER LINE RE RE G G G G W A S T E A R E A ICIC LOCATION PLAN 1:5000 TO KAZUNGULA TO NGOMA KASANE VILLAGE CHOBE RIVER COLLEGE BUS RANK RAC OFFICES MABELE ROAD CHILW ERO ROAD THOLO CRESECENT PLATEAU ROAD A33 200 CONC BLOCK WALLS BAGWASHED ON BOTH SIDES 200x600 RC STRIP FOUNDATION ON COMPACTED BASE TO SUIT SMOOTH FLOATED 85 RC FLOOR SLAB ON COMPACTED EARTH FILL TO SUIT 19 PLY CEILING FIXED TO U/SIDE OF RAFTERS CHROMADEK IBR ROOF SHEETING FIXED TO 25 STEEL PULOINS FIXED @ 1500 CS TO 150x50 STEEL RAFTERS 19 TIMBER BARGEBOARD FIXED TO RAFTER ENDS MAX +3100 +2530 +2300 FFL +0200 NGL 0000 FOUND. -0900 SECTION A-A 1:50 FLOOR PLAN 1:50 RAINWATER GUTTER TO SUIT FRONT ELEVATION 1:50 SIDE ELEVATION 1:50 REAR ELEVATION 1:50 SIDE ELEVATION 1:50 DATE: PROJECT: DRAWING: SCALE: DRAWN BY:CLIENT/APPLICANT: PLOT: CHECKED: APPROVAL PLANS LOCATION PLAN 1:5000 SITE PLAN 1:75 STAFF UNIT PLAN 1:50 SECTION A-A 1:50 ELEVATIONS 1:50 1:50/1:75/1:5000 G H CLIENT ADDRESS: P.O. BOX 368 KASANE SUBMITTED:REVISIONS PAGE #: PAGE FORMAT: A1L DRAWING NUMBER: / BM/SP/01 JULY 2014 2 BEDROOM HOUSE 1804, PLATEAU, KASANE B MACDONALD AREAS SITE AREA = 450 sqm MAIN HOUSE = 132 sqm (29.3%) STAFF = 18 sqm (4%) TOTAL = 150 sqm (33.3%)                     PLEASE NOTE A SETBACK OF 1.5m HAS BEEN MAINTAINED FROM ADJOINING BOUNDARIES - RESULTING IN THE BUILDING HAVING A MAX HEIGHT OF 6m. 1.5m X 4 = 6m A 5m SETBACK HAS BEEN MAINTAINED FROM THE FRONT OF THE SITE.