SlideShare a Scribd company logo
1 of 45
www.iid.com
1
Red Hill Bay Shallow Water Habitat
Restoration Project
presentation to ASCE-IV Branch
Graeme R. Donaldson
Program Manager Salton Sea Initiative
October 26, 2016
www.iid.com
2
Salton Sea Activities Overview
• Legislative/state agencies status and update
• Restoration proposals
 SSWIFT plan (development funded by SSA, but not adopted)
 Salton Sea Restoration & Renewable Energy Initiative (IID/IC)
 Salton Sea Management Program (SSMP)
• Near-term projects
 Red Hill Bay Project (RHB)
 Species Conservation Habitat (SCH)
 Salton Seawater Marine Habitat Pilot Project (SSMHP)
 IID Backbone Infrastructure Project development
www.iid.com
Salton Sea activities
 June, 2002 – Salton Sea legislation giving state responsibility for restoration under the QSA.
 November 18, 2014 – IID submits a Petition to the State Water Resources Control Board requesting it
exercise its continuing authority over the water transfers to ensure the state of California live up to its
Salton Sea restoration obligation in order to avoid devastating air quality and habitat impacts.
 March 18, 2015 – SWRCB holds Salton Sea workshop.
 May 2015 – Governor establishes Salton Sea Task Force that includes CNRA, CDWR, CDFW, CEC,
CARB, EPA and SWRCB.
 September 2015 – Governor appoints Bruce Wilcox assistant secretary for Salton Sea policy.
 October 9, 2015 – AB1095 (Garcia) signed into law by Governor Brown.
 The Salton Sea Restoration Act requires the Secretary of the CNRA in consultation and coordination with Salton Sea
Authority (SSA), to lead Salton Sea Restoration efforts.
 The Act will require on or before March 31, 2016 the CNRA to submit to legislature a list of “shovel ready” Salton
Sea restoration projects.
 January 4, 2016 – IID Board of Directors approve on a 5-0 vote the initiation of Backbone infrastructure
project, phase #1.
 January 5, 2016 – State Water Resources Control Board (SWRCB) held public workshop to receive
updates from (CNRA/CRRWQCB/CARB/CEC) & public comment re: Task Force actions.
 March 31, 2016 – AB1095 deadline for CNRA to submit to legislature a list of “shovel ready” Salton
Sea restoration projects. Most important will be the backbone infrastructure implementation.
3
www.iid.com
Salton Sea Task Force Agency Actions
• Begin immediate implementation and further development
of Salton Sea management plan
• Improve public outreach and local partnership
• Accelerate project implementation and delivery
• Meet a short-term (2016-2017) goal of 9,000-12,000 acres of
habitat creation and dust suppression projects at the sea
• Set medium-term (2018-2023) goal of 18,000-25,000 acres
of habitat creation and dust suppression projects at the sea
Ensure Oversight by Regulatory Agencies
• Consider opportunities for increasing renewable energy
development at and around the Salton Sea.
4
www.iid.com
SSWIFT Lake Concept (SSA)
5
www.iid.com
SSRREI proposal (IID/IC)
6
www.iid.com
7
www.iid.com
8
IID Grant Projects
www.iid.com
Aerial View of Red Hill Bay Restoration Site
9
The US Fish and Wildlife
Service, in partnership with
the Imperial Irrigation District,
intends to restore the habitat
values of the Red Hill Bay
with blended water from the
Salton Sea and nearby drain
water from the Alamo River.
Red Hill Bay is located on the
southeast shore of the Salton
Sea and is part of the Sonny
Bono Salton Sea National
Wildlife Refuge.
www.iid.com
Red Hill Bay Project (original configuration)
10
www.iid.com
www.iid.com
12
Overview
Red Hill Bay Shallow Water Habitat: USFWS partnered with IID
Project Description: up to 640 acre Shallow shorebird habitat created by
building low berms and mixing pumped Alamo River water & pumped Salton
Sea water to a desired salinity range of 25 to 40 ppt.
Project Summary:
 Budget - USFWS (FAP grant funding) $1,194,154
USFWS Refuge funding $ 332,760
IID in-kind (inc.land lease) $ 130,000
IID (WCB grant funding) $1,850,000
Total $3,506,914
 Permitting - All environmental permitting is complete.
 Schedule - April to July 2016: Contracted with firm DCE for project
engineering and design. Completed 7.29.16!
- August to November Construction RFP. Bid award.
- November 2016 to September 2017 project construction
- September 2017 Red Hill Bay habitat in operation.
www.iid.com
SALINITYTOLERANCES
Tilapia survival
Emergent vegetation
Mosquito control Mosquitoes
Survive
SUPPRESS MOST VEGETATION
Selenium Loading
OPTIMAL SURVIVAL AND REPRODUCTION
SCH OPERATIONS
Salinity in Ponds
0 ppt 10 20 30 40 50 60 70
Cardno/ENTRIX 2011
LESS RISKMORE RISK
MOSQUITO SUPPRESSION
Salinity Constraints and Thresholds
California Department of Water Resources
www.iid.com
14
www.iid.com
15
Project Overall
www.iid.com
16
Project Acreage
www.iid.com
17
Water Systems (Saline & River)
www.iid.com
18
Power supply (Saline & River)
www.iid.com
19
Salt Water Intake Floating Pump Station Cross Section Years 2016 to 2021
www.iid.com
20
Salt Water Intake Floating Pump Station Cross Section Years 2021 to 2036
www.iid.com
21
Comparable Jack-up saline pump barge
www.iid.com
22
Saline pump barge plan view
www.iid.com
23
Saline pump barge side elevation
www.iid.com
24
Saline pump
station wet well Fish screen
www.iid.com
25
Hidrostal submersible
pumps for both saline
and Alamo river waters
Pump characteristics:
1. “Fish Friendly”
2. Saline pump – 145 HP
River pump – 110 HP
Both pumps configured for
extreme arduous duty.
Double mechanical seals &
hermitically sealed & oil
filled motors.
3. Low speed application
which in the case of the Red
Hill Bay project both pumps
will be Vfd driven.
4. Saline pump design focus on
highly corrosive
environment and change of
pumping head over life of
project. Ease of impellor
change-out when needed.
5. River pump design focus on
highly erosive environment
due to sedimentation.
www.iid.com
26
Saline & River anticipated pump flows over the project life
www.iid.com
27
Alamo River Structure & Sedimentation Settling Basin
www.iid.com
28
Saline and Alamo river waters mixing station
www.iid.com
29
www.iid.com
30
www.iid.com
31
‘SSKGRA’
‘Red Hill Bay’
www.iid.com
32
www.iid.com
33
www.iid.com
34
www.iid.com
35
www.iid.com
The Source of the Problem
 Reduced Sea inflows due to Water Transfers
www.iid.com
The Related Problem
 Salinity rises until the Salton Sea is a Dead Sea
www.iid.com
38
Land
Owners
of Playa
to be
Exposed
Orange: IID
Green: Federal
(USBR)
These lands will be
exposed when the Sea
recedes to its lowest
forecast level or No
Action scenario
www.iid.com
39
Red Hill Bay-Garst
Rd. All 3 photos taken
within 30 minutes!
Red Hill Bay is Very
Emissive Playa
www.iid.com
40
www.iid.com
41
www.iid.com
www.iid.com
www.iid.com
44
www.iid.com
Questions?
Please contact Graeme Donaldson Cell # 760 457 6565,
e-mail GrDonaldson@iid.com

More Related Content

What's hot

Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and RestorationWoodglen Lake Dredging and Restoration
Woodglen Lake Dredging and RestorationFairfax County
 
Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012
Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012
Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012Recycling and Resource Management Division
 
Stone Edge Consulting Ltd. Corporate Resume
Stone Edge Consulting Ltd. Corporate ResumeStone Edge Consulting Ltd. Corporate Resume
Stone Edge Consulting Ltd. Corporate ResumeBarry Lunseth
 
GLCC-DEP Presentation to Derwood Community, Waste Delineation & Nature and Ex...
GLCC-DEP Presentation to Derwood Community, Waste Delineation & Nature and Ex...GLCC-DEP Presentation to Derwood Community, Waste Delineation & Nature and Ex...
GLCC-DEP Presentation to Derwood Community, Waste Delineation & Nature and Ex...Recycling and Resource Management Division
 
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...The Piedmont Environmental Council
 
A New Reservoir Project 30 Years in the Making - Tom Kula and Mike Rickman
A New Reservoir Project 30 Years in the Making - Tom Kula and Mike RickmanA New Reservoir Project 30 Years in the Making - Tom Kula and Mike Rickman
A New Reservoir Project 30 Years in the Making - Tom Kula and Mike RickmanTWCA
 
Flood Mitigation Project on Overly Drive
Flood Mitigation Project on Overly DriveFlood Mitigation Project on Overly Drive
Flood Mitigation Project on Overly DriveFairfax County
 
CBPA Regulations
CBPA RegulationsCBPA Regulations
CBPA RegulationsGary Hahn
 
Kaigah Hydropower Project
Kaigah Hydropower ProjectKaigah Hydropower Project
Kaigah Hydropower ProjectAli Sial
 
Northampton Landfill Waiver from DEP 06-23-2006
Northampton Landfill Waiver from DEP 06-23-2006Northampton Landfill Waiver from DEP 06-23-2006
Northampton Landfill Waiver from DEP 06-23-2006Adam Cohen
 
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public MeetingDraft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public MeetingFairfax County
 
Vol.9 appendices to environmental impact assessment and resettlement aspects
Vol.9  appendices to environmental impact assessment and resettlement aspectsVol.9  appendices to environmental impact assessment and resettlement aspects
Vol.9 appendices to environmental impact assessment and resettlement aspectszubeditufail
 
Autumnwood Park Pond Retrofit Project
Autumnwood Park Pond Retrofit ProjectAutumnwood Park Pond Retrofit Project
Autumnwood Park Pond Retrofit ProjectFairfax County
 
2016 FMA-presentation-Collaborateve FRR Projects (REV8)
2016 FMA-presentation-Collaborateve FRR Projects (REV8)2016 FMA-presentation-Collaborateve FRR Projects (REV8)
2016 FMA-presentation-Collaborateve FRR Projects (REV8)Jason Brabec, PE, CFM
 
Kissimmee Basin Modeling & Operations Study - Rama Rani
Kissimmee Basin Modeling & Operations Study - Rama RaniKissimmee Basin Modeling & Operations Study - Rama Rani
Kissimmee Basin Modeling & Operations Study - Rama RaniTWCA
 
Water infrastructure regulation in Italy: how does it work, does it work, and...
Water infrastructure regulation in Italy: how does it work, does it work, and...Water infrastructure regulation in Italy: how does it work, does it work, and...
Water infrastructure regulation in Italy: how does it work, does it work, and...Alberto Asquer
 

What's hot (20)

Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and RestorationWoodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration
 
Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012
Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012
Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012
 
Gude landfill remediation 161019
Gude landfill remediation 161019Gude landfill remediation 161019
Gude landfill remediation 161019
 
Gude Landfill Remediation - June 15, 2017
Gude Landfill Remediation - June 15, 2017Gude Landfill Remediation - June 15, 2017
Gude Landfill Remediation - June 15, 2017
 
Stone Edge Consulting Ltd. Corporate Resume
Stone Edge Consulting Ltd. Corporate ResumeStone Edge Consulting Ltd. Corporate Resume
Stone Edge Consulting Ltd. Corporate Resume
 
GLCC-DEP Presentation to Derwood Community, Waste Delineation & Nature and Ex...
GLCC-DEP Presentation to Derwood Community, Waste Delineation & Nature and Ex...GLCC-DEP Presentation to Derwood Community, Waste Delineation & Nature and Ex...
GLCC-DEP Presentation to Derwood Community, Waste Delineation & Nature and Ex...
 
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
 
A New Reservoir Project 30 Years in the Making - Tom Kula and Mike Rickman
A New Reservoir Project 30 Years in the Making - Tom Kula and Mike RickmanA New Reservoir Project 30 Years in the Making - Tom Kula and Mike Rickman
A New Reservoir Project 30 Years in the Making - Tom Kula and Mike Rickman
 
Gude Landfill Remediation update
Gude Landfill Remediation updateGude Landfill Remediation update
Gude Landfill Remediation update
 
Flood Mitigation Project on Overly Drive
Flood Mitigation Project on Overly DriveFlood Mitigation Project on Overly Drive
Flood Mitigation Project on Overly Drive
 
CBPA Regulations
CBPA RegulationsCBPA Regulations
CBPA Regulations
 
Kaigah Hydropower Project
Kaigah Hydropower ProjectKaigah Hydropower Project
Kaigah Hydropower Project
 
Northampton Landfill Waiver from DEP 06-23-2006
Northampton Landfill Waiver from DEP 06-23-2006Northampton Landfill Waiver from DEP 06-23-2006
Northampton Landfill Waiver from DEP 06-23-2006
 
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public MeetingDraft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
 
Vol.9 appendices to environmental impact assessment and resettlement aspects
Vol.9  appendices to environmental impact assessment and resettlement aspectsVol.9  appendices to environmental impact assessment and resettlement aspects
Vol.9 appendices to environmental impact assessment and resettlement aspects
 
Autumnwood Park Pond Retrofit Project
Autumnwood Park Pond Retrofit ProjectAutumnwood Park Pond Retrofit Project
Autumnwood Park Pond Retrofit Project
 
Ohio
OhioOhio
Ohio
 
2016 FMA-presentation-Collaborateve FRR Projects (REV8)
2016 FMA-presentation-Collaborateve FRR Projects (REV8)2016 FMA-presentation-Collaborateve FRR Projects (REV8)
2016 FMA-presentation-Collaborateve FRR Projects (REV8)
 
Kissimmee Basin Modeling & Operations Study - Rama Rani
Kissimmee Basin Modeling & Operations Study - Rama RaniKissimmee Basin Modeling & Operations Study - Rama Rani
Kissimmee Basin Modeling & Operations Study - Rama Rani
 
Water infrastructure regulation in Italy: how does it work, does it work, and...
Water infrastructure regulation in Italy: how does it work, does it work, and...Water infrastructure regulation in Italy: how does it work, does it work, and...
Water infrastructure regulation in Italy: how does it work, does it work, and...
 

Similar to IID ASCE_Red Hill Bay projecy-10.26a.16

IID Quechan Tribe_Salton Sea update-5.4.16
IID Quechan Tribe_Salton Sea update-5.4.16IID Quechan Tribe_Salton Sea update-5.4.16
IID Quechan Tribe_Salton Sea update-5.4.16Graeme Donaldson
 
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...Graeme Donaldson
 
Strategic Interventions of an RCE in Environmental Assessment, RCE Saskatchew...
Strategic Interventions of an RCE in Environmental Assessment, RCE Saskatchew...Strategic Interventions of an RCE in Environmental Assessment, RCE Saskatchew...
Strategic Interventions of an RCE in Environmental Assessment, RCE Saskatchew...Hanna Stahlberg
 
1 How to Overcome Public Perception Issues on Potable R.docx
1  How to Overcome Public Perception Issues on Potable R.docx1  How to Overcome Public Perception Issues on Potable R.docx
1 How to Overcome Public Perception Issues on Potable R.docxpoulterbarbara
 
1 How to Overcome Public Perception Issues on Potable R.docx
1  How to Overcome Public Perception Issues on Potable R.docx1  How to Overcome Public Perception Issues on Potable R.docx
1 How to Overcome Public Perception Issues on Potable R.docxjeremylockett77
 
Part 1 - Case Questions1. What is the name of the government init.pdf
Part 1 - Case Questions1. What is the name of the government init.pdfPart 1 - Case Questions1. What is the name of the government init.pdf
Part 1 - Case Questions1. What is the name of the government init.pdfamazing2001
 
LIDDLE - Project-Related Work Experience
LIDDLE - Project-Related Work ExperienceLIDDLE - Project-Related Work Experience
LIDDLE - Project-Related Work ExperienceGeorge Liddle
 
10. CaBA Conference 2017 United Utilities and CaBA - Glynn Haworth uu ca ba s...
10. CaBA Conference 2017 United Utilities and CaBA - Glynn Haworth uu ca ba s...10. CaBA Conference 2017 United Utilities and CaBA - Glynn Haworth uu ca ba s...
10. CaBA Conference 2017 United Utilities and CaBA - Glynn Haworth uu ca ba s...CaBASupport
 
#MP2014: Presentation by the Minister of Water Resources, Mrs. Sarah Ochekpa
#MP2014: Presentation by the Minister of Water Resources, Mrs. Sarah Ochekpa#MP2014: Presentation by the Minister of Water Resources, Mrs. Sarah Ochekpa
#MP2014: Presentation by the Minister of Water Resources, Mrs. Sarah OchekpaFMINigeria
 
Royal Lake Dredging and Restoration Project Update-June 2014
Royal Lake Dredging and Restoration Project Update-June 2014Royal Lake Dredging and Restoration Project Update-June 2014
Royal Lake Dredging and Restoration Project Update-June 2014Fairfax County
 
Citizens Vision - Cleveland OH Scranton Peninsula River Jewel
Citizens Vision - Cleveland OH Scranton Peninsula River JewelCitizens Vision - Cleveland OH Scranton Peninsula River Jewel
Citizens Vision - Cleveland OH Scranton Peninsula River JewelR Ray Saikus
 
Cadiz SCSSC June 2015 Presentation
Cadiz SCSSC June 2015 PresentationCadiz SCSSC June 2015 Presentation
Cadiz SCSSC June 2015 PresentationEquities.com Smith
 
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...Ekonnect Knowledge Foundation
 
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012Erin Vieira
 
9. Process based river restoration design in practice - Hamish Moir, CBEC Ec...
9.  Process based river restoration design in practice - Hamish Moir, CBEC Ec...9.  Process based river restoration design in practice - Hamish Moir, CBEC Ec...
9. Process based river restoration design in practice - Hamish Moir, CBEC Ec...Environmental Protection Agency, Ireland
 

Similar to IID ASCE_Red Hill Bay projecy-10.26a.16 (20)

IID Quechan Tribe_Salton Sea update-5.4.16
IID Quechan Tribe_Salton Sea update-5.4.16IID Quechan Tribe_Salton Sea update-5.4.16
IID Quechan Tribe_Salton Sea update-5.4.16
 
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
 
IID SSA_BBIP-2.18.16
IID SSA_BBIP-2.18.16IID SSA_BBIP-2.18.16
IID SSA_BBIP-2.18.16
 
Strategic Interventions of an RCE in Environmental Assessment, RCE Saskatchew...
Strategic Interventions of an RCE in Environmental Assessment, RCE Saskatchew...Strategic Interventions of an RCE in Environmental Assessment, RCE Saskatchew...
Strategic Interventions of an RCE in Environmental Assessment, RCE Saskatchew...
 
1 How to Overcome Public Perception Issues on Potable R.docx
1  How to Overcome Public Perception Issues on Potable R.docx1  How to Overcome Public Perception Issues on Potable R.docx
1 How to Overcome Public Perception Issues on Potable R.docx
 
1 How to Overcome Public Perception Issues on Potable R.docx
1  How to Overcome Public Perception Issues on Potable R.docx1  How to Overcome Public Perception Issues on Potable R.docx
1 How to Overcome Public Perception Issues on Potable R.docx
 
Part 1 - Case Questions1. What is the name of the government init.pdf
Part 1 - Case Questions1. What is the name of the government init.pdfPart 1 - Case Questions1. What is the name of the government init.pdf
Part 1 - Case Questions1. What is the name of the government init.pdf
 
LIDDLE - Project-Related Work Experience
LIDDLE - Project-Related Work ExperienceLIDDLE - Project-Related Work Experience
LIDDLE - Project-Related Work Experience
 
10. CaBA Conference 2017 United Utilities and CaBA - Glynn Haworth uu ca ba s...
10. CaBA Conference 2017 United Utilities and CaBA - Glynn Haworth uu ca ba s...10. CaBA Conference 2017 United Utilities and CaBA - Glynn Haworth uu ca ba s...
10. CaBA Conference 2017 United Utilities and CaBA - Glynn Haworth uu ca ba s...
 
Bay Delta Overview - March 28, 2013
Bay Delta Overview - March 28, 2013Bay Delta Overview - March 28, 2013
Bay Delta Overview - March 28, 2013
 
#MP2014: Presentation by the Minister of Water Resources, Mrs. Sarah Ochekpa
#MP2014: Presentation by the Minister of Water Resources, Mrs. Sarah Ochekpa#MP2014: Presentation by the Minister of Water Resources, Mrs. Sarah Ochekpa
#MP2014: Presentation by the Minister of Water Resources, Mrs. Sarah Ochekpa
 
Royal Lake Dredging and Restoration Project Update-June 2014
Royal Lake Dredging and Restoration Project Update-June 2014Royal Lake Dredging and Restoration Project Update-June 2014
Royal Lake Dredging and Restoration Project Update-June 2014
 
Citizens Vision - Cleveland OH Scranton Peninsula River Jewel
Citizens Vision - Cleveland OH Scranton Peninsula River JewelCitizens Vision - Cleveland OH Scranton Peninsula River Jewel
Citizens Vision - Cleveland OH Scranton Peninsula River Jewel
 
May 1 Water Talks - Halla Razak, P.E.
May 1 Water Talks - Halla Razak, P.E. May 1 Water Talks - Halla Razak, P.E.
May 1 Water Talks - Halla Razak, P.E.
 
Cadiz SCSSC June 2015 Presentation
Cadiz SCSSC June 2015 PresentationCadiz SCSSC June 2015 Presentation
Cadiz SCSSC June 2015 Presentation
 
Bay-Delta Activities Update - Aug. 25, 2011
Bay-Delta Activities Update - Aug. 25, 2011Bay-Delta Activities Update - Aug. 25, 2011
Bay-Delta Activities Update - Aug. 25, 2011
 
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
 
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
 
9. Process based river restoration design in practice - Hamish Moir, CBEC Ec...
9.  Process based river restoration design in practice - Hamish Moir, CBEC Ec...9.  Process based river restoration design in practice - Hamish Moir, CBEC Ec...
9. Process based river restoration design in practice - Hamish Moir, CBEC Ec...
 
SDS Whitepaper
SDS WhitepaperSDS Whitepaper
SDS Whitepaper
 

More from Graeme Donaldson

Colgreen North Shore presentation-1.8a.13
Colgreen North Shore presentation-1.8a.13Colgreen North Shore presentation-1.8a.13
Colgreen North Shore presentation-1.8a.13Graeme Donaldson
 
Colgreen North Shore presentation-7.26.12
Colgreen North Shore presentation-7.26.12Colgreen North Shore presentation-7.26.12
Colgreen North Shore presentation-7.26.12Graeme Donaldson
 
ASCE certificate of appreciation-10.26.16
ASCE certificate of appreciation-10.26.16ASCE certificate of appreciation-10.26.16
ASCE certificate of appreciation-10.26.16Graeme Donaldson
 
Colmac Energy secret to success
Colmac Energy secret to successColmac Energy secret to success
Colmac Energy secret to successGraeme Donaldson
 
Graeme Donaldson_Resume_2015a
Graeme Donaldson_Resume_2015aGraeme Donaldson_Resume_2015a
Graeme Donaldson_Resume_2015aGraeme Donaldson
 
Graeme R. Donaldson_Professional recommendations & references-8.26.13
Graeme R. Donaldson_Professional recommendations & references-8.26.13Graeme R. Donaldson_Professional recommendations & references-8.26.13
Graeme R. Donaldson_Professional recommendations & references-8.26.13Graeme Donaldson
 
Graeme Donaldson recommend letter from Siemens-10.30.13
Graeme Donaldson recommend letter from Siemens-10.30.13Graeme Donaldson recommend letter from Siemens-10.30.13
Graeme Donaldson recommend letter from Siemens-10.30.13Graeme Donaldson
 
The yellow capacity factor trend line does not lie
The yellow capacity factor trend line does not lieThe yellow capacity factor trend line does not lie
The yellow capacity factor trend line does not lieGraeme Donaldson
 

More from Graeme Donaldson (11)

USA BPPA presentation 07
USA BPPA presentation 07USA BPPA presentation 07
USA BPPA presentation 07
 
January 11 CN&N's
January 11 CN&N'sJanuary 11 CN&N's
January 11 CN&N's
 
Colgreen North Shore presentation-1.8a.13
Colgreen North Shore presentation-1.8a.13Colgreen North Shore presentation-1.8a.13
Colgreen North Shore presentation-1.8a.13
 
Colgreen North Shore presentation-7.26.12
Colgreen North Shore presentation-7.26.12Colgreen North Shore presentation-7.26.12
Colgreen North Shore presentation-7.26.12
 
ASCE certificate of appreciation-10.26.16
ASCE certificate of appreciation-10.26.16ASCE certificate of appreciation-10.26.16
ASCE certificate of appreciation-10.26.16
 
Colmac Energy secret to success
Colmac Energy secret to successColmac Energy secret to success
Colmac Energy secret to success
 
Graeme Donaldson_VG_2015a
Graeme Donaldson_VG_2015aGraeme Donaldson_VG_2015a
Graeme Donaldson_VG_2015a
 
Graeme Donaldson_Resume_2015a
Graeme Donaldson_Resume_2015aGraeme Donaldson_Resume_2015a
Graeme Donaldson_Resume_2015a
 
Graeme R. Donaldson_Professional recommendations & references-8.26.13
Graeme R. Donaldson_Professional recommendations & references-8.26.13Graeme R. Donaldson_Professional recommendations & references-8.26.13
Graeme R. Donaldson_Professional recommendations & references-8.26.13
 
Graeme Donaldson recommend letter from Siemens-10.30.13
Graeme Donaldson recommend letter from Siemens-10.30.13Graeme Donaldson recommend letter from Siemens-10.30.13
Graeme Donaldson recommend letter from Siemens-10.30.13
 
The yellow capacity factor trend line does not lie
The yellow capacity factor trend line does not lieThe yellow capacity factor trend line does not lie
The yellow capacity factor trend line does not lie
 

IID ASCE_Red Hill Bay projecy-10.26a.16

  • 1. www.iid.com 1 Red Hill Bay Shallow Water Habitat Restoration Project presentation to ASCE-IV Branch Graeme R. Donaldson Program Manager Salton Sea Initiative October 26, 2016
  • 2. www.iid.com 2 Salton Sea Activities Overview • Legislative/state agencies status and update • Restoration proposals  SSWIFT plan (development funded by SSA, but not adopted)  Salton Sea Restoration & Renewable Energy Initiative (IID/IC)  Salton Sea Management Program (SSMP) • Near-term projects  Red Hill Bay Project (RHB)  Species Conservation Habitat (SCH)  Salton Seawater Marine Habitat Pilot Project (SSMHP)  IID Backbone Infrastructure Project development
  • 3. www.iid.com Salton Sea activities  June, 2002 – Salton Sea legislation giving state responsibility for restoration under the QSA.  November 18, 2014 – IID submits a Petition to the State Water Resources Control Board requesting it exercise its continuing authority over the water transfers to ensure the state of California live up to its Salton Sea restoration obligation in order to avoid devastating air quality and habitat impacts.  March 18, 2015 – SWRCB holds Salton Sea workshop.  May 2015 – Governor establishes Salton Sea Task Force that includes CNRA, CDWR, CDFW, CEC, CARB, EPA and SWRCB.  September 2015 – Governor appoints Bruce Wilcox assistant secretary for Salton Sea policy.  October 9, 2015 – AB1095 (Garcia) signed into law by Governor Brown.  The Salton Sea Restoration Act requires the Secretary of the CNRA in consultation and coordination with Salton Sea Authority (SSA), to lead Salton Sea Restoration efforts.  The Act will require on or before March 31, 2016 the CNRA to submit to legislature a list of “shovel ready” Salton Sea restoration projects.  January 4, 2016 – IID Board of Directors approve on a 5-0 vote the initiation of Backbone infrastructure project, phase #1.  January 5, 2016 – State Water Resources Control Board (SWRCB) held public workshop to receive updates from (CNRA/CRRWQCB/CARB/CEC) & public comment re: Task Force actions.  March 31, 2016 – AB1095 deadline for CNRA to submit to legislature a list of “shovel ready” Salton Sea restoration projects. Most important will be the backbone infrastructure implementation. 3
  • 4. www.iid.com Salton Sea Task Force Agency Actions • Begin immediate implementation and further development of Salton Sea management plan • Improve public outreach and local partnership • Accelerate project implementation and delivery • Meet a short-term (2016-2017) goal of 9,000-12,000 acres of habitat creation and dust suppression projects at the sea • Set medium-term (2018-2023) goal of 18,000-25,000 acres of habitat creation and dust suppression projects at the sea Ensure Oversight by Regulatory Agencies • Consider opportunities for increasing renewable energy development at and around the Salton Sea. 4
  • 9. www.iid.com Aerial View of Red Hill Bay Restoration Site 9 The US Fish and Wildlife Service, in partnership with the Imperial Irrigation District, intends to restore the habitat values of the Red Hill Bay with blended water from the Salton Sea and nearby drain water from the Alamo River. Red Hill Bay is located on the southeast shore of the Salton Sea and is part of the Sonny Bono Salton Sea National Wildlife Refuge.
  • 10. www.iid.com Red Hill Bay Project (original configuration) 10
  • 12. www.iid.com 12 Overview Red Hill Bay Shallow Water Habitat: USFWS partnered with IID Project Description: up to 640 acre Shallow shorebird habitat created by building low berms and mixing pumped Alamo River water & pumped Salton Sea water to a desired salinity range of 25 to 40 ppt. Project Summary:  Budget - USFWS (FAP grant funding) $1,194,154 USFWS Refuge funding $ 332,760 IID in-kind (inc.land lease) $ 130,000 IID (WCB grant funding) $1,850,000 Total $3,506,914  Permitting - All environmental permitting is complete.  Schedule - April to July 2016: Contracted with firm DCE for project engineering and design. Completed 7.29.16! - August to November Construction RFP. Bid award. - November 2016 to September 2017 project construction - September 2017 Red Hill Bay habitat in operation.
  • 13. www.iid.com SALINITYTOLERANCES Tilapia survival Emergent vegetation Mosquito control Mosquitoes Survive SUPPRESS MOST VEGETATION Selenium Loading OPTIMAL SURVIVAL AND REPRODUCTION SCH OPERATIONS Salinity in Ponds 0 ppt 10 20 30 40 50 60 70 Cardno/ENTRIX 2011 LESS RISKMORE RISK MOSQUITO SUPPRESSION Salinity Constraints and Thresholds California Department of Water Resources
  • 19. www.iid.com 19 Salt Water Intake Floating Pump Station Cross Section Years 2016 to 2021
  • 20. www.iid.com 20 Salt Water Intake Floating Pump Station Cross Section Years 2021 to 2036
  • 25. www.iid.com 25 Hidrostal submersible pumps for both saline and Alamo river waters Pump characteristics: 1. “Fish Friendly” 2. Saline pump – 145 HP River pump – 110 HP Both pumps configured for extreme arduous duty. Double mechanical seals & hermitically sealed & oil filled motors. 3. Low speed application which in the case of the Red Hill Bay project both pumps will be Vfd driven. 4. Saline pump design focus on highly corrosive environment and change of pumping head over life of project. Ease of impellor change-out when needed. 5. River pump design focus on highly erosive environment due to sedimentation.
  • 26. www.iid.com 26 Saline & River anticipated pump flows over the project life
  • 27. www.iid.com 27 Alamo River Structure & Sedimentation Settling Basin
  • 28. www.iid.com 28 Saline and Alamo river waters mixing station
  • 36. www.iid.com The Source of the Problem  Reduced Sea inflows due to Water Transfers
  • 37. www.iid.com The Related Problem  Salinity rises until the Salton Sea is a Dead Sea
  • 38. www.iid.com 38 Land Owners of Playa to be Exposed Orange: IID Green: Federal (USBR) These lands will be exposed when the Sea recedes to its lowest forecast level or No Action scenario
  • 39. www.iid.com 39 Red Hill Bay-Garst Rd. All 3 photos taken within 30 minutes! Red Hill Bay is Very Emissive Playa
  • 45. www.iid.com Questions? Please contact Graeme Donaldson Cell # 760 457 6565, e-mail GrDonaldson@iid.com

Editor's Notes

  1. Key Operation Criteria Salinity of water inside ponds Volume of water inside ponds Residence time of water… Pond depth Fish species stocked in the pond (tilapia, desert pupfish) Physical cover elements