M5 PIFFS ELM OVERBRIDGE STRUCTURAL REPAIR
OVERVIEW
Piffs Elm is located on the M5 at junction 10. The works are to replace the existing foundation will be
replaced by piled foundations placed between the existing spread footings. 6 no. 900mm diameter bored,
cast in-situ concrete piles are to be installed on the centreline of each pier. The piles will be connected to
each other and to the existing columns by a new 1500mm wide by 1500 deep continuous pile cap to each
pier. Hydro-demolition of the columns below ground will leave existing columns reinforcement exposed,
which will be cast into the new pile cap. The existing foundation will remain in the ground, but will be
disconnected from the new foundations and will become redundant.
M5 PIFFS ELM STRUCTURAL REPAIR
M5 PIFFS ELM STRUCTURAL REPAIR
M5 PIFFS ELM STRUCTURAL REPAIR
M5 PIFFS ELM STRUCTURAL REPAIR
M5 PIFFS ELM STRUCTURAL REPAIR
M5 PIFFS ELM STRUCTURAL REPAIR
M5 PIFFS ELM STRUCTURAL REPAIR
M5 PIFFS ELM STRUCTURAL REPAIR
M5 PIFFS ELM STRUCTURAL REPAIR
M5 PIFFS ELM STRUCTURAL REPAIR
M5 PIFFS ELM STRUCTURAL REPAIR
M5 PIFFS ELM STRUCTURAL REPAIR
M5 PIFFS ELM STRUCTURAL REPAIR
M5 PIFFS ELM STRUCTURAL REPAIR
M5 PIFFS ELM STRUCTURAL REPAIR
M5 PIFFS ELM STRUCTURAL REPAIR
M5 PIFFS ELM STRUCTURAL REPAIR
M5 PIFFS ELM STRUCTURAL REPAIR
M5 PIFFS ELM STRUCTURAL REPAIR
M5 PIFFS ELM STRUCTURAL REPAIR
M5 PIFFS ELM STRUCTURAL REPAIR
M5 PIFFS ELM STRUCTURAL REPAIR

More Related Content

Viewers also liked

Conscious vs mechanical evolution: transcending biocentrist social ontologies
Conscious vs mechanical evolution: transcending biocentrist social ontologies Conscious vs mechanical evolution: transcending biocentrist social ontologies
Conscious vs mechanical evolution: transcending biocentrist social ontologies
Luke Barnesmoore o
 

Viewers also liked (10)

Conscious vs mechanical evolution: transcending biocentrist social ontologies
Conscious vs mechanical evolution: transcending biocentrist social ontologies Conscious vs mechanical evolution: transcending biocentrist social ontologies
Conscious vs mechanical evolution: transcending biocentrist social ontologies
 
Midterm call
Midterm callMidterm call
Midterm call
 
Foucault’s Symbolic Narrative Hypothesis
Foucault’s Symbolic Narrative HypothesisFoucault’s Symbolic Narrative Hypothesis
Foucault’s Symbolic Narrative Hypothesis
 
Tipos de corrosión
Tipos de corrosiónTipos de corrosión
Tipos de corrosión
 
Suzuki Piano School Volume 5 New International Edition
Suzuki Piano School Volume 5 New International EditionSuzuki Piano School Volume 5 New International Edition
Suzuki Piano School Volume 5 New International Edition
 
Suzuki Piano School Volume 2 New International Edition
Suzuki Piano School Volume 2 New International EditionSuzuki Piano School Volume 2 New International Edition
Suzuki Piano School Volume 2 New International Edition
 
Suzuki Piano School Volume 7 New International Edition
Suzuki Piano School Volume 7 New International EditionSuzuki Piano School Volume 7 New International Edition
Suzuki Piano School Volume 7 New International Edition
 
Suzuki Piano School Volume 4 New International Edition
Suzuki Piano School Volume 4 New International EditionSuzuki Piano School Volume 4 New International Edition
Suzuki Piano School Volume 4 New International Edition
 
Suzuki Piano School Volume 3 New International Edition
Suzuki Piano School Volume 3 New International EditionSuzuki Piano School Volume 3 New International Edition
Suzuki Piano School Volume 3 New International Edition
 
Suzuki Piano School Volume 1 New International Edition
Suzuki Piano School Volume 1 New International EditionSuzuki Piano School Volume 1 New International Edition
Suzuki Piano School Volume 1 New International Edition
 

M5 PIFFS ELM STRUCTURAL REPAIR

  • 1. M5 PIFFS ELM OVERBRIDGE STRUCTURAL REPAIR OVERVIEW Piffs Elm is located on the M5 at junction 10. The works are to replace the existing foundation will be replaced by piled foundations placed between the existing spread footings. 6 no. 900mm diameter bored, cast in-situ concrete piles are to be installed on the centreline of each pier. The piles will be connected to each other and to the existing columns by a new 1500mm wide by 1500 deep continuous pile cap to each pier. Hydro-demolition of the columns below ground will leave existing columns reinforcement exposed, which will be cast into the new pile cap. The existing foundation will remain in the ground, but will be disconnected from the new foundations and will become redundant.