SlideShare a Scribd company logo
1 of 4
Download to read offline
Foundation for Economic Freedom, Inc. 
BOARD OF ADVISERS: 
Gerardo Sicat 
Cesar A. Virata 
BOARD OF TRUSTEES: 
Roberto De Ocampo 
Chairman 
Romeo Bernardo 
Vice-Chairman 
Calixto Chikiamco 
President 
Ernest Leung 
Treasurer 
Atty. Ricardo Balatbat III 
Corporate Secretary 
Anthony Abad 
Art Corpuz 
Eduardo Gana 
Felipe Medalla 
Vaughn Montes 
Simon Paterno 
Gloria Tan-Climaco 
Francis Varela 
Atty. Ricardo Balatbat III 
Executive Director 
105 Philippine Social Science Center (PSSC) Commonwealth Ave., Diliman, Quezon City 
Telefax: (632) 4532375 (Main Office) Tel No.: (632) 8939602 (Accounting) 
Website: www.fef.org.ph Email: fefphilippines@gmail.com / fef@fef.org.ph 
FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS: 
Avoid Short-Term Solutions With A Long-term Cost Burden on Consumers 
The Energy Secretary has raised the alarm on an impending electric power shortage in the Luzon grid in the summer of 2015, projecting a reserve deficiency of 400-500 MW in the March-May period, translating into two or three hour rotating outage during that period. 
The Secretary has proposed, and the President has written a letter asking Congress to pass a ―Joint resolution authorizing the President to establish additional generating capacity.‖ The President’s letter said: ―The DoE reports and projects a critical electricity situation in the summer of 2015 arising from among others, the expected effect of El Niño phenomenon, the 2015 Malampaya Turnaround, increase and continuing outages of power plants and anticipated delays in the commissioning of committed power projects.‖ 
Additionally, in various pronouncements, the Secretary has proposed the additional contracting of 450 MW of solar power, and 200-300 MW of wind. 
The Foundation for Economic Freedom cautions that the actions taken by government to respond to this possible short term shortage and not load the system—and the consuming public-- with expensive quick fixes that will burden us for a long time. 
―Short-termism‖ and narrow view of key stakeholders led by the authorities, underlie in most part this temporary thinness of reserves and possible outages in the summer months. Such include: 
1. ―not in my backyard‖ environmental groups and local government units opposition to new generation capacity, with no viable options presented and failure of government to respond with resolve; 
2. politicized/poor management and resulting financial weakness of rural coops that have no capacity to contract but nonetheless avail of power; 
3. under-contracting and lack of transparency of needed ancillary reserve capacity and weak enforcement by the regulator; 
4. delays in rolling out of open access; and 
5. government intervention in the WESM over the years that have distorted price signals, and dampened investments and restricted supply.
Foundation for Economic Freedom, Inc. 
More recently, there seems to be inconsistent and incoherent policies where government is proposing every expensive solution to raise electricity supply, even as its regulatory arm is seen as flip-flopping on market pricing rules that make some of the existing peaking plants uneconomical to run, which thus limits supply. 
In particular, we caution against quick fixes with lasting cost consequences that some participants in the power industry, including government, have put forward: 
1. Government contracting for costly emergency power way beyond the expected three (3) summer months per year over two years when thin reserves are foreseen. The supply situation in the summer of 2015 will have the added burden of having to cope with the non-availability of Malampaya gas during the critical period. But a short term problem requires a short term solution, and any government contracting should be limited just to the period where they hope to guard against blackouts. If the problem is projected to persist, then other long term solutions must be found. It is premature for government to consider acquiring ―strategic‖ generation assets when it has not even completed the privatization process and still owns, among others, the CBK plants and Malaya. The argument is made that outright purchase is not much more expensive than leasing for two to three years, because of saving demobilization costs, but government may recall how little they received when they sold assets like the Limay and Dingle plants. How strategic are plants which cost 13-15 pesos/kWh to operate? 
2. Costly take-or-pay 20 year contracts for intermittent unreliable power from solar (an additional 450 MW) and wind ( an additional 300 MW) at high Feed in Tariff (FIT) Rates of P9.68 per kWh and P8.53 per kWh. These are two (2) year old rates in a segment of industry where costs change very quickly, being touted as incentives to solve the tight power supply instead of the blatant rent seeking they really are. At these rates and volumes, the incremental cost to the public by way of a higher power bill amounts to almost P5 billion annually. This will add at least another 7 centavos per kWh to the 4 centavos initially applied for to cover the cost differential. 
The case on how these unreliable power sources address peak demand shortages in the system when supply depends on when the whims of sun and wind is for solar, at best tenuous, and for wind, non- existent. The RE proponents trying to take advantage of this temporary supply situation to lock in their 20- year windfalls have said wind at P8.53 is cheaper than P13/kWh diesel. What they have not said is you pay the P13 to run the diesels only when needed while you pay P8.53 whenever the wind produces electricity whether you need it or not, and there are no guarantees they will operate when you actually need them, so you will still need the diesels for those times. 
These quick fixes will ultimately hurt not only the industrial sector but the household sector in particular. Instead, we fully support the following initiatives already being implemented in a partnership between government and the private sectors to address the immediate shortages: 
1. Interruptible Load Program (ILP). The Interruptible Load Program was initially proposed and applied for by Visayan Electric Co. (VECO) during a period when rotating blackouts were common in the Visayas Grid. The concept is to compensate customers with self-generation facilities to run their gensets for their own use, thus reducing overall demand. This reduced demand allows the utility to allocate the limited grid supply among its other customers, averting or reducing blackouts. To their credit the ERC approved this not just for the VECO application but as a general scheme available to all utilities and it has been successfully applied in Mindanao as
well. 
2. Lifting of the secondary price cap. The secondary price cap was originally proposed by the generators themselves, as a way of preventing extended periods of high prices if tight supply persists. The principle though was that the cap would be sufficient to cover the marginal costs of peaking plants so they could continue to operate within the market mechanisms. Instead the ERC instituted a cap of P6.245/kWh, which does not cover the costs of even the most efficient bunker fired plant, let alone the diesels. If we want to encourage the ILP participants to supply power to the grid beyond their own self-generation, then their costs, now set at around P14, must fall within the cap. Instead the ERC would have these market participants apply separately for cost recoveries above the cap. This process takes a long time and defeats the purpose of a functional market. A real market is self-financing, and not dependent on extraneous cost recoveries. 
3. Fuller utilization of government generation assets especially Malaya. This plant was available during the price spikes in November and December 2013, when Malampaya was also under maintenance, yet was underutilized. There were no blackouts then but greater use of the plant would have reduced the price spikes and avoided many of the knee-jerk reactions that now threaten the industry. There appears doubt as to whether repairs can be completed in time. Why this was not addressed earlier again brings to question the wisdom of giving government ―strategic‖ generation assets. 
4. Better scheduling of maintenance of plants. Because planned outage schedules are kept confidential, generators are not able to optimize their scheduling (as only the grid operator knows the planned outage schedules, it implies that they are not doing a good job). 
5. Demand side bidding in the WESM. 
6. Ancillary Services Procurement. Reserves are not only needed to balance demand and supply at every given moment through regulating reserves, but other reserves provide the first line of defense against blackouts caused by unplanned or forced outages. Unfortunately the procurement of reserves by the System Operator has been inadequate at best, and insufficient reserves only make the system more vulnerable to blackouts. In addition, the System Operator determining the level of Ancillary Services is self-serving as they are penalized or rewarded by the ERC on AS availability. 
7. Energy Conservation. In the short term, it may be difficult to add to supply quickly, but demand is within every Filipino’s ability to control. The consumer controls the light switches. Reducing consumption is the alternative to increasing supply, and has the added benefit of saving the consumer money. Cutting out unnecessary use of electricity, using more energy efficient lights and appliances, shifting consumption off-peak – these all help. But economics drives behavior. Prices have to reflect the costs. When gasoline is cheap, SUVs proliferate, but fuel-efficient cars only sell well when gasoline is scarce or prices are high. Same with everything else, electricity included. We 
Foundation for Economic Freedom, Inc.
have to remind every Meralco customer that when Malampaya is out, even when there is sufficient supply, prices will go up because the substitute fuel used in place of natural gas is more expensive. 
Addressing more fundamentally the remaining constraints that impede power supply and prevent lower prices: 
1. Roadblocks: Government needs to be more active in encouraging generation and supporting private developers in every way. Case in point is the 140 plus permits that are needed to be secured in constructing and operating a power plant. The appetite is there but developers are running into road blocks with ―not in my backyard‖ advocates and unsupportive government units. (e.g. The 600 MW RP Energy project in Subic is at least two years delayed, now pending judicial resolution in the writ of Kalikasan). 
2. Open Access: Continue to lower the threshold for Open Access. This will encourage more generation as they can look to end users as a competitive market, and thus by-pass distribution utilities, the monopoly segment of the industry. The power of choice, one of the key objectives of the industry restructuring, works both for the consumer as well as the supplier. 
3. Guarantee Unbankable Coops: The National Electrification Administration (NEA) needs to provide guarantees with automatic features, like a bond or L/C that can be drawn to make some rural cooperatives credit worthy. This will need to go hand in hand with NEA exacting financial and management disciplines on erring co-ops and stronger political will to cut-off recalcitrants who feed off the system that they are effectively not a market participant of. Corollary to this, EC’s should also be strengthened institutionally enabling capacity building (e.g. financial, technical, good governance) programs. 
4. Smarter and Firmer Regulation: The DoE and the ERC have to manage the industry and market in a way that encourages supply responses from generators, the competitive segment of the market. And be proactive in ensuring the monopoly leg, transmission under the National Grid Corporation fully contracts what the system requires. The establishment of a reserve market has long been delayed. 
In requesting for ―emergency power‖ the Secretary of Energy said the more grievous sin is not to do anything. We disagree. We think the greater sin is to do something costly but ineffective, or worse, harmful. While leaving unattended fundamental long term constraints. 
Release Date: October 7, 2014 
Foundation for Economic Freedom, Inc. 
For more information, please check our website: www.fef.org.ph , or contact the following: 
Ethel Briones, Program Officer – ebbriones@fef.org.ph /+63 2 453 2375 
Ranna Pintor, Program Officer – rannapintor@yahoo.com / +63 2 453 2375

More Related Content

What's hot

REC Mechanism -A overview
REC Mechanism -A overview REC Mechanism -A overview
REC Mechanism -A overview Ashish Verma
 
Energy crisis in Pakistan and its management
Energy crisis in Pakistan and its managementEnergy crisis in Pakistan and its management
Energy crisis in Pakistan and its managementpakistanvisionaryforum
 
Captive power Policy
Captive power PolicyCaptive power Policy
Captive power PolicyPRIYANK JAIN
 
Energy comsats 12_oct13_2
Energy comsats 12_oct13_2Energy comsats 12_oct13_2
Energy comsats 12_oct13_2Faizan Shabbir
 
Flora Flygt: Clean Power Plan Impact on Transmisssion Planning, Development a...
Flora Flygt: Clean Power Plan Impact on Transmisssion Planning, Development a...Flora Flygt: Clean Power Plan Impact on Transmisssion Planning, Development a...
Flora Flygt: Clean Power Plan Impact on Transmisssion Planning, Development a...EnergyTech2015
 
Indian Captive Power Producers Association - Rajiv Agrawal, Secretary, ICPPA
Indian Captive Power Producers Association - Rajiv Agrawal, Secretary, ICPPAIndian Captive Power Producers Association - Rajiv Agrawal, Secretary, ICPPA
Indian Captive Power Producers Association - Rajiv Agrawal, Secretary, ICPPAIPPAI
 
Andrew Ritch: Interruption in the Utility Industry
Andrew Ritch: Interruption in the Utility IndustryAndrew Ritch: Interruption in the Utility Industry
Andrew Ritch: Interruption in the Utility IndustryEnergyTech2015
 
ScottMadden's 51st State Roadmap
ScottMadden's 51st State RoadmapScottMadden's 51st State Roadmap
ScottMadden's 51st State RoadmapScottMadden, Inc.
 
Day-3, Mr. Rajiv Yadav
Day-3, Mr. Rajiv YadavDay-3, Mr. Rajiv Yadav
Day-3, Mr. Rajiv YadavIPPAI
 
Anurandha Annaswamy: Computation Model of the Nexus Between Natural Gas and E...
Anurandha Annaswamy: Computation Model of the Nexus Between Natural Gas and E...Anurandha Annaswamy: Computation Model of the Nexus Between Natural Gas and E...
Anurandha Annaswamy: Computation Model of the Nexus Between Natural Gas and E...EnergyTech2015
 
Captive Power Plants
Captive Power PlantsCaptive Power Plants
Captive Power PlantsKoos Smit
 
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNADay-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNAIPPAI
 
Renewable Energy Act of 2008: Hits and Misses for the Philippine Geothermal I...
Renewable Energy Act of 2008: Hits and Misses for the Philippine Geothermal I...Renewable Energy Act of 2008: Hits and Misses for the Philippine Geothermal I...
Renewable Energy Act of 2008: Hits and Misses for the Philippine Geothermal I...Fernando Penarroyo
 
Implementing Net Metering in the Developing World
Implementing Net Metering in the Developing WorldImplementing Net Metering in the Developing World
Implementing Net Metering in the Developing WorldRuchir Punjabi
 
National Energy Plan
National  Energy  PlanNational  Energy  Plan
National Energy PlanCGC CGC
 

What's hot (20)

REC Mechanism -A overview
REC Mechanism -A overview REC Mechanism -A overview
REC Mechanism -A overview
 
Energy crisis in Pakistan and its management
Energy crisis in Pakistan and its managementEnergy crisis in Pakistan and its management
Energy crisis in Pakistan and its management
 
Captive power Policy
Captive power PolicyCaptive power Policy
Captive power Policy
 
Energy comsats 12_oct13_2
Energy comsats 12_oct13_2Energy comsats 12_oct13_2
Energy comsats 12_oct13_2
 
Wind Energy Available for Sale in Tamil Nadu
Wind Energy Available for Sale in Tamil NaduWind Energy Available for Sale in Tamil Nadu
Wind Energy Available for Sale in Tamil Nadu
 
Flora Flygt: Clean Power Plan Impact on Transmisssion Planning, Development a...
Flora Flygt: Clean Power Plan Impact on Transmisssion Planning, Development a...Flora Flygt: Clean Power Plan Impact on Transmisssion Planning, Development a...
Flora Flygt: Clean Power Plan Impact on Transmisssion Planning, Development a...
 
Indian Captive Power Producers Association - Rajiv Agrawal, Secretary, ICPPA
Indian Captive Power Producers Association - Rajiv Agrawal, Secretary, ICPPAIndian Captive Power Producers Association - Rajiv Agrawal, Secretary, ICPPA
Indian Captive Power Producers Association - Rajiv Agrawal, Secretary, ICPPA
 
Agham Feed-in Tariff system Briefer
Agham Feed-in Tariff system BrieferAgham Feed-in Tariff system Briefer
Agham Feed-in Tariff system Briefer
 
Andrew Ritch: Interruption in the Utility Industry
Andrew Ritch: Interruption in the Utility IndustryAndrew Ritch: Interruption in the Utility Industry
Andrew Ritch: Interruption in the Utility Industry
 
ScottMadden's 51st State Roadmap
ScottMadden's 51st State RoadmapScottMadden's 51st State Roadmap
ScottMadden's 51st State Roadmap
 
Day-3, Mr. Rajiv Yadav
Day-3, Mr. Rajiv YadavDay-3, Mr. Rajiv Yadav
Day-3, Mr. Rajiv Yadav
 
Anurandha Annaswamy: Computation Model of the Nexus Between Natural Gas and E...
Anurandha Annaswamy: Computation Model of the Nexus Between Natural Gas and E...Anurandha Annaswamy: Computation Model of the Nexus Between Natural Gas and E...
Anurandha Annaswamy: Computation Model of the Nexus Between Natural Gas and E...
 
Economy and Energy Security for Pakistan - What lies ahead
Economy and Energy Security for Pakistan -What lies aheadEconomy and Energy Security for Pakistan -What lies ahead
Economy and Energy Security for Pakistan - What lies ahead
 
Captive Power Plants
Captive Power PlantsCaptive Power Plants
Captive Power Plants
 
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNADay-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
 
Pcci energy committe twg on power
Pcci energy committe   twg on powerPcci energy committe   twg on power
Pcci energy committe twg on power
 
Economics of electric service
Economics of electric service Economics of electric service
Economics of electric service
 
Renewable Energy Act of 2008: Hits and Misses for the Philippine Geothermal I...
Renewable Energy Act of 2008: Hits and Misses for the Philippine Geothermal I...Renewable Energy Act of 2008: Hits and Misses for the Philippine Geothermal I...
Renewable Energy Act of 2008: Hits and Misses for the Philippine Geothermal I...
 
Implementing Net Metering in the Developing World
Implementing Net Metering in the Developing WorldImplementing Net Metering in the Developing World
Implementing Net Metering in the Developing World
 
National Energy Plan
National  Energy  PlanNational  Energy  Plan
National Energy Plan
 

Similar to FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS: Avoid Short-Term Solutions With A Long-term Cost Burden on Consumers

Recharging the-power-sector
Recharging the-power-sectorRecharging the-power-sector
Recharging the-power-sectorL&C
 
Power Responsive DSR Conference 18th June - Summary Paper
Power Responsive DSR Conference 18th June - Summary PaperPower Responsive DSR Conference 18th June - Summary Paper
Power Responsive DSR Conference 18th June - Summary PaperPower Responsive
 
Renewable Energy Act of 2008 - Seven Years After
Renewable Energy Act of 2008 - Seven Years AfterRenewable Energy Act of 2008 - Seven Years After
Renewable Energy Act of 2008 - Seven Years AfterFernando Penarroyo
 
Regulatory Meeting - Rome 2003
Regulatory Meeting  - Rome 2003Regulatory Meeting  - Rome 2003
Regulatory Meeting - Rome 2003lmaurer
 
Battery storage: The next disruptive technology in the power sector
Battery storage: The next disruptive technology in the power sectorBattery storage: The next disruptive technology in the power sector
Battery storage: The next disruptive technology in the power sectorCluster TWEED
 
Energy Storage - Is the Time Ripe for India-As Published
Energy Storage - Is the Time Ripe for India-As PublishedEnergy Storage - Is the Time Ripe for India-As Published
Energy Storage - Is the Time Ripe for India-As Publishedjrosh
 
Recharging the-power-sector
Recharging the-power-sectorRecharging the-power-sector
Recharging the-power-sectorSmera Chawla
 
EWEB Electricity - Applied Reinventing Fire Sustainable Development Theories_...
EWEB Electricity - Applied Reinventing Fire Sustainable Development Theories_...EWEB Electricity - Applied Reinventing Fire Sustainable Development Theories_...
EWEB Electricity - Applied Reinventing Fire Sustainable Development Theories_...Benjamin Farrell
 
Eskom MYPD 3Selective Reopener presentation
Eskom MYPD 3Selective Reopener presentationEskom MYPD 3Selective Reopener presentation
Eskom MYPD 3Selective Reopener presentationMatthew Le Cordeur
 
Class 3 the power sector in india
Class 3   the power sector in indiaClass 3   the power sector in india
Class 3 the power sector in indiarajranjang
 
Electric energy storage: preparing for the revolution
Electric energy storage: preparing for the revolutionElectric energy storage: preparing for the revolution
Electric energy storage: preparing for the revolutionWhite & Case
 
Renewable Energy Hydrosector India
Renewable Energy Hydrosector IndiaRenewable Energy Hydrosector India
Renewable Energy Hydrosector IndiaHIMADRI BANERJI
 
Capgemini ses - smart grid operational services - leveraging technology to ...
Capgemini   ses - smart grid operational services - leveraging technology to ...Capgemini   ses - smart grid operational services - leveraging technology to ...
Capgemini ses - smart grid operational services - leveraging technology to ...Gord Reynolds
 
Icue 2007 Presentation Mutshidza
Icue 2007 Presentation  MutshidzaIcue 2007 Presentation  Mutshidza
Icue 2007 Presentation MutshidzaNndwamato
 
Privatization and deregulation
Privatization and deregulationPrivatization and deregulation
Privatization and deregulationNabeelAhmed258
 
Power generation and supply industry in india an economic analysis of the m...
Power generation and supply industry in india   an economic analysis of the m...Power generation and supply industry in india   an economic analysis of the m...
Power generation and supply industry in india an economic analysis of the m...Harsh Shah
 
Solar PV Curtailment in Changing Grid and Technological Contexts
Solar PV Curtailment in Changing Grid and Technological ContextsSolar PV Curtailment in Changing Grid and Technological Contexts
Solar PV Curtailment in Changing Grid and Technological ContextsPower System Operation
 

Similar to FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS: Avoid Short-Term Solutions With A Long-term Cost Burden on Consumers (20)

Reaction to presentations on PH Energy Outlook
Reaction to presentations on PH Energy OutlookReaction to presentations on PH Energy Outlook
Reaction to presentations on PH Energy Outlook
 
Recharging the-power-sector
Recharging the-power-sectorRecharging the-power-sector
Recharging the-power-sector
 
Power Responsive DSR Conference 18th June - Summary Paper
Power Responsive DSR Conference 18th June - Summary PaperPower Responsive DSR Conference 18th June - Summary Paper
Power Responsive DSR Conference 18th June - Summary Paper
 
Renewable Energy Act of 2008 - Seven Years After
Renewable Energy Act of 2008 - Seven Years AfterRenewable Energy Act of 2008 - Seven Years After
Renewable Energy Act of 2008 - Seven Years After
 
Regulatory Meeting - Rome 2003
Regulatory Meeting  - Rome 2003Regulatory Meeting  - Rome 2003
Regulatory Meeting - Rome 2003
 
Battery storage: The next disruptive technology in the power sector
Battery storage: The next disruptive technology in the power sectorBattery storage: The next disruptive technology in the power sector
Battery storage: The next disruptive technology in the power sector
 
Energy Storage - Is the Time Ripe for India-As Published
Energy Storage - Is the Time Ripe for India-As PublishedEnergy Storage - Is the Time Ripe for India-As Published
Energy Storage - Is the Time Ripe for India-As Published
 
Recharging the-power-sector
Recharging the-power-sectorRecharging the-power-sector
Recharging the-power-sector
 
EWEB Electricity - Applied Reinventing Fire Sustainable Development Theories_...
EWEB Electricity - Applied Reinventing Fire Sustainable Development Theories_...EWEB Electricity - Applied Reinventing Fire Sustainable Development Theories_...
EWEB Electricity - Applied Reinventing Fire Sustainable Development Theories_...
 
Eskom MYPD 3Selective Reopener presentation
Eskom MYPD 3Selective Reopener presentationEskom MYPD 3Selective Reopener presentation
Eskom MYPD 3Selective Reopener presentation
 
Class 3 the power sector in india
Class 3   the power sector in indiaClass 3   the power sector in india
Class 3 the power sector in india
 
Electric energy storage: preparing for the revolution
Electric energy storage: preparing for the revolutionElectric energy storage: preparing for the revolution
Electric energy storage: preparing for the revolution
 
Renewable Energy Hydrosector India
Renewable Energy Hydrosector IndiaRenewable Energy Hydrosector India
Renewable Energy Hydrosector India
 
Capgemini ses - smart grid operational services - leveraging technology to ...
Capgemini   ses - smart grid operational services - leveraging technology to ...Capgemini   ses - smart grid operational services - leveraging technology to ...
Capgemini ses - smart grid operational services - leveraging technology to ...
 
power systems.pdf
power systems.pdfpower systems.pdf
power systems.pdf
 
Icue 2007 Presentation Mutshidza
Icue 2007 Presentation  MutshidzaIcue 2007 Presentation  Mutshidza
Icue 2007 Presentation Mutshidza
 
Privatization and deregulation
Privatization and deregulationPrivatization and deregulation
Privatization and deregulation
 
Power generation and supply industry in india an economic analysis of the m...
Power generation and supply industry in india   an economic analysis of the m...Power generation and supply industry in india   an economic analysis of the m...
Power generation and supply industry in india an economic analysis of the m...
 
Solar PV Curtailment in Changing Grid and Technological Contexts
Solar PV Curtailment in Changing Grid and Technological ContextsSolar PV Curtailment in Changing Grid and Technological Contexts
Solar PV Curtailment in Changing Grid and Technological Contexts
 
Energy Storage
Energy StorageEnergy Storage
Energy Storage
 

More from FEF Philippines

Fef hails cabinet's decision not to extend quantitative restrictions on rice ...
Fef hails cabinet's decision not to extend quantitative restrictions on rice ...Fef hails cabinet's decision not to extend quantitative restrictions on rice ...
Fef hails cabinet's decision not to extend quantitative restrictions on rice ...FEF Philippines
 
FEF Statement on Philippine Pension System
FEF Statement on Philippine Pension SystemFEF Statement on Philippine Pension System
FEF Statement on Philippine Pension SystemFEF Philippines
 
FEF Statement on SMC Sale to PLDT and Globe
FEF Statement on SMC Sale to PLDT and GlobeFEF Statement on SMC Sale to PLDT and Globe
FEF Statement on SMC Sale to PLDT and GlobeFEF Philippines
 
FEF Statement on Mass Civil Registration and A National ID System
FEF Statement on Mass Civil Registration and A National ID SystemFEF Statement on Mass Civil Registration and A National ID System
FEF Statement on Mass Civil Registration and A National ID SystemFEF Philippines
 
FEF Statement on Philippine Rice Policy
FEF Statement on Philippine Rice PolicyFEF Statement on Philippine Rice Policy
FEF Statement on Philippine Rice PolicyFEF Philippines
 
FEF Congratulates President Elect Rodrigo Duterte
FEF Congratulates President Elect Rodrigo DuterteFEF Congratulates President Elect Rodrigo Duterte
FEF Congratulates President Elect Rodrigo DuterteFEF Philippines
 
Fef position on lowering income tax rates
Fef position on lowering income tax rates Fef position on lowering income tax rates
Fef position on lowering income tax rates FEF Philippines
 
Speech on inclusive economic growth by Calixto Chikiamco
Speech on inclusive economic growth  by Calixto ChikiamcoSpeech on inclusive economic growth  by Calixto Chikiamco
Speech on inclusive economic growth by Calixto ChikiamcoFEF Philippines
 
Five arrows for inclusive growth
Five arrows for inclusive growth Five arrows for inclusive growth
Five arrows for inclusive growth FEF Philippines
 
FEF Statement on the Extension of the Comprehensive Agrarian Reform Program
FEF Statement on the Extension of the Comprehensive Agrarian Reform ProgramFEF Statement on the Extension of the Comprehensive Agrarian Reform Program
FEF Statement on the Extension of the Comprehensive Agrarian Reform ProgramFEF Philippines
 
STATEMENT OF THE FOUNDATION FOR ECONOMIC FREEDOM (FEF) ON THE MRT-LRT FARE IN...
STATEMENT OF THE FOUNDATION FOR ECONOMIC FREEDOM (FEF) ON THE MRT-LRT FARE IN...STATEMENT OF THE FOUNDATION FOR ECONOMIC FREEDOM (FEF) ON THE MRT-LRT FARE IN...
STATEMENT OF THE FOUNDATION FOR ECONOMIC FREEDOM (FEF) ON THE MRT-LRT FARE IN...FEF Philippines
 
Press Release: FEF Statement of Support for the Passage of the Bangsamoro Bas...
Press Release: FEF Statement of Support for the Passage of the Bangsamoro Bas...Press Release: FEF Statement of Support for the Passage of the Bangsamoro Bas...
Press Release: FEF Statement of Support for the Passage of the Bangsamoro Bas...FEF Philippines
 
Estillore rfpa process_flow_of_applications
Estillore rfpa process_flow_of_applicationsEstillore rfpa process_flow_of_applications
Estillore rfpa process_flow_of_applicationsFEF Philippines
 
Tiamson introduction to land titling
Tiamson  introduction to land titlingTiamson  introduction to land titling
Tiamson introduction to land titlingFEF Philippines
 
Orceo converting tax declaration into titles
Orceo converting tax declaration into titlesOrceo converting tax declaration into titles
Orceo converting tax declaration into titlesFEF Philippines
 
Katigbak rfp and cadastral survey
Katigbak rfp and cadastral surveyKatigbak rfp and cadastral survey
Katigbak rfp and cadastral surveyFEF Philippines
 
FEF Statement of Support for Charter Change on Lifting Economic Restrictions
FEF Statement of Support for Charter Change on Lifting Economic RestrictionsFEF Statement of Support for Charter Change on Lifting Economic Restrictions
FEF Statement of Support for Charter Change on Lifting Economic RestrictionsFEF Philippines
 
FEF Press Release: FEF Opposes the Increase in Installation Capacity Under th...
FEF Press Release: FEF Opposes the Increase in Installation Capacity Under th...FEF Press Release: FEF Opposes the Increase in Installation Capacity Under th...
FEF Press Release: FEF Opposes the Increase in Installation Capacity Under th...FEF Philippines
 
FEF Opposes the Increase in Solar Installation Capacity Under the FIT Subsidy
FEF Opposes the Increase in Solar Installation Capacity Under the FIT SubsidyFEF Opposes the Increase in Solar Installation Capacity Under the FIT Subsidy
FEF Opposes the Increase in Solar Installation Capacity Under the FIT SubsidyFEF Philippines
 
Building an Inclusive Democracy
Building an Inclusive DemocracyBuilding an Inclusive Democracy
Building an Inclusive DemocracyFEF Philippines
 

More from FEF Philippines (20)

Fef hails cabinet's decision not to extend quantitative restrictions on rice ...
Fef hails cabinet's decision not to extend quantitative restrictions on rice ...Fef hails cabinet's decision not to extend quantitative restrictions on rice ...
Fef hails cabinet's decision not to extend quantitative restrictions on rice ...
 
FEF Statement on Philippine Pension System
FEF Statement on Philippine Pension SystemFEF Statement on Philippine Pension System
FEF Statement on Philippine Pension System
 
FEF Statement on SMC Sale to PLDT and Globe
FEF Statement on SMC Sale to PLDT and GlobeFEF Statement on SMC Sale to PLDT and Globe
FEF Statement on SMC Sale to PLDT and Globe
 
FEF Statement on Mass Civil Registration and A National ID System
FEF Statement on Mass Civil Registration and A National ID SystemFEF Statement on Mass Civil Registration and A National ID System
FEF Statement on Mass Civil Registration and A National ID System
 
FEF Statement on Philippine Rice Policy
FEF Statement on Philippine Rice PolicyFEF Statement on Philippine Rice Policy
FEF Statement on Philippine Rice Policy
 
FEF Congratulates President Elect Rodrigo Duterte
FEF Congratulates President Elect Rodrigo DuterteFEF Congratulates President Elect Rodrigo Duterte
FEF Congratulates President Elect Rodrigo Duterte
 
Fef position on lowering income tax rates
Fef position on lowering income tax rates Fef position on lowering income tax rates
Fef position on lowering income tax rates
 
Speech on inclusive economic growth by Calixto Chikiamco
Speech on inclusive economic growth  by Calixto ChikiamcoSpeech on inclusive economic growth  by Calixto Chikiamco
Speech on inclusive economic growth by Calixto Chikiamco
 
Five arrows for inclusive growth
Five arrows for inclusive growth Five arrows for inclusive growth
Five arrows for inclusive growth
 
FEF Statement on the Extension of the Comprehensive Agrarian Reform Program
FEF Statement on the Extension of the Comprehensive Agrarian Reform ProgramFEF Statement on the Extension of the Comprehensive Agrarian Reform Program
FEF Statement on the Extension of the Comprehensive Agrarian Reform Program
 
STATEMENT OF THE FOUNDATION FOR ECONOMIC FREEDOM (FEF) ON THE MRT-LRT FARE IN...
STATEMENT OF THE FOUNDATION FOR ECONOMIC FREEDOM (FEF) ON THE MRT-LRT FARE IN...STATEMENT OF THE FOUNDATION FOR ECONOMIC FREEDOM (FEF) ON THE MRT-LRT FARE IN...
STATEMENT OF THE FOUNDATION FOR ECONOMIC FREEDOM (FEF) ON THE MRT-LRT FARE IN...
 
Press Release: FEF Statement of Support for the Passage of the Bangsamoro Bas...
Press Release: FEF Statement of Support for the Passage of the Bangsamoro Bas...Press Release: FEF Statement of Support for the Passage of the Bangsamoro Bas...
Press Release: FEF Statement of Support for the Passage of the Bangsamoro Bas...
 
Estillore rfpa process_flow_of_applications
Estillore rfpa process_flow_of_applicationsEstillore rfpa process_flow_of_applications
Estillore rfpa process_flow_of_applications
 
Tiamson introduction to land titling
Tiamson  introduction to land titlingTiamson  introduction to land titling
Tiamson introduction to land titling
 
Orceo converting tax declaration into titles
Orceo converting tax declaration into titlesOrceo converting tax declaration into titles
Orceo converting tax declaration into titles
 
Katigbak rfp and cadastral survey
Katigbak rfp and cadastral surveyKatigbak rfp and cadastral survey
Katigbak rfp and cadastral survey
 
FEF Statement of Support for Charter Change on Lifting Economic Restrictions
FEF Statement of Support for Charter Change on Lifting Economic RestrictionsFEF Statement of Support for Charter Change on Lifting Economic Restrictions
FEF Statement of Support for Charter Change on Lifting Economic Restrictions
 
FEF Press Release: FEF Opposes the Increase in Installation Capacity Under th...
FEF Press Release: FEF Opposes the Increase in Installation Capacity Under th...FEF Press Release: FEF Opposes the Increase in Installation Capacity Under th...
FEF Press Release: FEF Opposes the Increase in Installation Capacity Under th...
 
FEF Opposes the Increase in Solar Installation Capacity Under the FIT Subsidy
FEF Opposes the Increase in Solar Installation Capacity Under the FIT SubsidyFEF Opposes the Increase in Solar Installation Capacity Under the FIT Subsidy
FEF Opposes the Increase in Solar Installation Capacity Under the FIT Subsidy
 
Building an Inclusive Democracy
Building an Inclusive DemocracyBuilding an Inclusive Democracy
Building an Inclusive Democracy
 

Recently uploaded

Opportunities, challenges, and power of media and information
Opportunities, challenges, and power of media and informationOpportunities, challenges, and power of media and information
Opportunities, challenges, and power of media and informationReyMonsales
 
Referendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoReferendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoSABC News
 
N Chandrababu Naidu Launches 'Praja Galam' As Part of TDP’s Election Campaign
N Chandrababu Naidu Launches 'Praja Galam' As Part of TDP’s Election CampaignN Chandrababu Naidu Launches 'Praja Galam' As Part of TDP’s Election Campaign
N Chandrababu Naidu Launches 'Praja Galam' As Part of TDP’s Election Campaignanjanibaddipudi1
 
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkcomplaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkbhavenpr
 
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep VictoryAP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victoryanjanibaddipudi1
 
VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012ankitnayak356677
 
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...Ismail Fahmi
 
Chandrayaan 3 Successful Moon Landing Mission.pdf
Chandrayaan 3 Successful Moon Landing Mission.pdfChandrayaan 3 Successful Moon Landing Mission.pdf
Chandrayaan 3 Successful Moon Landing Mission.pdfauroraaudrey4826
 
Quiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the roundsQuiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the roundsnaxymaxyy
 
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...Axel Bruns
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.NaveedKhaskheli1
 
Brief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert OppenheimerBrief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert OppenheimerOmarCabrera39
 
Top 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdfTop 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdfauroraaudrey4826
 
Manipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpkManipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpkbhavenpr
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdfGerald Furnkranz
 

Recently uploaded (15)

Opportunities, challenges, and power of media and information
Opportunities, challenges, and power of media and informationOpportunities, challenges, and power of media and information
Opportunities, challenges, and power of media and information
 
Referendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoReferendum Party 2024 Election Manifesto
Referendum Party 2024 Election Manifesto
 
N Chandrababu Naidu Launches 'Praja Galam' As Part of TDP’s Election Campaign
N Chandrababu Naidu Launches 'Praja Galam' As Part of TDP’s Election CampaignN Chandrababu Naidu Launches 'Praja Galam' As Part of TDP’s Election Campaign
N Chandrababu Naidu Launches 'Praja Galam' As Part of TDP’s Election Campaign
 
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkcomplaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
 
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep VictoryAP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
 
VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012
 
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
 
Chandrayaan 3 Successful Moon Landing Mission.pdf
Chandrayaan 3 Successful Moon Landing Mission.pdfChandrayaan 3 Successful Moon Landing Mission.pdf
Chandrayaan 3 Successful Moon Landing Mission.pdf
 
Quiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the roundsQuiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the rounds
 
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.
 
Brief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert OppenheimerBrief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert Oppenheimer
 
Top 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdfTop 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdf
 
Manipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpkManipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpk
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf
 

FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS: Avoid Short-Term Solutions With A Long-term Cost Burden on Consumers

  • 1. Foundation for Economic Freedom, Inc. BOARD OF ADVISERS: Gerardo Sicat Cesar A. Virata BOARD OF TRUSTEES: Roberto De Ocampo Chairman Romeo Bernardo Vice-Chairman Calixto Chikiamco President Ernest Leung Treasurer Atty. Ricardo Balatbat III Corporate Secretary Anthony Abad Art Corpuz Eduardo Gana Felipe Medalla Vaughn Montes Simon Paterno Gloria Tan-Climaco Francis Varela Atty. Ricardo Balatbat III Executive Director 105 Philippine Social Science Center (PSSC) Commonwealth Ave., Diliman, Quezon City Telefax: (632) 4532375 (Main Office) Tel No.: (632) 8939602 (Accounting) Website: www.fef.org.ph Email: fefphilippines@gmail.com / fef@fef.org.ph FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS: Avoid Short-Term Solutions With A Long-term Cost Burden on Consumers The Energy Secretary has raised the alarm on an impending electric power shortage in the Luzon grid in the summer of 2015, projecting a reserve deficiency of 400-500 MW in the March-May period, translating into two or three hour rotating outage during that period. The Secretary has proposed, and the President has written a letter asking Congress to pass a ―Joint resolution authorizing the President to establish additional generating capacity.‖ The President’s letter said: ―The DoE reports and projects a critical electricity situation in the summer of 2015 arising from among others, the expected effect of El Niño phenomenon, the 2015 Malampaya Turnaround, increase and continuing outages of power plants and anticipated delays in the commissioning of committed power projects.‖ Additionally, in various pronouncements, the Secretary has proposed the additional contracting of 450 MW of solar power, and 200-300 MW of wind. The Foundation for Economic Freedom cautions that the actions taken by government to respond to this possible short term shortage and not load the system—and the consuming public-- with expensive quick fixes that will burden us for a long time. ―Short-termism‖ and narrow view of key stakeholders led by the authorities, underlie in most part this temporary thinness of reserves and possible outages in the summer months. Such include: 1. ―not in my backyard‖ environmental groups and local government units opposition to new generation capacity, with no viable options presented and failure of government to respond with resolve; 2. politicized/poor management and resulting financial weakness of rural coops that have no capacity to contract but nonetheless avail of power; 3. under-contracting and lack of transparency of needed ancillary reserve capacity and weak enforcement by the regulator; 4. delays in rolling out of open access; and 5. government intervention in the WESM over the years that have distorted price signals, and dampened investments and restricted supply.
  • 2. Foundation for Economic Freedom, Inc. More recently, there seems to be inconsistent and incoherent policies where government is proposing every expensive solution to raise electricity supply, even as its regulatory arm is seen as flip-flopping on market pricing rules that make some of the existing peaking plants uneconomical to run, which thus limits supply. In particular, we caution against quick fixes with lasting cost consequences that some participants in the power industry, including government, have put forward: 1. Government contracting for costly emergency power way beyond the expected three (3) summer months per year over two years when thin reserves are foreseen. The supply situation in the summer of 2015 will have the added burden of having to cope with the non-availability of Malampaya gas during the critical period. But a short term problem requires a short term solution, and any government contracting should be limited just to the period where they hope to guard against blackouts. If the problem is projected to persist, then other long term solutions must be found. It is premature for government to consider acquiring ―strategic‖ generation assets when it has not even completed the privatization process and still owns, among others, the CBK plants and Malaya. The argument is made that outright purchase is not much more expensive than leasing for two to three years, because of saving demobilization costs, but government may recall how little they received when they sold assets like the Limay and Dingle plants. How strategic are plants which cost 13-15 pesos/kWh to operate? 2. Costly take-or-pay 20 year contracts for intermittent unreliable power from solar (an additional 450 MW) and wind ( an additional 300 MW) at high Feed in Tariff (FIT) Rates of P9.68 per kWh and P8.53 per kWh. These are two (2) year old rates in a segment of industry where costs change very quickly, being touted as incentives to solve the tight power supply instead of the blatant rent seeking they really are. At these rates and volumes, the incremental cost to the public by way of a higher power bill amounts to almost P5 billion annually. This will add at least another 7 centavos per kWh to the 4 centavos initially applied for to cover the cost differential. The case on how these unreliable power sources address peak demand shortages in the system when supply depends on when the whims of sun and wind is for solar, at best tenuous, and for wind, non- existent. The RE proponents trying to take advantage of this temporary supply situation to lock in their 20- year windfalls have said wind at P8.53 is cheaper than P13/kWh diesel. What they have not said is you pay the P13 to run the diesels only when needed while you pay P8.53 whenever the wind produces electricity whether you need it or not, and there are no guarantees they will operate when you actually need them, so you will still need the diesels for those times. These quick fixes will ultimately hurt not only the industrial sector but the household sector in particular. Instead, we fully support the following initiatives already being implemented in a partnership between government and the private sectors to address the immediate shortages: 1. Interruptible Load Program (ILP). The Interruptible Load Program was initially proposed and applied for by Visayan Electric Co. (VECO) during a period when rotating blackouts were common in the Visayas Grid. The concept is to compensate customers with self-generation facilities to run their gensets for their own use, thus reducing overall demand. This reduced demand allows the utility to allocate the limited grid supply among its other customers, averting or reducing blackouts. To their credit the ERC approved this not just for the VECO application but as a general scheme available to all utilities and it has been successfully applied in Mindanao as
  • 3. well. 2. Lifting of the secondary price cap. The secondary price cap was originally proposed by the generators themselves, as a way of preventing extended periods of high prices if tight supply persists. The principle though was that the cap would be sufficient to cover the marginal costs of peaking plants so they could continue to operate within the market mechanisms. Instead the ERC instituted a cap of P6.245/kWh, which does not cover the costs of even the most efficient bunker fired plant, let alone the diesels. If we want to encourage the ILP participants to supply power to the grid beyond their own self-generation, then their costs, now set at around P14, must fall within the cap. Instead the ERC would have these market participants apply separately for cost recoveries above the cap. This process takes a long time and defeats the purpose of a functional market. A real market is self-financing, and not dependent on extraneous cost recoveries. 3. Fuller utilization of government generation assets especially Malaya. This plant was available during the price spikes in November and December 2013, when Malampaya was also under maintenance, yet was underutilized. There were no blackouts then but greater use of the plant would have reduced the price spikes and avoided many of the knee-jerk reactions that now threaten the industry. There appears doubt as to whether repairs can be completed in time. Why this was not addressed earlier again brings to question the wisdom of giving government ―strategic‖ generation assets. 4. Better scheduling of maintenance of plants. Because planned outage schedules are kept confidential, generators are not able to optimize their scheduling (as only the grid operator knows the planned outage schedules, it implies that they are not doing a good job). 5. Demand side bidding in the WESM. 6. Ancillary Services Procurement. Reserves are not only needed to balance demand and supply at every given moment through regulating reserves, but other reserves provide the first line of defense against blackouts caused by unplanned or forced outages. Unfortunately the procurement of reserves by the System Operator has been inadequate at best, and insufficient reserves only make the system more vulnerable to blackouts. In addition, the System Operator determining the level of Ancillary Services is self-serving as they are penalized or rewarded by the ERC on AS availability. 7. Energy Conservation. In the short term, it may be difficult to add to supply quickly, but demand is within every Filipino’s ability to control. The consumer controls the light switches. Reducing consumption is the alternative to increasing supply, and has the added benefit of saving the consumer money. Cutting out unnecessary use of electricity, using more energy efficient lights and appliances, shifting consumption off-peak – these all help. But economics drives behavior. Prices have to reflect the costs. When gasoline is cheap, SUVs proliferate, but fuel-efficient cars only sell well when gasoline is scarce or prices are high. Same with everything else, electricity included. We Foundation for Economic Freedom, Inc.
  • 4. have to remind every Meralco customer that when Malampaya is out, even when there is sufficient supply, prices will go up because the substitute fuel used in place of natural gas is more expensive. Addressing more fundamentally the remaining constraints that impede power supply and prevent lower prices: 1. Roadblocks: Government needs to be more active in encouraging generation and supporting private developers in every way. Case in point is the 140 plus permits that are needed to be secured in constructing and operating a power plant. The appetite is there but developers are running into road blocks with ―not in my backyard‖ advocates and unsupportive government units. (e.g. The 600 MW RP Energy project in Subic is at least two years delayed, now pending judicial resolution in the writ of Kalikasan). 2. Open Access: Continue to lower the threshold for Open Access. This will encourage more generation as they can look to end users as a competitive market, and thus by-pass distribution utilities, the monopoly segment of the industry. The power of choice, one of the key objectives of the industry restructuring, works both for the consumer as well as the supplier. 3. Guarantee Unbankable Coops: The National Electrification Administration (NEA) needs to provide guarantees with automatic features, like a bond or L/C that can be drawn to make some rural cooperatives credit worthy. This will need to go hand in hand with NEA exacting financial and management disciplines on erring co-ops and stronger political will to cut-off recalcitrants who feed off the system that they are effectively not a market participant of. Corollary to this, EC’s should also be strengthened institutionally enabling capacity building (e.g. financial, technical, good governance) programs. 4. Smarter and Firmer Regulation: The DoE and the ERC have to manage the industry and market in a way that encourages supply responses from generators, the competitive segment of the market. And be proactive in ensuring the monopoly leg, transmission under the National Grid Corporation fully contracts what the system requires. The establishment of a reserve market has long been delayed. In requesting for ―emergency power‖ the Secretary of Energy said the more grievous sin is not to do anything. We disagree. We think the greater sin is to do something costly but ineffective, or worse, harmful. While leaving unattended fundamental long term constraints. Release Date: October 7, 2014 Foundation for Economic Freedom, Inc. For more information, please check our website: www.fef.org.ph , or contact the following: Ethel Briones, Program Officer – ebbriones@fef.org.ph /+63 2 453 2375 Ranna Pintor, Program Officer – rannapintor@yahoo.com / +63 2 453 2375