1. PERSONAL INFORMATION.
Ezequiel AMMANN,
37 yea you (02/05/1979) married. 137 Street and 90 ° Farms B Duggan. Los Hornos, La Plata
.Prov. of Buenos Aires. Argentina
54- (0221) 4 7 02434 / (0221 - 156-242653
Ezequielammann@yahoo.com.ar
DNI. 27110943
OBJECTIVE
A p licar knowledge Acquired in search of personal improvement.
COURSES: Knowle ENTS STANDARDS API / IRAM / IAS / OAS / ASME /
ASTM.
Theory Calculation of Compression / PSI. Hanover Training Center / S. tipsa. Comodoro
Rivadavia.
Integral maintenance service in ducts, pipelines, pipelines, gas pipelines Mineraloducts,
Aqueducts. HASASA Tecnoil Arg. / Nqn.
Assembly of heavy structures. CINTER SA. San Juan Cap.
Development and testing of piping in extreme temperatures. BARRICK GOLD. Veladero.
Manufacture and assembly purge storage tanks. Repsol YPF. Rdls.
PREMIUM connections and control. It repairing of comprehensive n Can Eri as affected by
corrosio n.
Introduc tio n patch and wraparound soldiers and reinforcements cold (CLOCKS Pring).
AWSD1.1 welding systems - GMAW - SAW. MIG / TIG, etc.
It Inspecció n and development of Piping. Pincer, Combined, A / c. - A / inox.
It Inspecció n and development of lines of conduction lí fiber.
Development of naval engineering to point - or detail and flames design. Planimetrí to -
Isometrí a.
Hydraulic testing / Ba rridos. / Fluss h ing, nondestructive testing END.
Reading and control of electronic plotter. Pason.
Volumetric-measurement formula and equation with pressure and upwelling -formulas for
maneuvers.
Inspection and Control PREMIUM:
Internal: Pyrometry. X-rays. Metallography. Hardness. Dimensional. Particles Magnetic.
External: Ultrasound. Gam m agraphia.
Fluid Control: Baker INTEQ.
Control of tubing and cassing use.
DTM / drumming and assembly of articulated cranes. Manitowock. -American. La Serena Chile.
BARRICK GOLD.
Calculation, design, diagram and lifting of suspended loads DE GRAN PORTE. (Over 200t.)
Techint.
Defensive driving. Auto stop. Security. Med io Environment, Quality Management.
Guilds management and union policies.
WORK EXPERIENCE
October 2015 - Present.
Mechanical Inspector. VB.- YPF. SAND PLANT BON.
Loma Campana. I do not know.
June 2014 -October 2015.
Insp ector Metalmecanico Class VB - YPF-
Refinery Coking Unit New Ensenada Prov. Bs As.
2. November 2013 - June 2014.
Head Mounting Rowing / DOORS SRL. UTE. TECHINT.
TERNIUM / SIDERAR. (General Plant Savio San Nicolas.
M ounting. Of vent ducts, Extension Ornó 2 continuous casting. .
Inspector of contract Summer Plan Edesur.
Head of work Manufacture and assembly gravitational tensors Ore bin 2. Mina Veladero SAN
JUAN. BARRICK GOLD.
Head of work Repair of Surge Bin. Primary / secondary crushing. Mina Veladero BARRICK
GOLD.
January 2012- November 2013.
Supervisor Mr. Mount. / WORK.
FLUOR / TECHINT.
ICK BARR GOLD. LAMA EASTER
Sup. Work EASTER LAMA.
manufacturing and tajes mon structure, Grinding.
Adequacy of tracks, assemblies, mechanical, electrical, structural, electromechanical, etc.
Manufacture, bonding, assembly and linking Izamientos cupulinos, control rooms, main frames
Leveling and poise of structures (mineraloducto 32 "and roof structures) with hydraulic jacks ren
suspended load, etc. Manufacture, assembly and linking of platforms mk. In 70mts.Desarme of
main cable articulated Manitovok 18.000 and 14.000, etc. Pre-assembled, and lifting of grinding
roof LOAD MAX. 380T. Etc. END. / Flushing, ph.barridos, etc. Hdp pipes, A / C. A / Inox. Rfv,
Centron, etc. Variable diameters from 1 ½ "to 46". Development of advance control of diversions,
total planimetry, etc.
Mov soil, conducting paths, tracks ampl i ation, etc.
FEB. 2011 -Aug 2012.
HEAD OF COUNTRY / WORK. PUERTAS SRL.
BARRICK GOLD MINE SA VELADERO / LAMA EASTER
Driving line 32 "X 5KM. Mineral cyanide duct. API .Process.
Freshwater line. HDP. Diameter var. 42 "- 3" (. 150 KM) pipe services throughout the Pascua
Lama area.
Assembly of Main Zaranda. TRITURATION / PROCESSING.
Extension of income tracks, income adjustment, mov. Of soil retaining walls .Manufacture and
assembly of main porticos plus power table and tensioners of main Zaranda Process / crushing.
Dtm of equipment, assembly of shed new more starter motors and grinding. More mechanical
bonding and start-up.
Production of support IPN 350 - Test of tension and penetrating inks. Suspension mount 45 t.
Alignment, leveling and bonding,
Enlargement TRUCK SHOP./ TRUCK LUBE.
Suspension mount 14000 tn, heavy structure, extending existing lines 9800 "p. Of piping diamet.
Variable between 1 ½ "12" threaded, welded caliper / caliper - combined. A / c. Stainless steel.
Fiber, etc.
Tests: sweep - penetrating ink - plaque -END flussing - PH- and start-up. Assembly of 4 stations
Lubricadoras. Development of bbas room and rebb stations. 16 manifold + 8 switchgear.
Assembly of 6 tk of accumulation and 3 discharge. 2000 m3. Total. Purging and proof of tightness
Assembly and precom measuring and protection devices: Flowmeters - manometers - flowmeters -
traccing - valv. Control, relief and retention.
Function: operational management of work in the field. Control of own resources and subc.
Technical project management, development and follow-up of progress, control, survey and re-
3. design of isometries and modifications, development of work conformance by deviation, etc.
ENGINEERING DEVELOPED BY TECHINT SA
NOV-2009 FEB. 2011.
SHIFT MANAGER. POLAR ARG. SA
Control of own resources and subcontractors. Preparation and control of procedures, standards
management, monitoring of resources, improvement plans, development of production plans,
electronic assemblies, mechanical, hydraulic, pneumatic, floating, confined, etc. Active, proactive
maintenance of lines and production / transfer tapes. 4 air compressors ABC Jet 230 and BELLIS
MORRISON. With cooling chiller and combined cycle system. Working pressure constant 50 bar.
430 c ° Temp. etc.
90 people in charge directly.
ENE -2009 - May 2009 / Current Contractor, MONOTRIBUTIST.
PETROLERA PIEDRA DEL AGUIL.A SA
IMPROVEMENT PLAN DEVELOPMENT AREA RAMOS MEXIA.
tolerance calculations plumbing, engineering, EIA, traceability, mechanical assemblies,
electromechanical, hydraulic, elect ronicos, unemployment programs, commissioning, testing
hydraulic, sweeps, corrosion inspections, welding cold - hot, etc. Adequacy of tracks, mov. Soil,
generation / expansion of tracks, locations and primary containment walls.
FEB -2008 / -2009 ENE Supervisor. Piping - Mounting. OPS
ArgentinaSACI
REPSOL / YPF SA.
Senior Supervisor of Maintenance and Engineering Works CHSN -lm the service area of Repsol
YPF. Project Leader expansion of batteries, flowlines, installation of pumping equipment, bb.
pcp.p / sup.Montaje distributors, tk, aqueducts, pipelines, gas compression plants, units
Separators, representative technician before operating. Supervisor Mr. maintenance of existing
facilities. (P / area, pumping devices, AIB, PCP, Pipelines, EIA, (traceability - calc tolerances -.)
Reparacione s hot / cold, patches Clo Ick Pring enclosures -. Mounts - mediacañas - changes
sections - REPAIRS and interventions in control without STOP PRODUCTION-mounting spools,
manifolds, parades and assemblies oleoductos- water, gas, pipelines, ditch digging, raids. Mov.
from lying ground transfer tracks, etc. Supervisor in charge of engineering works, maintenance of
existing facilities, management control and monitoring of own resources and subcontractors,
monitoring and development of works dealing with the operator, etc.
Sep-2006 / feb-2008 Supervisor surface installations., Rio Limay OIL
FIELD SERVICES SA
PETROLERA PIEDRA DEL AGUILA SA / ENARSA SA
Area supervisor. Yak. Ramo s Mexia. Serving Petrolera Piedra del Aguila. Maintenance of
existing facilities. Plus expansion of gas compression plant and separating unit. Replacement
.000 50 mts. of flowlines. Wells injectors and producers. I start Supervisor Inst. Of Yac Surface
Area Supervisor. Ramos Mexia. Serving Petrolera Piedra del Aguila SA development
maintenance of existing facilities, planning improvements area plant shutdowns, wells, supervision
of own resources and outsourced, I was conducted in collaboration with company Wehaterford SA
Design and assembly with commissioning of pumps PCP (progressive Cavity) as required cost / m3
day. WITH HIGHLY POSITIVE RESULT. The gas separation unit was expanded by adding a
compressor Cat Ariel fgt. Increasing the daily production of 70.000m3 (daily production gas)
200,000 daily (recirculating gas by controlling pumps Fisher adding a vertical accumulators and
primary filters and purge control, improvement plans existing facilities, preventive and proactive,
4. corrective maintenance, etc. I finish doing the trainee in three wells Company Man for Enarsa in
Comodoro exploratory / Chubut. Project mine and peak salamanca. Tracking mov. floor, locations,
roads
ENE -2005 / Feb 2006 Work supervisor. , AEROMECANICA Srl.
HIDENSA SA /
Works supervisor network gas, compressor stations, pipelines, boilers, compressors, slug catch,
accumulators, valves pneumatic, controllers, operating, withholding, etc. Rep. Technical to
operator-contractor, development of site visits, quotes, improvement plans, management of own
resources and subcontractors, etc.
ABR -2004 / -2005 ENE Head field, Emerson de Argentina SA
PAN AMERICAN ENERGY SA / REPSOL YPF SA
Construction manager, contract work. Technical Representative. For e contract No. 4900027109
to 110. Oil pipeline 16 "(coated descending soldier c / sleeve API Sch 160) Installation of
measuring instruments and control, radar, deltaV, flowmeters, controllers. Telemetry. Preventive
maintenance of own resources and subcontractors, supervision of own and contract resources,
technical reference, cost reduction plans management of own resources and subcontractors, etc.
ENE -2003 / Dec 2003 Official mounting, Patagonia Field necks SRL
CHEVRON TEXACO SA
Works and Assembly Officer Hired by work. Bat, N2 Yac. the gate. Chevron Texaco. Mounting
officer. I was carried from the stakeout, manufacture and assembly of the entire battery. Collectors
including two games with 15 mouths to future wells producers, tk control, storage recirculation
lines, pumping, booster, purging, venting, thickness measurement, nondestructive testing, hydraulic
testing, sweeps, connections of lines, etc.
Mar-2001 / Jan-2003 Ayudante, Contreras Hnos. SA
REPSOL YPF / TOTAL AUSTRAL.
Tasks: Field helper on site. USP / P. Gas Compressor Yac. LLL.Repsol YPF SA Assembly of
control valves, flow separators, flow measuring and control apparatus, motor compressors,
accumulators, FOBS, electrovalves, electropumps, gas measurement, Compressor assemblies,
fluid conduction lines, venting, Etc., lighters, separators, filters, various valves, generators, etc.
Mar-1999 / Jan 2001 Assistant, EPAS. (Prov Ente. Water and
sanitation)
Employee hired as technical / operational support. Service tasks: Cased h2o
sewer networks and pipelines them underground networks, level, direct, etc.
STUDIES
1994 Mar / Dec 200 0 Technical Electromecánico. ENET No. 1 .
February 2001 / October 2003, Petroleum engineering. ABANDONED.
KNOWLEDGE
LANGUAGES
5. ENGLISH: Basic Writing, Oral Intermediate
COMPUTING
OFFICE: Advanced Management
DATABASE: Intermediate Management
PROGRAMMING: Intermediate Management
TAS GRAPHIC TOOLS: Intermediate Management
SAP MANAGEMENT. Basic.
Eat. Intermediate management.
Well Control. Intermediate.
PREFERENCES
Salary: To be agreed.
AVAILABILITY OF TRANSFER / MOVING.
Area: Production - Construction - Maintenance - Engineering.
Industry: Mining / Oil / Gas / Energy. /manufacture.
Position: Supervisor / Inspector / site manager / head of sector.
REFERENCES:
Julio Cesar Gomez. Engineering coordinator Repsol YPF SA Area. ChsN .Lm. RDL. Joseph
Inspector Luis BESSO by contract engineering and maintenance. YPF SA TEL: 299154519737.
Lic. Fabricio Lizarrondo. Manager Rio Limay OFS Administration. SA
Ing. Andrés GRECO. Leader .Yac area. Lm. RDLS. Repsol YPF SA
Ing. Jorge Fernandez. Project manager. OPS SACI Arg in tub.
Ing. Guillermo TOMAS. Engineering Coordinator OPS Argentina SACI.
Ing. Carlos GIN GINS. President RIO LIMAY OIL FIELD SERVICES SA
Ing. Santiago GASTALDI. Production Manager .Petrolera Piedra del Aguila SA
Eng. Marcelo Salazar. Maintenance Manager Repsol YPF SA
Ing. Roberto. Production manager. Polar SA Cel: 0299-154122423
Ing. Otoniel FARFAN GUEVARA. Construction Manager Barrick Gold.
Mr. Roberto CAMPOS. Barrick Gold building inspector.
Mr. Rodrigo CAPELLO. Project Manager PUERTAS SRL.Cel.:2645218343.
Ing. Nestor ARZADUM. Project Manager TECHINT COORP. Cel.0111555862193.