Risk Assessment Template.doc
1. Risk Assessment Form –
Part A
ProductionName: Culture In The Digital Age Organisation Sunderland College
ProductionAddress: Bede Campus, Durham Road,
Sunderland SR3 4AH
Producer / Editor
Tel:
Mobile:
Elliot Daroczy
07398616881
Start date 29.03.22 End date 09.04.22
Distribution
Who gets a copyof the assessment
Me and The College
Outline of risk assessment
Summary of what is proposed in
terms of sequences and set ups.
You could fall over and hurt yourself
Team members / experts /
contractors / contributors etc.
List those involved
Elliot Daroczy
Locations
Outline locationsinvolved – indicate
any which are hostile environments
10 Burlaw n Close Ryhope, Sunderland College Bede Campus
Assessor Name
Signature
E.Daroczy Date completed 29.03.22
Authoriser Name
(if not Assessor) Signature
E.Daroczy Date authorised 29.03.22
Hazard list – select your hazards from the list belowand use these to complete Part B
Situational hazards Tick Physical / chemical hazards Tick Health hazards Tick
Assault by person Contact with cold liquid / v apour Disease causativ e agent
Attack by animal Contact with cold surf ace Inf ection
Breathing compressed gas Contact with hot liquid / v apour Allergic reaction
Cold env ironment Contact with hot surf ace Lack of f ood / water
Crush by load Electric shock Lack of oxy gen
Drowning Explosiv e blast Phy sical f atigue
Entanglement in mov ing machinery Explosiv e release of stored pressure Repetitiv e action
High atmospheric pressure Fire Static body posture
Hot env ironment Hazardous substance Stress / anxiety
Manual handling Ionizing radiation Venom poisoning
Object f alling, mov ing or f ly ing Y Laser light
Obstruction / exposed f eature Lightning strike Environmental hazards
Sharp object / material Noise Y Litter Y
Shot by f irearm Non-ionizing radiation Nuisance noise / v ibration
Slippery surf ace Y Stroboscopic light Phy sical damage
Trap in mov ing machinery Vibration Waste substance released into air
Trip hazard Y Waste substance released into soil / water
Vehicle impact / collision Managerial / organisational hazards
Falls f rom height Management f actors (lack of communication,
co-operation, co-ordination and competence)
Risk matrix – use this to determine risk for
each hazard i.e. ‘how bad and how likely’ Likelihood of Harm
Severity of Harm
Remote
e.g. <1 in 1000 chance
Very unlikely
e.g. 1 in 200 chance
Unlikely
e.g. 1 in 50 chance
Possible
e.g. 1 in 10 chance
Likely
e.g. >1 in 3 chance
Negligible e.g. small bruise Trivial Trivial Trivial Low Low
Slight e.g. small cut, deep bruise Trivial Trivial Low Low Medium
Moderate e.g. deep cut, torn muscle Trivial Low Medium Medium High
Severe e.g. fracture, loss of consciousness Low Medium High High Extremely high
Very Severe e.g. death, permanent disability Low Medium High Extremely high Extremely high
2. Risk Assessment Form – Part B
Activity1
– Each individual activity you are proposing: Location – w here this activity willtake place: Dates / times:
Hazards2
List what could cause harm f rom this activ ity
e.g. falls from height, trip hazard, fire, etc.
Who exposed
List who might be harmed
f rom this activ ity
e.g. staff, contractors,
contributors, public, etc.
Risk3
For each hazard, decide
lev el of risk as if y ou were to
do the activ ity without y our
controls
Control measures
For each hazard, list the measures y ou will be taking to minimise the risk identif ied
e.g. appointing competent persons, training received, planning and rehearsals, use of personal protective
equipment, provision of first aid, etc.
Risk3
For each hazard,
decide lev el of risk
once all y our controls
are in place
Object Falling
Me You could get hurtand
break a bone
Try and be carefularound tripods and equipment. Trivial
Trip Hazard Me Could fall over a wire Don’t leave w ires lying around. Low
Slippery Surface Me Could slip and hurt
yourself
Don’t run outside and be careful Low
Litter Me Could get dirty Be carefulw here your stepping Low
Continue on separate sheet if necessary
1 – complete separate table for each activity 2 - from hazard list in Part A 3 - from risk matrix in Part A