SlideShare a Scribd company logo
1 of 44
Download to read offline

19th Annual EPA Region 6 Stormwater Conference
September 17-21, 2017
Permeable Pavers: Missed Opportunities
and
Simplified Cross Sections
by
Elizabeth Arceneaux, P.E.
and
David Hasness, P.E.
Topics to Cover
 Impermeable Pavers vs Permeable Pavers
 Importance of limiting impervious cover
 Infiltration testing and interpretation
 Missed opportunities for infiltration
 Simplified cross sections for construction standards
adoption
People Love Pavers
 Decorative
 Unique
 Elegant
 Cool
 Durable
Dell Seton Medical Center
Austin, TX
Alamo Dome Plaza
San Antonio, TX
We see
them in
Plazas
Pearl Brewery Plaza, San Antonio
Sidewalks
Downtown New Braunfels, TX
Downtown Gruene, TX
TxDOT Rest Areas
Train Stations
of
Past Times
San Antonio, TX
Weatherford, TX
Traffic islands and medians
Most of the previous examples
are not permeable
Take a CLOSER look
PICP vs ICP
Permeable Interlocking
Concrete Pavers (PICP)
Interlocking Concrete
Pavers (ICP)
Compacted base
and subbase
Open base and
subbase
(gravels)
Both
$18-20/ft2
Importance of Permeable
Impervious Cover (IC)
 Adds to increased runoff
 Poorer water quality
 Greater than 10-15% IC leads
to stream degradation,
adverse effects (1)(2)(3)
 40 -70 % IC is not uncommon
for urban areas
References
(1)Greater Edwards Aquifer
Alliance, 2014 Low Impact
Development Manual
(2)Schueler, T. 1994, King et.al,
2011
(3)San Marcos Water Quality
Protection Plan for the HCP,
2015
Impact of IC
• Utilities are unearthed
• Road is undermined
• Stream bank is Eroded
• $ 3,000,000 creek restoration
project (San Marcos)
Increased flooding?
Reference: Greater Edwards Aquifer Alliance,
2014, LID Manual
We put a lot of effort into thinking about IC
Now
lets…

Permeable path @ Texas State University. Large tree protection!
Do SomethingAbout It
Step by StepWe Change our Nature
 If aesthetics is the driver, why not go permeable too?
 Easy testing to verify performance
 Make resources available for all to use
 Clear construction standards to insure success
 Include sections and details in municipal construction
standards so they are easy to find
Step by StepWe Change our Nature
 If aesthetics is the driver, why not go permeable too?
Testing byAuthors toVerify Performance
San Marcos, Wimberley, Seguin, Kingsland
Poor Performance (< 1 inch/hour)
Interlocking Concrete Paver (ICP) design - Decorative
Excellent Performance (54 to 650+ in/hr)
Permeable Interlocking Concrete Paver (PICP) design –
LID & Decorative
Used
the
PICP
Design
Missed
Opportunities
Simplified Cross Sections for
Municipal Construction Standards
References:
 Interlocking Concrete Pavement Institute
 American Society of Civil Engineers and
Environmental & Water Resources Institute
 San Antonio River Authority
 Concrete Paver Manufacturers
 Project Specific PICP Sections
 Make resources available for all to use
Cross sections in .dwg file
format for free download
www.icpi.org
ICPI Standard Detail for Driveways (No. 68)
 Clear construction standards to insure success
ICPI Standard Detail Sloped Surfaces (No. 81)
Lateral Flow Barriers
ASCE/EWRI Conceptual Designs
(all perm pavements)
Visual of the open base
Other Sections (available as a .dwg file)
Light Duty Pedestrian (TCEQ RG-348 Addendum 2012)
Waterproofing next to a building…no problem
ASTM #57 Open Base
Austin Animal
Center
Benefits of Standardizing
 Simplifies designs for PICP in neighborhoods,
casual spaces and plazas
 Ensures high infiltration of built surfaces
 Reduces uncertainty and increases
confidence
 Allows more widespread use of PICP
***PICP CAD files collected by Authors and available in Dropbox
(by clicking this link)
Resources
• ASCE/EWRI, Permeable Pavements, 2015, Permeable
Pavements Task Committee
• ICPI, Permeable Interlocking Concrete Pavements, Fourth
Edition, David R. Smith, 2011
• ICPI Specialist Course, 2009 First Edition
• ICPI Tech Spec #18 , 2013, Construction of Permeable
Interlocking Concrete Pavement Systems
• ICPI, Tech Spec #23, 2017, Maintenance Guide for
Permeable Interlocking Concrete Pavements
In Summary
 Impermeable Pavers vs Permeable Pavers?
 Are we missing opportunities to infiltrate?
 Do we want to reduce impervious cover?
 Can we include PICP cross sections in our
construction standards?
 If the answer is yes, then we can increase our use
of this valuable stormwater management practice.
Dave Hasness
www.pavestone.com
david.hasness@pavestone.com
512-787-1247
Lisa Arceneaux
eaenvironmental.com
elizabeth.arceneaux@austin.rr.com
512-644-1927
Any Questions?
(Don’t forget bonus material)
To see a 1 ½ minute video of the underdrain
discharge at the Texas State River House
Permeable Paver Parking Lot, following 9 inches
of rain right click this link and select open (takes a
minute to open):
River House Perm Paver Discharge 8-28-17
This was the discharge following several
days of rain from Hurricane Harvey
8/28/17
BONUS MATERIAL
(video, costs and more sections)
ICP Design for Heavy Duty Pedestrian Section
What about co$t$ ?
• 8 inch of compacted base is actually 10 -12 inch
before compaction
• Cost of compaction (equipment)
• Cost of density testing, proctors
• About $13/ft2 road base and $5-7/ft2 pavers OR
12 INCH
PICP Design for Heavy Duty Pedestrian
• Open stone 2 inches #8 or 9, and 12 inches #57
• Light compaction equipment
• No proctors, no densities
• About $13/ft2 open base and $5-7/ft2 pavers
Parking lot with concrete drive lanes, PICP and open base
below all of it
Gragg Park,
Houston, Texas
Preventive Maintenance
Sweeping / Vacuuming Intervals: Regenerative Air
Recommended Minimum 1 - 2x Year
O&M Cost Estimated To Be ≈ $ .02 - .03 / sf
Preventive Maintenance
Billy Goat Sweeper for Sidewalks, Patios,
Plazas, Driveways
Adding back #89 stone
44
$22- $25/cy

More Related Content

Similar to Permeable Pavers: Missed Opportunities and Simplified Cross Sections

000301_Ms3_Gantry_Foundations_Javad_Akhtar
000301_Ms3_Gantry_Foundations_Javad_Akhtar000301_Ms3_Gantry_Foundations_Javad_Akhtar
000301_Ms3_Gantry_Foundations_Javad_Akhtar
Javad Akhtar
 
Himkaar Singh Diepsloot SW Report
Himkaar Singh Diepsloot SW ReportHimkaar Singh Diepsloot SW Report
Himkaar Singh Diepsloot SW Report
Himkaar Singh
 
Lisa stormcon presentation number one ieca
Lisa stormcon presentation number one iecaLisa stormcon presentation number one ieca
Lisa stormcon presentation number one ieca
Lisa Nisenson
 
White paper permeablepavement
White paper permeablepavementWhite paper permeablepavement
White paper permeablepavement
cathexis123
 
S60 mb proper_20_pccp_20design_20details_20for_20performance_20__20road_20sch...
S60 mb proper_20_pccp_20design_20details_20for_20performance_20__20road_20sch...S60 mb proper_20_pccp_20design_20details_20for_20performance_20__20road_20sch...
S60 mb proper_20_pccp_20design_20details_20for_20performance_20__20road_20sch...
R C Patil Patil
 
Armoured Ford - Low Water Stream Crossing
Armoured Ford - Low Water Stream CrossingArmoured Ford - Low Water Stream Crossing
Armoured Ford - Low Water Stream Crossing
Eric Lestock Kay
 

Similar to Permeable Pavers: Missed Opportunities and Simplified Cross Sections (20)

Acf environmental 2016 apwa fl expo - integrated infrastructure-an innovati...
Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovati...Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovati...
Acf environmental 2016 apwa fl expo - integrated infrastructure-an innovati...
 
Composites for next generation infrastructure owens corning jec2018
Composites for next generation infrastructure owens corning jec2018Composites for next generation infrastructure owens corning jec2018
Composites for next generation infrastructure owens corning jec2018
 
Milestone Smart Choices
Milestone Smart ChoicesMilestone Smart Choices
Milestone Smart Choices
 
000301_Ms3_Gantry_Foundations_Javad_Akhtar
000301_Ms3_Gantry_Foundations_Javad_Akhtar000301_Ms3_Gantry_Foundations_Javad_Akhtar
000301_Ms3_Gantry_Foundations_Javad_Akhtar
 
Georgia DOT Drivable Grass 3 27-14
Georgia DOT Drivable Grass 3 27-14Georgia DOT Drivable Grass 3 27-14
Georgia DOT Drivable Grass 3 27-14
 
Trench Drain Systems: Types, Benefits, Applications, and Overview
Trench Drain Systems: Types, Benefits, Applications, and OverviewTrench Drain Systems: Types, Benefits, Applications, and Overview
Trench Drain Systems: Types, Benefits, Applications, and Overview
 
Moving transportation forward
Moving transportation forwardMoving transportation forward
Moving transportation forward
 
Bath, Maine Design And Resiliency Team (DART) Project
Bath, Maine Design And Resiliency Team (DART) ProjectBath, Maine Design And Resiliency Team (DART) Project
Bath, Maine Design And Resiliency Team (DART) Project
 
Nykilde geoweb load support design package
Nykilde geoweb load support design packageNykilde geoweb load support design package
Nykilde geoweb load support design package
 
Wilma Dykeman Riverway Road Intersection Re-modernization
Wilma Dykeman Riverway  Road Intersection Re-modernizationWilma Dykeman Riverway  Road Intersection Re-modernization
Wilma Dykeman Riverway Road Intersection Re-modernization
 
Norstar U Shaped Drains
Norstar U Shaped DrainsNorstar U Shaped Drains
Norstar U Shaped Drains
 
Himkaar Singh Diepsloot SW Report
Himkaar Singh Diepsloot SW ReportHimkaar Singh Diepsloot SW Report
Himkaar Singh Diepsloot SW Report
 
Lisa stormcon presentation number one ieca
Lisa stormcon presentation number one iecaLisa stormcon presentation number one ieca
Lisa stormcon presentation number one ieca
 
Underground Water Management for Utility Vaults and Manholes
Underground Water Management for Utility Vaults and ManholesUnderground Water Management for Utility Vaults and Manholes
Underground Water Management for Utility Vaults and Manholes
 
White paper permeablepavement
White paper permeablepavementWhite paper permeablepavement
White paper permeablepavement
 
S60 mb proper_20_pccp_20design_20details_20for_20performance_20__20road_20sch...
S60 mb proper_20_pccp_20design_20details_20for_20performance_20__20road_20sch...S60 mb proper_20_pccp_20design_20details_20for_20performance_20__20road_20sch...
S60 mb proper_20_pccp_20design_20details_20for_20performance_20__20road_20sch...
 
Site Solutions by Contech
Site Solutions by ContechSite Solutions by Contech
Site Solutions by Contech
 
Armoured Ford - Low Water Stream Crossing
Armoured Ford - Low Water Stream CrossingArmoured Ford - Low Water Stream Crossing
Armoured Ford - Low Water Stream Crossing
 
Quiet asphalt 2005_symposium_layfette_indiana_1
Quiet asphalt 2005_symposium_layfette_indiana_1Quiet asphalt 2005_symposium_layfette_indiana_1
Quiet asphalt 2005_symposium_layfette_indiana_1
 
Proposal presentation
Proposal presentationProposal presentation
Proposal presentation
 

Recently uploaded

VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Recently uploaded (20)

VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
 
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
 
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
 
Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate action
 
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
 
Green Marketing
Green MarketingGreen Marketing
Green Marketing
 
Climate Change
Climate ChangeClimate Change
Climate Change
 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995
 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
 
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
 
Deforestation
DeforestationDeforestation
Deforestation
 

Permeable Pavers: Missed Opportunities and Simplified Cross Sections

  • 1.  19th Annual EPA Region 6 Stormwater Conference September 17-21, 2017 Permeable Pavers: Missed Opportunities and Simplified Cross Sections by Elizabeth Arceneaux, P.E. and David Hasness, P.E.
  • 2. Topics to Cover  Impermeable Pavers vs Permeable Pavers  Importance of limiting impervious cover  Infiltration testing and interpretation  Missed opportunities for infiltration  Simplified cross sections for construction standards adoption
  • 3. People Love Pavers  Decorative  Unique  Elegant  Cool  Durable Dell Seton Medical Center Austin, TX
  • 4. Alamo Dome Plaza San Antonio, TX We see them in Plazas
  • 5. Pearl Brewery Plaza, San Antonio
  • 6. Sidewalks Downtown New Braunfels, TX Downtown Gruene, TX
  • 8. Train Stations of Past Times San Antonio, TX Weatherford, TX
  • 10. Most of the previous examples are not permeable Take a CLOSER look
  • 11. PICP vs ICP Permeable Interlocking Concrete Pavers (PICP) Interlocking Concrete Pavers (ICP)
  • 12. Compacted base and subbase Open base and subbase (gravels) Both $18-20/ft2
  • 13. Importance of Permeable Impervious Cover (IC)  Adds to increased runoff  Poorer water quality  Greater than 10-15% IC leads to stream degradation, adverse effects (1)(2)(3)  40 -70 % IC is not uncommon for urban areas References (1)Greater Edwards Aquifer Alliance, 2014 Low Impact Development Manual (2)Schueler, T. 1994, King et.al, 2011 (3)San Marcos Water Quality Protection Plan for the HCP, 2015
  • 14. Impact of IC • Utilities are unearthed • Road is undermined • Stream bank is Eroded • $ 3,000,000 creek restoration project (San Marcos) Increased flooding?
  • 15. Reference: Greater Edwards Aquifer Alliance, 2014, LID Manual We put a lot of effort into thinking about IC Now lets…
  • 16.  Permeable path @ Texas State University. Large tree protection! Do SomethingAbout It
  • 17. Step by StepWe Change our Nature  If aesthetics is the driver, why not go permeable too?  Easy testing to verify performance  Make resources available for all to use  Clear construction standards to insure success  Include sections and details in municipal construction standards so they are easy to find
  • 18. Step by StepWe Change our Nature  If aesthetics is the driver, why not go permeable too?
  • 19. Testing byAuthors toVerify Performance San Marcos, Wimberley, Seguin, Kingsland
  • 20. Poor Performance (< 1 inch/hour) Interlocking Concrete Paver (ICP) design - Decorative
  • 21. Excellent Performance (54 to 650+ in/hr) Permeable Interlocking Concrete Paver (PICP) design – LID & Decorative
  • 23. Simplified Cross Sections for Municipal Construction Standards References:  Interlocking Concrete Pavement Institute  American Society of Civil Engineers and Environmental & Water Resources Institute  San Antonio River Authority  Concrete Paver Manufacturers  Project Specific PICP Sections  Make resources available for all to use
  • 24. Cross sections in .dwg file format for free download www.icpi.org
  • 25. ICPI Standard Detail for Driveways (No. 68)  Clear construction standards to insure success
  • 26. ICPI Standard Detail Sloped Surfaces (No. 81) Lateral Flow Barriers
  • 27.
  • 28.
  • 29. ASCE/EWRI Conceptual Designs (all perm pavements) Visual of the open base
  • 30. Other Sections (available as a .dwg file)
  • 31. Light Duty Pedestrian (TCEQ RG-348 Addendum 2012)
  • 32. Waterproofing next to a building…no problem ASTM #57 Open Base Austin Animal Center
  • 33. Benefits of Standardizing  Simplifies designs for PICP in neighborhoods, casual spaces and plazas  Ensures high infiltration of built surfaces  Reduces uncertainty and increases confidence  Allows more widespread use of PICP ***PICP CAD files collected by Authors and available in Dropbox (by clicking this link)
  • 34. Resources • ASCE/EWRI, Permeable Pavements, 2015, Permeable Pavements Task Committee • ICPI, Permeable Interlocking Concrete Pavements, Fourth Edition, David R. Smith, 2011 • ICPI Specialist Course, 2009 First Edition • ICPI Tech Spec #18 , 2013, Construction of Permeable Interlocking Concrete Pavement Systems • ICPI, Tech Spec #23, 2017, Maintenance Guide for Permeable Interlocking Concrete Pavements
  • 35. In Summary  Impermeable Pavers vs Permeable Pavers?  Are we missing opportunities to infiltrate?  Do we want to reduce impervious cover?  Can we include PICP cross sections in our construction standards?  If the answer is yes, then we can increase our use of this valuable stormwater management practice.
  • 37. To see a 1 ½ minute video of the underdrain discharge at the Texas State River House Permeable Paver Parking Lot, following 9 inches of rain right click this link and select open (takes a minute to open): River House Perm Paver Discharge 8-28-17 This was the discharge following several days of rain from Hurricane Harvey 8/28/17 BONUS MATERIAL (video, costs and more sections)
  • 38. ICP Design for Heavy Duty Pedestrian Section What about co$t$ ? • 8 inch of compacted base is actually 10 -12 inch before compaction • Cost of compaction (equipment) • Cost of density testing, proctors • About $13/ft2 road base and $5-7/ft2 pavers OR
  • 39. 12 INCH PICP Design for Heavy Duty Pedestrian • Open stone 2 inches #8 or 9, and 12 inches #57 • Light compaction equipment • No proctors, no densities • About $13/ft2 open base and $5-7/ft2 pavers
  • 40. Parking lot with concrete drive lanes, PICP and open base below all of it Gragg Park, Houston, Texas
  • 41. Preventive Maintenance Sweeping / Vacuuming Intervals: Regenerative Air Recommended Minimum 1 - 2x Year O&M Cost Estimated To Be ≈ $ .02 - .03 / sf
  • 43. Billy Goat Sweeper for Sidewalks, Patios, Plazas, Driveways
  • 44. Adding back #89 stone 44 $22- $25/cy