This document discusses improvements made to a manufacturing process through kitting subassemblies, improving visual management, and reducing waste. Key changes included relocating trim assembly to a central location to remove trapped labor, building subassemblies in sequence, dedicating transport carts for work-in-process, and designing kit boxes with specific locations for all parts to pick correctly. These changes allowed reducing headcount, defects, and work-in-process while enhancing material flow and organization.