Energy Efficiency Retrofits in Commercial
Buildings
6 April 2017, IHC New Delhi
Retrofit offers immense opportunities for
energy efficiency in buildings
Retrofit opportunity would increase many fold
Quantum energy savings achievable
Owing to advancement in technologies
Paradigm shift
Today it is seen as a
key area for cost savings
Introduction – Need for Retrofitting
Energy consumption for thermal comfort
 Execution of O&M practices support project to
Enhance energy performance over time
Opportunities to Bring Down O&M Cost
Negligence in O&M
Proper O&M practices
At O&M Each Building Component has Imp. Role
 Buildings lead to dynamic performance
 Interaction with climate & operational features
 Continuous monitoring is essential
 To understand building behavior and take action plan
Building Performance
How to Ensure Performance ?
Building and equipment performance shall
be evaluated
Following several methods
COP/EE
R
kWh/TRh
kWh/sqm/
yr
kW/TR
© Confederation of Indian Industry
Approaches for Energy Efficient Retrofit
 3 Pronged approach
 To identify energy savings potential
© Confederation of Indian Industry
1) Walk Through Audit
Energy consumption can be reduced by
20-25 % over as on today
 Excellent performance
 86 kWh/m2/yr (Conditioned)
 54 kWh/m2/yr (BUA)
Thermax Corporate office
© Confederation of Indian Industry
Retrofit - Energy Saving Measures
 Condenser Pump (retrofit/ VFD)
 Cooling Towers (2 instead of one)
 Chilled water reset (8-9 v/s 6 o
C)
 Variable pump
 High Efficiency Motors (IE2 & IE3)
 Heat Recovery Wheel (delta T >5)
 Makeup cooling tower (5-6 kL/day)
 Installation of CPM
 Raised thermostat – UPS & server room
 Efficient interior lighting
 Adaptive thermostat
 Glass film (to reduce heat & glare)
 High albedo roof
 Rooftop SPV
 Others
Potential in Service Scalability
ECMs based on
Simple Payback
•Short term
•Medium term
•Long term
© Confederation of Indian Industry
Way forward – Office Buildings
 Feasible to save 20-25% energy
 Opportunity to offset grid energy
 10-20% RE generation
 3-5 storey building (depends on roof area
available)
 Moderate energy performance
 Significant water saving
 Leads to building energy efficiency
© Confederation of Indian Industry
© Confederation of Indian Industry
2) Green Buildings
 Holistic approach
 Implementation of green feature offers
 Enhanced building performance
 Enable projects to benchmark energy
consumption
 Metering & monitoring supports in
continuous performance monitoring
© Confederation of Indian Industry
a) Dell Office Hyderabad (ITES)
 Significant reduction in energy
consumption
 Continuous performance improvement
• Encourage Stakeholders
• Drive new product and latest technologies
Green Buildings
© Confederation of Indian Industry
 Savings: 10-15%
 Payback less than 1 year
 Rs. 1. lakh/chiller (250-320 TR)
Evaporative Condenser Cooling
Evaporative condenser cooling
(Dell Hyderabad)
© Confederation of Indian Industry
Installation of VFD
IE2/ IE3 motor, Dell Hyderabad
 Motor efficiency
>92%
Payback : less than 1.5-2 years
© Confederation of Indian Industry
 Installation of SPV
 230 kWp & 130 kWp
 4.8 Lakh Units
 Offset 6% grid energy
Renewable Energy (RE)
Every project has potential to have SPV system
(10-15% energy offset in Office Buildings)
High SRI Paint + SPV
Installed 360 kWp SPV, Dell HydGreen Building – RE Approach
RE as a % of
total kWh
Credit
points
2.5 2
5 4
7.5 6
© Confederation of Indian Industry
Continuous Improvements
 Continuous performance improvements
 Annual budget for retrofitting
 Complete site audit
16%
energy savings
2015-2016
0
500
1000
1500
2000
2500
3000
3500
4000
4500
0
2000000
4000000
6000000
8000000
10000000
12000000
14000000
2004 2006 2008 2010 2012 2014 2016 2018
kWh CMD A_MD
© Confederation of Indian Industry
b) HZL Udaipur – Key Features
 Retrofitting of lighting fixtures
 Exterior & Interior
 SPV
 100 kWp
 Occupancy sensor
 Facility areas
 High SRI paint
 Cloud based energy &
water monitoring
HZL Udaipur
(Platinum Certified)
© Confederation of Indian Industry
Installation of Occupancy Sensors
Installations occupancy sensors
Payback <1 year
© Confederation of Indian Industry
Fresh Air Ventilation – Enhanced Comfort
 Fresh air supply integrated with
 7 AHU’s
 Improves health and comfort
Fresh air supply (Inside – AHU room), HZL
Further targets:
•Installation of Heat Recovery Wheel (HRW)
© Confederation of Indian Industry
Building Automation : BMS System
 Energy monitoring
1. Main incomer TR1
2. Main lighting panel
3. Auditorium, AC
4. Ground floor AC
5. UPS 1
6. UPS 2
7. Lift
 Find improvement opportunities
 Air-conditioning , Lift, UPS, Lighting, etc.
EMS/BMS Supports in ‘Energy use Accountability’
© Confederation of Indian Industry
 Retrofitting of existing fixtures by LED Lighting
c) GBC - Lighting Retrofitting
LPD (W/ft2
)
As Built (2003) 1.04
Existing (2016) 0.49
72 W/ fixture, Efficacy : 60,
No. of fixtures : 211
Installed Lighting Fixtures
38 W/ fixture & Efficacy : 132
No. of Fixtures : <100
© Confederation of Indian Industry
Thermography of New and Existing
fixtures
Temp. Emiss. Refl. temp.°C
M1 50.0 0.90 20.0
LED 29 °C
Findings of therm
© Confederation of Indian Industry
 Cooling energy saving : 4 %
LED Based Lighting Fixtures
Operational cost savings : Rs. 1.2 lacs/ annum
Rs 10, 000/m
savings in
energy bill
© Confederation of Indian Industry
Building Automation System
 Smooth operation
 Air-conditioning , Fans, Pumps, Lighting, etc.
 Scheduling / Re-tuning of equipment operations
 Re-tuning is a systematic process to identify
operational problems
BMS enables energy efficiency by 8-10%
Cloud based
© Confederation of Indian Industry
Further Bring down Energy Usage
 30% efficient over Standard Case
 Performance improvement
opportunities
 20-25 % over As Built case
10.5 10.3
9.2 8.9
7.9 7.7 7.5
5.6
5.1 5.1
175 172
154 149
132 128 125
93
85 85
80
100
120
140
160
180
200
220
240
2
3
4
5
6
7
8
9
10
11
12
ActualCase
NightPurging
Lighting
ExtLighting
VFD_AHU
VFD_Pump
WindTower
SPVIntegration
BMS
EfficientDesign
Consumption(000xkWh)
Operationalcost(Rs.Lac)
Energy cost Energy Consumption
© Confederation of Indian Industry
3) Measurement & Verification
Protocols
IPMVP
FEMP
ASHRAE 14P
Measurement & Verification (M&V)
 Data collection
 Develop simulation
model
 Calibration
 Building level
 Component level
 Performance
comparison with
latest Codes &
recommend
 Energy Efficiency
Measures (ECMs)
Standard case v/s As Built case
Standard Case As Built
Inputs for Calibrated Simulation
HVAC (Chiller, AHU’s,
Pumps, CT, etc.)
Operation
Schedules:
• Occupancy
• lighting,
• Ext lighting,
• Equipment
• Fan,
• Thermostat
(as per space type)
Building Envelope
(Wall, roof, and glazing)
Interior and exterior
lighting Load
Equipment load
• Drawings (Architectural
and HVAC)
• Performance Data
• Site visits
can be further
improved
a) iLabs Hyderabad (ITES)
 Building energy consumption
MBE & CVRMSE, within specified limits
-IPMVP Errors Permissible
limits
Whole building
energy
Monthly MBE ±5% 2.83
Cv(RMSE 15% 6.09
Chiller Energy Consumption
Chiller performance
Errors Permissible
limits
Chiller energy
consumption
Monthly MBE ±5% 2.10
Cv(RMSE 15% 7.06
Performance Comparison
 As Built case is
10.6 % efficient
over
Standard case
 Performance
improvement
opportunities
 15-20 %
List of Energy Conservation Measures
 Retro-commissioning
 Primary, Secondary and Condenser
Pumps
 Cooling tower
 Evaporative cooling for condenser,
with Fan control
 Raised chilled water temperature
 Controls
 CAV to VAV system
 VFD (AHU Fan, primary/secondary
pumps, Fan – CT and Chiller)
 Daylight and occupancy control
 Lighting control
 CPM (Chiller Plant Manager - Load
and Chiller Sequencing)
 EMS/ BMS/ Feedback Loop
 Scheduling
 Condenser approach
 IE Motors
(Fan, Pump, Motors)
 Glass shade / film to reduce
heat gain
 High SRI paint over roof
 Raised thermostat
 Efficient Lighting fixtures
 Roof top SPV
 Demand control ventilation
 HRW (Delta T>5)
 Economiser operation
 Reduce/ replace Plug load
Buildings are designed for Peak design day, however
operated like every day is designed day
Experience : Energy Performance Monitoring
 EPM service offered to several office and
ITES buildings
 Owner and O&M team are committed
 Continuous performance monitoring is
essential
 ESCO’s are gaining ground
 Financial model can support to grow this
sector
Challenges faced
Large no. of IT/ITES buildings are tenant
occupied
Investment and savings ?
 Need awareness
 Govt. schemes and Industry support
 Adoption of Green Buildings
Tenants get operating
savings from retrofit
Regulatory support (Lead from BEE)
Empaneled Financial Institutions
ESCO’s (now 150 nos. whereas China has 5000)
Partial Risk Sharing Facility (PRSF)
SIDBI & IGBC
Expand proven programs &develop new tools
Engage (Vendors and Building Owners)
Support
Provide additional incentive
Building Energy Retrofit – Financing
Models
To sum up
 Reduce energy demand at several level
 Building level
 Society
 City level
 Country level
 Tremendous potential to improve
energy efficiency in building sector
 Energy retrofit will only grow
 Climate benefits
 Leadership in reducing the impact of
climate change
Stakeholder Engagement would result in EE in
For details, please contact:
Dr Shivraj Dhaka, Counsellor,
CII-Indian Green Building Council (IGBC) Hyderabad
shivraj.dhaka@cii.in; 040 44185211; 9177577288

More Related Content

What's hot

IEEE Systems and Information Engineering Design Symposium
IEEE Systems and Information Engineering Design SymposiumIEEE Systems and Information Engineering Design Symposium
IEEE Systems and Information Engineering Design Symposium
Srija Kumar
 
2015-12 -- State of Green Economy Report 2016_ENGIE LABS_Amit Pathare_Acceler...
2015-12 -- State of Green Economy Report 2016_ENGIE LABS_Amit Pathare_Acceler...2015-12 -- State of Green Economy Report 2016_ENGIE LABS_Amit Pathare_Acceler...
2015-12 -- State of Green Economy Report 2016_ENGIE LABS_Amit Pathare_Acceler...
Amit Pathare
 
Energy Manager_MRV article pdf
Energy Manager_MRV article pdfEnergy Manager_MRV article pdf
Energy Manager_MRV article pdf
Avijit Choudhury
 
Bill Jolly Keo Dubai Sustainability Design Process 19 March 2009
Bill Jolly   Keo Dubai Sustainability Design Process   19 March 2009Bill Jolly   Keo Dubai Sustainability Design Process   19 March 2009
Bill Jolly Keo Dubai Sustainability Design Process 19 March 2009
Billjolly
 
Ozone - Corporate Profile Detailed
Ozone - Corporate Profile DetailedOzone - Corporate Profile Detailed
Ozone - Corporate Profile Detailed
Setu Goyal
 

What's hot (20)

The role of delivered performance june2009
The role of delivered performance june2009The role of delivered performance june2009
The role of delivered performance june2009
 
IEEE Systems and Information Engineering Design Symposium
IEEE Systems and Information Engineering Design SymposiumIEEE Systems and Information Engineering Design Symposium
IEEE Systems and Information Engineering Design Symposium
 
Energy Optimization
Energy OptimizationEnergy Optimization
Energy Optimization
 
Presentation Solar Technologies Leonardo Energy - ICREPQ Congress 2009
Presentation Solar Technologies   Leonardo Energy   - ICREPQ Congress 2009Presentation Solar Technologies   Leonardo Energy   - ICREPQ Congress 2009
Presentation Solar Technologies Leonardo Energy - ICREPQ Congress 2009
 
Preparing for Zero Net Energy Buildings
Preparing for Zero Net Energy BuildingsPreparing for Zero Net Energy Buildings
Preparing for Zero Net Energy Buildings
 
2015-12 -- State of Green Economy Report 2016_ENGIE LABS_Amit Pathare_Acceler...
2015-12 -- State of Green Economy Report 2016_ENGIE LABS_Amit Pathare_Acceler...2015-12 -- State of Green Economy Report 2016_ENGIE LABS_Amit Pathare_Acceler...
2015-12 -- State of Green Economy Report 2016_ENGIE LABS_Amit Pathare_Acceler...
 
On the path to high-performance buildings and beyond
On the path to high-performance buildings and beyondOn the path to high-performance buildings and beyond
On the path to high-performance buildings and beyond
 
Engage with...Electrification of the AgriFood Sector
Engage with...Electrification of the AgriFood SectorEngage with...Electrification of the AgriFood Sector
Engage with...Electrification of the AgriFood Sector
 
Energy-Efficient Buildings of Tomorrow: Built on a Policy Cornerstone Today 
Energy-Efficient Buildings of Tomorrow: Built on a Policy Cornerstone Today Energy-Efficient Buildings of Tomorrow: Built on a Policy Cornerstone Today 
Energy-Efficient Buildings of Tomorrow: Built on a Policy Cornerstone Today 
 
Reducing energy intensity of the Indian economy, Saurabh Diddi, Bureau of Ene...
Reducing energy intensity of the Indian economy, Saurabh Diddi, Bureau of Ene...Reducing energy intensity of the Indian economy, Saurabh Diddi, Bureau of Ene...
Reducing energy intensity of the Indian economy, Saurabh Diddi, Bureau of Ene...
 
Energy Manager_MRV article pdf
Energy Manager_MRV article pdfEnergy Manager_MRV article pdf
Energy Manager_MRV article pdf
 
Eco Engineering and Energy Solutions EcoSol
Eco Engineering and Energy Solutions EcoSolEco Engineering and Energy Solutions EcoSol
Eco Engineering and Energy Solutions EcoSol
 
Day-4, Dr. Rahul Walalwalkar - Energy Storage 4 Renewables
Day-4, Dr. Rahul Walalwalkar - Energy Storage 4 RenewablesDay-4, Dr. Rahul Walalwalkar - Energy Storage 4 Renewables
Day-4, Dr. Rahul Walalwalkar - Energy Storage 4 Renewables
 
Ecbc ppt mk
Ecbc ppt   mkEcbc ppt   mk
Ecbc ppt mk
 
Engage with...Cummins
Engage with...CumminsEngage with...Cummins
Engage with...Cummins
 
Bill Jolly Keo Dubai Sustainability Design Process 19 March 2009
Bill Jolly   Keo Dubai Sustainability Design Process   19 March 2009Bill Jolly   Keo Dubai Sustainability Design Process   19 March 2009
Bill Jolly Keo Dubai Sustainability Design Process 19 March 2009
 
Ozone - Corporate Profile Detailed
Ozone - Corporate Profile DetailedOzone - Corporate Profile Detailed
Ozone - Corporate Profile Detailed
 
Consultancy Projects - Presentation
Consultancy Projects - Presentation Consultancy Projects - Presentation
Consultancy Projects - Presentation
 
Engage with...YASA
Engage with...YASAEngage with...YASA
Engage with...YASA
 
Gsy Energy Renewable Energy Consulting
Gsy Energy Renewable Energy ConsultingGsy Energy Renewable Energy Consulting
Gsy Energy Renewable Energy Consulting
 

Similar to CK2017: Energy Efficiency Retrofits in Commercial Buildings

EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016
Dennis Cody
 
ICPCI saves energy with VRF technology
ICPCI saves energy with VRF technology ICPCI saves energy with VRF technology
ICPCI saves energy with VRF technology
ICPCI
 
Venkat Rajaraman - Su-kam
Venkat Rajaraman - Su-kamVenkat Rajaraman - Su-kam
Venkat Rajaraman - Su-kam
guest17a0764
 
PROFILE- ENCON EMSPL
PROFILE- ENCON EMSPLPROFILE- ENCON EMSPL
PROFILE- ENCON EMSPL
Cdr S Kumar
 
Green Machines - How OEMs can improve the energy efficiency of machine
Green Machines - How OEMs can improve the energy efficiency of machine Green Machines - How OEMs can improve the energy efficiency of machine
Green Machines - How OEMs can improve the energy efficiency of machine
Schneider Electric India
 
Energy Management-7 Oct (Skykine)
Energy Management-7 Oct (Skykine)Energy Management-7 Oct (Skykine)
Energy Management-7 Oct (Skykine)
Dalip Singh
 

Similar to CK2017: Energy Efficiency Retrofits in Commercial Buildings (20)

EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016
 
Industrial energy efficiency - approaches, technologies and policies, Girish ...
Industrial energy efficiency - approaches, technologies and policies, Girish ...Industrial energy efficiency - approaches, technologies and policies, Girish ...
Industrial energy efficiency - approaches, technologies and policies, Girish ...
 
Energy audit and career opportunities -EnSave
Energy audit  and career opportunities -EnSaveEnergy audit  and career opportunities -EnSave
Energy audit and career opportunities -EnSave
 
ICPCI saves energy with VRF technology
ICPCI saves energy with VRF technology ICPCI saves energy with VRF technology
ICPCI saves energy with VRF technology
 
General em presentation (25 02-09)
General em presentation (25 02-09)General em presentation (25 02-09)
General em presentation (25 02-09)
 
Enhancing competitiveness and achieving sustainability
Enhancing competitiveness and achieving sustainabilityEnhancing competitiveness and achieving sustainability
Enhancing competitiveness and achieving sustainability
 
Top 10 Products That Save Money - David McDougall, EnerNOC
Top 10 Products That Save Money - David McDougall, EnerNOCTop 10 Products That Save Money - David McDougall, EnerNOC
Top 10 Products That Save Money - David McDougall, EnerNOC
 
Green & Beyond: Data Center Actions to Increase Business Responsiveness and R...
Green & Beyond: Data Center Actions to Increase Business Responsiveness and R...Green & Beyond: Data Center Actions to Increase Business Responsiveness and R...
Green & Beyond: Data Center Actions to Increase Business Responsiveness and R...
 
EC Fans Efficiency / Upgrade Projects
EC Fans Efficiency / Upgrade ProjectsEC Fans Efficiency / Upgrade Projects
EC Fans Efficiency / Upgrade Projects
 
Venkat Rajaraman - Su-kam
Venkat Rajaraman - Su-kamVenkat Rajaraman - Su-kam
Venkat Rajaraman - Su-kam
 
Maintenance Head
Maintenance  HeadMaintenance  Head
Maintenance Head
 
PROFILE- ENCON EMSPL
PROFILE- ENCON EMSPLPROFILE- ENCON EMSPL
PROFILE- ENCON EMSPL
 
ASHRAE Standard 100
ASHRAE Standard 100ASHRAE Standard 100
ASHRAE Standard 100
 
The Benefits of Remote Energy Management
The Benefits of Remote Energy ManagementThe Benefits of Remote Energy Management
The Benefits of Remote Energy Management
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
 
Green Machines - How OEMs can improve the energy efficiency of machine
Green Machines - How OEMs can improve the energy efficiency of machine Green Machines - How OEMs can improve the energy efficiency of machine
Green Machines - How OEMs can improve the energy efficiency of machine
 
Energy Management-7 Oct (Skykine)
Energy Management-7 Oct (Skykine)Energy Management-7 Oct (Skykine)
Energy Management-7 Oct (Skykine)
 
Indian Green Building Council- Green Factory Rating System
Indian Green Building Council- Green Factory Rating SystemIndian Green Building Council- Green Factory Rating System
Indian Green Building Council- Green Factory Rating System
 
#EnergyEfficiency investment trend in the #Spinning Industry in India.
 #EnergyEfficiency investment trend in the #Spinning Industry in India. #EnergyEfficiency investment trend in the #Spinning Industry in India.
#EnergyEfficiency investment trend in the #Spinning Industry in India.
 

More from WRI Ross Center for Sustainable Cities

More from WRI Ross Center for Sustainable Cities (20)

Restoration of Urban Blue Acres_Case of Rajokari Village
Restoration of Urban Blue Acres_Case of Rajokari VillageRestoration of Urban Blue Acres_Case of Rajokari Village
Restoration of Urban Blue Acres_Case of Rajokari Village
 
Restoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakes
Restoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakesRestoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakes
Restoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakes
 
Restoration of Urban Blue Acres_Green Water Revoln. Pune
Restoration of Urban Blue Acres_Green Water Revoln. PuneRestoration of Urban Blue Acres_Green Water Revoln. Pune
Restoration of Urban Blue Acres_Green Water Revoln. Pune
 
Restoration of Urban Blue Acres_Biostarts Ventures
Restoration of Urban Blue Acres_Biostarts VenturesRestoration of Urban Blue Acres_Biostarts Ventures
Restoration of Urban Blue Acres_Biostarts Ventures
 
Restoration of Urban Blue Acres_Biome Water for Cities
Restoration of Urban Blue Acres_Biome Water for CitiesRestoration of Urban Blue Acres_Biome Water for Cities
Restoration of Urban Blue Acres_Biome Water for Cities
 
Restoration of Urban Blue Acres_Relevance of Global Outlook to HYD
Restoration of Urban Blue Acres_Relevance of Global Outlook to HYDRestoration of Urban Blue Acres_Relevance of Global Outlook to HYD
Restoration of Urban Blue Acres_Relevance of Global Outlook to HYD
 
Restoration of Urban Blue Acres_Ayala
Restoration of Urban Blue Acres_AyalaRestoration of Urban Blue Acres_Ayala
Restoration of Urban Blue Acres_Ayala
 
Restoration of Urban Blue Acres_Multi-stakeholder forum HYD
Restoration of Urban Blue Acres_Multi-stakeholder forum HYDRestoration of Urban Blue Acres_Multi-stakeholder forum HYD
Restoration of Urban Blue Acres_Multi-stakeholder forum HYD
 
Unlock Bengaluru 2018: Roadmap to the Townships and Campuses of the Future
Unlock Bengaluru 2018: Roadmap to the Townships and Campuses of the FutureUnlock Bengaluru 2018: Roadmap to the Townships and Campuses of the Future
Unlock Bengaluru 2018: Roadmap to the Townships and Campuses of the Future
 
Unlock Bengaluru 2018: Water - Are we nearing Day Zero?
Unlock Bengaluru 2018: Water - Are we nearing Day Zero?Unlock Bengaluru 2018: Water - Are we nearing Day Zero?
Unlock Bengaluru 2018: Water - Are we nearing Day Zero?
 
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization ProjectCK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
 
CK2018: Green Corridor TOD Project - Cali, Colombia
CK2018: Green Corridor TOD Project - Cali, ColombiaCK2018: Green Corridor TOD Project - Cali, Colombia
CK2018: Green Corridor TOD Project - Cali, Colombia
 
CK2018: Land value capture in Brazil
CK2018: Land value capture in BrazilCK2018: Land value capture in Brazil
CK2018: Land value capture in Brazil
 
CK2018: Urban Development - Examples from Mexico
CK2018: Urban Development - Examples from MexicoCK2018: Urban Development - Examples from Mexico
CK2018: Urban Development - Examples from Mexico
 
CK2018: Working with Partners & Data Sharing
CK2018: Working with Partners & Data Sharing CK2018: Working with Partners & Data Sharing
CK2018: Working with Partners & Data Sharing
 
CK2018: Global Convenant of Mayors approach to Climate Action Planning
CK2018: Global Convenant of Mayors approach to Climate Action PlanningCK2018: Global Convenant of Mayors approach to Climate Action Planning
CK2018: Global Convenant of Mayors approach to Climate Action Planning
 
CK2018: GHG Platform India
CK2018: GHG Platform IndiaCK2018: GHG Platform India
CK2018: GHG Platform India
 
CK2018: Climate Actions for Cities India's NDC, NAPCC and SAPCC
CK2018: Climate Actions for Cities India's NDC, NAPCC and SAPCCCK2018: Climate Actions for Cities India's NDC, NAPCC and SAPCC
CK2018: Climate Actions for Cities India's NDC, NAPCC and SAPCC
 
CK2018: Barriers and Global Innovations for Electric Bus Fleets
CK2018: Barriers and Global Innovations for Electric Bus FleetsCK2018: Barriers and Global Innovations for Electric Bus Fleets
CK2018: Barriers and Global Innovations for Electric Bus Fleets
 
CK2018: Electric Vehicle Financing
CK2018: Electric Vehicle FinancingCK2018: Electric Vehicle Financing
CK2018: Electric Vehicle Financing
 

Recently uploaded

2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
MadhuKothuru
 
Mifepristion Pills IN Kuwait (+918133066128) Where I Can Buy Abortion pills K...
Mifepristion Pills IN Kuwait (+918133066128) Where I Can Buy Abortion pills K...Mifepristion Pills IN Kuwait (+918133066128) Where I Can Buy Abortion pills K...
Mifepristion Pills IN Kuwait (+918133066128) Where I Can Buy Abortion pills K...
Abortion pills in Kuwait Cytotec pills in Kuwait
 

Recently uploaded (20)

The impact and warm of wildlife crime - 2024 World Wildlife Crime Report.
The impact and warm of wildlife crime - 2024 World Wildlife Crime Report.The impact and warm of wildlife crime - 2024 World Wildlife Crime Report.
The impact and warm of wildlife crime - 2024 World Wildlife Crime Report.
 
The 2024 World Wildlife Crime Report tracks all these issues, trends and more...
The 2024 World Wildlife Crime Report tracks all these issues, trends and more...The 2024 World Wildlife Crime Report tracks all these issues, trends and more...
The 2024 World Wildlife Crime Report tracks all these issues, trends and more...
 
PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438
 
POKKUVARAVU OF RR property-directions for mutation
POKKUVARAVU OF RR property-directions  for mutationPOKKUVARAVU OF RR property-directions  for mutation
POKKUVARAVU OF RR property-directions for mutation
 
RIMJHIM $ best call girls in Anand Call Girls Service 👉📞 6378878445 👉📞 Just📲 ...
RIMJHIM $ best call girls in Anand Call Girls Service 👉📞 6378878445 👉📞 Just📲 ...RIMJHIM $ best call girls in Anand Call Girls Service 👉📞 6378878445 👉📞 Just📲 ...
RIMJHIM $ best call girls in Anand Call Girls Service 👉📞 6378878445 👉📞 Just📲 ...
 
Nitrogen filled high expansion foam in open Containers
Nitrogen filled high expansion foam in open ContainersNitrogen filled high expansion foam in open Containers
Nitrogen filled high expansion foam in open Containers
 
Item ## 4a -- April 29, 2024 CCM Minutes
Item ## 4a -- April 29, 2024 CCM MinutesItem ## 4a -- April 29, 2024 CCM Minutes
Item ## 4a -- April 29, 2024 CCM Minutes
 
Spring 2024 Issue Punitive and Productive Suffering
Spring 2024 Issue Punitive and Productive SufferingSpring 2024 Issue Punitive and Productive Suffering
Spring 2024 Issue Punitive and Productive Suffering
 
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
 
Mifepristion Pills IN Kuwait (+918133066128) Where I Can Buy Abortion pills K...
Mifepristion Pills IN Kuwait (+918133066128) Where I Can Buy Abortion pills K...Mifepristion Pills IN Kuwait (+918133066128) Where I Can Buy Abortion pills K...
Mifepristion Pills IN Kuwait (+918133066128) Where I Can Buy Abortion pills K...
 
Call Girls Service Ajmer 6378878445 Book Escort Models Any Time
Call Girls Service Ajmer 6378878445 Book Escort Models Any TimeCall Girls Service Ajmer 6378878445 Book Escort Models Any Time
Call Girls Service Ajmer 6378878445 Book Escort Models Any Time
 
sponsor for poor old age person food.pdf
sponsor for poor old age person food.pdfsponsor for poor old age person food.pdf
sponsor for poor old age person food.pdf
 
Managing large-scale outbreaks at Farrow-to-Weaner Farms
Managing large-scale outbreaks at Farrow-to-Weaner FarmsManaging large-scale outbreaks at Farrow-to-Weaner Farms
Managing large-scale outbreaks at Farrow-to-Weaner Farms
 
Value, protect, respect and invest in our nuses for a sustainable future for ...
Value, protect, respect and invest in our nuses for a sustainable future for ...Value, protect, respect and invest in our nuses for a sustainable future for ...
Value, protect, respect and invest in our nuses for a sustainable future for ...
 
Introduction to The Guidelines for the Long-term Sustainability of Outer Spac...
Introduction to The Guidelines for the Long-term Sustainability of Outer Spac...Introduction to The Guidelines for the Long-term Sustainability of Outer Spac...
Introduction to The Guidelines for the Long-term Sustainability of Outer Spac...
 
"Plant health, safe trade and digital technology." International Day of Plant...
"Plant health, safe trade and digital technology." International Day of Plant..."Plant health, safe trade and digital technology." International Day of Plant...
"Plant health, safe trade and digital technology." International Day of Plant...
 
School Health and Wellness Programme -.pptx
School Health and Wellness Programme -.pptxSchool Health and Wellness Programme -.pptx
School Health and Wellness Programme -.pptx
 
2024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 312024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 31
 
2024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 322024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 32
 
Electric Vehicle infrastructure planning in Rural Planning Organizations
Electric Vehicle infrastructure planning in Rural Planning OrganizationsElectric Vehicle infrastructure planning in Rural Planning Organizations
Electric Vehicle infrastructure planning in Rural Planning Organizations
 

CK2017: Energy Efficiency Retrofits in Commercial Buildings

  • 1. Energy Efficiency Retrofits in Commercial Buildings 6 April 2017, IHC New Delhi
  • 2. Retrofit offers immense opportunities for energy efficiency in buildings Retrofit opportunity would increase many fold Quantum energy savings achievable Owing to advancement in technologies Paradigm shift Today it is seen as a key area for cost savings Introduction – Need for Retrofitting Energy consumption for thermal comfort
  • 3.  Execution of O&M practices support project to Enhance energy performance over time Opportunities to Bring Down O&M Cost Negligence in O&M Proper O&M practices
  • 4. At O&M Each Building Component has Imp. Role  Buildings lead to dynamic performance  Interaction with climate & operational features  Continuous monitoring is essential  To understand building behavior and take action plan Building Performance
  • 5. How to Ensure Performance ? Building and equipment performance shall be evaluated Following several methods COP/EE R kWh/TRh kWh/sqm/ yr kW/TR
  • 6. © Confederation of Indian Industry Approaches for Energy Efficient Retrofit  3 Pronged approach  To identify energy savings potential
  • 7. © Confederation of Indian Industry 1) Walk Through Audit Energy consumption can be reduced by 20-25 % over as on today  Excellent performance  86 kWh/m2/yr (Conditioned)  54 kWh/m2/yr (BUA) Thermax Corporate office
  • 8. © Confederation of Indian Industry Retrofit - Energy Saving Measures  Condenser Pump (retrofit/ VFD)  Cooling Towers (2 instead of one)  Chilled water reset (8-9 v/s 6 o C)  Variable pump  High Efficiency Motors (IE2 & IE3)  Heat Recovery Wheel (delta T >5)  Makeup cooling tower (5-6 kL/day)  Installation of CPM  Raised thermostat – UPS & server room  Efficient interior lighting  Adaptive thermostat  Glass film (to reduce heat & glare)  High albedo roof  Rooftop SPV  Others Potential in Service Scalability ECMs based on Simple Payback •Short term •Medium term •Long term
  • 9. © Confederation of Indian Industry Way forward – Office Buildings  Feasible to save 20-25% energy  Opportunity to offset grid energy  10-20% RE generation  3-5 storey building (depends on roof area available)  Moderate energy performance  Significant water saving  Leads to building energy efficiency
  • 10. © Confederation of Indian Industry
  • 11. © Confederation of Indian Industry 2) Green Buildings  Holistic approach  Implementation of green feature offers  Enhanced building performance  Enable projects to benchmark energy consumption  Metering & monitoring supports in continuous performance monitoring
  • 12. © Confederation of Indian Industry a) Dell Office Hyderabad (ITES)  Significant reduction in energy consumption  Continuous performance improvement • Encourage Stakeholders • Drive new product and latest technologies Green Buildings
  • 13. © Confederation of Indian Industry  Savings: 10-15%  Payback less than 1 year  Rs. 1. lakh/chiller (250-320 TR) Evaporative Condenser Cooling Evaporative condenser cooling (Dell Hyderabad)
  • 14. © Confederation of Indian Industry Installation of VFD IE2/ IE3 motor, Dell Hyderabad  Motor efficiency >92% Payback : less than 1.5-2 years
  • 15. © Confederation of Indian Industry  Installation of SPV  230 kWp & 130 kWp  4.8 Lakh Units  Offset 6% grid energy Renewable Energy (RE) Every project has potential to have SPV system (10-15% energy offset in Office Buildings) High SRI Paint + SPV Installed 360 kWp SPV, Dell HydGreen Building – RE Approach RE as a % of total kWh Credit points 2.5 2 5 4 7.5 6
  • 16. © Confederation of Indian Industry Continuous Improvements  Continuous performance improvements  Annual budget for retrofitting  Complete site audit 16% energy savings 2015-2016 0 500 1000 1500 2000 2500 3000 3500 4000 4500 0 2000000 4000000 6000000 8000000 10000000 12000000 14000000 2004 2006 2008 2010 2012 2014 2016 2018 kWh CMD A_MD
  • 17. © Confederation of Indian Industry b) HZL Udaipur – Key Features  Retrofitting of lighting fixtures  Exterior & Interior  SPV  100 kWp  Occupancy sensor  Facility areas  High SRI paint  Cloud based energy & water monitoring HZL Udaipur (Platinum Certified)
  • 18. © Confederation of Indian Industry Installation of Occupancy Sensors Installations occupancy sensors Payback <1 year
  • 19. © Confederation of Indian Industry Fresh Air Ventilation – Enhanced Comfort  Fresh air supply integrated with  7 AHU’s  Improves health and comfort Fresh air supply (Inside – AHU room), HZL Further targets: •Installation of Heat Recovery Wheel (HRW)
  • 20. © Confederation of Indian Industry Building Automation : BMS System  Energy monitoring 1. Main incomer TR1 2. Main lighting panel 3. Auditorium, AC 4. Ground floor AC 5. UPS 1 6. UPS 2 7. Lift  Find improvement opportunities  Air-conditioning , Lift, UPS, Lighting, etc. EMS/BMS Supports in ‘Energy use Accountability’
  • 21. © Confederation of Indian Industry  Retrofitting of existing fixtures by LED Lighting c) GBC - Lighting Retrofitting LPD (W/ft2 ) As Built (2003) 1.04 Existing (2016) 0.49 72 W/ fixture, Efficacy : 60, No. of fixtures : 211 Installed Lighting Fixtures 38 W/ fixture & Efficacy : 132 No. of Fixtures : <100
  • 22. © Confederation of Indian Industry Thermography of New and Existing fixtures Temp. Emiss. Refl. temp.°C M1 50.0 0.90 20.0 LED 29 °C Findings of therm
  • 23. © Confederation of Indian Industry  Cooling energy saving : 4 % LED Based Lighting Fixtures Operational cost savings : Rs. 1.2 lacs/ annum Rs 10, 000/m savings in energy bill
  • 24. © Confederation of Indian Industry Building Automation System  Smooth operation  Air-conditioning , Fans, Pumps, Lighting, etc.  Scheduling / Re-tuning of equipment operations  Re-tuning is a systematic process to identify operational problems BMS enables energy efficiency by 8-10% Cloud based
  • 25. © Confederation of Indian Industry Further Bring down Energy Usage  30% efficient over Standard Case  Performance improvement opportunities  20-25 % over As Built case 10.5 10.3 9.2 8.9 7.9 7.7 7.5 5.6 5.1 5.1 175 172 154 149 132 128 125 93 85 85 80 100 120 140 160 180 200 220 240 2 3 4 5 6 7 8 9 10 11 12 ActualCase NightPurging Lighting ExtLighting VFD_AHU VFD_Pump WindTower SPVIntegration BMS EfficientDesign Consumption(000xkWh) Operationalcost(Rs.Lac) Energy cost Energy Consumption
  • 26. © Confederation of Indian Industry
  • 27. 3) Measurement & Verification Protocols IPMVP FEMP ASHRAE 14P
  • 28. Measurement & Verification (M&V)  Data collection  Develop simulation model  Calibration  Building level  Component level  Performance comparison with latest Codes & recommend  Energy Efficiency Measures (ECMs)
  • 29. Standard case v/s As Built case Standard Case As Built
  • 30. Inputs for Calibrated Simulation HVAC (Chiller, AHU’s, Pumps, CT, etc.) Operation Schedules: • Occupancy • lighting, • Ext lighting, • Equipment • Fan, • Thermostat (as per space type) Building Envelope (Wall, roof, and glazing) Interior and exterior lighting Load Equipment load • Drawings (Architectural and HVAC) • Performance Data • Site visits can be further improved
  • 31. a) iLabs Hyderabad (ITES)  Building energy consumption MBE & CVRMSE, within specified limits -IPMVP Errors Permissible limits Whole building energy Monthly MBE ±5% 2.83 Cv(RMSE 15% 6.09
  • 32. Chiller Energy Consumption Chiller performance Errors Permissible limits Chiller energy consumption Monthly MBE ±5% 2.10 Cv(RMSE 15% 7.06
  • 33. Performance Comparison  As Built case is 10.6 % efficient over Standard case  Performance improvement opportunities  15-20 %
  • 34. List of Energy Conservation Measures  Retro-commissioning  Primary, Secondary and Condenser Pumps  Cooling tower  Evaporative cooling for condenser, with Fan control  Raised chilled water temperature  Controls  CAV to VAV system  VFD (AHU Fan, primary/secondary pumps, Fan – CT and Chiller)  Daylight and occupancy control  Lighting control  CPM (Chiller Plant Manager - Load and Chiller Sequencing)  EMS/ BMS/ Feedback Loop  Scheduling  Condenser approach  IE Motors (Fan, Pump, Motors)  Glass shade / film to reduce heat gain  High SRI paint over roof  Raised thermostat  Efficient Lighting fixtures  Roof top SPV  Demand control ventilation  HRW (Delta T>5)  Economiser operation  Reduce/ replace Plug load Buildings are designed for Peak design day, however operated like every day is designed day
  • 35. Experience : Energy Performance Monitoring  EPM service offered to several office and ITES buildings  Owner and O&M team are committed  Continuous performance monitoring is essential  ESCO’s are gaining ground  Financial model can support to grow this sector
  • 36. Challenges faced Large no. of IT/ITES buildings are tenant occupied Investment and savings ?  Need awareness  Govt. schemes and Industry support  Adoption of Green Buildings Tenants get operating savings from retrofit
  • 37. Regulatory support (Lead from BEE) Empaneled Financial Institutions ESCO’s (now 150 nos. whereas China has 5000) Partial Risk Sharing Facility (PRSF) SIDBI & IGBC Expand proven programs &develop new tools Engage (Vendors and Building Owners) Support Provide additional incentive Building Energy Retrofit – Financing Models
  • 38. To sum up  Reduce energy demand at several level  Building level  Society  City level  Country level  Tremendous potential to improve energy efficiency in building sector  Energy retrofit will only grow  Climate benefits  Leadership in reducing the impact of climate change Stakeholder Engagement would result in EE in
  • 39. For details, please contact: Dr Shivraj Dhaka, Counsellor, CII-Indian Green Building Council (IGBC) Hyderabad shivraj.dhaka@cii.in; 040 44185211; 9177577288

Editor's Notes

  1. Building consumes 30-40% energy (Resi &amp; Comm). Retrofit benefits : Reduced power &amp; water bills; Enhance occupant health and comfort; Address : Energy, Air Quality and Water crisis
  2. GB - Metering, monitoring and data analytics, &amp; Identify performance gaps, M&amp;V : Identify energy efficiency retrofit measures along with cost economics. Never ending and sustainable approach.
  3. Feasibility Study carried out
  4. GB - Metering, monitoring and data analytics, &amp; Identify performance gaps, M&amp;V : Identify energy efficiency retrofit measures along with cost economics. Never ending and sustainable approach.
  5. Energy metering Water metering
  6. GB encourage to meter and monitor. GB support in implementation – drive product and technologies
  7. Building cost is less as compared to employee
  8. GB - Metering, monitoring and data analytics, &amp; Identify performance gaps, M&amp;V : Identify energy efficiency retrofit measures along with cost economics. Never ending and sustainable approach.