Context:
Further to the strong political momentum given by the Mexico HLM in April 2014 and
building on the work of the last two years, the Global Partnership for Effective
Development Cooperation (GPEDC) is in the process of renewing its vision for the
future, including reflection on its contribution to the implementation of the post-2015
agenda. Increased coherence within its work is part of the aims for the new vision. A
work plan for the Global Partnership for 2015-2016 in this context would be needed,
allowing for the translation of the new vision into practice.
During the Steering Committee of the GPEDC in July 2014, the European
Commission offered to host a planning workshop, which would bring together all
interested parties of the Global Partnership in order to develop such a work plan for
2015-16.
Purpose:
The Planning Workshop is intended to constitute a wide and inclusive consultation of
members of the Global Partnership, beyond those represented in the Steering
Committee, on the future work of the GPEDC. There are a lot of work streams active
as part of the implementation of the aid and development effectiveness agenda that
could be better coordinated, communicated and related to the work of the steering
committee.
The expected output of the workshop would be a two year work plan for the Global
Partnership, with clear work-streams and corresponding activities, captured in a
coherent framework that would encompass aid and development effectiveness
undertakings of the GPEDC constituencies, regional organisations, thematic Building
Blocks and voluntary initiatives, namely those included in the Mexico Communiqué.
The work plan will also contain key milestones and deliverables, along with
mechanisms for communicating and reporting these to the Steering Committee and
in a broader manner.
The work plan will also be sought as a defined framework capturing the GPEDC
experiences, part of which can constitute a contribution to the implementation of the
post 2015 agenda, organised along the axes proposed in the GPEDC input to the
UNSG Synthesis Report.
Date: 21-22 January 2015 (after to the GPEDC Steering Committee meeting taking
place in the Netherlands on 19-20 January)
Proposed place: Brussels
Organisers
The workshop is organised in coordination with the GPEDC co-chairs and hosted by
the European Commission, the NEPAD Agency Africa platform for Development
effectiveness (APDev), as well as the Asia-Pacific Development Effectiveness Facility
(AP-DEF)-TBC.
The Joint Support Team (JST) will play its role in preparing the meeting, especially
for information dissemination, mobilisation of participants and development of some
background material.
Proposed participation: +/- 160 participants
The planning meeting shall gather a range of stakeholders, represented at the
technical level by aid and development effectiveness representatives including:
 Members of the GPEDC Steering Committee & support organisations
 Leaders and key members of the thematic Building Blocks
 Leaders and key members of the voluntary initiatives launched at the Mexico
HLM
 Regional organisations/ platforms
 Other, as appropriate
Facilitators: one facilitator per working group (which co-organisers will identify).
Content elements for the tentative Programme
In order to deliver a draft 2-year work plan for the GPEDC at the end of the 2-day
meeting, joint work in break-out groups will be instrumental.
1st
day
 Welcoming addresses from co-hosts
 Presentation of the renewed vision of the GPEDC and of the priority directions
for the work of the Partnership by the GPEDC co-chairs- feedback from the
discussions in the Steering Committee in the Netherlands (including feedback
from the GPEDC questionnaire on future work, as well as highlighting the key
inputs provided to the UNSG Synthesis Report)
 Presentation from Republic of Korea on the outcome of the Seoul November
workshop: How country-focused implementation can translate into better
planning for the next phase.
 6 parallel Working Groups, bringing together representatives of the GPEDC
members, Building Blocks, voluntary initiatives, others, on the following pre-
identified workstreams:
o DRM,
o Private Sector,
o South-South cooperation & knowledge sharing,
o MICs,
o LICs, Fragility & conflict ,
o Regional and country-led efforts on development, effectiveness and
quality
The 6 working groups will horizontally address the design of multi-
stakeholder partnerships and inventorying best practices on effective
cooperation.
 Presentations from the working groups on concrete 'mini-workplans' for
selected work-streams
 Plenary discussion on completing the workplan framework, additional
elements not captured through the above mentioned WGs
2nd
Day
 6 parallel Working Groups: bringing together representatives of the GPEDC
members, Building Blocks, voluntary initiatives, others, on the following pre-
identified workstreams (to be discussed and further refined):
o Implementation of the principles for development effectiveness:
Results, Transparency, Country ownership, Inclusive development
partnerships,
o Linkages with the post 2015 agenda and other processes, including
UNDCF activities.
o Stakeholder engagement and improving communication among and
between constituencies within the GPEDC
o Outreach activities, including to new partners and fundraising
o Integrating Building Blocks and Voluntary Initiatives fully in the GPEDC
architecture
o Monitoring, including steps for the critical assessment of the existing
framework in the light of post-2015 requirements.
 Presentations from the working groups in plenary
 Wrap-up of the workshop, including final remarks on the way forward and
Conclusions from the co-hosts and co-organisers

More Related Content

Viewers also liked

Country Development Cooperation Strategy 2013-2018
Country Development Cooperation Strategy 2013-2018Country Development Cooperation Strategy 2013-2018
Country Development Cooperation Strategy 2013-2018Dr Lendy Spires
 
Implementation of APRM programme of action on Benin interim report
Implementation of APRM programme of action on Benin interim reportImplementation of APRM programme of action on Benin interim report
Implementation of APRM programme of action on Benin interim reportDr Lendy Spires
 
Bringing Taxation into the Post-2015 Development Framework
Bringing Taxation into the Post-2015 Development FrameworkBringing Taxation into the Post-2015 Development Framework
Bringing Taxation into the Post-2015 Development FrameworkDr Lendy Spires
 
Annotated Provisional Agenda
Annotated Provisional AgendaAnnotated Provisional Agenda
Annotated Provisional AgendaDr Lendy Spires
 
Illustrative Indicators for a Post-2015 Fiscal Revolution
Illustrative Indicators for a Post-2015 Fiscal RevolutionIllustrative Indicators for a Post-2015 Fiscal Revolution
Illustrative Indicators for a Post-2015 Fiscal RevolutionDr Lendy Spires
 
Thirteenth UN Congress on Crime Prevention and Criminal Justice Doha 12-19 Ap...
Thirteenth UN Congress on Crime Prevention and Criminal Justice Doha 12-19 Ap...Thirteenth UN Congress on Crime Prevention and Criminal Justice Doha 12-19 Ap...
Thirteenth UN Congress on Crime Prevention and Criminal Justice Doha 12-19 Ap...Dr Lendy Spires
 
Fair Migration: Setting an ILO Agenda
Fair Migration: Setting an ILO AgendaFair Migration: Setting an ILO Agenda
Fair Migration: Setting an ILO AgendaDr Lendy Spires
 
Undef newsletter november 2014
Undef newsletter november 2014Undef newsletter november 2014
Undef newsletter november 2014Dr Lendy Spires
 
Undef newsletter february 2015
Undef newsletter february 2015Undef newsletter february 2015
Undef newsletter february 2015Dr Lendy Spires
 
Working with ECOSOC an NGOs Guide to Consultative Status
Working with ECOSOC an NGOs Guide to Consultative StatusWorking with ECOSOC an NGOs Guide to Consultative Status
Working with ECOSOC an NGOs Guide to Consultative StatusDr Lendy Spires
 
DAC Global Relations Strategy
DAC Global Relations StrategyDAC Global Relations Strategy
DAC Global Relations StrategyDr Lendy Spires
 
Building Trade Capacities for Africa's Trasformation: A Critical Review of Ai...
Building Trade Capacities for Africa's Trasformation: A Critical Review of Ai...Building Trade Capacities for Africa's Trasformation: A Critical Review of Ai...
Building Trade Capacities for Africa's Trasformation: A Critical Review of Ai...Dr Lendy Spires
 

Viewers also liked (15)

Is gbulletin3
Is gbulletin3Is gbulletin3
Is gbulletin3
 
Country Development Cooperation Strategy 2013-2018
Country Development Cooperation Strategy 2013-2018Country Development Cooperation Strategy 2013-2018
Country Development Cooperation Strategy 2013-2018
 
Implementation of APRM programme of action on Benin interim report
Implementation of APRM programme of action on Benin interim reportImplementation of APRM programme of action on Benin interim report
Implementation of APRM programme of action on Benin interim report
 
Bringing Taxation into the Post-2015 Development Framework
Bringing Taxation into the Post-2015 Development FrameworkBringing Taxation into the Post-2015 Development Framework
Bringing Taxation into the Post-2015 Development Framework
 
Annotated Provisional Agenda
Annotated Provisional AgendaAnnotated Provisional Agenda
Annotated Provisional Agenda
 
Illustrative Indicators for a Post-2015 Fiscal Revolution
Illustrative Indicators for a Post-2015 Fiscal RevolutionIllustrative Indicators for a Post-2015 Fiscal Revolution
Illustrative Indicators for a Post-2015 Fiscal Revolution
 
Thirteenth UN Congress on Crime Prevention and Criminal Justice Doha 12-19 Ap...
Thirteenth UN Congress on Crime Prevention and Criminal Justice Doha 12-19 Ap...Thirteenth UN Congress on Crime Prevention and Criminal Justice Doha 12-19 Ap...
Thirteenth UN Congress on Crime Prevention and Criminal Justice Doha 12-19 Ap...
 
Fair Migration: Setting an ILO Agenda
Fair Migration: Setting an ILO AgendaFair Migration: Setting an ILO Agenda
Fair Migration: Setting an ILO Agenda
 
Undef newsletter november 2014
Undef newsletter november 2014Undef newsletter november 2014
Undef newsletter november 2014
 
Is gbulletin2
Is gbulletin2Is gbulletin2
Is gbulletin2
 
Undef newsletter february 2015
Undef newsletter february 2015Undef newsletter february 2015
Undef newsletter february 2015
 
Is gbulletin5
Is gbulletin5Is gbulletin5
Is gbulletin5
 
Working with ECOSOC an NGOs Guide to Consultative Status
Working with ECOSOC an NGOs Guide to Consultative StatusWorking with ECOSOC an NGOs Guide to Consultative Status
Working with ECOSOC an NGOs Guide to Consultative Status
 
DAC Global Relations Strategy
DAC Global Relations StrategyDAC Global Relations Strategy
DAC Global Relations Strategy
 
Building Trade Capacities for Africa's Trasformation: A Critical Review of Ai...
Building Trade Capacities for Africa's Trasformation: A Critical Review of Ai...Building Trade Capacities for Africa's Trasformation: A Critical Review of Ai...
Building Trade Capacities for Africa's Trasformation: A Critical Review of Ai...
 

Similar to Summary concept note gpedc planning meeting

GPEDC Planning Workshop Strengthening Cooperation to Deliver Results - Outcom...
GPEDC Planning Workshop Strengthening Cooperation to Deliver Results - Outcom...GPEDC Planning Workshop Strengthening Cooperation to Deliver Results - Outcom...
GPEDC Planning Workshop Strengthening Cooperation to Deliver Results - Outcom...Dr Lendy Spires
 
Nap expo 2015 session 1 AC
Nap expo 2015 session 1 ACNap expo 2015 session 1 AC
Nap expo 2015 session 1 ACNAP Events
 
1st high level meeting of the global partnership for effective development co...
1st high level meeting of the global partnership for effective development co...1st high level meeting of the global partnership for effective development co...
1st high level meeting of the global partnership for effective development co...Dr Lendy Spires
 
Strengthening the global partnership monitoring framework
Strengthening the global partnership monitoring frameworkStrengthening the global partnership monitoring framework
Strengthening the global partnership monitoring frameworkDr Lendy Spires
 
PIDA Terms of Reference Panel of Experts
PIDA   Terms of Reference Panel of ExpertsPIDA   Terms of Reference Panel of Experts
PIDA Terms of Reference Panel of ExpertsDr Lendy Spires
 
Accountable and effective development cooperation in a post 2015 era
Accountable and effective development cooperation in a post 2015 eraAccountable and effective development cooperation in a post 2015 era
Accountable and effective development cooperation in a post 2015 eraDr Lendy Spires
 
The role of the Mozambique and Southern Africa observatories in alleviating p...
The role of the Mozambique and Southern Africa observatories in alleviating p...The role of the Mozambique and Southern Africa observatories in alleviating p...
The role of the Mozambique and Southern Africa observatories in alleviating p...UNICEF Algérie
 
Un chief executive board for coordination 2014-6-hlcp 28-final ods
Un chief executive board for coordination 2014-6-hlcp 28-final odsUn chief executive board for coordination 2014-6-hlcp 28-final ods
Un chief executive board for coordination 2014-6-hlcp 28-final odsDr Lendy Spires
 
Post 2015 english - july 08
Post 2015   english - july 08Post 2015   english - july 08
Post 2015 english - july 08Dr Lendy Spires
 
Presentations from the 3rd PISA for Development International Advisory Group ...
Presentations from the 3rd PISA for Development International Advisory Group ...Presentations from the 3rd PISA for Development International Advisory Group ...
Presentations from the 3rd PISA for Development International Advisory Group ...EduSkills OECD
 
AEP-UNDP_ERD_final MTE report 070914
 AEP-UNDP_ERD_final MTE report 070914 AEP-UNDP_ERD_final MTE report 070914
AEP-UNDP_ERD_final MTE report 070914Nizam Al-Hussainy
 
Item 5a Enhancing collaboration with development finance institutions
Item 5a Enhancing collaboration with development finance institutionsItem 5a Enhancing collaboration with development finance institutions
Item 5a Enhancing collaboration with development finance institutionsOECD Environment
 
UNEP - Proposed biennial programme of work and budget for 2016–2017
UNEP - Proposed biennial programme of work and budget for 2016–2017UNEP - Proposed biennial programme of work and budget for 2016–2017
UNEP - Proposed biennial programme of work and budget for 2016–2017Dr Lendy Spires
 
Post-2015 UN Development Agenda - UN System-wide Preparations
Post-2015 UN Development Agenda - UN System-wide PreparationsPost-2015 UN Development Agenda - UN System-wide Preparations
Post-2015 UN Development Agenda - UN System-wide PreparationsUN Development Group (UNDG)
 
Guide to the Monitoring Framework of the Global Partnership
Guide to the Monitoring Framework of the Global PartnershipGuide to the Monitoring Framework of the Global Partnership
Guide to the Monitoring Framework of the Global PartnershipDr Lendy Spires
 
Outcomes of Durban
Outcomes of DurbanOutcomes of Durban
Outcomes of DurbanUNDP Eurasia
 
Spending reviews - Ulf Rosner, Germany
Spending reviews - Ulf Rosner, GermanySpending reviews - Ulf Rosner, Germany
Spending reviews - Ulf Rosner, GermanyOECD Governance
 
{LIKE} kick off PPT
{LIKE} kick off PPT{LIKE} kick off PPT
{LIKE} kick off PPTLIKE
 

Similar to Summary concept note gpedc planning meeting (20)

GPEDC Planning Workshop Strengthening Cooperation to Deliver Results - Outcom...
GPEDC Planning Workshop Strengthening Cooperation to Deliver Results - Outcom...GPEDC Planning Workshop Strengthening Cooperation to Deliver Results - Outcom...
GPEDC Planning Workshop Strengthening Cooperation to Deliver Results - Outcom...
 
Nap expo 2015 session 1 AC
Nap expo 2015 session 1 ACNap expo 2015 session 1 AC
Nap expo 2015 session 1 AC
 
1st high level meeting of the global partnership for effective development co...
1st high level meeting of the global partnership for effective development co...1st high level meeting of the global partnership for effective development co...
1st high level meeting of the global partnership for effective development co...
 
Strengthening the global partnership monitoring framework
Strengthening the global partnership monitoring frameworkStrengthening the global partnership monitoring framework
Strengthening the global partnership monitoring framework
 
PIDA Terms of Reference Panel of Experts
PIDA   Terms of Reference Panel of ExpertsPIDA   Terms of Reference Panel of Experts
PIDA Terms of Reference Panel of Experts
 
Accountable and effective development cooperation in a post 2015 era
Accountable and effective development cooperation in a post 2015 eraAccountable and effective development cooperation in a post 2015 era
Accountable and effective development cooperation in a post 2015 era
 
The role of the Mozambique and Southern Africa observatories in alleviating p...
The role of the Mozambique and Southern Africa observatories in alleviating p...The role of the Mozambique and Southern Africa observatories in alleviating p...
The role of the Mozambique and Southern Africa observatories in alleviating p...
 
Un chief executive board for coordination 2014-6-hlcp 28-final ods
Un chief executive board for coordination 2014-6-hlcp 28-final odsUn chief executive board for coordination 2014-6-hlcp 28-final ods
Un chief executive board for coordination 2014-6-hlcp 28-final ods
 
Post 2015 english - july 08
Post 2015   english - july 08Post 2015   english - july 08
Post 2015 english - july 08
 
Project starting report iktimed 2 nov
Project starting report iktimed 2  novProject starting report iktimed 2  nov
Project starting report iktimed 2 nov
 
Summary 2019 International Meeting on Triangular Co-operation
Summary 2019 International Meeting on Triangular Co-operationSummary 2019 International Meeting on Triangular Co-operation
Summary 2019 International Meeting on Triangular Co-operation
 
Presentations from the 3rd PISA for Development International Advisory Group ...
Presentations from the 3rd PISA for Development International Advisory Group ...Presentations from the 3rd PISA for Development International Advisory Group ...
Presentations from the 3rd PISA for Development International Advisory Group ...
 
AEP-UNDP_ERD_final MTE report 070914
 AEP-UNDP_ERD_final MTE report 070914 AEP-UNDP_ERD_final MTE report 070914
AEP-UNDP_ERD_final MTE report 070914
 
Item 5a Enhancing collaboration with development finance institutions
Item 5a Enhancing collaboration with development finance institutionsItem 5a Enhancing collaboration with development finance institutions
Item 5a Enhancing collaboration with development finance institutions
 
UNEP - Proposed biennial programme of work and budget for 2016–2017
UNEP - Proposed biennial programme of work and budget for 2016–2017UNEP - Proposed biennial programme of work and budget for 2016–2017
UNEP - Proposed biennial programme of work and budget for 2016–2017
 
Post-2015 UN Development Agenda - UN System-wide Preparations
Post-2015 UN Development Agenda - UN System-wide PreparationsPost-2015 UN Development Agenda - UN System-wide Preparations
Post-2015 UN Development Agenda - UN System-wide Preparations
 
Guide to the Monitoring Framework of the Global Partnership
Guide to the Monitoring Framework of the Global PartnershipGuide to the Monitoring Framework of the Global Partnership
Guide to the Monitoring Framework of the Global Partnership
 
Outcomes of Durban
Outcomes of DurbanOutcomes of Durban
Outcomes of Durban
 
Spending reviews - Ulf Rosner, Germany
Spending reviews - Ulf Rosner, GermanySpending reviews - Ulf Rosner, Germany
Spending reviews - Ulf Rosner, Germany
 
{LIKE} kick off PPT
{LIKE} kick off PPT{LIKE} kick off PPT
{LIKE} kick off PPT
 

Recently uploaded

PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)ahcitycouncil
 
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...Suhani Kapoor
 
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...ResolutionFoundation
 
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Roomishabajaj13
 
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...ankitnayak356677
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27JSchaus & Associates
 
VIP Call Girls Pune Vani 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Vani 8617697112 Independent Escort Service PuneVIP Call Girls Pune Vani 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Vani 8617697112 Independent Escort Service PuneCall girls in Ahmedabad High profile
 
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...Suhani Kapoor
 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersCongressional Budget Office
 
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls ServiceCall Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Servicenarwatsonia7
 
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service BangaloreCall Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalorenarwatsonia7
 
DNV publication: China Energy Transition Outlook 2024
DNV publication: China Energy Transition Outlook 2024DNV publication: China Energy Transition Outlook 2024
DNV publication: China Energy Transition Outlook 2024Energy for One World
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCongressional Budget Office
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...anilsa9823
 
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...ResolutionFoundation
 
WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.Christina Parmionova
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...CedZabala
 

Recently uploaded (20)

Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)
 
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
 
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
 
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Room
 
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27
 
VIP Call Girls Pune Vani 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Vani 8617697112 Independent Escort Service PuneVIP Call Girls Pune Vani 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Vani 8617697112 Independent Escort Service Pune
 
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists Lawmakers
 
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls ServiceCall Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
 
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service BangaloreCall Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
 
DNV publication: China Energy Transition Outlook 2024
DNV publication: China Energy Transition Outlook 2024DNV publication: China Energy Transition Outlook 2024
DNV publication: China Energy Transition Outlook 2024
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related Topics
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
 
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...
 
WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
 
Call Girls In Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In  Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In  Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 

Summary concept note gpedc planning meeting

  • 1. Summary Concept Note Global Partnership for Effective Development Cooperation Planning Workshop- Strengthening Coordination to Deliver Results Context: Further to the strong political momentum given by the Mexico HLM in April 2014 and building on the work of the last two years, the Global Partnership for Effective Development Cooperation (GPEDC) is in the process of renewing its vision for the future, including reflection on its contribution to the implementation of the post-2015 agenda. Increased coherence within its work is part of the aims for the new vision. A work plan for the Global Partnership for 2015-2016 in this context would be needed, allowing for the translation of the new vision into practice. During the Steering Committee of the GPEDC in July 2014, the European Commission offered to host a planning workshop, which would bring together all interested parties of the Global Partnership in order to develop such a work plan for 2015-16. Purpose: The Planning Workshop is intended to constitute a wide and inclusive consultation of members of the Global Partnership, beyond those represented in the Steering Committee, on the future work of the GPEDC. There are a lot of work streams active as part of the implementation of the aid and development effectiveness agenda that could be better coordinated, communicated and related to the work of the steering committee. The expected output of the workshop would be a two year work plan for the Global Partnership, with clear work-streams and corresponding activities, captured in a coherent framework that would encompass aid and development effectiveness undertakings of the GPEDC constituencies, regional organisations, thematic Building Blocks and voluntary initiatives, namely those included in the Mexico Communiqué. The work plan will also contain key milestones and deliverables, along with mechanisms for communicating and reporting these to the Steering Committee and in a broader manner. The work plan will also be sought as a defined framework capturing the GPEDC experiences, part of which can constitute a contribution to the implementation of the post 2015 agenda, organised along the axes proposed in the GPEDC input to the UNSG Synthesis Report. Date: 21-22 January 2015 (after to the GPEDC Steering Committee meeting taking place in the Netherlands on 19-20 January) Proposed place: Brussels Organisers The workshop is organised in coordination with the GPEDC co-chairs and hosted by the European Commission, the NEPAD Agency Africa platform for Development
  • 2. effectiveness (APDev), as well as the Asia-Pacific Development Effectiveness Facility (AP-DEF)-TBC. The Joint Support Team (JST) will play its role in preparing the meeting, especially for information dissemination, mobilisation of participants and development of some background material. Proposed participation: +/- 160 participants The planning meeting shall gather a range of stakeholders, represented at the technical level by aid and development effectiveness representatives including:  Members of the GPEDC Steering Committee & support organisations  Leaders and key members of the thematic Building Blocks  Leaders and key members of the voluntary initiatives launched at the Mexico HLM  Regional organisations/ platforms  Other, as appropriate Facilitators: one facilitator per working group (which co-organisers will identify). Content elements for the tentative Programme In order to deliver a draft 2-year work plan for the GPEDC at the end of the 2-day meeting, joint work in break-out groups will be instrumental. 1st day  Welcoming addresses from co-hosts  Presentation of the renewed vision of the GPEDC and of the priority directions for the work of the Partnership by the GPEDC co-chairs- feedback from the discussions in the Steering Committee in the Netherlands (including feedback from the GPEDC questionnaire on future work, as well as highlighting the key inputs provided to the UNSG Synthesis Report)  Presentation from Republic of Korea on the outcome of the Seoul November workshop: How country-focused implementation can translate into better planning for the next phase.  6 parallel Working Groups, bringing together representatives of the GPEDC members, Building Blocks, voluntary initiatives, others, on the following pre- identified workstreams: o DRM, o Private Sector, o South-South cooperation & knowledge sharing, o MICs, o LICs, Fragility & conflict , o Regional and country-led efforts on development, effectiveness and quality The 6 working groups will horizontally address the design of multi- stakeholder partnerships and inventorying best practices on effective cooperation.  Presentations from the working groups on concrete 'mini-workplans' for selected work-streams
  • 3.  Plenary discussion on completing the workplan framework, additional elements not captured through the above mentioned WGs 2nd Day  6 parallel Working Groups: bringing together representatives of the GPEDC members, Building Blocks, voluntary initiatives, others, on the following pre- identified workstreams (to be discussed and further refined): o Implementation of the principles for development effectiveness: Results, Transparency, Country ownership, Inclusive development partnerships, o Linkages with the post 2015 agenda and other processes, including UNDCF activities. o Stakeholder engagement and improving communication among and between constituencies within the GPEDC o Outreach activities, including to new partners and fundraising o Integrating Building Blocks and Voluntary Initiatives fully in the GPEDC architecture o Monitoring, including steps for the critical assessment of the existing framework in the light of post-2015 requirements.  Presentations from the working groups in plenary  Wrap-up of the workshop, including final remarks on the way forward and Conclusions from the co-hosts and co-organisers