Suwannee County Proposed
Catalyst Site Expansion
April 17, 2015
Presented by
Dr. Alvin B. Jackson, Jr. & Jimmy Massey
Suwannee County Economic Development Office
Background
• Selected in 2007
• Developed with the help of the State of Florida as a
strategy for economic development in Florida’s Rural
Area of Critical Economic Concern (RACEC)
• Focused on targeting tomorrow’s most promising
industries with the goal of creating high value-added
jobs, capital investment, and an economic benefit
that will ripple throughout each RACEC.
Existing Catalyst Site
• Location: 7 miles west of Live Oak on US
Highway 90; ½ mile from Interstate 10
interchange
• Acres: 500 acres
• Infrastructure: Water Plant, electric,
natural gas, fiber, and rail spur from CSX
mainline, (soon to be under construction)
Existing Catalyst Site Success
• The first resident of the Catalyst Site is Klausner Lumber One,
a high-tech facility that will create 350 permanent jobs, inject
• $130 million in capital investment.
• Klausner began operations in January 2015.
• Created 120 permanent jobs, to date.
• Will create additional 200+ jobs by end of year, when second
and third shift is added.
• Project has created approx. 270 indirect jobs
• Klausner is purchasing goods and services from local
companies
Companies Locating adjacent or near
Catalyst Site
1. Project Padre- 200,000 MT Wood Pellet Factory
 $26 mil capital investment
 80 new jobs
 15 acres
 Exporter
 Est operating by Jan 2016
2. Project Cross City-Raw Pine Bark Plant
 $1 mil capital investment
 5 new jobs
 20 acres
 Under construction
Prospects
1. Rail Terminal Operator- In the Existing site-
100 acres, 30 jobs. $1 mil capital investment
2. Pressure Wood Treatment Plant- looking
both inside the site and adjacent to site- 70-
90 new jobs, $8.8 mil. capital investment
3. Carrot Processing Plant- 200 acres in the
area, 200 new jobs.
4. Agri-Tourism-Dairy Living Exhibit site-200
acres, 15-20 jobs
Rationale for Proposed Catalyst Site
Expansion
 With more than half of the existing Catalyst site developed, and only 60
acres available which is owned by Suwannee County there is a serious
need to expand the Catalyst site, for access to the much needed assistance
from the State of Florida for infrastructure improvements, incentives for
job creation and to remain competitive in the region.
 There are over 10,000 acres available for potential development for
industrial, warehousing, manufacturing and logistics sites.
 The I-10/HWY 90 interchange has 2 large parcels, one 100 acres – north
side and 77 acres –south side of the interchange. These sites are prime
sites. Both sites have rail access, natural gas and fiber, however no water
lines. Water lines could be extended from the existing Catalyst site, the
distance is approx. 9000 linear feet and an estimated cost of $1.1 mil.
Description of Expansion
• 8400 acres
• Sections 22,23,26,27,33,34 and 35, TWP 01
South, Range 12 East; and Sections 1,2,3,4,
and 12, TWP 02 South, Range 12 East; and
Section 7, TWP 02 South, Range 13 East.
• 316 Parcels
Countywide Data
• Population- 44,168
• Unemployment Rate - 7.5%
• Average Annual Wage-$29,720
• Poverty Rate- 21.90%
Visit www.floridasnewfrontier.com

More Related Content

Similar to Suwannee County Proposed Catalyst Site ExpansionPP

Brbc video bpt mktg cmpgn ec dev june 2010
Brbc video bpt mktg cmpgn ec dev june 2010Brbc video bpt mktg cmpgn ec dev june 2010
Brbc video bpt mktg cmpgn ec dev june 2010GMSolis
 
Bricker & Eckler: Shale Economic Development Overview in Ohio - Fall 2015
Bricker & Eckler: Shale Economic Development Overview in Ohio - Fall 2015Bricker & Eckler: Shale Economic Development Overview in Ohio - Fall 2015
Bricker & Eckler: Shale Economic Development Overview in Ohio - Fall 2015Marcellus Drilling News
 
Owensboro Sites And Buildings
Owensboro Sites And BuildingsOwensboro Sites And Buildings
Owensboro Sites And BuildingsNicholas Brake
 
Bricker & Eckler: Shale Economic Development Overview in Ohio - Spring 2015
Bricker & Eckler: Shale Economic Development Overview in Ohio - Spring 2015Bricker & Eckler: Shale Economic Development Overview in Ohio - Spring 2015
Bricker & Eckler: Shale Economic Development Overview in Ohio - Spring 2015Marcellus Drilling News
 
Projects in So. County for website 2014
Projects in So. County for website 2014Projects in So. County for website 2014
Projects in So. County for website 2014SouthCountyEDC
 
Titusville FL Talking Points January 2017
Titusville FL Talking Points   January 2017Titusville FL Talking Points   January 2017
Titusville FL Talking Points January 2017Edyie McCall
 
Updated Vision Power Point March 2015(b)
Updated Vision Power Point March 2015(b)Updated Vision Power Point March 2015(b)
Updated Vision Power Point March 2015(b)SouthCountyEDC
 
Bricker & Eckler Shale Economic Development Overview (Fall 2014)
Bricker & Eckler Shale Economic Development Overview (Fall 2014)Bricker & Eckler Shale Economic Development Overview (Fall 2014)
Bricker & Eckler Shale Economic Development Overview (Fall 2014)Marcellus Drilling News
 
Koch foods investing $50 m in new alabama feed mill
Koch foods investing $50 m in new alabama feed millKoch foods investing $50 m in new alabama feed mill
Koch foods investing $50 m in new alabama feed millChristian Dillstrom
 
Webinar New England and NL Offshore Wind 4 March 2021
Webinar New England and NL Offshore Wind 4 March 2021Webinar New England and NL Offshore Wind 4 March 2021
Webinar New England and NL Offshore Wind 4 March 2021Carter Craft
 
Benesch Shale Industry Report - Quarterly Summary Q2 2014
Benesch Shale Industry Report - Quarterly Summary Q2 2014Benesch Shale Industry Report - Quarterly Summary Q2 2014
Benesch Shale Industry Report - Quarterly Summary Q2 2014Marcellus Drilling News
 
List of Economic Development Projects in Eastern Ohio Related to Utica Shale
List of Economic Development Projects in Eastern Ohio Related to Utica ShaleList of Economic Development Projects in Eastern Ohio Related to Utica Shale
List of Economic Development Projects in Eastern Ohio Related to Utica ShaleMarcellus Drilling News
 
GCEGC Presentation
GCEGC PresentationGCEGC Presentation
GCEGC Presentationguest001a7e9
 
Innovation Valley Presentation March 2016
Innovation Valley Presentation March 2016Innovation Valley Presentation March 2016
Innovation Valley Presentation March 2016InnovationValley
 
NCEast Alliance 2016 State of the Region
NCEast Alliance 2016 State of the RegionNCEast Alliance 2016 State of the Region
NCEast Alliance 2016 State of the RegionNCEast Alliance
 
122915 Project List
122915 Project List122915 Project List
122915 Project ListJohn Wu
 
Rodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction ManagerRodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction ManagerRodney Hibbard
 

Similar to Suwannee County Proposed Catalyst Site ExpansionPP (20)

Brbc video bpt mktg cmpgn ec dev june 2010
Brbc video bpt mktg cmpgn ec dev june 2010Brbc video bpt mktg cmpgn ec dev june 2010
Brbc video bpt mktg cmpgn ec dev june 2010
 
Fort Bend Area Council Meeting
Fort Bend Area Council MeetingFort Bend Area Council Meeting
Fort Bend Area Council Meeting
 
Bricker & Eckler: Shale Economic Development Overview in Ohio - Fall 2015
Bricker & Eckler: Shale Economic Development Overview in Ohio - Fall 2015Bricker & Eckler: Shale Economic Development Overview in Ohio - Fall 2015
Bricker & Eckler: Shale Economic Development Overview in Ohio - Fall 2015
 
Owensboro Sites And Buildings
Owensboro Sites And BuildingsOwensboro Sites And Buildings
Owensboro Sites And Buildings
 
Bricker & Eckler: Shale Economic Development Overview in Ohio - Spring 2015
Bricker & Eckler: Shale Economic Development Overview in Ohio - Spring 2015Bricker & Eckler: Shale Economic Development Overview in Ohio - Spring 2015
Bricker & Eckler: Shale Economic Development Overview in Ohio - Spring 2015
 
Projects in So. County for website 2014
Projects in So. County for website 2014Projects in So. County for website 2014
Projects in So. County for website 2014
 
Titusville FL Talking Points January 2017
Titusville FL Talking Points   January 2017Titusville FL Talking Points   January 2017
Titusville FL Talking Points January 2017
 
Updated Vision Power Point March 2015(b)
Updated Vision Power Point March 2015(b)Updated Vision Power Point March 2015(b)
Updated Vision Power Point March 2015(b)
 
Bricker & Eckler Shale Economic Development Overview (Fall 2014)
Bricker & Eckler Shale Economic Development Overview (Fall 2014)Bricker & Eckler Shale Economic Development Overview (Fall 2014)
Bricker & Eckler Shale Economic Development Overview (Fall 2014)
 
Benesch Shale Industry Report - 3Q14
Benesch Shale Industry Report - 3Q14Benesch Shale Industry Report - 3Q14
Benesch Shale Industry Report - 3Q14
 
Koch foods investing $50 m in new alabama feed mill
Koch foods investing $50 m in new alabama feed millKoch foods investing $50 m in new alabama feed mill
Koch foods investing $50 m in new alabama feed mill
 
Webinar New England and NL Offshore Wind 4 March 2021
Webinar New England and NL Offshore Wind 4 March 2021Webinar New England and NL Offshore Wind 4 March 2021
Webinar New England and NL Offshore Wind 4 March 2021
 
Benesch Shale Industry Report - Quarterly Summary Q2 2014
Benesch Shale Industry Report - Quarterly Summary Q2 2014Benesch Shale Industry Report - Quarterly Summary Q2 2014
Benesch Shale Industry Report - Quarterly Summary Q2 2014
 
List of Economic Development Projects in Eastern Ohio Related to Utica Shale
List of Economic Development Projects in Eastern Ohio Related to Utica ShaleList of Economic Development Projects in Eastern Ohio Related to Utica Shale
List of Economic Development Projects in Eastern Ohio Related to Utica Shale
 
GCEGC Presentation
GCEGC PresentationGCEGC Presentation
GCEGC Presentation
 
GCEGC Presentation
GCEGC PresentationGCEGC Presentation
GCEGC Presentation
 
Innovation Valley Presentation March 2016
Innovation Valley Presentation March 2016Innovation Valley Presentation March 2016
Innovation Valley Presentation March 2016
 
NCEast Alliance 2016 State of the Region
NCEast Alliance 2016 State of the RegionNCEast Alliance 2016 State of the Region
NCEast Alliance 2016 State of the Region
 
122915 Project List
122915 Project List122915 Project List
122915 Project List
 
Rodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction ManagerRodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction Manager
 

Suwannee County Proposed Catalyst Site ExpansionPP

  • 1. Suwannee County Proposed Catalyst Site Expansion April 17, 2015 Presented by Dr. Alvin B. Jackson, Jr. & Jimmy Massey Suwannee County Economic Development Office
  • 2. Background • Selected in 2007 • Developed with the help of the State of Florida as a strategy for economic development in Florida’s Rural Area of Critical Economic Concern (RACEC) • Focused on targeting tomorrow’s most promising industries with the goal of creating high value-added jobs, capital investment, and an economic benefit that will ripple throughout each RACEC.
  • 3. Existing Catalyst Site • Location: 7 miles west of Live Oak on US Highway 90; ½ mile from Interstate 10 interchange • Acres: 500 acres • Infrastructure: Water Plant, electric, natural gas, fiber, and rail spur from CSX mainline, (soon to be under construction)
  • 4.
  • 5. Existing Catalyst Site Success • The first resident of the Catalyst Site is Klausner Lumber One, a high-tech facility that will create 350 permanent jobs, inject • $130 million in capital investment. • Klausner began operations in January 2015. • Created 120 permanent jobs, to date. • Will create additional 200+ jobs by end of year, when second and third shift is added. • Project has created approx. 270 indirect jobs • Klausner is purchasing goods and services from local companies
  • 6. Companies Locating adjacent or near Catalyst Site 1. Project Padre- 200,000 MT Wood Pellet Factory  $26 mil capital investment  80 new jobs  15 acres  Exporter  Est operating by Jan 2016 2. Project Cross City-Raw Pine Bark Plant  $1 mil capital investment  5 new jobs  20 acres  Under construction
  • 7. Prospects 1. Rail Terminal Operator- In the Existing site- 100 acres, 30 jobs. $1 mil capital investment 2. Pressure Wood Treatment Plant- looking both inside the site and adjacent to site- 70- 90 new jobs, $8.8 mil. capital investment 3. Carrot Processing Plant- 200 acres in the area, 200 new jobs. 4. Agri-Tourism-Dairy Living Exhibit site-200 acres, 15-20 jobs
  • 8. Rationale for Proposed Catalyst Site Expansion  With more than half of the existing Catalyst site developed, and only 60 acres available which is owned by Suwannee County there is a serious need to expand the Catalyst site, for access to the much needed assistance from the State of Florida for infrastructure improvements, incentives for job creation and to remain competitive in the region.  There are over 10,000 acres available for potential development for industrial, warehousing, manufacturing and logistics sites.  The I-10/HWY 90 interchange has 2 large parcels, one 100 acres – north side and 77 acres –south side of the interchange. These sites are prime sites. Both sites have rail access, natural gas and fiber, however no water lines. Water lines could be extended from the existing Catalyst site, the distance is approx. 9000 linear feet and an estimated cost of $1.1 mil.
  • 9. Description of Expansion • 8400 acres • Sections 22,23,26,27,33,34 and 35, TWP 01 South, Range 12 East; and Sections 1,2,3,4, and 12, TWP 02 South, Range 12 East; and Section 7, TWP 02 South, Range 13 East. • 316 Parcels
  • 10.
  • 11. Countywide Data • Population- 44,168 • Unemployment Rate - 7.5% • Average Annual Wage-$29,720 • Poverty Rate- 21.90%