POLILAGO
© SAP America, Inc / 1
plastilago
ROBERTO ALVAREZ
Plastilago-Polilago
AN 18 MONTH BIG BANG
IN THE VENEZUELAN
PETROCHEMICALS INDUSTRY
.
POLILAGO
© SAP America, Inc / 2
plastilago
COMPANY CARACTERIZATION:
 PLASTILAGO AND POLILAGO ARE TWO VENEZUELAN
PETROCHEMICAL COMPANIES WHICH PRODUCE
170.000 METRIC TONS OF HIGH AND LOW DENSITY
POLYETHYLENE PER YEAR FOR LOCAL AND
INTERNATIONAL MARKETS.
 YEARLY INCOME: 200 MEGA $. 480 EMPLOYEES.
 PRODUCTION, SALES AND ADMINISTRATION OCCUR
AT THE PETROCHEMICAL COMPLEX OF EL TABLAZO,
CARACAS AND MARACAIBO, RESPECTIVELY.
 STOCKHOLDERS ARE STATE OWNED PEQUIVEN,
VENEZUELAN INVESTORS GRUPO ZULIANO, ELF
ATOCHEM AND MITSUI.
.
POLILAGO
© SAP America, Inc / 3
plastilago
CONTEXT BY OCTOBER 1995:
 INSUFFICIENT APPLICATIONS INTEGRATION:
COMPANY APPLICATIONS RESTED ON FOUR
SYSTEMS ARCHITECTURES: MVS, VM, X-BASE AND
VARIOUS PACKAGES - I.E.: MILLENNIUM.
 INSUFFICIENT APPLICATION FUNCTIONALITY: ±
50% OUTSTANDING REQUIREMENTS MET.
 PURVEYOR OF ECONOMIC MAINFRAME SERVICES
HAD ANNOUNCED DISCONTINUATION OF ITS
ARCHITECTURE BY THE END OF 1997.
 NECESSITY OF SCALABLE SOFTWARE IN ORDER TO
SUPPORT A CHANGING BUSINESS ENVIRONMENT.
.
POLILAGO
© SAP America, Inc / 4
plastilago
ARCHITECTURE HISTORY:
FOUR
CONCURRENT
ARCHITECTURES
FOUR SETS OF
SPECIALISTS WITH
DIFFERENT
BACKGROUNDS
1975 1980 1985 1990
MILLENNIUM
SQL/VM
IDMS/MVS
X-BASE
S/34
S/3
ARCHITECTURE
.
POLILAGO
© SAP America, Inc / 5
plastilago
FUNCTIONALITY EVOLUTION:
MARGINAL RETURNS:
10%
20%
30%
40%
50%
1975-1990 1991 1992 1993 1994
%REQUIREDFUNCTIONALITY
35%
8%
3% 2% 1,5%
.
POLILAGO
© SAP America, Inc / 6
plastilago
WHY CHOOSE R/3?:
 IN FUNCTIONALITY, R/3 COMPARED FAVOURABLY
WITH OTHER INTEGRATED SYSTEMS UNDER
SCRUTINY.
 SEVERAL STOCKHOLDING COMPANIES HAD
ALREADY ADOPTED R/3:
 STATE OWNED PEQUIVEN
 ELF ATOCHEM
 THE COMPANY HAD ACCESS TO RELATIVELY LOW
R/3 PRICES, AGREED BETWEEN SAP-AG AND PDVSA
- VENEZUELA’S STATE OWNED OIL CONGLOMERATE
AND PEQUIVEN’S HOLDING COMPANY.
.
POLILAGO
© SAP America, Inc / 7
plastilago
PROJECT PREPARATION:
 DEVELOPING AN UNDERSTANDING OF LOCAL AND
INTERNATIONAL CONSULTANCY LIMITATIONS FOR
R/3 PROJECTS - ASAP AS SUCH YET NON EXISTENT
 TAKING ADVANTAGE OF A FOUR MONTH FORCED
WAITING PERIOD AS AN OPPORTUNITY FOR:
 856 HOURS OF EARLY TRAINING FOR 22 PROJECT MEMBERS
 EARLY PROGRESS ON DIVERSE INFRASTRUCTURE
STRUCTURAL ELEMENTS:
 CONCEPTUAL DESIGN OF NETWORK TOPOLOGY
 INSTALLATION OF REQUIRED NETWORK NODES
 PROCUREMENT OF INTERURBAN TELECOM LINKS
.
POLILAGO
© SAP America, Inc / 8
plastilago
PRELIMINARY SCOPE AND PROJECT
INVESTMENT MODEL
 PRELIMINARY FUNCTIONALITY SCOPE WAS DEFINED
ACCORDING TO THE COMPANY PROCESS MODEL
 PRELIMINARY PROJECT INVESTMENT ASCERTAINED:
COMPANY IT TEAM
32%
CONSULTANTS
22%
HARDWARE
25%
SOFTWARE
12%
RDBMS
9%
TOTAL PROJECT
INVESTMENT:
$ 2,862,137
.
POLILAGO
© SAP America, Inc / 9
plastilago
PROCESS OPTIMIZATION AND
COMPUTERIZATION RFP STRATEGY:
 JOINING FORCES WITH A SYSTEMS INTEGRATOR:
 COMPANY DESCRIBES PRESENT AND EXPECTED FUTURE
 PARTNER DEFINES PATH FROM PRESENT TO FUTURE
 DISCOVERY OF A SUCCESSFUL MODAL SOLUTION
 PROCESS OPTIMIZATION APPROACH MUST FIT R/3
 COMPUTERIZATION APPROACH MUST BE COMPACT
 COST OPTIMIZATION
 COMPANY HARDWARE/SOFTWARE PREFERENTIAL PRICES
 USE OF COMPANY IT PERSONNEL
 PROJECT DIRECTION UNDER COMPANY CONTROL
.
POLILAGO
© SAP America, Inc / 10
plastilago
SOME PROPOSAL EXPECTED DELIVERABLES:
 PURVEYORS’ R/3 EXPERIENCES AND REFERENCES
 DESCRIPTION OF CONSTRUCTION TECHNIQUE AND
DETAILED PRODUCT STRUCTURE - PBS
 PROJECT PERT NETWORKS AND GANTT CHARTS
 ASSIGNED RESOURCE RESUMES AND HISTOGRAMS
 PROGRAMMED PHYSICAL PROGRESS, MAN-HOUR
INVESTMENT AND CASH FLOW ‘S’ CURVES
 ECONOMIC DATA: HOURLY RATES, PERDIEMS, ETC.
 SCOPE CHANGE, PROBLEMS & REPORT PROTOCOLS
.
POLILAGO
© SAP America, Inc / 11
plastilago
SELECTED PROPOSAL CHARACTERISTICS:
 PRIME CONTRACTOR, INTEGRATOR AND BASIS
EXPERTISE: DIGITAL EQUIPMENT VENEZUELA
 FUNCTIONAL SAP EXPERTISE: SEMA GROUP - A
EUROPEAN CONSULTING COMPANY
 FUNCTIONALITY: SD, MM, PP-PI, QM, PM, HR, FI, CO, AM
 PROJECT EXPECTED DURATION: 18 MONTHS
 APPROACH: SEMA GROUP HOMEGROWN PROTO-ASAP
 INVESTMENT MIX: 4,700 CONSULTANT MAN-HOURS
AND 80,000 CLIENT MAN-HOURS - 50 USERS AND 13 IT
SPECIALISTS
.
POLILAGO
© SAP America, Inc / 12
plastilago
PROJECT TIMETABLE:
SEMESTER 1 SEMESTER 2 SEMESTER 3
SALES,EXPEDITIONS,INVOICING,WAREHOUSE MGMT.
GENERAL ACCOUNTING,PAYABLES,RECEIVABLES
MAINTENANCE
PRODUCTION,MATERIALS MGMT.,PURCHASING,QUALITY MGMT.
COST ACCOUNTING
ASSET MGMT.,TREASURY MGMT.
PAYROLL AND HUMAN RESOURCES - BEING DEFINED
JUNE1996
NOVEMBER1997
.
POLILAGO
© SAP America, Inc / 13
plastilago
COMPACT METHODOLOGY:
 PROJECT SUCCESS
ASSOCIATED TO
STREET-WISE SAP
DISTILLATES
 COMMON SUCCESS
FACTORS WERE:
 USER
INVOLVEMENT
 STERN PROJECT
CONTROL
 INTEGRATED
CHANGE
MANAGEMENT
ORGANIZATION AND
CONCEPTUAL
DESIGN
DETAILED DESIGN
AND
PARAMETRIZATION
PREPARATION
FOR
PRODUCTION
OPERATIONS
OPTIMIZATION
CHANGE MANAGEMENT
WELL DEFINED
PRODUCT
STRUCTURE
AND
NATURE
.
POLILAGO
© SAP America, Inc / 14
plastilago
STERN PROJECT CONTROL:
A The Assyrian came down like
the wolf on the fold
B And his cohorts were gleaming
in purple and gold
A The Assyrian came down like
the wolf on the fold
B And his cohorts were gleaming
in purple and gold
C And the shhen of his
A The Assyrian came down like
the wolf on the fold
B And his cohorts were gleaming
A The Assyrian came down like
the wolf on the fold
PRODUCT
STRUCTURE &
NATURE
PROGRESS
REPORTS
PERT
DIAGRAMS
‘S’
CURVES
.
POLILAGO
© SAP America, Inc / 15
plastilago
PROJECT ORGANIZATION:
USER LIAISON
USER ANALYST
SYSTEMS ANALYST
FUNCTIONAL CONSULTING
PER R/3 MODULE
INFRASTRUCTURE SPECIALISTS
PROJECT MANAGEMENT
MANAGERS:
•SALES
•FINANCE
•HUMAN RESOURCES
•PRODUCTION
•LOGISTICS
•IT
OTHER DECISION
MAKERS
CHIEF EXECUTIVE50 USERS
18 IT SPECIALISTS
5.000 HRS CONSULTING
ABAP/4 SPECIALISTS
POOLS
.
POLILAGO
© SAP America, Inc / 16
plastilago
BLOCK I - JUNE 96/JANUARY 97:
 SALES
 MASTER DATA
 PRICES
 DISCOUNTS
 BUSINESS PARTNERS
 ORDERS
 CONTRACTS
 DELIVERY PLANS
 SALES STATISTICS
 BILLING
 INVOICES
 PLANNING
 FORECAST
 SOP
 MPS
 SHIPPING
 DELIVERIES
 RETURN DELIVERIES
 REPLENISHMENT
 FINISHED PRODUCTS
 GOODS RECEIPT
 TRANSFER REQUIREMENT
 TRANSFER ORDER
 PHYSICAL INVENTORY
 VALUATION
 TRANSPORT ORDER
.
POLILAGO
© SAP America, Inc / 17
plastilago
BLOCK II - JUNE 96/JANUARY 97:
 GENERAL ACCOUNTING
 GENERAL LEDGER
 FINANCIAL REPORTING
 STATISTICS
 ACCOUNTS PAYABLE
 MASTER DATA
 VENDOR
 BANK
 CREDIT MEMO
 DOWN PAYMENT
 POSTING
 PAYMENTS
 ADVANCES
 TAXES
 CHECKS
 ACCOUNTS RECEIVABLE
 CREDIT/DEBIT MEMO
 REBATES
 LETTERS OF CREDIT
 COLLECTIONS
 DOWN PAYMENTS
 INTERNAL TRANSFER POSTING
 AUTOMATIC CREDIT CONTROL
OF SALES ORDERS
 CREDIT MANAGEMENT
 INTEREST CALCULATION
 CLEAR ANALYSIS
.
POLILAGO
© SAP America, Inc / 18
plastilago
BLOCKS III & IV - FROM JAN 97 TO AUG/OCT 97:
 PURCHASING
 GOODS
 SERVICES
 INVENTORY MGMT (SPARE PARTS,
OPERATING SUPPLIES, EMPTIES,
SEMIFINISHED PRODUCT, RAW
MATERIALS)
 RESERVATIONS
 GOODS RECEIPT
 TRANSFER ORDER
 TRANSFER REQUIREMENT
 PHYSICAL INVENTORY
 VALUATION
 STATISTICS
 COST CONTROL
 COST CENTERS
 PROJECTS SYSTEM
 PRODUCTION COSTS
 PROFITABILITY ANALYSIS
 ABC
 PRODUCTION - PROCESS
 MASTER RECIPES
 RESOURCES
 PROCESS ORDERS
 CONTROL RECIPES
 PI - SHEET
 CAPACITY LEVELLING
 MRP
 STATISTICS
 QUALITY MANAGEMENT
 INSPECTION PLANNING
 QUALITY CERTIFICATES
 PROCUREMENT
 QUALITY INSPECTIONS
 STATISTICS
.
POLILAGO
© SAP America, Inc / 19
plastilago
MARACAIBO CENTRAL COMPLEX:
UPS
REDUNDANT
POWER
SUPPLIES
REDUNDANT
SERVERS
DISK MIRRORING
FOR R/3
TAPE
BACKUP
CENTRAL COMPLEX:
• 2 COMPAQ PROLIANT
5000 SERVERS WITH
STANDBY RECOVERY
OPTION
•• 2 PENTIUM PRO
200 Mhz
•• 640 Mb RAM
• 35 Gb DISC
• 2 DLT TAPE UNITS
• 250 Mbps ETHERNET
CARD
.
POLILAGO
© SAP America, Inc / 20
plastilago
THE NETWORK:
EL TABLAZO COMPLEX
MBO CCS
EXTERNAL
STORAGE
x.25 internet
HIGH DENSITY PE PLANT LOW DENSITY PE PLANT
EXTERNAL
STORAGE
.
POLILAGO
© SAP America, Inc / 21
plastilago
SOFTWARE GENERAL ARCHITECTURE:
ABAP/4ABAP/4
INFORMIX ODS 7.20T21INFORMIX ODS 7.20T21
WINDOWS NT 3.51 SP 4WINDOWS NT 3.51 SP 4
MS OFFICEMS OFFICE
4.214.21
& OTHERS& OTHERS
SAP R/3 3.0E+SAP R/3 3.0E+
.
POLILAGO
© SAP America, Inc / 22
plastilago
DON’T:
 SELECT THE WRONG DEVELOPMENT APPROACH
 SELECT THE WRONG USERS
 SELECT THE WRONG FUNCTIONAL CONSULTANTS
 SELECT WRONG PURVEYORS
 SELECT WRONG BASIS PERSONNEL
 UNDERESTIMATE IMPORTANCE OF BASIS TRAINING
 UNDERESTIMATE TIME - AND COST - OF REWORKING
 UNDERESTIMATE PROCUREMENT/DELIVERY TIMES
.
POLILAGO
© SAP America, Inc / 23
plastilago
DO:
 EXCEL AT CHANGE MANAGEMENT
 RECRUIT THE COMPANY PRINCIPAL - SINE QUA NON
 RECRUIT - OR LEVY - TOP MANAGEMENT
 OBTAIN RIGHT AMOUNT OF THE ABLEST USERS
 CONFINE CONSULTANT TO PREDEFINED ROLE
 STERNEST PROJECT MANAGEMENT: TIME, COST, QUALITY
 R/3 CHOICE-OF-FIT REENGINEERING
 MINIMIZE NON R/3 FUNCTIONALITY
 ZERO CHANGES TO R/3 BASE CODE
 EARLY INSTALLATION R/3 DEVELOPMENT ENVIRONMENT
 EARLIEST POSSIBLE TRAINING OF USERS & SPECIALISTS

More Related Content

Similar to SAPPHIRE 97

OSIsoft White Paper "Impacting the Bottom Line" in O&G
OSIsoft White Paper "Impacting the Bottom Line" in O&GOSIsoft White Paper "Impacting the Bottom Line" in O&G
OSIsoft White Paper "Impacting the Bottom Line" in O&GTjeerd Zwijnenberg
 
Kemira Selects Steelwedge For Supply Chain Planning
Kemira Selects Steelwedge For Supply Chain PlanningKemira Selects Steelwedge For Supply Chain Planning
Kemira Selects Steelwedge For Supply Chain Planningtenderboyfriend96
 
Product Management
Product ManagementProduct Management
Product ManagementADITYA KARWA
 
Stopping Internal Corrosion Pipeline Leaks
Stopping Internal Corrosion Pipeline LeaksStopping Internal Corrosion Pipeline Leaks
Stopping Internal Corrosion Pipeline LeaksDavid Richardson
 
Genscape-Capabilities-Brochure
Genscape-Capabilities-BrochureGenscape-Capabilities-Brochure
Genscape-Capabilities-BrochureJaimie Weiss
 
2016 Genscape-Capabilities-Product-Index
2016 Genscape-Capabilities-Product-Index2016 Genscape-Capabilities-Product-Index
2016 Genscape-Capabilities-Product-IndexThomas DeMartino
 
Mdm for materials –positive impact of data quality improvement
Mdm for materials –positive impact of data quality improvementMdm for materials –positive impact of data quality improvement
Mdm for materials –positive impact of data quality improvementVerdantis Inc.
 
Procurement Professional
Procurement ProfessionalProcurement Professional
Procurement ProfessionalLarry Kittilsen
 
BNamericas Corporate ppt
BNamericas Corporate pptBNamericas Corporate ppt
BNamericas Corporate pptludhiarich
 
Digitalization of Engineering Silos Howell
Digitalization of Engineering Silos HowellDigitalization of Engineering Silos Howell
Digitalization of Engineering Silos HowellKBC (A Yokogawa Company)
 
Rolta SmartPlant for YANSAB Project Services
Rolta SmartPlant for YANSAB Project ServicesRolta SmartPlant for YANSAB Project Services
Rolta SmartPlant for YANSAB Project ServicesRolta
 
Jerry James Supply Chain Manager Resume
Jerry James Supply Chain Manager ResumeJerry James Supply Chain Manager Resume
Jerry James Supply Chain Manager Resumejamescpim
 
MOONSHOTS for in-memory computing
MOONSHOTS for in-memory computingMOONSHOTS for in-memory computing
MOONSHOTS for in-memory computingugur candan
 
Bioplastics Market Analysis – Study, Strategic assessment, Scope of Market, M...
Bioplastics Market Analysis – Study, Strategic assessment, Scope of Market, M...Bioplastics Market Analysis – Study, Strategic assessment, Scope of Market, M...
Bioplastics Market Analysis – Study, Strategic assessment, Scope of Market, M...JACKSON ADELISA
 
Sourcing and Procurement Excellence in a Networked World
Sourcing and Procurement Excellence in a Networked WorldSourcing and Procurement Excellence in a Networked World
Sourcing and Procurement Excellence in a Networked WorldSAP Ariba
 
DOES16 San Francisco - Carmen DeArdo, Cindy Payne, & Jim Grafmeyer - Episode ...
DOES16 San Francisco - Carmen DeArdo, Cindy Payne, & Jim Grafmeyer - Episode ...DOES16 San Francisco - Carmen DeArdo, Cindy Payne, & Jim Grafmeyer - Episode ...
DOES16 San Francisco - Carmen DeArdo, Cindy Payne, & Jim Grafmeyer - Episode ...Gene Kim
 
RyanMoyer_FinalResume
RyanMoyer_FinalResumeRyanMoyer_FinalResume
RyanMoyer_FinalResumeRyan Moyer PE
 

Similar to SAPPHIRE 97 (20)

OSIsoft White Paper "Impacting the Bottom Line" in O&G
OSIsoft White Paper "Impacting the Bottom Line" in O&GOSIsoft White Paper "Impacting the Bottom Line" in O&G
OSIsoft White Paper "Impacting the Bottom Line" in O&G
 
Kemira Selects Steelwedge For Supply Chain Planning
Kemira Selects Steelwedge For Supply Chain PlanningKemira Selects Steelwedge For Supply Chain Planning
Kemira Selects Steelwedge For Supply Chain Planning
 
Product Management
Product ManagementProduct Management
Product Management
 
Stopping Internal Corrosion Pipeline Leaks
Stopping Internal Corrosion Pipeline LeaksStopping Internal Corrosion Pipeline Leaks
Stopping Internal Corrosion Pipeline Leaks
 
Genscape-Capabilities-Brochure
Genscape-Capabilities-BrochureGenscape-Capabilities-Brochure
Genscape-Capabilities-Brochure
 
2016 Genscape-Capabilities-Product-Index
2016 Genscape-Capabilities-Product-Index2016 Genscape-Capabilities-Product-Index
2016 Genscape-Capabilities-Product-Index
 
Mdm for materials –positive impact of data quality improvement
Mdm for materials –positive impact of data quality improvementMdm for materials –positive impact of data quality improvement
Mdm for materials –positive impact of data quality improvement
 
Procurement Professional
Procurement ProfessionalProcurement Professional
Procurement Professional
 
BNamericas Corporate ppt
BNamericas Corporate pptBNamericas Corporate ppt
BNamericas Corporate ppt
 
Digitalization of Engineering Silos Howell
Digitalization of Engineering Silos HowellDigitalization of Engineering Silos Howell
Digitalization of Engineering Silos Howell
 
Rolta SmartPlant for YANSAB Project Services
Rolta SmartPlant for YANSAB Project ServicesRolta SmartPlant for YANSAB Project Services
Rolta SmartPlant for YANSAB Project Services
 
Case presentation - Information and Communication Technologies in Microfinance
Case presentation - Information and Communication Technologies in MicrofinanceCase presentation - Information and Communication Technologies in Microfinance
Case presentation - Information and Communication Technologies in Microfinance
 
Jerry James Supply Chain Manager Resume
Jerry James Supply Chain Manager ResumeJerry James Supply Chain Manager Resume
Jerry James Supply Chain Manager Resume
 
Top 5 Lessons Learned in Deploying AI in the Real World
Top 5 Lessons Learned in Deploying AI in the Real WorldTop 5 Lessons Learned in Deploying AI in the Real World
Top 5 Lessons Learned in Deploying AI in the Real World
 
MOONSHOTS for in-memory computing
MOONSHOTS for in-memory computingMOONSHOTS for in-memory computing
MOONSHOTS for in-memory computing
 
Bioplastics Market Analysis – Study, Strategic assessment, Scope of Market, M...
Bioplastics Market Analysis – Study, Strategic assessment, Scope of Market, M...Bioplastics Market Analysis – Study, Strategic assessment, Scope of Market, M...
Bioplastics Market Analysis – Study, Strategic assessment, Scope of Market, M...
 
ATMO China 2018 - Key Trends Slideshow
ATMO China 2018 -  Key Trends SlideshowATMO China 2018 -  Key Trends Slideshow
ATMO China 2018 - Key Trends Slideshow
 
Sourcing and Procurement Excellence in a Networked World
Sourcing and Procurement Excellence in a Networked WorldSourcing and Procurement Excellence in a Networked World
Sourcing and Procurement Excellence in a Networked World
 
DOES16 San Francisco - Carmen DeArdo, Cindy Payne, & Jim Grafmeyer - Episode ...
DOES16 San Francisco - Carmen DeArdo, Cindy Payne, & Jim Grafmeyer - Episode ...DOES16 San Francisco - Carmen DeArdo, Cindy Payne, & Jim Grafmeyer - Episode ...
DOES16 San Francisco - Carmen DeArdo, Cindy Payne, & Jim Grafmeyer - Episode ...
 
RyanMoyer_FinalResume
RyanMoyer_FinalResumeRyanMoyer_FinalResume
RyanMoyer_FinalResume
 

SAPPHIRE 97

  • 1. . POLILAGO © SAP America, Inc / 1 plastilago ROBERTO ALVAREZ Plastilago-Polilago AN 18 MONTH BIG BANG IN THE VENEZUELAN PETROCHEMICALS INDUSTRY
  • 2. . POLILAGO © SAP America, Inc / 2 plastilago COMPANY CARACTERIZATION:  PLASTILAGO AND POLILAGO ARE TWO VENEZUELAN PETROCHEMICAL COMPANIES WHICH PRODUCE 170.000 METRIC TONS OF HIGH AND LOW DENSITY POLYETHYLENE PER YEAR FOR LOCAL AND INTERNATIONAL MARKETS.  YEARLY INCOME: 200 MEGA $. 480 EMPLOYEES.  PRODUCTION, SALES AND ADMINISTRATION OCCUR AT THE PETROCHEMICAL COMPLEX OF EL TABLAZO, CARACAS AND MARACAIBO, RESPECTIVELY.  STOCKHOLDERS ARE STATE OWNED PEQUIVEN, VENEZUELAN INVESTORS GRUPO ZULIANO, ELF ATOCHEM AND MITSUI.
  • 3. . POLILAGO © SAP America, Inc / 3 plastilago CONTEXT BY OCTOBER 1995:  INSUFFICIENT APPLICATIONS INTEGRATION: COMPANY APPLICATIONS RESTED ON FOUR SYSTEMS ARCHITECTURES: MVS, VM, X-BASE AND VARIOUS PACKAGES - I.E.: MILLENNIUM.  INSUFFICIENT APPLICATION FUNCTIONALITY: ± 50% OUTSTANDING REQUIREMENTS MET.  PURVEYOR OF ECONOMIC MAINFRAME SERVICES HAD ANNOUNCED DISCONTINUATION OF ITS ARCHITECTURE BY THE END OF 1997.  NECESSITY OF SCALABLE SOFTWARE IN ORDER TO SUPPORT A CHANGING BUSINESS ENVIRONMENT.
  • 4. . POLILAGO © SAP America, Inc / 4 plastilago ARCHITECTURE HISTORY: FOUR CONCURRENT ARCHITECTURES FOUR SETS OF SPECIALISTS WITH DIFFERENT BACKGROUNDS 1975 1980 1985 1990 MILLENNIUM SQL/VM IDMS/MVS X-BASE S/34 S/3 ARCHITECTURE
  • 5. . POLILAGO © SAP America, Inc / 5 plastilago FUNCTIONALITY EVOLUTION: MARGINAL RETURNS: 10% 20% 30% 40% 50% 1975-1990 1991 1992 1993 1994 %REQUIREDFUNCTIONALITY 35% 8% 3% 2% 1,5%
  • 6. . POLILAGO © SAP America, Inc / 6 plastilago WHY CHOOSE R/3?:  IN FUNCTIONALITY, R/3 COMPARED FAVOURABLY WITH OTHER INTEGRATED SYSTEMS UNDER SCRUTINY.  SEVERAL STOCKHOLDING COMPANIES HAD ALREADY ADOPTED R/3:  STATE OWNED PEQUIVEN  ELF ATOCHEM  THE COMPANY HAD ACCESS TO RELATIVELY LOW R/3 PRICES, AGREED BETWEEN SAP-AG AND PDVSA - VENEZUELA’S STATE OWNED OIL CONGLOMERATE AND PEQUIVEN’S HOLDING COMPANY.
  • 7. . POLILAGO © SAP America, Inc / 7 plastilago PROJECT PREPARATION:  DEVELOPING AN UNDERSTANDING OF LOCAL AND INTERNATIONAL CONSULTANCY LIMITATIONS FOR R/3 PROJECTS - ASAP AS SUCH YET NON EXISTENT  TAKING ADVANTAGE OF A FOUR MONTH FORCED WAITING PERIOD AS AN OPPORTUNITY FOR:  856 HOURS OF EARLY TRAINING FOR 22 PROJECT MEMBERS  EARLY PROGRESS ON DIVERSE INFRASTRUCTURE STRUCTURAL ELEMENTS:  CONCEPTUAL DESIGN OF NETWORK TOPOLOGY  INSTALLATION OF REQUIRED NETWORK NODES  PROCUREMENT OF INTERURBAN TELECOM LINKS
  • 8. . POLILAGO © SAP America, Inc / 8 plastilago PRELIMINARY SCOPE AND PROJECT INVESTMENT MODEL  PRELIMINARY FUNCTIONALITY SCOPE WAS DEFINED ACCORDING TO THE COMPANY PROCESS MODEL  PRELIMINARY PROJECT INVESTMENT ASCERTAINED: COMPANY IT TEAM 32% CONSULTANTS 22% HARDWARE 25% SOFTWARE 12% RDBMS 9% TOTAL PROJECT INVESTMENT: $ 2,862,137
  • 9. . POLILAGO © SAP America, Inc / 9 plastilago PROCESS OPTIMIZATION AND COMPUTERIZATION RFP STRATEGY:  JOINING FORCES WITH A SYSTEMS INTEGRATOR:  COMPANY DESCRIBES PRESENT AND EXPECTED FUTURE  PARTNER DEFINES PATH FROM PRESENT TO FUTURE  DISCOVERY OF A SUCCESSFUL MODAL SOLUTION  PROCESS OPTIMIZATION APPROACH MUST FIT R/3  COMPUTERIZATION APPROACH MUST BE COMPACT  COST OPTIMIZATION  COMPANY HARDWARE/SOFTWARE PREFERENTIAL PRICES  USE OF COMPANY IT PERSONNEL  PROJECT DIRECTION UNDER COMPANY CONTROL
  • 10. . POLILAGO © SAP America, Inc / 10 plastilago SOME PROPOSAL EXPECTED DELIVERABLES:  PURVEYORS’ R/3 EXPERIENCES AND REFERENCES  DESCRIPTION OF CONSTRUCTION TECHNIQUE AND DETAILED PRODUCT STRUCTURE - PBS  PROJECT PERT NETWORKS AND GANTT CHARTS  ASSIGNED RESOURCE RESUMES AND HISTOGRAMS  PROGRAMMED PHYSICAL PROGRESS, MAN-HOUR INVESTMENT AND CASH FLOW ‘S’ CURVES  ECONOMIC DATA: HOURLY RATES, PERDIEMS, ETC.  SCOPE CHANGE, PROBLEMS & REPORT PROTOCOLS
  • 11. . POLILAGO © SAP America, Inc / 11 plastilago SELECTED PROPOSAL CHARACTERISTICS:  PRIME CONTRACTOR, INTEGRATOR AND BASIS EXPERTISE: DIGITAL EQUIPMENT VENEZUELA  FUNCTIONAL SAP EXPERTISE: SEMA GROUP - A EUROPEAN CONSULTING COMPANY  FUNCTIONALITY: SD, MM, PP-PI, QM, PM, HR, FI, CO, AM  PROJECT EXPECTED DURATION: 18 MONTHS  APPROACH: SEMA GROUP HOMEGROWN PROTO-ASAP  INVESTMENT MIX: 4,700 CONSULTANT MAN-HOURS AND 80,000 CLIENT MAN-HOURS - 50 USERS AND 13 IT SPECIALISTS
  • 12. . POLILAGO © SAP America, Inc / 12 plastilago PROJECT TIMETABLE: SEMESTER 1 SEMESTER 2 SEMESTER 3 SALES,EXPEDITIONS,INVOICING,WAREHOUSE MGMT. GENERAL ACCOUNTING,PAYABLES,RECEIVABLES MAINTENANCE PRODUCTION,MATERIALS MGMT.,PURCHASING,QUALITY MGMT. COST ACCOUNTING ASSET MGMT.,TREASURY MGMT. PAYROLL AND HUMAN RESOURCES - BEING DEFINED JUNE1996 NOVEMBER1997
  • 13. . POLILAGO © SAP America, Inc / 13 plastilago COMPACT METHODOLOGY:  PROJECT SUCCESS ASSOCIATED TO STREET-WISE SAP DISTILLATES  COMMON SUCCESS FACTORS WERE:  USER INVOLVEMENT  STERN PROJECT CONTROL  INTEGRATED CHANGE MANAGEMENT ORGANIZATION AND CONCEPTUAL DESIGN DETAILED DESIGN AND PARAMETRIZATION PREPARATION FOR PRODUCTION OPERATIONS OPTIMIZATION CHANGE MANAGEMENT WELL DEFINED PRODUCT STRUCTURE AND NATURE
  • 14. . POLILAGO © SAP America, Inc / 14 plastilago STERN PROJECT CONTROL: A The Assyrian came down like the wolf on the fold B And his cohorts were gleaming in purple and gold A The Assyrian came down like the wolf on the fold B And his cohorts were gleaming in purple and gold C And the shhen of his A The Assyrian came down like the wolf on the fold B And his cohorts were gleaming A The Assyrian came down like the wolf on the fold PRODUCT STRUCTURE & NATURE PROGRESS REPORTS PERT DIAGRAMS ‘S’ CURVES
  • 15. . POLILAGO © SAP America, Inc / 15 plastilago PROJECT ORGANIZATION: USER LIAISON USER ANALYST SYSTEMS ANALYST FUNCTIONAL CONSULTING PER R/3 MODULE INFRASTRUCTURE SPECIALISTS PROJECT MANAGEMENT MANAGERS: •SALES •FINANCE •HUMAN RESOURCES •PRODUCTION •LOGISTICS •IT OTHER DECISION MAKERS CHIEF EXECUTIVE50 USERS 18 IT SPECIALISTS 5.000 HRS CONSULTING ABAP/4 SPECIALISTS POOLS
  • 16. . POLILAGO © SAP America, Inc / 16 plastilago BLOCK I - JUNE 96/JANUARY 97:  SALES  MASTER DATA  PRICES  DISCOUNTS  BUSINESS PARTNERS  ORDERS  CONTRACTS  DELIVERY PLANS  SALES STATISTICS  BILLING  INVOICES  PLANNING  FORECAST  SOP  MPS  SHIPPING  DELIVERIES  RETURN DELIVERIES  REPLENISHMENT  FINISHED PRODUCTS  GOODS RECEIPT  TRANSFER REQUIREMENT  TRANSFER ORDER  PHYSICAL INVENTORY  VALUATION  TRANSPORT ORDER
  • 17. . POLILAGO © SAP America, Inc / 17 plastilago BLOCK II - JUNE 96/JANUARY 97:  GENERAL ACCOUNTING  GENERAL LEDGER  FINANCIAL REPORTING  STATISTICS  ACCOUNTS PAYABLE  MASTER DATA  VENDOR  BANK  CREDIT MEMO  DOWN PAYMENT  POSTING  PAYMENTS  ADVANCES  TAXES  CHECKS  ACCOUNTS RECEIVABLE  CREDIT/DEBIT MEMO  REBATES  LETTERS OF CREDIT  COLLECTIONS  DOWN PAYMENTS  INTERNAL TRANSFER POSTING  AUTOMATIC CREDIT CONTROL OF SALES ORDERS  CREDIT MANAGEMENT  INTEREST CALCULATION  CLEAR ANALYSIS
  • 18. . POLILAGO © SAP America, Inc / 18 plastilago BLOCKS III & IV - FROM JAN 97 TO AUG/OCT 97:  PURCHASING  GOODS  SERVICES  INVENTORY MGMT (SPARE PARTS, OPERATING SUPPLIES, EMPTIES, SEMIFINISHED PRODUCT, RAW MATERIALS)  RESERVATIONS  GOODS RECEIPT  TRANSFER ORDER  TRANSFER REQUIREMENT  PHYSICAL INVENTORY  VALUATION  STATISTICS  COST CONTROL  COST CENTERS  PROJECTS SYSTEM  PRODUCTION COSTS  PROFITABILITY ANALYSIS  ABC  PRODUCTION - PROCESS  MASTER RECIPES  RESOURCES  PROCESS ORDERS  CONTROL RECIPES  PI - SHEET  CAPACITY LEVELLING  MRP  STATISTICS  QUALITY MANAGEMENT  INSPECTION PLANNING  QUALITY CERTIFICATES  PROCUREMENT  QUALITY INSPECTIONS  STATISTICS
  • 19. . POLILAGO © SAP America, Inc / 19 plastilago MARACAIBO CENTRAL COMPLEX: UPS REDUNDANT POWER SUPPLIES REDUNDANT SERVERS DISK MIRRORING FOR R/3 TAPE BACKUP CENTRAL COMPLEX: • 2 COMPAQ PROLIANT 5000 SERVERS WITH STANDBY RECOVERY OPTION •• 2 PENTIUM PRO 200 Mhz •• 640 Mb RAM • 35 Gb DISC • 2 DLT TAPE UNITS • 250 Mbps ETHERNET CARD
  • 20. . POLILAGO © SAP America, Inc / 20 plastilago THE NETWORK: EL TABLAZO COMPLEX MBO CCS EXTERNAL STORAGE x.25 internet HIGH DENSITY PE PLANT LOW DENSITY PE PLANT EXTERNAL STORAGE
  • 21. . POLILAGO © SAP America, Inc / 21 plastilago SOFTWARE GENERAL ARCHITECTURE: ABAP/4ABAP/4 INFORMIX ODS 7.20T21INFORMIX ODS 7.20T21 WINDOWS NT 3.51 SP 4WINDOWS NT 3.51 SP 4 MS OFFICEMS OFFICE 4.214.21 & OTHERS& OTHERS SAP R/3 3.0E+SAP R/3 3.0E+
  • 22. . POLILAGO © SAP America, Inc / 22 plastilago DON’T:  SELECT THE WRONG DEVELOPMENT APPROACH  SELECT THE WRONG USERS  SELECT THE WRONG FUNCTIONAL CONSULTANTS  SELECT WRONG PURVEYORS  SELECT WRONG BASIS PERSONNEL  UNDERESTIMATE IMPORTANCE OF BASIS TRAINING  UNDERESTIMATE TIME - AND COST - OF REWORKING  UNDERESTIMATE PROCUREMENT/DELIVERY TIMES
  • 23. . POLILAGO © SAP America, Inc / 23 plastilago DO:  EXCEL AT CHANGE MANAGEMENT  RECRUIT THE COMPANY PRINCIPAL - SINE QUA NON  RECRUIT - OR LEVY - TOP MANAGEMENT  OBTAIN RIGHT AMOUNT OF THE ABLEST USERS  CONFINE CONSULTANT TO PREDEFINED ROLE  STERNEST PROJECT MANAGEMENT: TIME, COST, QUALITY  R/3 CHOICE-OF-FIT REENGINEERING  MINIMIZE NON R/3 FUNCTIONALITY  ZERO CHANGES TO R/3 BASE CODE  EARLY INSTALLATION R/3 DEVELOPMENT ENVIRONMENT  EARLIEST POSSIBLE TRAINING OF USERS & SPECIALISTS