Plastilago-Polilago
AN 18 MONTH BIG BANG
IN THE VENEZUELAN
PETROCHEMICALS INDUSTRY
- 2. .
POLILAGO
© SAP America, Inc / 2
plastilago
COMPANY CARACTERIZATION:
PLASTILAGO AND POLILAGO ARE TWO VENEZUELAN
PETROCHEMICAL COMPANIES WHICH PRODUCE
170.000 METRIC TONS OF HIGH AND LOW DENSITY
POLYETHYLENE PER YEAR FOR LOCAL AND
INTERNATIONAL MARKETS.
YEARLY INCOME: 200 MEGA $. 480 EMPLOYEES.
PRODUCTION, SALES AND ADMINISTRATION OCCUR
AT THE PETROCHEMICAL COMPLEX OF EL TABLAZO,
CARACAS AND MARACAIBO, RESPECTIVELY.
STOCKHOLDERS ARE STATE OWNED PEQUIVEN,
VENEZUELAN INVESTORS GRUPO ZULIANO, ELF
ATOCHEM AND MITSUI.
- 3. .
POLILAGO
© SAP America, Inc / 3
plastilago
CONTEXT BY OCTOBER 1995:
INSUFFICIENT APPLICATIONS INTEGRATION:
COMPANY APPLICATIONS RESTED ON FOUR
SYSTEMS ARCHITECTURES: MVS, VM, X-BASE AND
VARIOUS PACKAGES - I.E.: MILLENNIUM.
INSUFFICIENT APPLICATION FUNCTIONALITY: ±
50% OUTSTANDING REQUIREMENTS MET.
PURVEYOR OF ECONOMIC MAINFRAME SERVICES
HAD ANNOUNCED DISCONTINUATION OF ITS
ARCHITECTURE BY THE END OF 1997.
NECESSITY OF SCALABLE SOFTWARE IN ORDER TO
SUPPORT A CHANGING BUSINESS ENVIRONMENT.
- 4. .
POLILAGO
© SAP America, Inc / 4
plastilago
ARCHITECTURE HISTORY:
FOUR
CONCURRENT
ARCHITECTURES
FOUR SETS OF
SPECIALISTS WITH
DIFFERENT
BACKGROUNDS
1975 1980 1985 1990
MILLENNIUM
SQL/VM
IDMS/MVS
X-BASE
S/34
S/3
ARCHITECTURE
- 5. .
POLILAGO
© SAP America, Inc / 5
plastilago
FUNCTIONALITY EVOLUTION:
MARGINAL RETURNS:
10%
20%
30%
40%
50%
1975-1990 1991 1992 1993 1994
%REQUIREDFUNCTIONALITY
35%
8%
3% 2% 1,5%
- 6. .
POLILAGO
© SAP America, Inc / 6
plastilago
WHY CHOOSE R/3?:
IN FUNCTIONALITY, R/3 COMPARED FAVOURABLY
WITH OTHER INTEGRATED SYSTEMS UNDER
SCRUTINY.
SEVERAL STOCKHOLDING COMPANIES HAD
ALREADY ADOPTED R/3:
STATE OWNED PEQUIVEN
ELF ATOCHEM
THE COMPANY HAD ACCESS TO RELATIVELY LOW
R/3 PRICES, AGREED BETWEEN SAP-AG AND PDVSA
- VENEZUELA’S STATE OWNED OIL CONGLOMERATE
AND PEQUIVEN’S HOLDING COMPANY.
- 7. .
POLILAGO
© SAP America, Inc / 7
plastilago
PROJECT PREPARATION:
DEVELOPING AN UNDERSTANDING OF LOCAL AND
INTERNATIONAL CONSULTANCY LIMITATIONS FOR
R/3 PROJECTS - ASAP AS SUCH YET NON EXISTENT
TAKING ADVANTAGE OF A FOUR MONTH FORCED
WAITING PERIOD AS AN OPPORTUNITY FOR:
856 HOURS OF EARLY TRAINING FOR 22 PROJECT MEMBERS
EARLY PROGRESS ON DIVERSE INFRASTRUCTURE
STRUCTURAL ELEMENTS:
CONCEPTUAL DESIGN OF NETWORK TOPOLOGY
INSTALLATION OF REQUIRED NETWORK NODES
PROCUREMENT OF INTERURBAN TELECOM LINKS
- 8. .
POLILAGO
© SAP America, Inc / 8
plastilago
PRELIMINARY SCOPE AND PROJECT
INVESTMENT MODEL
PRELIMINARY FUNCTIONALITY SCOPE WAS DEFINED
ACCORDING TO THE COMPANY PROCESS MODEL
PRELIMINARY PROJECT INVESTMENT ASCERTAINED:
COMPANY IT TEAM
32%
CONSULTANTS
22%
HARDWARE
25%
SOFTWARE
12%
RDBMS
9%
TOTAL PROJECT
INVESTMENT:
$ 2,862,137
- 9. .
POLILAGO
© SAP America, Inc / 9
plastilago
PROCESS OPTIMIZATION AND
COMPUTERIZATION RFP STRATEGY:
JOINING FORCES WITH A SYSTEMS INTEGRATOR:
COMPANY DESCRIBES PRESENT AND EXPECTED FUTURE
PARTNER DEFINES PATH FROM PRESENT TO FUTURE
DISCOVERY OF A SUCCESSFUL MODAL SOLUTION
PROCESS OPTIMIZATION APPROACH MUST FIT R/3
COMPUTERIZATION APPROACH MUST BE COMPACT
COST OPTIMIZATION
COMPANY HARDWARE/SOFTWARE PREFERENTIAL PRICES
USE OF COMPANY IT PERSONNEL
PROJECT DIRECTION UNDER COMPANY CONTROL
- 10. .
POLILAGO
© SAP America, Inc / 10
plastilago
SOME PROPOSAL EXPECTED DELIVERABLES:
PURVEYORS’ R/3 EXPERIENCES AND REFERENCES
DESCRIPTION OF CONSTRUCTION TECHNIQUE AND
DETAILED PRODUCT STRUCTURE - PBS
PROJECT PERT NETWORKS AND GANTT CHARTS
ASSIGNED RESOURCE RESUMES AND HISTOGRAMS
PROGRAMMED PHYSICAL PROGRESS, MAN-HOUR
INVESTMENT AND CASH FLOW ‘S’ CURVES
ECONOMIC DATA: HOURLY RATES, PERDIEMS, ETC.
SCOPE CHANGE, PROBLEMS & REPORT PROTOCOLS
- 11. .
POLILAGO
© SAP America, Inc / 11
plastilago
SELECTED PROPOSAL CHARACTERISTICS:
PRIME CONTRACTOR, INTEGRATOR AND BASIS
EXPERTISE: DIGITAL EQUIPMENT VENEZUELA
FUNCTIONAL SAP EXPERTISE: SEMA GROUP - A
EUROPEAN CONSULTING COMPANY
FUNCTIONALITY: SD, MM, PP-PI, QM, PM, HR, FI, CO, AM
PROJECT EXPECTED DURATION: 18 MONTHS
APPROACH: SEMA GROUP HOMEGROWN PROTO-ASAP
INVESTMENT MIX: 4,700 CONSULTANT MAN-HOURS
AND 80,000 CLIENT MAN-HOURS - 50 USERS AND 13 IT
SPECIALISTS
- 12. .
POLILAGO
© SAP America, Inc / 12
plastilago
PROJECT TIMETABLE:
SEMESTER 1 SEMESTER 2 SEMESTER 3
SALES,EXPEDITIONS,INVOICING,WAREHOUSE MGMT.
GENERAL ACCOUNTING,PAYABLES,RECEIVABLES
MAINTENANCE
PRODUCTION,MATERIALS MGMT.,PURCHASING,QUALITY MGMT.
COST ACCOUNTING
ASSET MGMT.,TREASURY MGMT.
PAYROLL AND HUMAN RESOURCES - BEING DEFINED
JUNE1996
NOVEMBER1997
- 13. .
POLILAGO
© SAP America, Inc / 13
plastilago
COMPACT METHODOLOGY:
PROJECT SUCCESS
ASSOCIATED TO
STREET-WISE SAP
DISTILLATES
COMMON SUCCESS
FACTORS WERE:
USER
INVOLVEMENT
STERN PROJECT
CONTROL
INTEGRATED
CHANGE
MANAGEMENT
ORGANIZATION AND
CONCEPTUAL
DESIGN
DETAILED DESIGN
AND
PARAMETRIZATION
PREPARATION
FOR
PRODUCTION
OPERATIONS
OPTIMIZATION
CHANGE MANAGEMENT
WELL DEFINED
PRODUCT
STRUCTURE
AND
NATURE
- 14. .
POLILAGO
© SAP America, Inc / 14
plastilago
STERN PROJECT CONTROL:
A The Assyrian came down like
the wolf on the fold
B And his cohorts were gleaming
in purple and gold
A The Assyrian came down like
the wolf on the fold
B And his cohorts were gleaming
in purple and gold
C And the shhen of his
A The Assyrian came down like
the wolf on the fold
B And his cohorts were gleaming
A The Assyrian came down like
the wolf on the fold
PRODUCT
STRUCTURE &
NATURE
PROGRESS
REPORTS
PERT
DIAGRAMS
‘S’
CURVES
- 15. .
POLILAGO
© SAP America, Inc / 15
plastilago
PROJECT ORGANIZATION:
USER LIAISON
USER ANALYST
SYSTEMS ANALYST
FUNCTIONAL CONSULTING
PER R/3 MODULE
INFRASTRUCTURE SPECIALISTS
PROJECT MANAGEMENT
MANAGERS:
•SALES
•FINANCE
•HUMAN RESOURCES
•PRODUCTION
•LOGISTICS
•IT
OTHER DECISION
MAKERS
CHIEF EXECUTIVE50 USERS
18 IT SPECIALISTS
5.000 HRS CONSULTING
ABAP/4 SPECIALISTS
POOLS
- 16. .
POLILAGO
© SAP America, Inc / 16
plastilago
BLOCK I - JUNE 96/JANUARY 97:
SALES
MASTER DATA
PRICES
DISCOUNTS
BUSINESS PARTNERS
ORDERS
CONTRACTS
DELIVERY PLANS
SALES STATISTICS
BILLING
INVOICES
PLANNING
FORECAST
SOP
MPS
SHIPPING
DELIVERIES
RETURN DELIVERIES
REPLENISHMENT
FINISHED PRODUCTS
GOODS RECEIPT
TRANSFER REQUIREMENT
TRANSFER ORDER
PHYSICAL INVENTORY
VALUATION
TRANSPORT ORDER
- 17. .
POLILAGO
© SAP America, Inc / 17
plastilago
BLOCK II - JUNE 96/JANUARY 97:
GENERAL ACCOUNTING
GENERAL LEDGER
FINANCIAL REPORTING
STATISTICS
ACCOUNTS PAYABLE
MASTER DATA
VENDOR
BANK
CREDIT MEMO
DOWN PAYMENT
POSTING
PAYMENTS
ADVANCES
TAXES
CHECKS
ACCOUNTS RECEIVABLE
CREDIT/DEBIT MEMO
REBATES
LETTERS OF CREDIT
COLLECTIONS
DOWN PAYMENTS
INTERNAL TRANSFER POSTING
AUTOMATIC CREDIT CONTROL
OF SALES ORDERS
CREDIT MANAGEMENT
INTEREST CALCULATION
CLEAR ANALYSIS
- 18. .
POLILAGO
© SAP America, Inc / 18
plastilago
BLOCKS III & IV - FROM JAN 97 TO AUG/OCT 97:
PURCHASING
GOODS
SERVICES
INVENTORY MGMT (SPARE PARTS,
OPERATING SUPPLIES, EMPTIES,
SEMIFINISHED PRODUCT, RAW
MATERIALS)
RESERVATIONS
GOODS RECEIPT
TRANSFER ORDER
TRANSFER REQUIREMENT
PHYSICAL INVENTORY
VALUATION
STATISTICS
COST CONTROL
COST CENTERS
PROJECTS SYSTEM
PRODUCTION COSTS
PROFITABILITY ANALYSIS
ABC
PRODUCTION - PROCESS
MASTER RECIPES
RESOURCES
PROCESS ORDERS
CONTROL RECIPES
PI - SHEET
CAPACITY LEVELLING
MRP
STATISTICS
QUALITY MANAGEMENT
INSPECTION PLANNING
QUALITY CERTIFICATES
PROCUREMENT
QUALITY INSPECTIONS
STATISTICS
- 19. .
POLILAGO
© SAP America, Inc / 19
plastilago
MARACAIBO CENTRAL COMPLEX:
UPS
REDUNDANT
POWER
SUPPLIES
REDUNDANT
SERVERS
DISK MIRRORING
FOR R/3
TAPE
BACKUP
CENTRAL COMPLEX:
• 2 COMPAQ PROLIANT
5000 SERVERS WITH
STANDBY RECOVERY
OPTION
•• 2 PENTIUM PRO
200 Mhz
•• 640 Mb RAM
• 35 Gb DISC
• 2 DLT TAPE UNITS
• 250 Mbps ETHERNET
CARD
- 20. .
POLILAGO
© SAP America, Inc / 20
plastilago
THE NETWORK:
EL TABLAZO COMPLEX
MBO CCS
EXTERNAL
STORAGE
x.25 internet
HIGH DENSITY PE PLANT LOW DENSITY PE PLANT
EXTERNAL
STORAGE
- 21. .
POLILAGO
© SAP America, Inc / 21
plastilago
SOFTWARE GENERAL ARCHITECTURE:
ABAP/4ABAP/4
INFORMIX ODS 7.20T21INFORMIX ODS 7.20T21
WINDOWS NT 3.51 SP 4WINDOWS NT 3.51 SP 4
MS OFFICEMS OFFICE
4.214.21
& OTHERS& OTHERS
SAP R/3 3.0E+SAP R/3 3.0E+
- 22. .
POLILAGO
© SAP America, Inc / 22
plastilago
DON’T:
SELECT THE WRONG DEVELOPMENT APPROACH
SELECT THE WRONG USERS
SELECT THE WRONG FUNCTIONAL CONSULTANTS
SELECT WRONG PURVEYORS
SELECT WRONG BASIS PERSONNEL
UNDERESTIMATE IMPORTANCE OF BASIS TRAINING
UNDERESTIMATE TIME - AND COST - OF REWORKING
UNDERESTIMATE PROCUREMENT/DELIVERY TIMES
- 23. .
POLILAGO
© SAP America, Inc / 23
plastilago
DO:
EXCEL AT CHANGE MANAGEMENT
RECRUIT THE COMPANY PRINCIPAL - SINE QUA NON
RECRUIT - OR LEVY - TOP MANAGEMENT
OBTAIN RIGHT AMOUNT OF THE ABLEST USERS
CONFINE CONSULTANT TO PREDEFINED ROLE
STERNEST PROJECT MANAGEMENT: TIME, COST, QUALITY
R/3 CHOICE-OF-FIT REENGINEERING
MINIMIZE NON R/3 FUNCTIONALITY
ZERO CHANGES TO R/3 BASE CODE
EARLY INSTALLATION R/3 DEVELOPMENT ENVIRONMENT
EARLIEST POSSIBLE TRAINING OF USERS & SPECIALISTS