SlideShare a Scribd company logo
1 of 2
Danielle L. Ramos
Certifications:
 ACIConcrete Technician- Grade I
 TroxlerNuclearGauge Certified
 FACE
EmploymentHistory:
Shaw/CBI
V.C. SummerNuclear Plant Units2 and 3
September2011 to Present
Jenkinsville,SC
 Performedlabworktoinclude Sieveanalysisoncoarse andfine aggregate,SpecificGravityfor
coarse and fine aggregate,Total moisture contentforcoarse andfine aggregate,Lightweight
particlesincoarse and fine aggregate,Claylumpsforcoarse andfine aggregate,Flatand
elongatedparticles,Organicimpurities, Controlledaggregate bins,Samplingaggregates,
Splittingaggregatestotestsize.ITM171
 Batch PlantInspectionRequests ITM111
 PreplacementandGroutInspectionRequestsITM113
 PreplacementInspectionRequestsITM112
AMEC April 2011- September2011
Jenkinsville,SC
 Fieldtechnician.PerformedShaw ITR113 and ITR 171
Aerotek(Terracon Consultants,Inc.) August2011-October 2011
Tucson,AZ
 Performedfieldworktoinclude concrete sampling,performingslump,aircontentand
fabricatedcylinders
 Verifiedthe placementof reinforcingsteel foraccuracyinslabs,footings,beamsandwallsprior
to the placementof concrete
 Performedlaboratoryworktoinclude sieve analysis,proctors(ASTMD 1557 and D698)
Project Administrator,Power Services,Inc. June 2010-October 2010
UASTB TEMF and COF Facilities
Ft. Huachuca,AZ
 Prepare submittals/Transmittals
 Enter fieldandcontractordata intothe QCS/RMS System
 Ensure each contractor hassubmittedappropriate paperworkpriortowork
 DeliverDailyFieldreportstothe USACOEand retrievingpaperwork
EngineeringTechnician/ProjectManager,Terracon Consultants,Inc. March 1997- July 2008
Hartford,CT, Charlotte,NC
 Performedlabandfieldworkincludingcompressive strengthtestingonmortar, grout and
concrete cylindersandbeams,mix design
 Verifiedthe placementof reinforcingsteel foraccuracyinslabs,footings,beamsandwallsprior
to the placementof concrete
 Fireproofing
 Asphaltextractions,sampling,sieve analysis,specificgravities,fabricatingsamplesanddensity
analysis
 Performedsoilsanalysistoincludesieve analysis,specificgravityof fine andcourse aggregate,
atterburglimits,proctors(ASTMD1557 and D698), permeabilityinlaboratoryandinplace
 Floorflatness/floorlevelness
 NDT testingtoinclude Windsorpin/probe
 Performedbatchplantinspections
 Interactedwitharchitects,structural engineersandcontractorson behalf of the clientand
reportreview
 SafetyOfficer

More Related Content

Similar to RESUME

JKBernard_Resume_July15_doc
JKBernard_Resume_July15_docJKBernard_Resume_July15_doc
JKBernard_Resume_July15_docJohn Bernard
 
16 lbnl deep borehole research summary dobson lbnl
16 lbnl deep borehole research summary dobson lbnl16 lbnl deep borehole research summary dobson lbnl
16 lbnl deep borehole research summary dobson lbnlleann_mays
 
Resume(Chang Jung)_Laboratory Researcher
Resume(Chang Jung)_Laboratory ResearcherResume(Chang Jung)_Laboratory Researcher
Resume(Chang Jung)_Laboratory ResearcherChang Min Jung
 
IRJET- Structural Health Monitoring of Glass Fibre Reinforced Concrete Beam
IRJET- Structural Health Monitoring of Glass Fibre Reinforced Concrete BeamIRJET- Structural Health Monitoring of Glass Fibre Reinforced Concrete Beam
IRJET- Structural Health Monitoring of Glass Fibre Reinforced Concrete BeamIRJET Journal
 
DETERMINATION OF STRENGTH OF SOIL AND ITS STABILITY USING NON DESTRUCTIVE TESTS
DETERMINATION OF STRENGTH OF SOIL AND ITS STABILITY USING NON DESTRUCTIVE TESTSDETERMINATION OF STRENGTH OF SOIL AND ITS STABILITY USING NON DESTRUCTIVE TESTS
DETERMINATION OF STRENGTH OF SOIL AND ITS STABILITY USING NON DESTRUCTIVE TESTSIRJET Journal
 

Similar to RESUME (7)

JKBernard_Resume_July15_doc
JKBernard_Resume_July15_docJKBernard_Resume_July15_doc
JKBernard_Resume_July15_doc
 
CRSP Poster Final
CRSP Poster FinalCRSP Poster Final
CRSP Poster Final
 
16 lbnl deep borehole research summary dobson lbnl
16 lbnl deep borehole research summary dobson lbnl16 lbnl deep borehole research summary dobson lbnl
16 lbnl deep borehole research summary dobson lbnl
 
Resume(Chang Jung)_Laboratory Researcher
Resume(Chang Jung)_Laboratory ResearcherResume(Chang Jung)_Laboratory Researcher
Resume(Chang Jung)_Laboratory Researcher
 
IRJET- Structural Health Monitoring of Glass Fibre Reinforced Concrete Beam
IRJET- Structural Health Monitoring of Glass Fibre Reinforced Concrete BeamIRJET- Structural Health Monitoring of Glass Fibre Reinforced Concrete Beam
IRJET- Structural Health Monitoring of Glass Fibre Reinforced Concrete Beam
 
Quiz 2
Quiz 2Quiz 2
Quiz 2
 
DETERMINATION OF STRENGTH OF SOIL AND ITS STABILITY USING NON DESTRUCTIVE TESTS
DETERMINATION OF STRENGTH OF SOIL AND ITS STABILITY USING NON DESTRUCTIVE TESTSDETERMINATION OF STRENGTH OF SOIL AND ITS STABILITY USING NON DESTRUCTIVE TESTS
DETERMINATION OF STRENGTH OF SOIL AND ITS STABILITY USING NON DESTRUCTIVE TESTS
 

RESUME

  • 1. Danielle L. Ramos Certifications:  ACIConcrete Technician- Grade I  TroxlerNuclearGauge Certified  FACE EmploymentHistory: Shaw/CBI V.C. SummerNuclear Plant Units2 and 3 September2011 to Present Jenkinsville,SC  Performedlabworktoinclude Sieveanalysisoncoarse andfine aggregate,SpecificGravityfor coarse and fine aggregate,Total moisture contentforcoarse andfine aggregate,Lightweight particlesincoarse and fine aggregate,Claylumpsforcoarse andfine aggregate,Flatand elongatedparticles,Organicimpurities, Controlledaggregate bins,Samplingaggregates, Splittingaggregatestotestsize.ITM171  Batch PlantInspectionRequests ITM111  PreplacementandGroutInspectionRequestsITM113  PreplacementInspectionRequestsITM112 AMEC April 2011- September2011 Jenkinsville,SC  Fieldtechnician.PerformedShaw ITR113 and ITR 171 Aerotek(Terracon Consultants,Inc.) August2011-October 2011 Tucson,AZ  Performedfieldworktoinclude concrete sampling,performingslump,aircontentand fabricatedcylinders  Verifiedthe placementof reinforcingsteel foraccuracyinslabs,footings,beamsandwallsprior to the placementof concrete  Performedlaboratoryworktoinclude sieve analysis,proctors(ASTMD 1557 and D698) Project Administrator,Power Services,Inc. June 2010-October 2010 UASTB TEMF and COF Facilities
  • 2. Ft. Huachuca,AZ  Prepare submittals/Transmittals  Enter fieldandcontractordata intothe QCS/RMS System  Ensure each contractor hassubmittedappropriate paperworkpriortowork  DeliverDailyFieldreportstothe USACOEand retrievingpaperwork EngineeringTechnician/ProjectManager,Terracon Consultants,Inc. March 1997- July 2008 Hartford,CT, Charlotte,NC  Performedlabandfieldworkincludingcompressive strengthtestingonmortar, grout and concrete cylindersandbeams,mix design  Verifiedthe placementof reinforcingsteel foraccuracyinslabs,footings,beamsandwallsprior to the placementof concrete  Fireproofing  Asphaltextractions,sampling,sieve analysis,specificgravities,fabricatingsamplesanddensity analysis  Performedsoilsanalysistoincludesieve analysis,specificgravityof fine andcourse aggregate, atterburglimits,proctors(ASTMD1557 and D698), permeabilityinlaboratoryandinplace  Floorflatness/floorlevelness  NDT testingtoinclude Windsorpin/probe  Performedbatchplantinspections  Interactedwitharchitects,structural engineersandcontractorson behalf of the clientand reportreview  SafetyOfficer