Sensors
•• Capacitance MatCapacitance Mat
•• Rigid ChannelRigid Channel PiezoPiezo
•• BareBare PiezoPiezo
•• Bending PlateBending Plate
•• Load CellLoad Cell
Capacitance MatCapacitance Mat
•• Do wear out.Do wear out.
•• Water destroys.Water destroys.
•• Use permanent loops if possible.Use permanent loops if possible.
•• Use TapUse Tap--Con screwsCon screws
•• Lots ofLots of bitchethenebitchethene tapetape
Capacitance MatCapacitance Mat
Typical Mat installationsTypical Mat installations
Rigid ChannelRigid Channel PiezoPiezo
•• Stay in concrete wellStay in concrete well
•• Need good groutNeed good grout
•• Tend to pop out of pavement especiallyTend to pop out of pavement especially
rutted asphaltrutted asphalt
•• Not easily “held” in slot during epoxyNot easily “held” in slot during epoxy
cure timecure time
Rigid ChannelRigid Channel PiezoPiezo
ThisThis
sensor hassensor has
beenbeen
workingworking
for morefor more
than sixthan six
years!years!
Rigid ChannelRigid Channel PiezoPiezo
ThisThis
sensorsensor
hashas
not.not.
Rigid ChannelRigid Channel PiezoPiezo
Too Deep?Too Deep?
VoidVoid
unevenuneven
Rigid ChannelRigid Channel PiezoPiezo
BareBare PiezoPiezo
•• Easily installedEasily installed
•• Installs quicklyInstalls quickly
•• Small saw slotSmall saw slot
•• Can be used in portable applicationsCan be used in portable applications
BareBare PiezoPiezo
voidsvoids
BareBare PiezoPiezo
Note voidNote void
Note dipNote dip
Bending PlateBending Plate -- Load CellLoad Cell
•• Have plenty of finishers available when usingHave plenty of finishers available when using
‘high‘high--early” concreteearly” concrete
•• Don’t pour concrete directly on framesDon’t pour concrete directly on frames
•• Pour sides and vibratePour sides and vibrate
•• Tie rebar tightTie rebar tight
•• Make sure water drains to the ditch and not toMake sure water drains to the ditch and not to
the cabinet through conduitthe cabinet through conduit
Bending PlateBending Plate -- Load CellLoad Cell
•• Always make sure you tamp the bottom of theAlways make sure you tamp the bottom of the
pitpit
•• Use joint sized epoxy coated rebarUse joint sized epoxy coated rebar
•• Don’t bore under asphalt to concreteDon’t bore under asphalt to concrete
•• Don’t expect a more expensive WIM systemsDon’t expect a more expensive WIM systems
to compensate for poor road characteristicsto compensate for poor road characteristics
Bending PlateBending Plate
Typical Bending Plate installationsTypical Bending Plate installations
Load CellLoad Cell
Typical LoadTypical Load--cell installationscell installations
Common to all
Three typesThree types
of installedof installed
sensorssensors
Common to all
The GoodThe Good
•• Work all the timeWork all the time
•• Have worked for yearsHave worked for years
•• Doesn’t matter what theDoesn’t matter what the
installation looks likeinstallation looks like
Common to all
The BadThe Bad
•• Don’t workDon’t work
•• Can’t get it to workCan’t get it to work
•• Doesn’t matter what theDoesn’t matter what the
installation looks likeinstallation looks like
Common to all
The UglyThe Ugly
•• Only works when you are thereOnly works when you are there
•• Checks out OKChecks out OK
•• The installation usually looks goodThe installation usually looks good
Common to all
Invest in aInvest in a
good Digitalgood Digital
StorageStorage
OscilloscopeOscilloscope
Common to allCommon to all
ContractorsContractors
Common to allCommon to all
Roadway ConsiderationsRoadway Considerations
•• StraightStraight
•• SmoothSmooth
•• LevelLevel
•• “Good” surface“Good” surface
•• No ruttingNo rutting
•• ASTM WIM specASTM WIM spec
Common to allCommon to all
RoadsRoads
Common to allCommon to all
InstallationInstallation
•• Have detailed plansHave detailed plans
•• Have an “expert” on siteHave an “expert” on site
•• Keep future repairs in mindKeep future repairs in mind
Common to allCommon to all
Note allNote all
leadlead--in slotsin slots
converge toconverge to
one point.one point.
This makesThis makes
futurefuture
installationsinstallations
and repairsand repairs
difficult.difficult.
Common to allCommon to all
Avoid wheel track “triangles”Avoid wheel track “triangles”
Common to allCommon to all
Common to allCommon to all
DrillDrill
oneone--inch holesinch holes
in cornersin corners
Run leadRun lead--in Straight to pull boxin Straight to pull box
Common to allCommon to all
Don’t forget maintenance to otherDon’t forget maintenance to other
components at site.components at site.
Common to allCommon to all
Plan the workPlan the work
•• Know where everythingKnow where everything
is going to gois going to go
•• Mark all saw cutsMark all saw cuts
before starting the sawbefore starting the saw
•• The more wires in a slot,The more wires in a slot,
the deeper it has to bethe deeper it has to be
Common to allCommon to all
Plan the workPlan the work
•• Accurately measure/layoutAccurately measure/layout
straight lines perpendicular tostraight lines perpendicular to
traffic flowtraffic flow
•• Cut accurate, straight slotsCut accurate, straight slots
•• Always “wet” cutAlways “wet” cut
Common to all
3 (9’)3 (9’)
4 (12’)4 (12’)
5 (15’)5 (15’)
Don’t justDon’t just
“eyeball it”.“eyeball it”.
Measure it!Measure it!
It can beIt can be
easilyeasily
accomplishedaccomplished
byby
constructingconstructing
aa
33--44--55
triangle.triangle.
Common to allCommon to all
Thoroughly clean all slots to remove anyThoroughly clean all slots to remove any
debris, sludge, etc.debris, sludge, etc.
Use high pressure washerUse high pressure washer
Then dry with oil free compressed airThen dry with oil free compressed air
Use wire brushUse wire brush
Common to allCommon to all
SensorSensor
crossingscrossings
should beshould be
11--2mm2mm
high,high,
lightlylightly
feathered.feathered.
NO DIPSNO DIPS!!!!!!
(Dip = Loss(Dip = Loss
of Signal)of Signal)
Common to allCommon to all
TheThe
contractorcontractor
didn’tdidn’t
smile...smile... when hewhen he
had tohad to
replacereplace
thisthis
“smile”.“smile”.
Common to allCommon to all
Loops were installed in base.Loops were installed in base.
Common to allCommon to all
When driving surface was put down it did notWhen driving surface was put down it did not
adhere to loop sealant. Neatness counts.adhere to loop sealant. Neatness counts.
Future DirectionsFuture Directions
•• Fiber Optic sensorsFiber Optic sensors
•• PiezoPiezo--quartzquartz
•• ????
ThankThank
YouYou

More Related Content

Viewers also liked

جوائز عالمية
جوائز عالميةجوائز عالمية
جوائز عالميةguest1c1fbdd
 
Gdańsk - Marcin Drożdżowski WSB 29119
Gdańsk - Marcin Drożdżowski WSB 29119Gdańsk - Marcin Drożdżowski WSB 29119
Gdańsk - Marcin Drożdżowski WSB 29119MarcinDro
 
Course Outline (Accounting).doc
Course Outline (Accounting).docCourse Outline (Accounting).doc
Course Outline (Accounting).docXying Lee
 
Epc(lee xin ying 0322432)
Epc(lee xin ying 0322432)Epc(lee xin ying 0322432)
Epc(lee xin ying 0322432)Xying Lee
 
Relación becas libros concedidas
Relación becas libros concedidasRelación becas libros concedidas
Relación becas libros concedidascpramonlaza
 
Finnish technology industry, October 2016
Finnish technology industry, October 2016Finnish technology industry, October 2016
Finnish technology industry, October 2016TechFinland
 
KH. Abdurrahman Wahid
KH. Abdurrahman WahidKH. Abdurrahman Wahid
KH. Abdurrahman WahidAdellaGF
 
Liver function tests and interpretation
Liver function tests and interpretation Liver function tests and interpretation
Liver function tests and interpretation subramaniam sethupathy
 
파이썬 class 및 인스턴스 생성 이해하기
파이썬 class 및 인스턴스 생성 이해하기파이썬 class 및 인스턴스 생성 이해하기
파이썬 class 및 인스턴스 생성 이해하기Yong Joon Moon
 

Viewers also liked (13)

15-Inabnitt
15-Inabnitt15-Inabnitt
15-Inabnitt
 
جوائز عالمية
جوائز عالميةجوائز عالمية
جوائز عالمية
 
Recursosnaturales
RecursosnaturalesRecursosnaturales
Recursosnaturales
 
Gdańsk - Marcin Drożdżowski WSB 29119
Gdańsk - Marcin Drożdżowski WSB 29119Gdańsk - Marcin Drożdżowski WSB 29119
Gdańsk - Marcin Drożdżowski WSB 29119
 
Course Outline (Accounting).doc
Course Outline (Accounting).docCourse Outline (Accounting).doc
Course Outline (Accounting).doc
 
Epc(lee xin ying 0322432)
Epc(lee xin ying 0322432)Epc(lee xin ying 0322432)
Epc(lee xin ying 0322432)
 
Relación becas libros concedidas
Relación becas libros concedidasRelación becas libros concedidas
Relación becas libros concedidas
 
Finnish technology industry, October 2016
Finnish technology industry, October 2016Finnish technology industry, October 2016
Finnish technology industry, October 2016
 
Selasar edisi 17
Selasar edisi 17Selasar edisi 17
Selasar edisi 17
 
KH. Abdurrahman Wahid
KH. Abdurrahman WahidKH. Abdurrahman Wahid
KH. Abdurrahman Wahid
 
Liver function tests and interpretation
Liver function tests and interpretation Liver function tests and interpretation
Liver function tests and interpretation
 
파이썬 class 및 인스턴스 생성 이해하기
파이썬 class 및 인스턴스 생성 이해하기파이썬 class 및 인스턴스 생성 이해하기
파이썬 class 및 인스턴스 생성 이해하기
 
Block Drivers
Block DriversBlock Drivers
Block Drivers
 

Similar to NA2_A Inabnitt

underwater construction
underwater constructionunderwater construction
underwater constructionYasir Hashmi
 
Practical assessment 2 instructions -Installing A Cavity Slider
Practical assessment 2 instructions -Installing A Cavity SliderPractical assessment 2 instructions -Installing A Cavity Slider
Practical assessment 2 instructions -Installing A Cavity SliderCanberra Institute of technology
 
Pitch Book
Pitch BookPitch Book
Pitch Bookeasyfish
 
Casting defects / dental crown & bridge courses
Casting defects / dental crown & bridge coursesCasting defects / dental crown & bridge courses
Casting defects / dental crown & bridge coursesIndian dental academy
 
dental Casting defects/prosthodontic courses
dental Casting defects/prosthodontic coursesdental Casting defects/prosthodontic courses
dental Casting defects/prosthodontic coursesIndian dental academy
 
FABRICATION OF BRIDGE GRIDER ,GLUED JOINT AT STRUCTURAL YARD AND CASTING OF ...
FABRICATION OF BRIDGE GRIDER ,GLUED JOINT AT STRUCTURAL YARD AND CASTING OF  ...FABRICATION OF BRIDGE GRIDER ,GLUED JOINT AT STRUCTURAL YARD AND CASTING OF  ...
FABRICATION OF BRIDGE GRIDER ,GLUED JOINT AT STRUCTURAL YARD AND CASTING OF ...VikingRaiders
 
Best practices day 4 am new
Best practices day 4 am newBest practices day 4 am new
Best practices day 4 am newAhmed Radwan
 
Basic bricklaying skills power point 2015
Basic bricklaying skills power point 2015Basic bricklaying skills power point 2015
Basic bricklaying skills power point 2015Luke D'Arcy
 
Steps in installation of gutters
Steps in installation of guttersSteps in installation of gutters
Steps in installation of gutterslee shin
 
Dsi Column Powerpoint w-audio
Dsi Column Powerpoint w-audioDsi Column Powerpoint w-audio
Dsi Column Powerpoint w-audiojeffschork
 
Design for in-circuit test (vintage 1994)
Design for in-circuit test (vintage 1994)Design for in-circuit test (vintage 1994)
Design for in-circuit test (vintage 1994)Richard Farr
 
An close industrial approach to look into Pre-cast mode of construction
An close industrial approach to look into Pre-cast mode of constructionAn close industrial approach to look into Pre-cast mode of construction
An close industrial approach to look into Pre-cast mode of constructionShanmukha Srinivas Byrukuri Gangadhar
 
Hull_Planking_Hints___Tips__Don_Dressel.pdf
Hull_Planking_Hints___Tips__Don_Dressel.pdfHull_Planking_Hints___Tips__Don_Dressel.pdf
Hull_Planking_Hints___Tips__Don_Dressel.pdfAgustinFroufe1
 
Operation and Well Setting GTI SEG-SUSC 08-10-2016
Operation and Well Setting GTI SEG-SUSC 08-10-2016Operation and Well Setting GTI SEG-SUSC 08-10-2016
Operation and Well Setting GTI SEG-SUSC 08-10-2016Mohamed _el_shora
 

Similar to NA2_A Inabnitt (20)

underwater construction
underwater constructionunderwater construction
underwater construction
 
Norse flyer
Norse flyerNorse flyer
Norse flyer
 
Practical assessment 2 instructions -Installing A Cavity Slider
Practical assessment 2 instructions -Installing A Cavity SliderPractical assessment 2 instructions -Installing A Cavity Slider
Practical assessment 2 instructions -Installing A Cavity Slider
 
08 drilling
08   drilling08   drilling
08 drilling
 
Pitch Book
Pitch BookPitch Book
Pitch Book
 
Cst21
Cst21Cst21
Cst21
 
Casting defects/ dentist laboratory
Casting defects/ dentist laboratoryCasting defects/ dentist laboratory
Casting defects/ dentist laboratory
 
Casting defects / dental crown & bridge courses
Casting defects / dental crown & bridge coursesCasting defects / dental crown & bridge courses
Casting defects / dental crown & bridge courses
 
dental Casting defects/prosthodontic courses
dental Casting defects/prosthodontic coursesdental Casting defects/prosthodontic courses
dental Casting defects/prosthodontic courses
 
FABRICATION OF BRIDGE GRIDER ,GLUED JOINT AT STRUCTURAL YARD AND CASTING OF ...
FABRICATION OF BRIDGE GRIDER ,GLUED JOINT AT STRUCTURAL YARD AND CASTING OF  ...FABRICATION OF BRIDGE GRIDER ,GLUED JOINT AT STRUCTURAL YARD AND CASTING OF  ...
FABRICATION OF BRIDGE GRIDER ,GLUED JOINT AT STRUCTURAL YARD AND CASTING OF ...
 
Best practices day 4 am new
Best practices day 4 am newBest practices day 4 am new
Best practices day 4 am new
 
Drill jig
Drill jigDrill jig
Drill jig
 
Basic bricklaying skills power point 2015
Basic bricklaying skills power point 2015Basic bricklaying skills power point 2015
Basic bricklaying skills power point 2015
 
Steps in installation of gutters
Steps in installation of guttersSteps in installation of gutters
Steps in installation of gutters
 
Dsi Column Powerpoint w-audio
Dsi Column Powerpoint w-audioDsi Column Powerpoint w-audio
Dsi Column Powerpoint w-audio
 
Design for in-circuit test (vintage 1994)
Design for in-circuit test (vintage 1994)Design for in-circuit test (vintage 1994)
Design for in-circuit test (vintage 1994)
 
An close industrial approach to look into Pre-cast mode of construction
An close industrial approach to look into Pre-cast mode of constructionAn close industrial approach to look into Pre-cast mode of construction
An close industrial approach to look into Pre-cast mode of construction
 
Hull_Planking_Hints___Tips__Don_Dressel.pdf
Hull_Planking_Hints___Tips__Don_Dressel.pdfHull_Planking_Hints___Tips__Don_Dressel.pdf
Hull_Planking_Hints___Tips__Don_Dressel.pdf
 
Amanco Gutter Slideshow
Amanco Gutter SlideshowAmanco Gutter Slideshow
Amanco Gutter Slideshow
 
Operation and Well Setting GTI SEG-SUSC 08-10-2016
Operation and Well Setting GTI SEG-SUSC 08-10-2016Operation and Well Setting GTI SEG-SUSC 08-10-2016
Operation and Well Setting GTI SEG-SUSC 08-10-2016
 

NA2_A Inabnitt

  • 3. Sensors •• Capacitance MatCapacitance Mat •• Rigid ChannelRigid Channel PiezoPiezo •• BareBare PiezoPiezo •• Bending PlateBending Plate •• Load CellLoad Cell
  • 4. Capacitance MatCapacitance Mat •• Do wear out.Do wear out. •• Water destroys.Water destroys. •• Use permanent loops if possible.Use permanent loops if possible. •• Use TapUse Tap--Con screwsCon screws •• Lots ofLots of bitchethenebitchethene tapetape
  • 5. Capacitance MatCapacitance Mat Typical Mat installationsTypical Mat installations
  • 6. Rigid ChannelRigid Channel PiezoPiezo •• Stay in concrete wellStay in concrete well •• Need good groutNeed good grout •• Tend to pop out of pavement especiallyTend to pop out of pavement especially rutted asphaltrutted asphalt •• Not easily “held” in slot during epoxyNot easily “held” in slot during epoxy cure timecure time
  • 7. Rigid ChannelRigid Channel PiezoPiezo ThisThis sensor hassensor has beenbeen workingworking for morefor more than sixthan six years!years!
  • 8. Rigid ChannelRigid Channel PiezoPiezo ThisThis sensorsensor hashas not.not.
  • 9. Rigid ChannelRigid Channel PiezoPiezo Too Deep?Too Deep? VoidVoid unevenuneven
  • 11. BareBare PiezoPiezo •• Easily installedEasily installed •• Installs quicklyInstalls quickly •• Small saw slotSmall saw slot •• Can be used in portable applicationsCan be used in portable applications
  • 13. BareBare PiezoPiezo Note voidNote void Note dipNote dip
  • 14. Bending PlateBending Plate -- Load CellLoad Cell •• Have plenty of finishers available when usingHave plenty of finishers available when using ‘high‘high--early” concreteearly” concrete •• Don’t pour concrete directly on framesDon’t pour concrete directly on frames •• Pour sides and vibratePour sides and vibrate •• Tie rebar tightTie rebar tight •• Make sure water drains to the ditch and not toMake sure water drains to the ditch and not to the cabinet through conduitthe cabinet through conduit
  • 15. Bending PlateBending Plate -- Load CellLoad Cell •• Always make sure you tamp the bottom of theAlways make sure you tamp the bottom of the pitpit •• Use joint sized epoxy coated rebarUse joint sized epoxy coated rebar •• Don’t bore under asphalt to concreteDon’t bore under asphalt to concrete •• Don’t expect a more expensive WIM systemsDon’t expect a more expensive WIM systems to compensate for poor road characteristicsto compensate for poor road characteristics
  • 16. Bending PlateBending Plate Typical Bending Plate installationsTypical Bending Plate installations
  • 17. Load CellLoad Cell Typical LoadTypical Load--cell installationscell installations
  • 18. Common to all Three typesThree types of installedof installed sensorssensors
  • 19. Common to all The GoodThe Good •• Work all the timeWork all the time •• Have worked for yearsHave worked for years •• Doesn’t matter what theDoesn’t matter what the installation looks likeinstallation looks like
  • 20. Common to all The BadThe Bad •• Don’t workDon’t work •• Can’t get it to workCan’t get it to work •• Doesn’t matter what theDoesn’t matter what the installation looks likeinstallation looks like
  • 21. Common to all The UglyThe Ugly •• Only works when you are thereOnly works when you are there •• Checks out OKChecks out OK •• The installation usually looks goodThe installation usually looks good
  • 22. Common to all Invest in aInvest in a good Digitalgood Digital StorageStorage OscilloscopeOscilloscope
  • 23. Common to allCommon to all ContractorsContractors
  • 24. Common to allCommon to all Roadway ConsiderationsRoadway Considerations •• StraightStraight •• SmoothSmooth •• LevelLevel •• “Good” surface“Good” surface •• No ruttingNo rutting •• ASTM WIM specASTM WIM spec
  • 25. Common to allCommon to all RoadsRoads
  • 26. Common to allCommon to all InstallationInstallation •• Have detailed plansHave detailed plans •• Have an “expert” on siteHave an “expert” on site •• Keep future repairs in mindKeep future repairs in mind
  • 27. Common to allCommon to all Note allNote all leadlead--in slotsin slots converge toconverge to one point.one point. This makesThis makes futurefuture installationsinstallations and repairsand repairs difficult.difficult.
  • 28. Common to allCommon to all Avoid wheel track “triangles”Avoid wheel track “triangles”
  • 30. Common to allCommon to all DrillDrill oneone--inch holesinch holes in cornersin corners Run leadRun lead--in Straight to pull boxin Straight to pull box
  • 31. Common to allCommon to all Don’t forget maintenance to otherDon’t forget maintenance to other components at site.components at site.
  • 32. Common to allCommon to all Plan the workPlan the work •• Know where everythingKnow where everything is going to gois going to go •• Mark all saw cutsMark all saw cuts before starting the sawbefore starting the saw •• The more wires in a slot,The more wires in a slot, the deeper it has to bethe deeper it has to be
  • 33. Common to allCommon to all Plan the workPlan the work •• Accurately measure/layoutAccurately measure/layout straight lines perpendicular tostraight lines perpendicular to traffic flowtraffic flow •• Cut accurate, straight slotsCut accurate, straight slots •• Always “wet” cutAlways “wet” cut
  • 34. Common to all 3 (9’)3 (9’) 4 (12’)4 (12’) 5 (15’)5 (15’) Don’t justDon’t just “eyeball it”.“eyeball it”. Measure it!Measure it! It can beIt can be easilyeasily accomplishedaccomplished byby constructingconstructing aa 33--44--55 triangle.triangle.
  • 35. Common to allCommon to all Thoroughly clean all slots to remove anyThoroughly clean all slots to remove any debris, sludge, etc.debris, sludge, etc. Use high pressure washerUse high pressure washer Then dry with oil free compressed airThen dry with oil free compressed air Use wire brushUse wire brush
  • 36. Common to allCommon to all SensorSensor crossingscrossings should beshould be 11--2mm2mm high,high, lightlylightly feathered.feathered. NO DIPSNO DIPS!!!!!! (Dip = Loss(Dip = Loss of Signal)of Signal)
  • 37. Common to allCommon to all TheThe contractorcontractor didn’tdidn’t smile...smile... when hewhen he had tohad to replacereplace thisthis “smile”.“smile”.
  • 38. Common to allCommon to all Loops were installed in base.Loops were installed in base.
  • 39. Common to allCommon to all When driving surface was put down it did notWhen driving surface was put down it did not adhere to loop sealant. Neatness counts.adhere to loop sealant. Neatness counts.
  • 40. Future DirectionsFuture Directions •• Fiber Optic sensorsFiber Optic sensors •• PiezoPiezo--quartzquartz •• ????