1. Don’t Remove and Replace!
For AsphaltParking Lotsand Streets That RequireFull Reconstruction –
Full Depth Reclamation (FDR) will:
Savea minimum of 30% overa remove and replaceconstruction method.
Takeup to halfthe time to complete
Providethe client witha better structural section than an aggregatebase
as the base section.
Cost effective on projects as small as20,000SF
ProvideLEEDS credits and GHG/Energyreductions
For AsphaltParking Lotsand Streets That Just Need the UpperAsphalt
Section Replaced-Cold Central PlantRecycling (CCPR)or Cold In-Place
Recycling (CIR) will:
Savea minimum of 30% overa remove and replace(mill andfill/grind
and overlay) construction method.
Takeless timeto completethe project
Will notsacrifice design lifeor structural integrity
Cost effective on projects of 150,000SF or biggerin size
ProvideLEEDS and GHG/Energyreductions
For Weak, Wet, YieldingSubgrade/SoilConditionsThatNeed Stabilizing
to Build Streets or BuildingsOn – Soil Stabilizationwill:
Saveup to 75% of a removeand replace construction method
Providea better structural section than a ClassII aggregatebase
Strengthen the soil in placeto providea firm and unyielding surfaceto
paveor build on.
Weatherproof the stabilized section
Minimizeutilityimpact
Shorten the construction schedule
ProvideGHG and Energyreductions in not exporting and importing
materials
Contact Craig Harrington at(805)405-1455for a project evaluation and
estimatesfor comparisons. Wehave engineerson staff to work withthe project
engineerto implementthe valueengineered alternative.