SlideShare a Scribd company logo
1 of 1
Don’t Remove and Replace!
 For AsphaltParking Lotsand Streets That RequireFull Reconstruction –
Full Depth Reclamation (FDR) will:
 Savea minimum of 30% overa remove and replaceconstruction method.
 Takeup to halfthe time to complete
 Providethe client witha better structural section than an aggregatebase
as the base section.
 Cost effective on projects as small as20,000SF
 ProvideLEEDS credits and GHG/Energyreductions
For AsphaltParking Lotsand Streets That Just Need the UpperAsphalt
Section Replaced-Cold Central PlantRecycling (CCPR)or Cold In-Place
Recycling (CIR) will:
 Savea minimum of 30% overa remove and replace(mill andfill/grind
and overlay) construction method.
 Takeless timeto completethe project
 Will notsacrifice design lifeor structural integrity
 Cost effective on projects of 150,000SF or biggerin size
 ProvideLEEDS and GHG/Energyreductions
For Weak, Wet, YieldingSubgrade/SoilConditionsThatNeed Stabilizing
to Build Streets or BuildingsOn – Soil Stabilizationwill:
 Saveup to 75% of a removeand replace construction method
 Providea better structural section than a ClassII aggregatebase
 Strengthen the soil in placeto providea firm and unyielding surfaceto
paveor build on.
 Weatherproof the stabilized section
 Minimizeutilityimpact
 Shorten the construction schedule
 ProvideGHG and Energyreductions in not exporting and importing
materials
Contact Craig Harrington at(805)405-1455for a project evaluation and
estimatesfor comparisons. Wehave engineerson staff to work withthe project
engineerto implementthe valueengineered alternative.

More Related Content

What's hot

AH City Council Meeting 03.14.16 - Item #7 Bark Park Parking Crosswalk
AH City Council Meeting 03.14.16 - Item #7  Bark Park Parking CrosswalkAH City Council Meeting 03.14.16 - Item #7  Bark Park Parking Crosswalk
AH City Council Meeting 03.14.16 - Item #7 Bark Park Parking CrosswalkMarian Vargas Mendoza
 
Recent Project History
Recent Project HistoryRecent Project History
Recent Project Historybyron_cormack
 
Building a mega-power plant on liquefiable sands
Building a mega-power plant on liquefiable sandsBuilding a mega-power plant on liquefiable sands
Building a mega-power plant on liquefiable sandsInfocengrs63
 
Final Presentation (Transportation Planning & Design)
Final Presentation (Transportation Planning & Design)Final Presentation (Transportation Planning & Design)
Final Presentation (Transportation Planning & Design)Josia Tannos, EIT
 
Metapave : Revolutionary way to pave
Metapave : Revolutionary way to paveMetapave : Revolutionary way to pave
Metapave : Revolutionary way to paveKumar Sunita
 
March_2013_PCC_green_committee
March_2013_PCC_green_committeeMarch_2013_PCC_green_committee
March_2013_PCC_green_committeessarro
 
Performances analysis rmx
Performances analysis rmxPerformances analysis rmx
Performances analysis rmxARIVU SUDAR
 
A Low Impact Solution for Increasing Existing Structural Loads
A Low Impact Solution for Increasing Existing Structural LoadsA Low Impact Solution for Increasing Existing Structural Loads
A Low Impact Solution for Increasing Existing Structural LoadsUretek Mid-Atlantic
 
Brayton Energy SunShot Poster 2016-04-07
Brayton Energy SunShot Poster 2016-04-07Brayton Energy SunShot Poster 2016-04-07
Brayton Energy SunShot Poster 2016-04-07Shaun Sullivan
 
Van Dyk H - WSP PB Master CV
Van Dyk H - WSP PB Master CVVan Dyk H - WSP PB Master CV
Van Dyk H - WSP PB Master CVHenk van Dyk
 
Project Experience Overview
Project Experience OverviewProject Experience Overview
Project Experience OverviewEric Pruden
 
Reducing Ship Emissions: a Review of Potential Practical Improvements in the ...
Reducing Ship Emissions: a Review of Potential Practical Improvements in the ...Reducing Ship Emissions: a Review of Potential Practical Improvements in the ...
Reducing Ship Emissions: a Review of Potential Practical Improvements in the ...CIFOR-ICRAF
 

What's hot (20)

SOME OF THE PROJECTS HANDLED
SOME OF THE PROJECTS HANDLEDSOME OF THE PROJECTS HANDLED
SOME OF THE PROJECTS HANDLED
 
AH City Council Meeting 03.14.16 - Item #7 Bark Park Parking Crosswalk
AH City Council Meeting 03.14.16 - Item #7  Bark Park Parking CrosswalkAH City Council Meeting 03.14.16 - Item #7  Bark Park Parking Crosswalk
AH City Council Meeting 03.14.16 - Item #7 Bark Park Parking Crosswalk
 
Mahagun ppt
Mahagun pptMahagun ppt
Mahagun ppt
 
Airport Commerce
Airport CommerceAirport Commerce
Airport Commerce
 
Recent Project History
Recent Project HistoryRecent Project History
Recent Project History
 
Building a mega-power plant on liquefiable sands
Building a mega-power plant on liquefiable sandsBuilding a mega-power plant on liquefiable sands
Building a mega-power plant on liquefiable sands
 
Final Presentation (Transportation Planning & Design)
Final Presentation (Transportation Planning & Design)Final Presentation (Transportation Planning & Design)
Final Presentation (Transportation Planning & Design)
 
Dynamo Script
Dynamo ScriptDynamo Script
Dynamo Script
 
Metapave : Revolutionary way to pave
Metapave : Revolutionary way to paveMetapave : Revolutionary way to pave
Metapave : Revolutionary way to pave
 
March_2013_PCC_green_committee
March_2013_PCC_green_committeeMarch_2013_PCC_green_committee
March_2013_PCC_green_committee
 
Performances analysis rmx
Performances analysis rmxPerformances analysis rmx
Performances analysis rmx
 
Hydroelectric generator
Hydroelectric generatorHydroelectric generator
Hydroelectric generator
 
A Low Impact Solution for Increasing Existing Structural Loads
A Low Impact Solution for Increasing Existing Structural LoadsA Low Impact Solution for Increasing Existing Structural Loads
A Low Impact Solution for Increasing Existing Structural Loads
 
Brayton Energy SunShot Poster 2016-04-07
Brayton Energy SunShot Poster 2016-04-07Brayton Energy SunShot Poster 2016-04-07
Brayton Energy SunShot Poster 2016-04-07
 
Van Dyk H - WSP PB Master CV
Van Dyk H - WSP PB Master CVVan Dyk H - WSP PB Master CV
Van Dyk H - WSP PB Master CV
 
111009 102 N. Federal Highway
111009 102 N. Federal Highway111009 102 N. Federal Highway
111009 102 N. Federal Highway
 
What it Takes to Harness the Sun
What it Takes to Harness the SunWhat it Takes to Harness the Sun
What it Takes to Harness the Sun
 
Chimney Hill Rezoning
Chimney Hill RezoningChimney Hill Rezoning
Chimney Hill Rezoning
 
Project Experience Overview
Project Experience OverviewProject Experience Overview
Project Experience Overview
 
Reducing Ship Emissions: a Review of Potential Practical Improvements in the ...
Reducing Ship Emissions: a Review of Potential Practical Improvements in the ...Reducing Ship Emissions: a Review of Potential Practical Improvements in the ...
Reducing Ship Emissions: a Review of Potential Practical Improvements in the ...
 

Viewers also liked

школьная библиотека как одна из важных составляющих
школьная библиотека как  одна из важных составляющихшкольная библиотека как  одна из важных составляющих
школьная библиотека как одна из важных составляющихgym1551
 
1 a 13 writing workshop essay 3 vocab game
1 a 13 writing workshop essay 3 vocab game1 a 13 writing workshop essay 3 vocab game
1 a 13 writing workshop essay 3 vocab gamejordanlachance
 
Class 21 writing workshop 4; vocab test 5
Class 21 writing workshop 4; vocab test 5 Class 21 writing workshop 4; vocab test 5
Class 21 writing workshop 4; vocab test 5 jordanlachance
 
GPS Talent - Overview
GPS Talent - OverviewGPS Talent - Overview
GPS Talent - Overviewguysloyan
 
Samsung company marketing
Samsung company marketingSamsung company marketing
Samsung company marketingAbdul Mutal
 
Pagpapangkat ng mga wika sa Pilipinas
Pagpapangkat ng mga wika sa PilipinasPagpapangkat ng mga wika sa Pilipinas
Pagpapangkat ng mga wika sa PilipinasJesseca Aban
 
Los reinos cristianos: reconquista, repoblación y organización social
Los reinos cristianos: reconquista, repoblación y organización socialLos reinos cristianos: reconquista, repoblación y organización social
Los reinos cristianos: reconquista, repoblación y organización sociallioba78
 

Viewers also liked (11)

A2 media
A2 mediaA2 media
A2 media
 
школьная библиотека как одна из важных составляющих
школьная библиотека как  одна из важных составляющихшкольная библиотека как  одна из важных составляющих
школьная библиотека как одна из важных составляющих
 
1 a 13 writing workshop essay 3 vocab game
1 a 13 writing workshop essay 3 vocab game1 a 13 writing workshop essay 3 vocab game
1 a 13 writing workshop essay 3 vocab game
 
Class 21 writing workshop 4; vocab test 5
Class 21 writing workshop 4; vocab test 5 Class 21 writing workshop 4; vocab test 5
Class 21 writing workshop 4; vocab test 5
 
GPS Talent - Overview
GPS Talent - OverviewGPS Talent - Overview
GPS Talent - Overview
 
sclabas2005
sclabas2005sclabas2005
sclabas2005
 
CV IT MM
CV IT MMCV IT MM
CV IT MM
 
Heat Exchange Fundamentals for Shell and Tube Units
Heat Exchange Fundamentals for Shell and Tube UnitsHeat Exchange Fundamentals for Shell and Tube Units
Heat Exchange Fundamentals for Shell and Tube Units
 
Samsung company marketing
Samsung company marketingSamsung company marketing
Samsung company marketing
 
Pagpapangkat ng mga wika sa Pilipinas
Pagpapangkat ng mga wika sa PilipinasPagpapangkat ng mga wika sa Pilipinas
Pagpapangkat ng mga wika sa Pilipinas
 
Los reinos cristianos: reconquista, repoblación y organización social
Los reinos cristianos: reconquista, repoblación y organización socialLos reinos cristianos: reconquista, repoblación y organización social
Los reinos cristianos: reconquista, repoblación y organización social
 

Similar to Stop Don't R&R Contractors Flyer

15146_S16_A1-Asrar_Mustafa
15146_S16_A1-Asrar_Mustafa15146_S16_A1-Asrar_Mustafa
15146_S16_A1-Asrar_MustafaMustafa Asrar
 
Synopsis of Projects Suitable For In-Place Recycling
Synopsis of Projects Suitable For In-Place RecyclingSynopsis of Projects Suitable For In-Place Recycling
Synopsis of Projects Suitable For In-Place RecyclingCraig Harrington
 
SHATEC Engineering Consultants - Graniterock dba FMG CIR Whitepaper
SHATEC Engineering Consultants - Graniterock dba FMG CIR WhitepaperSHATEC Engineering Consultants - Graniterock dba FMG CIR Whitepaper
SHATEC Engineering Consultants - Graniterock dba FMG CIR WhitepaperDennis McElroy
 
Green building presentation
Green building presentationGreen building presentation
Green building presentationAmr Shalash
 
Dehumidification
DehumidificationDehumidification
DehumidificationLen Kobylus
 
Compass Compression Cold Weather Modularization
Compass Compression Cold Weather ModularizationCompass Compression Cold Weather Modularization
Compass Compression Cold Weather Modularizationm_johnson_compass
 
ES&T - HDD as GSR Feature
ES&T - HDD as GSR FeatureES&T - HDD as GSR Feature
ES&T - HDD as GSR FeatureMike Lubrecht
 
Architects using Adjustable Pedestals
Architects using Adjustable PedestalsArchitects using Adjustable Pedestals
Architects using Adjustable PedestalsHakimuddinGheewala
 
Case study of ms1525 energy efficiency and renewable energy code of practice.
Case study of ms1525   energy efficiency and renewable energy code of practice.Case study of ms1525   energy efficiency and renewable energy code of practice.
Case study of ms1525 energy efficiency and renewable energy code of practice.Steve Lojuntin
 
Bituminous Pavement Recycling – Effective Utilization of Depleting Non-Renewa...
Bituminous Pavement Recycling – Effective Utilization of Depleting Non-Renewa...Bituminous Pavement Recycling – Effective Utilization of Depleting Non-Renewa...
Bituminous Pavement Recycling – Effective Utilization of Depleting Non-Renewa...theijes
 
Sustainable Modifications and Innovations using LEED of a Women University in...
Sustainable Modifications and Innovations using LEED of a Women University in...Sustainable Modifications and Innovations using LEED of a Women University in...
Sustainable Modifications and Innovations using LEED of a Women University in...Asadullah Malik
 
Intent: The Real LEED Requirements
Intent: The Real LEED RequirementsIntent: The Real LEED Requirements
Intent: The Real LEED RequirementsScott DeGaro
 
Howden Water Technology Brochure 2012
Howden Water Technology Brochure 2012Howden Water Technology Brochure 2012
Howden Water Technology Brochure 2012Antoine Robillard
 
Petrofed_2015_Oct-Dec_KBR-DWC
Petrofed_2015_Oct-Dec_KBR-DWCPetrofed_2015_Oct-Dec_KBR-DWC
Petrofed_2015_Oct-Dec_KBR-DWCSaran Raj
 
Haul Road e-Brochure 2016 V1
Haul Road e-Brochure 2016 V1Haul Road e-Brochure 2016 V1
Haul Road e-Brochure 2016 V1Dominick Holland
 

Similar to Stop Don't R&R Contractors Flyer (20)

15146_S16_A1-Asrar_Mustafa
15146_S16_A1-Asrar_Mustafa15146_S16_A1-Asrar_Mustafa
15146_S16_A1-Asrar_Mustafa
 
Synopsis of Projects Suitable For In-Place Recycling
Synopsis of Projects Suitable For In-Place RecyclingSynopsis of Projects Suitable For In-Place Recycling
Synopsis of Projects Suitable For In-Place Recycling
 
SHATEC Engineering Consultants - Graniterock dba FMG CIR Whitepaper
SHATEC Engineering Consultants - Graniterock dba FMG CIR WhitepaperSHATEC Engineering Consultants - Graniterock dba FMG CIR Whitepaper
SHATEC Engineering Consultants - Graniterock dba FMG CIR Whitepaper
 
Green building presentation
Green building presentationGreen building presentation
Green building presentation
 
Dehumidification
DehumidificationDehumidification
Dehumidification
 
Compass Compression Cold Weather Modularization
Compass Compression Cold Weather ModularizationCompass Compression Cold Weather Modularization
Compass Compression Cold Weather Modularization
 
From Sieve to Silver
From Sieve to SilverFrom Sieve to Silver
From Sieve to Silver
 
ES&T - HDD as GSR Feature
ES&T - HDD as GSR FeatureES&T - HDD as GSR Feature
ES&T - HDD as GSR Feature
 
Next Generation
Next GenerationNext Generation
Next Generation
 
Architects using Adjustable Pedestals
Architects using Adjustable PedestalsArchitects using Adjustable Pedestals
Architects using Adjustable Pedestals
 
RAISED ACCESS FLOOR
RAISED ACCESS FLOORRAISED ACCESS FLOOR
RAISED ACCESS FLOOR
 
Why Consider a Green Roof?
Why Consider a Green Roof?Why Consider a Green Roof?
Why Consider a Green Roof?
 
Case study of ms1525 energy efficiency and renewable energy code of practice.
Case study of ms1525   energy efficiency and renewable energy code of practice.Case study of ms1525   energy efficiency and renewable energy code of practice.
Case study of ms1525 energy efficiency and renewable energy code of practice.
 
Bituminous Pavement Recycling – Effective Utilization of Depleting Non-Renewa...
Bituminous Pavement Recycling – Effective Utilization of Depleting Non-Renewa...Bituminous Pavement Recycling – Effective Utilization of Depleting Non-Renewa...
Bituminous Pavement Recycling – Effective Utilization of Depleting Non-Renewa...
 
Sustainable Modifications and Innovations using LEED of a Women University in...
Sustainable Modifications and Innovations using LEED of a Women University in...Sustainable Modifications and Innovations using LEED of a Women University in...
Sustainable Modifications and Innovations using LEED of a Women University in...
 
Intent: The Real LEED Requirements
Intent: The Real LEED RequirementsIntent: The Real LEED Requirements
Intent: The Real LEED Requirements
 
Innovation through carbon
Innovation through carbonInnovation through carbon
Innovation through carbon
 
Howden Water Technology Brochure 2012
Howden Water Technology Brochure 2012Howden Water Technology Brochure 2012
Howden Water Technology Brochure 2012
 
Petrofed_2015_Oct-Dec_KBR-DWC
Petrofed_2015_Oct-Dec_KBR-DWCPetrofed_2015_Oct-Dec_KBR-DWC
Petrofed_2015_Oct-Dec_KBR-DWC
 
Haul Road e-Brochure 2016 V1
Haul Road e-Brochure 2016 V1Haul Road e-Brochure 2016 V1
Haul Road e-Brochure 2016 V1
 

Stop Don't R&R Contractors Flyer

  • 1. Don’t Remove and Replace!  For AsphaltParking Lotsand Streets That RequireFull Reconstruction – Full Depth Reclamation (FDR) will:  Savea minimum of 30% overa remove and replaceconstruction method.  Takeup to halfthe time to complete  Providethe client witha better structural section than an aggregatebase as the base section.  Cost effective on projects as small as20,000SF  ProvideLEEDS credits and GHG/Energyreductions For AsphaltParking Lotsand Streets That Just Need the UpperAsphalt Section Replaced-Cold Central PlantRecycling (CCPR)or Cold In-Place Recycling (CIR) will:  Savea minimum of 30% overa remove and replace(mill andfill/grind and overlay) construction method.  Takeless timeto completethe project  Will notsacrifice design lifeor structural integrity  Cost effective on projects of 150,000SF or biggerin size  ProvideLEEDS and GHG/Energyreductions For Weak, Wet, YieldingSubgrade/SoilConditionsThatNeed Stabilizing to Build Streets or BuildingsOn – Soil Stabilizationwill:  Saveup to 75% of a removeand replace construction method  Providea better structural section than a ClassII aggregatebase  Strengthen the soil in placeto providea firm and unyielding surfaceto paveor build on.  Weatherproof the stabilized section  Minimizeutilityimpact  Shorten the construction schedule  ProvideGHG and Energyreductions in not exporting and importing materials Contact Craig Harrington at(805)405-1455for a project evaluation and estimatesfor comparisons. Wehave engineerson staff to work withthe project engineerto implementthe valueengineered alternative.