  1. 1.  Approval of minutes – Erich Tiepel Grounds Report- Steve Sarro  Driving Range Improvements  Phelps/Tanner consulting  Tree Care  2012 Maintenance  Imprelis  Water Update  Harriman Construction  Outlook on 2013  Water  Rough maintenance and new mow lines  Project Status: tees, dam, bunker  New Business
  2. 2. Concept A
  3. 3. Concept A
  4. 4.  Lower Range Tee New Target Greens Some Mounding around the range Reconstructed staging area and bag drop North side of clubhouse Minor revisions to the Pfluger putting green Estimated Cost for Range area only $455,000 Estimated Cost for Staging Area only $225,000 Estimated Design/Engineering Costs $75,000 Total Estimated Cost for Concept A: $755,000
  5. 5. Concept B
  6. 6. Concept B
  7. 7.  Include the cope of work with Concept A Minor changes to the access from 12 Green to 13 Tee Move 1 and 13 Tee back to gain approximately 30 yards Shifts range to the left and away from 16 fairway. Changes to the practice green Estimated Cost of $895,000
  8. 8. Old Cottonwood More Poa More Bent
  9. 9. Water Plan 2013 Storage Rights: Total of 107-122 AF1. 24 AF in Soda Lakes2. 58 AF in Harriman3. 25-40AF from Mt. Mutual Reservoir Co.
  10. 10. 2012 was the hottest summer on recordPCC used 136 AF of storage water from May through October

×