Successfully reported this slideshow.
Your SlideShare is downloading. ×

Electroplating wastewater treatment case

Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Loading in …3
×

Check these out next

1 of 10 Ad

Electroplating wastewater treatment case

Download to read offline

Practical case of electroplating wastewater treatment system for 900 T/D at Heyuan Water Industrial Park.The water production quality:achieve the water quality standard for urban miscellaneous water consumption(GB18920-2002)

Practical case of electroplating wastewater treatment system for 900 T/D at Heyuan Water Industrial Park.The water production quality:achieve the water quality standard for urban miscellaneous water consumption(GB18920-2002)

Advertisement
Advertisement

More Related Content

Advertisement

Electroplating wastewater treatment case

  1. 1. Electroplating wastewater treatment --- Case study
  2. 2. About Electroplating Wastewater • Electroplating wastewater comes from surface plating operations where the metal is dipped in an electroplating solution of various types of metals and then rinsed. • Typical plating includes brass, nickel, cadmium, zinc, silver, copper, and gold. Electroplating wastewater is typically from washing, rinsing and batch dumps and is at a low pH of ~3-5 and contains soluble forms of the various metals. In order to remove soluble metals from the wastewater it must first be made insoluble. The insoluble metal is then coagulated, flocculated and clarified by sedimentation. • The typical method to reduce and remove soluble electroplating metals from wastewater is as follows:
  3. 3. Practical Case
  4. 4. Basic Info •Project : 900TPD waste water reuse system for Heyuan Water Industrial Park •Capacity : 900m³/d •Feed water type : electroplating wastewater •Product water quality : achieve the water quality standard for urban miscellaneous water consumption ( GB18920-2002 )
  5. 5. Water quality standard No. item unit Discharge standard 1 PH - 6-9 2 Cr6+ mg/L 0.05 3 Total Cr mg/L 0.1 4 Total Cu mg/L 0.5 5 Total Ni mg/L 0.05 6 Total Zn mg/L 1.0 7 Total Fe mg/L 10 8 cyanide mg/L 0.5 9 CODcr mg/L 20 10 SS mg/L 10 11 conductivity μm/cm 300
  6. 6. Process decription This zero liquid discharge water reuse project has been completed in a pharmaceutical company in Inner Mongolia, which is the largest in the use of MFT super RO membrane, recovery rate goes up to 90%. The wastewater consists of penicillin pharmaceutical wastewater, water system brine, recycled water drainage and biological effluent water. The project has been commissioned in December 2014 and under normal operation ever since, treating 6300 tons of wastewater per day. The entire treatment process use more than one thousand membranes including UF membrane, spiral wound RO membrane and super RO membrane.
  7. 7. Process
  8. 8. On-site Photos