SlideShare a Scribd company logo
1 of 1
Download to read offline
CAPABILITIES STATEMENT Who we are:
ECR w/ EvergreenUV
is your federal contracting
UV HVAC Coil Optimization Solution Provider
From Site Assessment to Task Order to Professional
retrofit install with M&V. ECR/EverGreen UV offers a
unique support advantage for all IDIQ and federal
ESPC contracts.
D&B# 828341961 Cage# 576M4
EIN# 26-3357056 www.ecrsdvosb.com
Clayton Poff 901-800-1709
Clayton.Poff@energycostreducers.net
Past Performance: • 10 years of industry experience
in turn-key retrofit installations! 100% customer satisfaction
Energy Efficiency
Millions of sq ft of facility installations as a 1st phase
ECM on multiple ESPC’s since 2008
Healthcare & Indoor Environment Benefits
 Assures Veterans Best Patient Care Possible in VHA
 Improves Patient Outcomes
 Keeps Troops, Staff and Patients Safer and Healthier
 Reduces Absenteeism
 Reduces Maintenance Cost and Increase Equipment Life
The Solution:
Evergreen’s in-house SDVOSB Contracting Division in-
cludes a partnership with The Venergy Group
(GSA 03FAC # GS-21F-054BA )
Our team understands, and assists, with ease all Federal
Procurement Needs, Reporting and Compliance Require-
ments, and Best Practices. No other ECM provides greater
benefits and best value than the:
(ECO) Evergreen Coil Optimization Solutions
Product and service: The ECO Solution
ECO (Evergreen Coil Optimization) Solutions
such as the Lumalier AR-60 Adjustable Racks, are
installed proximate of AHU cooling coils to provide high
level, facility-wide IAQ, eliminate insulating biofilm to
improve heat exchange and air flow, reduce work load and
improve efficiencies. In-duct fixtures are scalable to fit any
size AHU.
 Lowest cost ECM option to achieve greatest efficiency
benefits per square foot coverage ($ / Ft2).
 Uses existing ventilation system equipment to
disinfect and distribute air.
 Eliminates biological growth on coils and in drain pan
that can cause coil fouling, odors, and premature
failure of air conditioning equipment.
 Eliminating insulating biofilm on cooling coils has
been proven to reduce AHU energy consumption by
about 20%.
 Our lamp replacement cost is lowest in the industry
$35-$40 non-proprietary Philips chill corrected UV
lamps, with UV ballasts for greater lifecycle.
 Evergreen UV provides a suite of M&V tools for every
installation.
WHAT WE DO NAICS / PSC
UV
Manufacturing
335110, 335122,
335129, 339113
BLDG. RCx 236220, 541620, 541350,
HVAC RCx 238220– PSC 65
ELEC RCx 238210– PSC 61, 62
"Industry differentiator”
The ECM, ECO Solutions manufactured by David Skelton’s
EvergreenUV, is a result of over a decade of engineered
improvements on UV retrofit projects.

More Related Content

What's hot

sse-enterprise-case-study-hinchingbrooke-hospital
sse-enterprise-case-study-hinchingbrooke-hospitalsse-enterprise-case-study-hinchingbrooke-hospital
sse-enterprise-case-study-hinchingbrooke-hospitalMatthew Warr
 
Kalepa Tech Project Management V09
Kalepa Tech Project Management V09Kalepa Tech Project Management V09
Kalepa Tech Project Management V09kceridon
 
Michael Wenzel Component Engineer
Michael Wenzel Component EngineerMichael Wenzel Component Engineer
Michael Wenzel Component Engineerfolsom17
 
Case Study Importance of relay selection in grid connected industries
Case Study Importance of relay selection in grid connected industriesCase Study Importance of relay selection in grid connected industries
Case Study Importance of relay selection in grid connected industriesSystem Protection
 
Silvapen Industrialized Cons.
Silvapen Industrialized Cons.Silvapen Industrialized Cons.
Silvapen Industrialized Cons.Silvapen
 
ChemTreat Intro - Ian Elseth
ChemTreat Intro - Ian ElsethChemTreat Intro - Ian Elseth
ChemTreat Intro - Ian ElsethIan Elseth
 
Net_Alliant_Technologies
Net_Alliant_TechnologiesNet_Alliant_Technologies
Net_Alliant_TechnologiesCris Beagle
 
Power Quality Analyzer KEW 6315 | System Protection
Power Quality Analyzer KEW 6315 | System ProtectionPower Quality Analyzer KEW 6315 | System Protection
Power Quality Analyzer KEW 6315 | System ProtectionSystem Protection
 
Untitleddocument (2)
Untitleddocument (2)Untitleddocument (2)
Untitleddocument (2)R.L. Harris
 
Capacity planning case study 1
Capacity planning case study 1Capacity planning case study 1
Capacity planning case study 1Upendra Lele
 
What's New With GreenLee July 2013
What's New With GreenLee July 2013What's New With GreenLee July 2013
What's New With GreenLee July 2013Lauren_D
 
SolarPulse helps PV plants reduce field expenses
SolarPulse helps PV plants reduce field expensesSolarPulse helps PV plants reduce field expenses
SolarPulse helps PV plants reduce field expensesMachinePulse
 
Adroit facility services - Ahmedabad
Adroit facility services - AhmedabadAdroit facility services - Ahmedabad
Adroit facility services - AhmedabadNeel Darji
 
SolarPulse solves the problem of managing distributed solar sites
SolarPulse solves the problem of managing distributed solar sitesSolarPulse solves the problem of managing distributed solar sites
SolarPulse solves the problem of managing distributed solar sitesMachinePulse
 

What's hot (19)

sse-enterprise-case-study-hinchingbrooke-hospital
sse-enterprise-case-study-hinchingbrooke-hospitalsse-enterprise-case-study-hinchingbrooke-hospital
sse-enterprise-case-study-hinchingbrooke-hospital
 
Courtney Warren CV
Courtney Warren CVCourtney Warren CV
Courtney Warren CV
 
On-the-fly Tree Counting and Caliper Measure
On-the-fly Tree Counting and Caliper MeasureOn-the-fly Tree Counting and Caliper Measure
On-the-fly Tree Counting and Caliper Measure
 
Kalepa Tech Project Management V09
Kalepa Tech Project Management V09Kalepa Tech Project Management V09
Kalepa Tech Project Management V09
 
Gas turbine supplier
Gas turbine supplierGas turbine supplier
Gas turbine supplier
 
Gil Garcia Resume
Gil Garcia ResumeGil Garcia Resume
Gil Garcia Resume
 
Michael Wenzel Component Engineer
Michael Wenzel Component EngineerMichael Wenzel Component Engineer
Michael Wenzel Component Engineer
 
Case Study Importance of relay selection in grid connected industries
Case Study Importance of relay selection in grid connected industriesCase Study Importance of relay selection in grid connected industries
Case Study Importance of relay selection in grid connected industries
 
Silvapen Industrialized Cons.
Silvapen Industrialized Cons.Silvapen Industrialized Cons.
Silvapen Industrialized Cons.
 
ChemTreat Intro - Ian Elseth
ChemTreat Intro - Ian ElsethChemTreat Intro - Ian Elseth
ChemTreat Intro - Ian Elseth
 
Net_Alliant_Technologies
Net_Alliant_TechnologiesNet_Alliant_Technologies
Net_Alliant_Technologies
 
Power Quality Analyzer KEW 6315 | System Protection
Power Quality Analyzer KEW 6315 | System ProtectionPower Quality Analyzer KEW 6315 | System Protection
Power Quality Analyzer KEW 6315 | System Protection
 
Untitleddocument (2)
Untitleddocument (2)Untitleddocument (2)
Untitleddocument (2)
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
Capacity planning case study 1
Capacity planning case study 1Capacity planning case study 1
Capacity planning case study 1
 
What's New With GreenLee July 2013
What's New With GreenLee July 2013What's New With GreenLee July 2013
What's New With GreenLee July 2013
 
SolarPulse helps PV plants reduce field expenses
SolarPulse helps PV plants reduce field expensesSolarPulse helps PV plants reduce field expenses
SolarPulse helps PV plants reduce field expenses
 
Adroit facility services - Ahmedabad
Adroit facility services - AhmedabadAdroit facility services - Ahmedabad
Adroit facility services - Ahmedabad
 
SolarPulse solves the problem of managing distributed solar sites
SolarPulse solves the problem of managing distributed solar sitesSolarPulse solves the problem of managing distributed solar sites
SolarPulse solves the problem of managing distributed solar sites
 

Viewers also liked

Viewers also liked (15)

Identifikationsnummer
IdentifikationsnummerIdentifikationsnummer
Identifikationsnummer
 
Design nomad
Design nomad Design nomad
Design nomad
 
Final major project production diary by james fox 28.1.13
Final major project production diary by james fox 28.1.13Final major project production diary by james fox 28.1.13
Final major project production diary by james fox 28.1.13
 
Hollandhardware
HollandhardwareHollandhardware
Hollandhardware
 
Edit decision list 1
Edit decision list 1Edit decision list 1
Edit decision list 1
 
Alien Landscaping - Mars 3-D
Alien Landscaping - Mars 3-DAlien Landscaping - Mars 3-D
Alien Landscaping - Mars 3-D
 
Diploma 1
Diploma 1Diploma 1
Diploma 1
 
Identifikationsnummer
IdentifikationsnummerIdentifikationsnummer
Identifikationsnummer
 
Diploma 1
Diploma 1Diploma 1
Diploma 1
 
Curriculum Vitae Javed
Curriculum Vitae  JavedCurriculum Vitae  Javed
Curriculum Vitae Javed
 
Retail Brochure 2015
Retail Brochure 2015Retail Brochure 2015
Retail Brochure 2015
 
Hw 1-28
Hw 1-28Hw 1-28
Hw 1-28
 
Leader Guide-Balance
Leader Guide-BalanceLeader Guide-Balance
Leader Guide-Balance
 
Simanye asset based development paradigms
Simanye asset based development paradigmsSimanye asset based development paradigms
Simanye asset based development paradigms
 
Análise 13M
Análise 13MAnálise 13M
Análise 13M
 

Similar to ECR 2016 slick

Forum_Enviro_Brch_VPO
Forum_Enviro_Brch_VPOForum_Enviro_Brch_VPO
Forum_Enviro_Brch_VPOChris Forrest
 
Bringing Sustainable Efficiency to Wind Power
Bringing Sustainable Efficiency to Wind PowerBringing Sustainable Efficiency to Wind Power
Bringing Sustainable Efficiency to Wind PowerSchneider Electric
 
(B) pepco energy solutions overview document email
(B) pepco energy solutions overview document email(B) pepco energy solutions overview document email
(B) pepco energy solutions overview document emailsgraham007
 
Super inverter epcen08 114-catalogues_english (2)
Super inverter epcen08 114-catalogues_english (2)Super inverter epcen08 114-catalogues_english (2)
Super inverter epcen08 114-catalogues_english (2)Henry Hollands
 
CS243I1410B1_low.pdf
CS243I1410B1_low.pdfCS243I1410B1_low.pdf
CS243I1410B1_low.pdfNelsonYucra7
 
Wedeco spektron تطهير مياه الشرب و تقنية توزيع التدفق معا فى نظام واحد يعمل ب...
Wedeco spektron تطهير مياه الشرب و تقنية توزيع التدفق معا فى نظام واحد يعمل ب...Wedeco spektron تطهير مياه الشرب و تقنية توزيع التدفق معا فى نظام واحد يعمل ب...
Wedeco spektron تطهير مياه الشرب و تقنية توزيع التدفق معا فى نظام واحد يعمل ب...Rheoserve Industrial Solutions
 
LHouseEU Lighting as a Service
LHouseEU Lighting as a ServiceLHouseEU Lighting as a Service
LHouseEU Lighting as a ServiceKaspars Osis
 
Dns Smartcool Eco3
Dns Smartcool Eco3Dns Smartcool Eco3
Dns Smartcool Eco3sdas61
 
EcoCooling IT Sales Manual
EcoCooling IT Sales ManualEcoCooling IT Sales Manual
EcoCooling IT Sales ManualAlan Beresford
 
EPE Profile 13.01.16 (Digital Links)
EPE Profile 13.01.16 (Digital Links)EPE Profile 13.01.16 (Digital Links)
EPE Profile 13.01.16 (Digital Links)Hayden Sherwood
 
Lennox_NationalAccounts_Brochure
Lennox_NationalAccounts_BrochureLennox_NationalAccounts_Brochure
Lennox_NationalAccounts_BrochureJeni West
 

Similar to ECR 2016 slick (20)

ELOHIM INDUSTRIAL SALES INC
ELOHIM INDUSTRIAL SALES INCELOHIM INDUSTRIAL SALES INC
ELOHIM INDUSTRIAL SALES INC
 
Forum_Enviro_Brch_VPO
Forum_Enviro_Brch_VPOForum_Enviro_Brch_VPO
Forum_Enviro_Brch_VPO
 
Bảng catalog sản phảm máy cắt không khí ACB Easypact EVS Schneider
Bảng catalog sản phảm máy cắt không khí ACB Easypact EVS SchneiderBảng catalog sản phảm máy cắt không khí ACB Easypact EVS Schneider
Bảng catalog sản phảm máy cắt không khí ACB Easypact EVS Schneider
 
Bringing Sustainable Efficiency to Wind Power
Bringing Sustainable Efficiency to Wind PowerBringing Sustainable Efficiency to Wind Power
Bringing Sustainable Efficiency to Wind Power
 
Digital edition may 2020
Digital edition may 2020Digital edition may 2020
Digital edition may 2020
 
(B) pepco energy solutions overview document email
(B) pepco energy solutions overview document email(B) pepco energy solutions overview document email
(B) pepco energy solutions overview document email
 
Super inverter epcen08 114-catalogues_english (2)
Super inverter epcen08 114-catalogues_english (2)Super inverter epcen08 114-catalogues_english (2)
Super inverter epcen08 114-catalogues_english (2)
 
Catalog busbar Legrand
Catalog busbar LegrandCatalog busbar Legrand
Catalog busbar Legrand
 
Schneider GenieEvo MV Modular Switchboard (13.8kV)
Schneider GenieEvo MV Modular Switchboard (13.8kV)Schneider GenieEvo MV Modular Switchboard (13.8kV)
Schneider GenieEvo MV Modular Switchboard (13.8kV)
 
CS243I1410B1_low.pdf
CS243I1410B1_low.pdfCS243I1410B1_low.pdf
CS243I1410B1_low.pdf
 
Catalog busbar legrand
Catalog busbar legrand Catalog busbar legrand
Catalog busbar legrand
 
Wedeco spektron تطهير مياه الشرب و تقنية توزيع التدفق معا فى نظام واحد يعمل ب...
Wedeco spektron تطهير مياه الشرب و تقنية توزيع التدفق معا فى نظام واحد يعمل ب...Wedeco spektron تطهير مياه الشرب و تقنية توزيع التدفق معا فى نظام واحد يعمل ب...
Wedeco spektron تطهير مياه الشرب و تقنية توزيع التدفق معا فى نظام واحد يعمل ب...
 
LHouseEU Lighting as a Service
LHouseEU Lighting as a ServiceLHouseEU Lighting as a Service
LHouseEU Lighting as a Service
 
Dns Smartcool Eco3
Dns Smartcool Eco3Dns Smartcool Eco3
Dns Smartcool Eco3
 
EcoCooling IT Sales Manual
EcoCooling IT Sales ManualEcoCooling IT Sales Manual
EcoCooling IT Sales Manual
 
EPE Profile 13.01.16 (Digital Links)
EPE Profile 13.01.16 (Digital Links)EPE Profile 13.01.16 (Digital Links)
EPE Profile 13.01.16 (Digital Links)
 
WATTSCORE ENERGY
WATTSCORE ENERGYWATTSCORE ENERGY
WATTSCORE ENERGY
 
About TBA - PT Toyosae Berkah Abadi
About TBA - PT Toyosae Berkah AbadiAbout TBA - PT Toyosae Berkah Abadi
About TBA - PT Toyosae Berkah Abadi
 
Lennox_NationalAccounts_Brochure
Lennox_NationalAccounts_BrochureLennox_NationalAccounts_Brochure
Lennox_NationalAccounts_Brochure
 
RENEWABLE ENERGY SOLUTIONS
RENEWABLE ENERGY SOLUTIONSRENEWABLE ENERGY SOLUTIONS
RENEWABLE ENERGY SOLUTIONS
 

ECR 2016 slick

  • 1. CAPABILITIES STATEMENT Who we are: ECR w/ EvergreenUV is your federal contracting UV HVAC Coil Optimization Solution Provider From Site Assessment to Task Order to Professional retrofit install with M&V. ECR/EverGreen UV offers a unique support advantage for all IDIQ and federal ESPC contracts. D&B# 828341961 Cage# 576M4 EIN# 26-3357056 www.ecrsdvosb.com Clayton Poff 901-800-1709 Clayton.Poff@energycostreducers.net Past Performance: • 10 years of industry experience in turn-key retrofit installations! 100% customer satisfaction Energy Efficiency Millions of sq ft of facility installations as a 1st phase ECM on multiple ESPC’s since 2008 Healthcare & Indoor Environment Benefits  Assures Veterans Best Patient Care Possible in VHA  Improves Patient Outcomes  Keeps Troops, Staff and Patients Safer and Healthier  Reduces Absenteeism  Reduces Maintenance Cost and Increase Equipment Life The Solution: Evergreen’s in-house SDVOSB Contracting Division in- cludes a partnership with The Venergy Group (GSA 03FAC # GS-21F-054BA ) Our team understands, and assists, with ease all Federal Procurement Needs, Reporting and Compliance Require- ments, and Best Practices. No other ECM provides greater benefits and best value than the: (ECO) Evergreen Coil Optimization Solutions Product and service: The ECO Solution ECO (Evergreen Coil Optimization) Solutions such as the Lumalier AR-60 Adjustable Racks, are installed proximate of AHU cooling coils to provide high level, facility-wide IAQ, eliminate insulating biofilm to improve heat exchange and air flow, reduce work load and improve efficiencies. In-duct fixtures are scalable to fit any size AHU.  Lowest cost ECM option to achieve greatest efficiency benefits per square foot coverage ($ / Ft2).  Uses existing ventilation system equipment to disinfect and distribute air.  Eliminates biological growth on coils and in drain pan that can cause coil fouling, odors, and premature failure of air conditioning equipment.  Eliminating insulating biofilm on cooling coils has been proven to reduce AHU energy consumption by about 20%.  Our lamp replacement cost is lowest in the industry $35-$40 non-proprietary Philips chill corrected UV lamps, with UV ballasts for greater lifecycle.  Evergreen UV provides a suite of M&V tools for every installation. WHAT WE DO NAICS / PSC UV Manufacturing 335110, 335122, 335129, 339113 BLDG. RCx 236220, 541620, 541350, HVAC RCx 238220– PSC 65 ELEC RCx 238210– PSC 61, 62 "Industry differentiator” The ECM, ECO Solutions manufactured by David Skelton’s EvergreenUV, is a result of over a decade of engineered improvements on UV retrofit projects.