SlideShare a Scribd company logo
1 of 6
Clayton Skorski


Call sheet




Date: 18/02/2013

Start Time: 15:00

Location Address:Hilton Lane, Manchester M28 0SY




                                                   1
Clayton Skorski


Contact Information:

Name of Crew Member: Clayton Skorski

Phone number: 07526933530

Email: Clayskorski@gmail.com

Job Role: Camera Person and Director of Photography



Name of Crew Member: Denni Hepburn

Phone number: 07891148699

Email: dennihepburn96@gmail.com

Job Role: Director



Name of Crew Member: Ellie Ryan

Phone number: 07769210628

Email: elleryanx@yahoo.co.uk

Job Role: Production Runner and Producer




                                                      2
Clayton Skorski


Schedule for the Day

Scenes being shot: 1,2,3,4,5,6,7,8,9,10,11,12,13,14,17,18,19,20,21,23



Script pages being shot: 1,2,3,4,5,6,7,8



Address of the location for the day: Hilton Lane, Manchester M28 0SY



Cast transportation arrangements: & parking instructions (If any): Buses run as normal, parking spaces available on site



Safety notes (Eg: ice on roads):N/A




                                                                                                                           3
Clayton Skorski


Other Information needed

Weather for the day: Common weather, cold with the potential for light showers (Based on results from http://www.bbc.co.uk/weather)



Sunrise/sunset times: 06:00/3:00 (based on results fromhttp://www.bbc.co.uk/weather)



Local hospitals: Hope Hospital – M6 8HD



Local Market (If items are needed) (food/drinks ect): Local stores and Tesco




                                                                                                                                      4
Clayton Skorski


Planned Table Scenes being shot (week) February 18th – 24th

Scenes        3pm         4pm             5pm        6pm               7pm      8pm           9pm        10pm     11pm       12pm
being shot
Monday        1,2,3.4,5,6 7,8,9                      10,11,12,13,14 17,18       19,20,21,23
Tuesday
Wednesday
Thursday      15,16,22    24,25,26,27,28
Friday
Saturday
Sunday        *           *               *          *                 *        *             *          *        *          *
        *Any shots that may have been unable to previously shoot, or sudden add on shots, or anything that was needed to re-shoot.




                                                                                                                                     5
Clayton Skorski


Planned Table Shots being shot (Day) – Monday 18th February 2013

Time      Scene) Shots being Shot (description)                                               Location (Outside/Inside)
3pm       1)Medium shot of the Band walk to building with equipment                           Inside
          2)Medium shot of the Band checking in
          3) Close up of the recording studio and equipment
          4) Close up of drummer preforming on equipment and drums
          5) Close up of singing waiting for band to record
          6) Close up of microphone, as vocals are being sung
4pm       7) Close up of vocalists foot tap to the drum beat                                  Inside
          8) Medium wide shot of discussion about the lyrics, vocalists make ripping action
          9) Medium shot of whole band laughing
5pm
6pm       10) Medium/long shot of singer and guitarist                                        Inside
          11) Close up of singer smiling with the microphone
          12) Medium handheld shot from the view of the drummer
          13) Extreme close up of a glass with water shaking from the beat
          14) Close up of singer with his eye closed
7pm       17) Portrait close up of singer                                                     Inside
          18) Wide angle shot of the whole band
8pm       19) Medium shot, slow motion of the drummer                                         Inside
          20) Close up of the whole studio
          21) Medium shot of the band packing up the equipment
          23) Close up of singer singing in an empty background
9pm
10pm
11pm
12pm




                                                                                                                      6

More Related Content

Similar to Call sheet schedule 18.02.2013

Call sheet schedule_2
Call sheet schedule_2Call sheet schedule_2
Call sheet schedule_2elleryanx
 
Call sheet schedule 21.02.2013
Call sheet schedule 21.02.2013Call sheet schedule 21.02.2013
Call sheet schedule 21.02.2013ClaySkorski
 
Call sheet schedule 24.02.2013
Call sheet schedule 24.02.2013Call sheet schedule 24.02.2013
Call sheet schedule 24.02.2013ClaySkorski
 
Document
DocumentDocument
DocumentVivyKoo
 

Similar to Call sheet schedule 18.02.2013 (6)

Call sheet schedule_2
Call sheet schedule_2Call sheet schedule_2
Call sheet schedule_2
 
Call sheet schedule 21.02.2013
Call sheet schedule 21.02.2013Call sheet schedule 21.02.2013
Call sheet schedule 21.02.2013
 
Call sheet 2
Call sheet 2Call sheet 2
Call sheet 2
 
Call sheet schedule 24.02.2013
Call sheet schedule 24.02.2013Call sheet schedule 24.02.2013
Call sheet schedule 24.02.2013
 
Call sheet 3
Call sheet 3Call sheet 3
Call sheet 3
 
Document
DocumentDocument
Document
 

More from ClaySkorski

Phone hacking scandal
Phone hacking scandalPhone hacking scandal
Phone hacking scandalClaySkorski
 
Madeinsalford clay
Madeinsalford  clayMadeinsalford  clay
Madeinsalford clayClaySkorski
 
Types of contract and recruitment methods
Types of contract and recruitment methodsTypes of contract and recruitment methods
Types of contract and recruitment methodsClaySkorski
 
Clayton skorski resume
Clayton skorski resumeClayton skorski resume
Clayton skorski resumeClaySkorski
 
Definingthemajormediaindustrysectors clay
Definingthemajormediaindustrysectors   clayDefiningthemajormediaindustrysectors   clay
Definingthemajormediaindustrysectors clayClaySkorski
 
Casestudypownership clay
Casestudypownership   clayCasestudypownership   clay
Casestudypownership clayClaySkorski
 
Pp production log_template
Pp production log_templatePp production log_template
Pp production log_templateClaySkorski
 
Pp production log_template
Pp production log_templatePp production log_template
Pp production log_templateClaySkorski
 
Ig3 music video_production_diary_template
Ig3 music video_production_diary_templateIg3 music video_production_diary_template
Ig3 music video_production_diary_templateClaySkorski
 
Music video final evaluation
Music video final evaluationMusic video final evaluation
Music video final evaluationClaySkorski
 
Script for radio show
Script for radio showScript for radio show
Script for radio showClaySkorski
 
Ha4 synopisis i phone ad
Ha4 synopisis i phone adHa4 synopisis i phone ad
Ha4 synopisis i phone adClaySkorski
 
I have done a rough edit for the music video that i am doing of the song supe...
I have done a rough edit for the music video that i am doing of the song supe...I have done a rough edit for the music video that i am doing of the song supe...
I have done a rough edit for the music video that i am doing of the song supe...ClaySkorski
 
Ig3 music_video_assignment_updated_02.2013
 Ig3 music_video_assignment_updated_02.2013 Ig3 music_video_assignment_updated_02.2013
Ig3 music_video_assignment_updated_02.2013ClaySkorski
 
New cv feb_2013-1-
New cv feb_2013-1-New cv feb_2013-1-
New cv feb_2013-1-ClaySkorski
 

More from ClaySkorski (20)

Phone hacking scandal
Phone hacking scandalPhone hacking scandal
Phone hacking scandal
 
Madeinsalford clay
Madeinsalford  clayMadeinsalford  clay
Madeinsalford clay
 
Types of contract and recruitment methods
Types of contract and recruitment methodsTypes of contract and recruitment methods
Types of contract and recruitment methods
 
Clayton skorski resume
Clayton skorski resumeClayton skorski resume
Clayton skorski resume
 
Definingthemajormediaindustrysectors clay
Definingthemajormediaindustrysectors   clayDefiningthemajormediaindustrysectors   clay
Definingthemajormediaindustrysectors clay
 
Casestudypownership clay
Casestudypownership   clayCasestudypownership   clay
Casestudypownership clay
 
Ownership
OwnershipOwnership
Ownership
 
Pp production log_template
Pp production log_templatePp production log_template
Pp production log_template
 
Pp production log_template
Pp production log_templatePp production log_template
Pp production log_template
 
Video title
Video titleVideo title
Video title
 
Pre
PrePre
Pre
 
Ig3 music video_production_diary_template
Ig3 music video_production_diary_templateIg3 music video_production_diary_template
Ig3 music video_production_diary_template
 
Music video final evaluation
Music video final evaluationMusic video final evaluation
Music video final evaluation
 
Script for radio show
Script for radio showScript for radio show
Script for radio show
 
Ha4 synopisis i phone ad
Ha4 synopisis i phone adHa4 synopisis i phone ad
Ha4 synopisis i phone ad
 
I have done a rough edit for the music video that i am doing of the song supe...
I have done a rough edit for the music video that i am doing of the song supe...I have done a rough edit for the music video that i am doing of the song supe...
I have done a rough edit for the music video that i am doing of the song supe...
 
Artist
ArtistArtist
Artist
 
Ig3 music_video_assignment_updated_02.2013
 Ig3 music_video_assignment_updated_02.2013 Ig3 music_video_assignment_updated_02.2013
Ig3 music_video_assignment_updated_02.2013
 
New cv feb_2013-1-
New cv feb_2013-1-New cv feb_2013-1-
New cv feb_2013-1-
 
Fut janr task 1
Fut janr   task 1Fut janr   task 1
Fut janr task 1
 

Call sheet schedule 18.02.2013

  • 1. Clayton Skorski Call sheet Date: 18/02/2013 Start Time: 15:00 Location Address:Hilton Lane, Manchester M28 0SY 1
  • 2. Clayton Skorski Contact Information: Name of Crew Member: Clayton Skorski Phone number: 07526933530 Email: Clayskorski@gmail.com Job Role: Camera Person and Director of Photography Name of Crew Member: Denni Hepburn Phone number: 07891148699 Email: dennihepburn96@gmail.com Job Role: Director Name of Crew Member: Ellie Ryan Phone number: 07769210628 Email: elleryanx@yahoo.co.uk Job Role: Production Runner and Producer 2
  • 3. Clayton Skorski Schedule for the Day Scenes being shot: 1,2,3,4,5,6,7,8,9,10,11,12,13,14,17,18,19,20,21,23 Script pages being shot: 1,2,3,4,5,6,7,8 Address of the location for the day: Hilton Lane, Manchester M28 0SY Cast transportation arrangements: & parking instructions (If any): Buses run as normal, parking spaces available on site Safety notes (Eg: ice on roads):N/A 3
  • 4. Clayton Skorski Other Information needed Weather for the day: Common weather, cold with the potential for light showers (Based on results from http://www.bbc.co.uk/weather) Sunrise/sunset times: 06:00/3:00 (based on results fromhttp://www.bbc.co.uk/weather) Local hospitals: Hope Hospital – M6 8HD Local Market (If items are needed) (food/drinks ect): Local stores and Tesco 4
  • 5. Clayton Skorski Planned Table Scenes being shot (week) February 18th – 24th Scenes 3pm 4pm 5pm 6pm 7pm 8pm 9pm 10pm 11pm 12pm being shot Monday 1,2,3.4,5,6 7,8,9 10,11,12,13,14 17,18 19,20,21,23 Tuesday Wednesday Thursday 15,16,22 24,25,26,27,28 Friday Saturday Sunday * * * * * * * * * * *Any shots that may have been unable to previously shoot, or sudden add on shots, or anything that was needed to re-shoot. 5
  • 6. Clayton Skorski Planned Table Shots being shot (Day) – Monday 18th February 2013 Time Scene) Shots being Shot (description) Location (Outside/Inside) 3pm 1)Medium shot of the Band walk to building with equipment Inside 2)Medium shot of the Band checking in 3) Close up of the recording studio and equipment 4) Close up of drummer preforming on equipment and drums 5) Close up of singing waiting for band to record 6) Close up of microphone, as vocals are being sung 4pm 7) Close up of vocalists foot tap to the drum beat Inside 8) Medium wide shot of discussion about the lyrics, vocalists make ripping action 9) Medium shot of whole band laughing 5pm 6pm 10) Medium/long shot of singer and guitarist Inside 11) Close up of singer smiling with the microphone 12) Medium handheld shot from the view of the drummer 13) Extreme close up of a glass with water shaking from the beat 14) Close up of singer with his eye closed 7pm 17) Portrait close up of singer Inside 18) Wide angle shot of the whole band 8pm 19) Medium shot, slow motion of the drummer Inside 20) Close up of the whole studio 21) Medium shot of the band packing up the equipment 23) Close up of singer singing in an empty background 9pm 10pm 11pm 12pm 6