Father’s Name: Muhammad Afzal
Date of Birth: 04-12-1979
Nationality: Pakistani.
Religion: Islam.
N.I.C. No. 34201-0433777-9
Contact No. (0306-6730000)
Postal Address: Village Lahorian, Post office Dolat Nagar
Tehsil & District Gujrat.
E-Mail Address: chshakeel2006@gmail.com
Marital Status: Married.
Qualification: Diploma in Associate Engineer (Civil)
From 1996 to 1999
Computer Skill Ms Word, Ms Excel,
Detail of 17 Years’ Experience.
With Jv of SMEC International and EGC
Project: Construction of New Khanki Barrage having Cost of Rs 23
Billion
Period: 23 November 2013 to date
Designation: Quantity Surveyor
Responsibilities:
Processing and verifying the quantities of interim payment Certificate ranging from Rs 200
Million to Rs 400 Millions
With SKB (Pvt) Ltd
Project: Ubaro to 20km beyond Rahim Yar Khan.
Period: 04 July 2000 to 30 May 2001.
Designation: Assistant Quantity Surveyor.
SHAKEEL AFZAL
Responsibilities:
 Preparing the Interim Payment Certificates for Earth work, Excavation +Filling,
Calculation of quantities of Sub Grade, Sub Base, Base Course and Asphalt.
Calculation of quantities of Concrete, Reinforcement, Structural Backfilling for
culverts and Bridges
With PETROCON (Pvt) Ltd
Project: Fire Main Line in Dock Yard.
Period: 01 June 2001 to 30 May 2002.
Designation: Site Engineer.
Responsibilities:
 Supervision of the all-ductile work
 Surveying all the ductile work.
With DYNAFORCE (Pvt) Ltd
Project: Karachi Northern Bypass.
Period: 08 June 2002 to 23 August 2003.
Designation: Site Engineer /Project Manager
Responsibilities:
 Supervision of the all roadwork, hill Cutting.
 Supervision of the all Drilling Work
 Supervision all the Ballasting Work.
 Managing all Site Works
 Preparing All Billing Works
With IHC (Pvt) Ltd
Project: Army Housing Project Askari IV Karachi.
Period: 24 August 2003 to 18 April 2004.
Designation: Quantity Surveyor.
Responsibilities:
 Supervision of the all Buildings Works (48 Flats)
 Billing of all the Building Works.
With SZS (Pvt Ltd
Project: Rehabilitation of Bhit Jhangera road, Box Culverts&
Causeways.
Period: 19 April 2004 to 10 – Jan -2007
2
2
Designation: Quantity Surveyor, Planning Engineer and Acting project manager
Responsibilities:
 Supervision of the all Box Culverts( 6 and 8 Cells)
 Supervision of the Causeways (Length 200 to 300 Meter
 Supervision of the Road works.
 Billing of all the Works.
 Planning of the entire Project.
With Pakistan Motorway Consultant (Pvt Ltd
Project: Construction of Islamabad Peshawar Motorway (M-1).
Period: 17- Jan- 2007 to 17-Jan -2008
Designation: Quantity Surveyor
Responsibilities::
 Checking of IPC (Road Works, Building Works)
 Checking of Escalation
 Checking of Variation Orders
With Inter Construct (Pvt Ltd
Project: Construction of Khanqah Dogran Interchange on (M-2).
Period: 17- Mar- 2008 to 11- Mar- 2009
Designation: Quantity Surveyor
Responsibilities:
 Making of IPC’s,
 Making of Variation Orders,
 Making of Claims
 Making of Rate Analysis etc.
With Khyber Consultant
Project: Construction of Turnol Chablat -57 Km Road Project
Period: 12- March- 2009 to 20 November 2013
Designation: Quantity Surveyor
Responsibilities:
 Checking of IPC (Road Works, Under Pass, Culverts and Bridges)
 Checking of Escalation
 Checking of Variation Orders
 Checking of Rate Analysis
3
3
4
4

More Related Content

What's hot

September and october training schedule
September and october training scheduleSeptember and october training schedule
September and october training scheduleCarlo Siracusa
 
Gary Coombe, President, Europe - Procter & Gamble at SPIEF
Gary Coombe, President, Europe - Procter & Gamble at SPIEFGary Coombe, President, Europe - Procter & Gamble at SPIEF
Gary Coombe, President, Europe - Procter & Gamble at SPIEFGary Coombe
 
Attendance record aacvjr february 2018
Attendance record aacvjr february 2018Attendance record aacvjr february 2018
Attendance record aacvjr february 2018Alfredo Claro
 
Palu land survey | jasa pemetaan palu
Palu land survey | jasa pemetaan paluPalu land survey | jasa pemetaan palu
Palu land survey | jasa pemetaan palusupriyantoedi
 
IYSO Team INDIA APPEAL FOR JUSTICE TO HONORABLE PRIME MINISTER OF INDIA
IYSO Team INDIA APPEAL FOR JUSTICE TO HONORABLE PRIME MINISTER OF INDIAIYSO Team INDIA APPEAL FOR JUSTICE TO HONORABLE PRIME MINISTER OF INDIA
IYSO Team INDIA APPEAL FOR JUSTICE TO HONORABLE PRIME MINISTER OF INDIAINDIAN YOUTH SECURED ORGANISATION
 

What's hot (12)

September and october training schedule
September and october training scheduleSeptember and october training schedule
September and october training schedule
 
Gary Coombe, President, Europe - Procter & Gamble at SPIEF
Gary Coombe, President, Europe - Procter & Gamble at SPIEFGary Coombe, President, Europe - Procter & Gamble at SPIEF
Gary Coombe, President, Europe - Procter & Gamble at SPIEF
 
JP ER (2)
JP ER (2)JP ER (2)
JP ER (2)
 
Attendance record aacvjr february 2018
Attendance record aacvjr february 2018Attendance record aacvjr february 2018
Attendance record aacvjr february 2018
 
Berkeley taxi service
Berkeley taxi serviceBerkeley taxi service
Berkeley taxi service
 
Resume for Sr.Land Surveyor
Resume for Sr.Land SurveyorResume for Sr.Land Surveyor
Resume for Sr.Land Surveyor
 
Marks CV1
Marks CV1Marks CV1
Marks CV1
 
Shahir Lbg recomm
Shahir Lbg recommShahir Lbg recomm
Shahir Lbg recomm
 
Palu land survey | jasa pemetaan palu
Palu land survey | jasa pemetaan paluPalu land survey | jasa pemetaan palu
Palu land survey | jasa pemetaan palu
 
Caleb cv
Caleb cvCaleb cv
Caleb cv
 
Magazine ---
Magazine ---Magazine ---
Magazine ---
 
IYSO Team INDIA APPEAL FOR JUSTICE TO HONORABLE PRIME MINISTER OF INDIA
IYSO Team INDIA APPEAL FOR JUSTICE TO HONORABLE PRIME MINISTER OF INDIAIYSO Team INDIA APPEAL FOR JUSTICE TO HONORABLE PRIME MINISTER OF INDIA
IYSO Team INDIA APPEAL FOR JUSTICE TO HONORABLE PRIME MINISTER OF INDIA
 

Viewers also liked

present-20150728-v8
present-20150728-v8present-20150728-v8
present-20150728-v8NG RAE
 
Presentación slideshare aprendizaje autonomo por octavio perez
Presentación slideshare aprendizaje autonomo por octavio perezPresentación slideshare aprendizaje autonomo por octavio perez
Presentación slideshare aprendizaje autonomo por octavio perezoctavio israel perez pantoja
 
J montesdeocasoe115week6rhymesandchant
J montesdeocasoe115week6rhymesandchantJ montesdeocasoe115week6rhymesandchant
J montesdeocasoe115week6rhymesandchantjoanadoca12
 
Aprendizaje autonomo
Aprendizaje autonomoAprendizaje autonomo
Aprendizaje autonomoJorge Nava
 
Marmen sonia -_alma_de_highlander_04_-_el_r_o_de_l
Marmen sonia -_alma_de_highlander_04_-_el_r_o_de_lMarmen sonia -_alma_de_highlander_04_-_el_r_o_de_l
Marmen sonia -_alma_de_highlander_04_-_el_r_o_de_lKrysthiana Castro
 

Viewers also liked (9)

present-20150728-v8
present-20150728-v8present-20150728-v8
present-20150728-v8
 
Presentación slideshare aprendizaje autonomo por octavio perez
Presentación slideshare aprendizaje autonomo por octavio perezPresentación slideshare aprendizaje autonomo por octavio perez
Presentación slideshare aprendizaje autonomo por octavio perez
 
J montesdeocasoe115week6rhymesandchant
J montesdeocasoe115week6rhymesandchantJ montesdeocasoe115week6rhymesandchant
J montesdeocasoe115week6rhymesandchant
 
Aprendizaje autonomo presentacion
Aprendizaje autonomo presentacionAprendizaje autonomo presentacion
Aprendizaje autonomo presentacion
 
Aprendizaje autonomo
Aprendizaje autonomoAprendizaje autonomo
Aprendizaje autonomo
 
Aprendizaje autonomo
Aprendizaje autonomoAprendizaje autonomo
Aprendizaje autonomo
 
Aprendizaje autonomo
Aprendizaje autonomoAprendizaje autonomo
Aprendizaje autonomo
 
Marmen sonia -_alma_de_highlander_04_-_el_r_o_de_l
Marmen sonia -_alma_de_highlander_04_-_el_r_o_de_lMarmen sonia -_alma_de_highlander_04_-_el_r_o_de_l
Marmen sonia -_alma_de_highlander_04_-_el_r_o_de_l
 
Melissa Crawford resume
Melissa Crawford resumeMelissa Crawford resume
Melissa Crawford resume
 

Similar to CV ....

Similar to CV .... (20)

Zafarullah CV.doc-001
Zafarullah CV.doc-001Zafarullah CV.doc-001
Zafarullah CV.doc-001
 
Shahnawaz Latest CV dated 16,September 2015
Shahnawaz Latest CV dated 16,September 2015Shahnawaz Latest CV dated 16,September 2015
Shahnawaz Latest CV dated 16,September 2015
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
CV SUJINLAL
CV SUJINLALCV SUJINLAL
CV SUJINLAL
 
CopyofZeeshanAliChannaResume1 (1) (1) (1)
CopyofZeeshanAliChannaResume1 (1) (1) (1)CopyofZeeshanAliChannaResume1 (1) (1) (1)
CopyofZeeshanAliChannaResume1 (1) (1) (1)
 
CV Sriinivas 1i doc
CV Sriinivas 1i docCV Sriinivas 1i doc
CV Sriinivas 1i doc
 
MUHAMMAD BILAL CV For Surveyor
MUHAMMAD BILAL CV For SurveyorMUHAMMAD BILAL CV For Surveyor
MUHAMMAD BILAL CV For Surveyor
 
Arshad Jan CV
Arshad Jan CVArshad Jan CV
Arshad Jan CV
 
A. Nasir CV(1)
A. Nasir CV(1)A. Nasir CV(1)
A. Nasir CV(1)
 
M.Muneer C.V
M.Muneer C.VM.Muneer C.V
M.Muneer C.V
 
Zia Ullah Khan 2 new
Zia Ullah Khan 2 newZia Ullah Khan 2 new
Zia Ullah Khan 2 new
 
Kousik Rakshit_Planning Engineer_21.01.16
Kousik Rakshit_Planning Engineer_21.01.16Kousik Rakshit_Planning Engineer_21.01.16
Kousik Rakshit_Planning Engineer_21.01.16
 
Land Surveyor Akmal Khan
Land Surveyor Akmal KhanLand Surveyor Akmal Khan
Land Surveyor Akmal Khan
 
Rajesh Resume
Rajesh ResumeRajesh Resume
Rajesh Resume
 
Mukesh__CV_SQS_QS
Mukesh__CV_SQS_QSMukesh__CV_SQS_QS
Mukesh__CV_SQS_QS
 
CV Muhammad Tayyab Mehmood pdf
CV Muhammad Tayyab Mehmood pdfCV Muhammad Tayyab Mehmood pdf
CV Muhammad Tayyab Mehmood pdf
 
Resume
ResumeResume
Resume
 
Billing Engineer_CV
Billing Engineer_CVBilling Engineer_CV
Billing Engineer_CV
 
Veeru Resume
Veeru ResumeVeeru Resume
Veeru Resume
 
Sharma cv
Sharma  cv Sharma  cv
Sharma cv
 

CV ....

  • 1. Father’s Name: Muhammad Afzal Date of Birth: 04-12-1979 Nationality: Pakistani. Religion: Islam. N.I.C. No. 34201-0433777-9 Contact No. (0306-6730000) Postal Address: Village Lahorian, Post office Dolat Nagar Tehsil & District Gujrat. E-Mail Address: chshakeel2006@gmail.com Marital Status: Married. Qualification: Diploma in Associate Engineer (Civil) From 1996 to 1999 Computer Skill Ms Word, Ms Excel, Detail of 17 Years’ Experience. With Jv of SMEC International and EGC Project: Construction of New Khanki Barrage having Cost of Rs 23 Billion Period: 23 November 2013 to date Designation: Quantity Surveyor Responsibilities: Processing and verifying the quantities of interim payment Certificate ranging from Rs 200 Million to Rs 400 Millions With SKB (Pvt) Ltd Project: Ubaro to 20km beyond Rahim Yar Khan. Period: 04 July 2000 to 30 May 2001. Designation: Assistant Quantity Surveyor. SHAKEEL AFZAL
  • 2. Responsibilities:  Preparing the Interim Payment Certificates for Earth work, Excavation +Filling, Calculation of quantities of Sub Grade, Sub Base, Base Course and Asphalt. Calculation of quantities of Concrete, Reinforcement, Structural Backfilling for culverts and Bridges With PETROCON (Pvt) Ltd Project: Fire Main Line in Dock Yard. Period: 01 June 2001 to 30 May 2002. Designation: Site Engineer. Responsibilities:  Supervision of the all-ductile work  Surveying all the ductile work. With DYNAFORCE (Pvt) Ltd Project: Karachi Northern Bypass. Period: 08 June 2002 to 23 August 2003. Designation: Site Engineer /Project Manager Responsibilities:  Supervision of the all roadwork, hill Cutting.  Supervision of the all Drilling Work  Supervision all the Ballasting Work.  Managing all Site Works  Preparing All Billing Works With IHC (Pvt) Ltd Project: Army Housing Project Askari IV Karachi. Period: 24 August 2003 to 18 April 2004. Designation: Quantity Surveyor. Responsibilities:  Supervision of the all Buildings Works (48 Flats)  Billing of all the Building Works. With SZS (Pvt Ltd Project: Rehabilitation of Bhit Jhangera road, Box Culverts& Causeways. Period: 19 April 2004 to 10 – Jan -2007 2 2
  • 3. Designation: Quantity Surveyor, Planning Engineer and Acting project manager Responsibilities:  Supervision of the all Box Culverts( 6 and 8 Cells)  Supervision of the Causeways (Length 200 to 300 Meter  Supervision of the Road works.  Billing of all the Works.  Planning of the entire Project. With Pakistan Motorway Consultant (Pvt Ltd Project: Construction of Islamabad Peshawar Motorway (M-1). Period: 17- Jan- 2007 to 17-Jan -2008 Designation: Quantity Surveyor Responsibilities::  Checking of IPC (Road Works, Building Works)  Checking of Escalation  Checking of Variation Orders With Inter Construct (Pvt Ltd Project: Construction of Khanqah Dogran Interchange on (M-2). Period: 17- Mar- 2008 to 11- Mar- 2009 Designation: Quantity Surveyor Responsibilities:  Making of IPC’s,  Making of Variation Orders,  Making of Claims  Making of Rate Analysis etc. With Khyber Consultant Project: Construction of Turnol Chablat -57 Km Road Project Period: 12- March- 2009 to 20 November 2013 Designation: Quantity Surveyor Responsibilities:  Checking of IPC (Road Works, Under Pass, Culverts and Bridges)  Checking of Escalation  Checking of Variation Orders  Checking of Rate Analysis 3 3
  • 4. 4 4