SlideShare a Scribd company logo
1 of 3
T.CHANDRAMOULI
Mobile: +965-65610797 ~ E-Mail: chandra.finesco@gmail.com
Education
 25 Years of Operational Maintenance Experience in Oil & Gas & Power Sector
Industries.
Career Scan
Currently Since Apr’13 with Finesco International General Trading Co. Kuwait
 Significant Highlights
 Presently working as Electrical Engineer – Construction for 8000 BPD Dhariff Water Injection Plant.
 Responsible for Preparing Project Initiation documentation and Identify the all statutory
requirement of the project at project planning stage, and maintain the site related
documentation.
 Responsible for Ensuring the availability of Approved design documents/drawings, before starting the
site activities
 Responsible for coordination with Testing and commissioning team for your requirement
towards completion of installation activities
 Responsible for Preparation of consolidated Project plan as per the time line with close
coordination with PM/ Dy.PM and monitor the progress
 Responsible for Review, work progress with the Project Team and contractors daily.
 Responsible for Review, work progress with Senior Managers weekly / Monthly.
 Responsible for Escalating issues and areas of concern to senior managers.
 Responsible for Preparation of action Plan to meet monthly targets of site works
 Responsible for ensuring best value is obtained for the project including supplier base, use of
internal and external resources.
 Maintaining and completing KPI’s. Writing detailed and summarized project progress reports.
 Responsible for Tracking activities against the detailed project plans & Updating project plans
to include agreed changes & Identifying, costing and processing any contract variations.
 Maintaining of M Book for joint measurements immediate to the execution from contractor &
Certification of invoice for service contractor payment.
 Maintain a good healthy relationship with the customers as well as the project team including
any subcontractors to ensure Projects and Programmes are executed using agreed standards
& processes.
 Ensured staff and sub contractors timesheets were accurately completed.
Since Apr’12 with Surya Chakra Power Pvt.Ltd., Hyderabad – India as Deputy General
Manager – Operations & Co-Ordination
 Significant Highlights
 In-charge of operations for 1X60MW Thermal power plants each at Parbhani & Hingoli at
Maharashtra & 2X60MW at Sapos Chattisgarh.
 Coordination with both operations & Maintenance teams for optimum efficiency.
 Statutory compliance certifications.
 Continuous coordination with bio-mass suppliers for fuel linkage.
 Safety & Security systems.
 Manpower management & appraisals.
Since Nov’10 with ICOMM TELE Ltd., Rayagada (Orissa) – India as Manager -
Projects
Significant Highlights
 Conducted erection & augmentation of 33kV & 11kV Sub-stations and effectively handled
RGGVY Rural Electrification Project in the district of Rayagada, Orissa.
 Inspected and bagged approval for drawings of HT Transmission & LT Transmission
Distribution Lines in the villages.
 Successfully performed quality inspection of erection works and approval for charging the
same and handed it over to the Govt. Agency.
 Interfaced with REC Ltd., NHPC Ltd., NTPC Ltd. & Forest Dept. & Local bodies for adhering to
statutory compliance speedy electrification.
 Managed team of Engineers, other Technical staff and sub-Agencies for speedy completion of
project.
Oct’09 - Oct’10 with Indus Towers JV, Vizag – India as Head - Operations &
Maintenance
 Significant Highlights
 Administered & Handled all operational & maintenance activities of Infra Project, thereby
developing new vendors and ensured quality of work.
 Managed complete team of Engineers, dealing with customers regarding daily status and
issues for the company, thereby met all the targets before the targeted time handling
complete civil activities.
 Ensured the quality of all project being implemented in the region.
Sep’08 - Sep’09 with M/s Suguna Ltd., Hyderabad - India as Electrical Manager.
Significant Highlights
 Guided Electrical, Electronics & Instrumentation Works related to projects.
 Created the financial variance report on own budget, Project cost monitoring and time line.
 Coordinated with the statutory authorities’ viz., State & Center Pollution Control Boards,
Factories Department, Fire & Safety Certifications, Aviation Clearance from DGCA and Local
Bodies.
Effectively implemented:
 Modifications of Electrical Systems for improvement of electrical efficiency by scrutinising
critical areas for improvising energy efficiency and installed Variable Frequency Drives Soft
Starters and Energy Efficient Motors.
 Introduced Stop/Start (Logic) Method for Conveying Systems to increase life span equipment,
reduce maintenance and operational costs.
Sep’91 - Aug’08 with M/s ITC Ltd. ILTD Division - Chirala – India as Electrical Engineer
 Significant Highlights
 AC & DC drives & circuits, MOCB’s, Air circuits Breakers & Vacuum Circuit Breakers.
 DG sets and Auxiliaries & Other Utilities – DG Safety Relays, Air Compressors for Pneumatic
systems and Centrifuges for fuel filtering, Blowers and Cooling Towers.
 Power & Control systems for Electrical - MCC’s, PCC’s, RCP’s Power & Distribution
Transformers, APFC systems & SCADA.
 Sub Station Operations & Maintenance.
 Material Handling Equipment – Fork Lifts, Tractors, Battery Charging equipment, Conveying
systems, Hoists & Gantry Cranes..
 PLC’s of M/s Allen Bradley make using Rs Logix for Device Net & Control Net systems for Plant
Operations & PLC’s of Siemens make using Step5 STL for Plant operations.
 Variable Frequency Drives MOV’s, Pneumatic control valves, Flow Indication / Control Valves,
Pressure Indication / Control Valves
 Body & Lightening Earth protection systems.
 Preventive & Predictive maintenance procedures.
 Electrical Safety Practises.
PA & Fire Hydrant Systems- in Installation & Commissioning of:
 Public Annunciation & Access Control System.
 Addressable Fire Alarm System.
 Automatic Fire Hydrant (both electrical motor pump & diesel engine pump) and Sprinkler
Systems.
 CCTV Surveillance System.
 Programming Familiarity:
 PLC’s & MMI’s (Ladder Logic, STL).
 Responsible for shop floor Safety procedures & practices.
 Knowledge in EHS systems.
Achievement:
 Awarded best suggestion for implementing Stop/Start Method to increase life span equipment,
reduce maintenance and operational costs Common Conveyor Line for processed material
transport of for plants to its storages, thereby saved energy of 7000KW.
Bio-Data
Date of Birth : 28th
November, 1968.
Marital Status : Married.
Nationality : Indian.
Education : Diploma Electronics & Communication Engineering.
: Professional Graduate Programme in Electrical Engineering. (PGPEE).
: Bachelor in Computer Applications. (BCA)
Present Address : C/o Asia Super market, Fahaheel, Macca Street, Block-9,Street-47, Behind
Pakistan School, Kuwait. - 64020
India Address : House No. 1-12, NTR Colony, Near VRS & YRN College Center, Chirala –
523157, Prakasam Dist., A.P. India.
Visa : No.18 Transferable.
Passport Number : K8570881.
Civil ID No : 268112804641.

More Related Content

What's hot

paulagautreaux_resume (new)
paulagautreaux_resume (new)paulagautreaux_resume (new)
paulagautreaux_resume (new)Paul Gautreaux
 
MEP Engineer with Revit Certification
MEP Engineer with Revit CertificationMEP Engineer with Revit Certification
MEP Engineer with Revit CertificationVishnuprasad P
 
George blane resume 1
George blane resume 1George blane resume 1
George blane resume 1Blane Arnold
 
Imran Resume HVAC Engineer
Imran Resume HVAC EngineerImran Resume HVAC Engineer
Imran Resume HVAC Engineerimran ahmed
 
boiler operator cv
boiler operator cvboiler operator cv
boiler operator cvHamad Talhaa
 
Elvis joy cv- mechanical engineer, primavera p6 hvac
Elvis joy  cv- mechanical engineer, primavera p6 hvacElvis joy  cv- mechanical engineer, primavera p6 hvac
Elvis joy cv- mechanical engineer, primavera p6 hvacElvis Joy
 
Swapnil Juvekar_HVAC Engineer_CV
Swapnil Juvekar_HVAC Engineer_CVSwapnil Juvekar_HVAC Engineer_CV
Swapnil Juvekar_HVAC Engineer_CVSwapnil Juvekar
 
Nitin_Patil_Resume
Nitin_Patil_ResumeNitin_Patil_Resume
Nitin_Patil_ResumeNitin Patil
 
UPDATED Electrical Assembler Resume
UPDATED  Electrical Assembler ResumeUPDATED  Electrical Assembler Resume
UPDATED Electrical Assembler ResumePamela Bundros
 

What's hot (19)

paulagautreaux_resume (new)
paulagautreaux_resume (new)paulagautreaux_resume (new)
paulagautreaux_resume (new)
 
Resume
ResumeResume
Resume
 
MEP Engineer with Revit Certification
MEP Engineer with Revit CertificationMEP Engineer with Revit Certification
MEP Engineer with Revit Certification
 
George blane resume 1
George blane resume 1George blane resume 1
George blane resume 1
 
Imran Resume HVAC Engineer
Imran Resume HVAC EngineerImran Resume HVAC Engineer
Imran Resume HVAC Engineer
 
venky CV( solar )
venky CV( solar )venky CV( solar )
venky CV( solar )
 
Jordan Dorwart, P.E. - Resume
Jordan Dorwart, P.E. - ResumeJordan Dorwart, P.E. - Resume
Jordan Dorwart, P.E. - Resume
 
CV_HVAC_ENGINEER
CV_HVAC_ENGINEERCV_HVAC_ENGINEER
CV_HVAC_ENGINEER
 
new C.v.update_antonio2
new C.v.update_antonio2new C.v.update_antonio2
new C.v.update_antonio2
 
boiler operator cv
boiler operator cvboiler operator cv
boiler operator cv
 
2015resume1
2015resume12015resume1
2015resume1
 
Rabeesh CV 2014
Rabeesh CV  2014Rabeesh CV  2014
Rabeesh CV 2014
 
Elvis joy cv- mechanical engineer, primavera p6 hvac
Elvis joy  cv- mechanical engineer, primavera p6 hvacElvis joy  cv- mechanical engineer, primavera p6 hvac
Elvis joy cv- mechanical engineer, primavera p6 hvac
 
Sharma Resume
Sharma ResumeSharma Resume
Sharma Resume
 
Lepthaghosh(cv)
Lepthaghosh(cv)Lepthaghosh(cv)
Lepthaghosh(cv)
 
Swapnil Juvekar_HVAC Engineer_CV
Swapnil Juvekar_HVAC Engineer_CVSwapnil Juvekar_HVAC Engineer_CV
Swapnil Juvekar_HVAC Engineer_CV
 
Nitin_Patil_Resume
Nitin_Patil_ResumeNitin_Patil_Resume
Nitin_Patil_Resume
 
Resume
ResumeResume
Resume
 
UPDATED Electrical Assembler Resume
UPDATED  Electrical Assembler ResumeUPDATED  Electrical Assembler Resume
UPDATED Electrical Assembler Resume
 

Similar to T.Chandramouli _ Resume

Similar to T.Chandramouli _ Resume (20)

T.chandramouli O & M_ele
T.chandramouli O & M_eleT.chandramouli O & M_ele
T.chandramouli O & M_ele
 
T.chandramouli O & M_Electrical
T.chandramouli O & M_ElectricalT.chandramouli O & M_Electrical
T.chandramouli O & M_Electrical
 
syed Raza _CV
syed Raza _CVsyed Raza _CV
syed Raza _CV
 
M.Kamran Resume
M.Kamran ResumeM.Kamran Resume
M.Kamran Resume
 
Resume_sdy-4-1
Resume_sdy-4-1Resume_sdy-4-1
Resume_sdy-4-1
 
Rama nand yadav cv
Rama nand yadav   cvRama nand yadav   cv
Rama nand yadav cv
 
Resume-Chandra Mouli
Resume-Chandra MouliResume-Chandra Mouli
Resume-Chandra Mouli
 
Rama_Rao_0553758017
Rama_Rao_0553758017Rama_Rao_0553758017
Rama_Rao_0553758017
 
Pramod Chand Chaturvedi
Pramod Chand ChaturvediPramod Chand Chaturvedi
Pramod Chand Chaturvedi
 
SRao_cv
SRao_cvSRao_cv
SRao_cv
 
RESUME october 2016 F
RESUME october 2016 FRESUME october 2016 F
RESUME october 2016 F
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
 
Suresh V Resume
Suresh V ResumeSuresh V Resume
Suresh V Resume
 
anil
anilanil
anil
 
DGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CV
DGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CVDGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CV
DGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CV
 
Resume E&I
Resume E&IResume E&I
Resume E&I
 
Resume.
Resume.Resume.
Resume.
 
Shaik Abubakr CV
Shaik Abubakr CVShaik Abubakr CV
Shaik Abubakr CV
 
Mithun Kumar Electrical
Mithun Kumar ElectricalMithun Kumar Electrical
Mithun Kumar Electrical
 
BALAKRISHNAN ANIL KUMAR RESUME
BALAKRISHNAN ANIL KUMAR RESUMEBALAKRISHNAN ANIL KUMAR RESUME
BALAKRISHNAN ANIL KUMAR RESUME
 

T.Chandramouli _ Resume

  • 1. T.CHANDRAMOULI Mobile: +965-65610797 ~ E-Mail: chandra.finesco@gmail.com Education  25 Years of Operational Maintenance Experience in Oil & Gas & Power Sector Industries. Career Scan Currently Since Apr’13 with Finesco International General Trading Co. Kuwait  Significant Highlights  Presently working as Electrical Engineer – Construction for 8000 BPD Dhariff Water Injection Plant.  Responsible for Preparing Project Initiation documentation and Identify the all statutory requirement of the project at project planning stage, and maintain the site related documentation.  Responsible for Ensuring the availability of Approved design documents/drawings, before starting the site activities  Responsible for coordination with Testing and commissioning team for your requirement towards completion of installation activities  Responsible for Preparation of consolidated Project plan as per the time line with close coordination with PM/ Dy.PM and monitor the progress  Responsible for Review, work progress with the Project Team and contractors daily.  Responsible for Review, work progress with Senior Managers weekly / Monthly.  Responsible for Escalating issues and areas of concern to senior managers.  Responsible for Preparation of action Plan to meet monthly targets of site works  Responsible for ensuring best value is obtained for the project including supplier base, use of internal and external resources.  Maintaining and completing KPI’s. Writing detailed and summarized project progress reports.  Responsible for Tracking activities against the detailed project plans & Updating project plans to include agreed changes & Identifying, costing and processing any contract variations.  Maintaining of M Book for joint measurements immediate to the execution from contractor & Certification of invoice for service contractor payment.  Maintain a good healthy relationship with the customers as well as the project team including any subcontractors to ensure Projects and Programmes are executed using agreed standards & processes.  Ensured staff and sub contractors timesheets were accurately completed. Since Apr’12 with Surya Chakra Power Pvt.Ltd., Hyderabad – India as Deputy General Manager – Operations & Co-Ordination  Significant Highlights  In-charge of operations for 1X60MW Thermal power plants each at Parbhani & Hingoli at Maharashtra & 2X60MW at Sapos Chattisgarh.  Coordination with both operations & Maintenance teams for optimum efficiency.  Statutory compliance certifications.  Continuous coordination with bio-mass suppliers for fuel linkage.  Safety & Security systems.  Manpower management & appraisals. Since Nov’10 with ICOMM TELE Ltd., Rayagada (Orissa) – India as Manager - Projects Significant Highlights  Conducted erection & augmentation of 33kV & 11kV Sub-stations and effectively handled RGGVY Rural Electrification Project in the district of Rayagada, Orissa.  Inspected and bagged approval for drawings of HT Transmission & LT Transmission Distribution Lines in the villages.  Successfully performed quality inspection of erection works and approval for charging the same and handed it over to the Govt. Agency.  Interfaced with REC Ltd., NHPC Ltd., NTPC Ltd. & Forest Dept. & Local bodies for adhering to statutory compliance speedy electrification.
  • 2.  Managed team of Engineers, other Technical staff and sub-Agencies for speedy completion of project. Oct’09 - Oct’10 with Indus Towers JV, Vizag – India as Head - Operations & Maintenance  Significant Highlights  Administered & Handled all operational & maintenance activities of Infra Project, thereby developing new vendors and ensured quality of work.  Managed complete team of Engineers, dealing with customers regarding daily status and issues for the company, thereby met all the targets before the targeted time handling complete civil activities.  Ensured the quality of all project being implemented in the region. Sep’08 - Sep’09 with M/s Suguna Ltd., Hyderabad - India as Electrical Manager. Significant Highlights  Guided Electrical, Electronics & Instrumentation Works related to projects.  Created the financial variance report on own budget, Project cost monitoring and time line.  Coordinated with the statutory authorities’ viz., State & Center Pollution Control Boards, Factories Department, Fire & Safety Certifications, Aviation Clearance from DGCA and Local Bodies. Effectively implemented:  Modifications of Electrical Systems for improvement of electrical efficiency by scrutinising critical areas for improvising energy efficiency and installed Variable Frequency Drives Soft Starters and Energy Efficient Motors.  Introduced Stop/Start (Logic) Method for Conveying Systems to increase life span equipment, reduce maintenance and operational costs. Sep’91 - Aug’08 with M/s ITC Ltd. ILTD Division - Chirala – India as Electrical Engineer  Significant Highlights  AC & DC drives & circuits, MOCB’s, Air circuits Breakers & Vacuum Circuit Breakers.  DG sets and Auxiliaries & Other Utilities – DG Safety Relays, Air Compressors for Pneumatic systems and Centrifuges for fuel filtering, Blowers and Cooling Towers.  Power & Control systems for Electrical - MCC’s, PCC’s, RCP’s Power & Distribution Transformers, APFC systems & SCADA.  Sub Station Operations & Maintenance.  Material Handling Equipment – Fork Lifts, Tractors, Battery Charging equipment, Conveying systems, Hoists & Gantry Cranes..  PLC’s of M/s Allen Bradley make using Rs Logix for Device Net & Control Net systems for Plant Operations & PLC’s of Siemens make using Step5 STL for Plant operations.  Variable Frequency Drives MOV’s, Pneumatic control valves, Flow Indication / Control Valves, Pressure Indication / Control Valves  Body & Lightening Earth protection systems.  Preventive & Predictive maintenance procedures.  Electrical Safety Practises. PA & Fire Hydrant Systems- in Installation & Commissioning of:  Public Annunciation & Access Control System.  Addressable Fire Alarm System.  Automatic Fire Hydrant (both electrical motor pump & diesel engine pump) and Sprinkler Systems.  CCTV Surveillance System.  Programming Familiarity:  PLC’s & MMI’s (Ladder Logic, STL).  Responsible for shop floor Safety procedures & practices.  Knowledge in EHS systems. Achievement:  Awarded best suggestion for implementing Stop/Start Method to increase life span equipment, reduce maintenance and operational costs Common Conveyor Line for processed material transport of for plants to its storages, thereby saved energy of 7000KW. Bio-Data
  • 3. Date of Birth : 28th November, 1968. Marital Status : Married. Nationality : Indian. Education : Diploma Electronics & Communication Engineering. : Professional Graduate Programme in Electrical Engineering. (PGPEE). : Bachelor in Computer Applications. (BCA) Present Address : C/o Asia Super market, Fahaheel, Macca Street, Block-9,Street-47, Behind Pakistan School, Kuwait. - 64020 India Address : House No. 1-12, NTR Colony, Near VRS & YRN College Center, Chirala – 523157, Prakasam Dist., A.P. India. Visa : No.18 Transferable. Passport Number : K8570881. Civil ID No : 268112804641.